Harold E Howell
- Listed as
- architect, engineer
- Firm
- Takami Engineering
- Based in
- Sf
- On San Francisco permits
- Jul 2019 to Jul 2025
5 permits since 2000 (engineer on 4 permits, architect on 1 permit): 2 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2025 | In progress filed Jul 2025, not yet issued | 267 Ellsworth St | revision to pa# 202405172389: demo all plaster interior walls, adding new drywall, insulation, new electrical, new plumbing, adding new shear walls, new stud walls at 3 locations. repairing of (e) deck, adding (n) footings at post.Details
revision to pa# 202405172389: demo all plaster interior walls, adding new drywall, insulation, new electrical, new plumbing, adding new shear walls, new stud walls at 3 locations. repairing of (e) deck, adding (n) footings at post. | $275,000 | |
| Dec 8, 2023 | Expired or cancelled expired Mar 2025 | 3355 Mission St | Cooke Construction | installation of new kitchen and upgrade to existing dining room in new bar restaurant. new cooking equipment under new hood. commercial space only.Details
installation of new kitchen and upgrade to existing dining room in new bar restaurant. new cooking equipment under new hood. commercial space only. | $75,000 |
| Sep 26, 2020 | Never finaled issued Nov 2020, no final | 2415 03rd St | create mail room in an exist warehouse spaceDetails
create mail room in an exist warehouse space | $15,000 | |
| Dec 17, 2019 | Completed final sign-off Aug 2020 | 99 Drumm St | Wai-Wong Construction Company | ti: boba tea bar to replace subway sandwiches. this will require new finishes, sinks & electrical outlets for new equipments. lighting & ventilation to remain as existing.Details
ti: boba tea bar to replace subway sandwiches. this will require new finishes, sinks & electrical outlets for new equipments. lighting & ventilation to remain as existing. | $80,000 |
| Jul 3, 2019 | Completed final sign-off Aug 2020 | 2339 03rd St | Jose Viera | 4th flr, ste 4r modifiying (e) production, fabrication and office space into a(n) production, literature processing and archive storage area. (e) restrooms to remain. mep under separate permit. 6463 sq ft on 4th flr. no exterior or structural workDetails
4th flr, ste 4r modifiying (e) production, fabrication and office space into a(n) production, literature processing and archive storage area. (e) restrooms to remain. mep under separate permit. 6463 sq ft on 4th flr. no exterior or structural work | $135,000 |