Permit GraphShortlistSan Francisco building permits since 2000

Mark Robison

License
M28712
Look the license up with the state
Listed as
engineer
Firm
Robison Engineer. Inc
Based in
Lynnwood
On San Francisco permits
Mar 2015 to Apr 2023

24 permits since 2000 (engineer on 24 permits): 17 completed, 4 never finaled, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 6, 2023Completed
final sign-off May 2023
99 Ocean AvJames E Roberts-Obayashi Corporationrevision to permit 201912038490 for changes to emergency power to corridor exhaust fans.
Details
Permit
202304065255
Status
complete
Filed
Apr 6, 2023
Permit issued
Apr 11, 2023
Final sign-off
May 24, 2023
Address
99 Ocean Av

revision to permit 201912038490 for changes to emergency power to corridor exhaust fans.

Open the permit page

Nov 10, 2022Expired or cancelled
withdrawn Dec 2022
345 04th Stas-built for elevator pressuization fan
Details
Permit
202211106342
Status
withdrawn
Filed
Nov 10, 2022
Declared cost
$10,000
Address
345 04th St

as-built for elevator pressuization fan

Open the permit page

$10,000
Sep 29, 2022Expired or cancelled
withdrawn May 2023
851 California Stconfiguration of ground fl, public spaces, & guestrooms. individual bathrooms will be added to each guestroom. egress will be updated to include 2 code-compliant stairs & elevator with roof access to new roof deck. remove (e) exterior fire escapes & stairs. accessible, seismic, structural & mepf.
Details
Permit
202209293456
Status
withdrawn
Filed
Sep 29, 2022
Declared cost
$7,500,000
Address
851 California St

configuration of ground fl, public spaces, & guestrooms. individual bathrooms will be added to each guestroom. egress will be updated to include 2 code-compliant stairs & elevator with roof access to new roof deck. remove (e) exterior fire escapes & stairs. accessible, seismic, structural & mepf.

Open the permit page

$7,500,000
Jul 15, 2022Completed
final sign-off May 2023
1318 Stockton StEric F Anderson Incorporatedt.i. non-bearing partition demo and buil-out. upgrades to finishes, furniture, casework & reintallment of (e) bank equipment monor mep work. business entrance accessibility upgrade.
Details
Permit
202207158575
Status
complete
Filed
Jul 15, 2022
Permit issued
Sep 22, 2022
Final sign-off
May 1, 2023
Declared cost
$220,000
Address
1318 Stockton St

t.i. non-bearing partition demo and buil-out. upgrades to finishes, furniture, casework & reintallment of (e) bank equipment monor mep work. business entrance accessibility upgrade.

Open the permit page

$220,000
Jun 13, 2022Completed
final sign-off Jul 2023
1501 Van Ness AvJones/Convey Group Incorportaedrev to bpa#202106233062. minor changes.install heavy duty concrete pavement w/in property line. reonfig floor plan per sales, storage, cashier areas. new ceiling speaker throughout sales fl, new platforms on roof w/insulation cricket attached. paint ext/int. structural pad for tanks, new landscaping
Details
Permit
202206136154
Status
complete
Filed
Jun 13, 2022
Permit issued
Nov 8, 2022
Final sign-off
Jul 28, 2023
Address
1501 Van Ness Av

rev to bpa#202106233062. minor changes.install heavy duty concrete pavement w/in property line. reonfig floor plan per sales, storage, cashier areas. new ceiling speaker throughout sales fl, new platforms on roof w/insulation cricket attached. paint ext/int. structural pad for tanks, new landscaping

Open the permit page

Apr 20, 2022Completed
final sign-off Nov 2023
1820 Alemany BlJames E Roberts-Obayashi Corporationprop h: tenant improvement. non-profit child care facility.
Details
Permit
202204202620
Status
complete
Filed
Apr 20, 2022
Permit issued
Nov 28, 2022
Final sign-off
Nov 21, 2023
Declared cost
$1,200,000
Address
1820 Alemany Bl

prop h: tenant improvement. non-profit child care facility.

Open the permit page

$1,200,000
Jan 14, 2022Completed
final sign-off Jun 2022
550 Geary StContinental Contractors Incselect work in 129 guestroom bathrooms. rooms in scope will feature a tub to shower conversion, including new tile & fixtures. fire life safety under separate permit. no exterior work.
Details
Permit
202201146038
Status
complete
Filed
Jan 14, 2022
Permit issued
Mar 4, 2022
Final sign-off
Jun 29, 2022
Declared cost
$150,000
Address
550 Geary St

select work in 129 guestroom bathrooms. rooms in scope will feature a tub to shower conversion, including new tile & fixtures. fire life safety under separate permit. no exterior work.

Open the permit page

$150,000
Jun 14, 2021Completed
final sign-off Jul 2022
609 Market StHolt Construction Incmain floor dining and front counter remodel.no increase in occupant load.relocation of existing non-grease kitchen equipment.replacement of existing split system hvac unit-like for like.install (n) gender neutral bath in bsmt.remove (e) dining fixtures in basement. convert dining to storage in bsmt.
Details
Permit
202106142326
Status
complete
Filed
Jun 14, 2021
Permit issued
Feb 17, 2022
Final sign-off
Jul 5, 2022
Declared cost
$325,000
Address
609 Market St

main floor dining and front counter remodel.no increase in occupant load.relocation of existing non-grease kitchen equipment.replacement of existing split system hvac unit-like for like.install (n) gender neutral bath in bsmt.remove (e) dining fixtures in basement. convert dining to storage in bsmt.

Open the permit page

$325,000
Mar 24, 2021Completed
final sign-off May 2022
8 Mission Stti to (e) lobby, meeting space and fitness room on the 1st and 2nd flrs. no change in use or occupancy. no new sq ft added. new non-structural, non bearing walls, new lighting and outlets, relocation of (e) hvac ductwork and new finishes.
Details
Permit
202103247172
Status
complete
Filed
Mar 24, 2021
Permit issued
Jun 14, 2021
Final sign-off
May 27, 2022
Declared cost
$475,000
Address
8 Mission St

ti to (e) lobby, meeting space and fitness room on the 1st and 2nd flrs. no change in use or occupancy. no new sq ft added. new non-structural, non bearing walls, new lighting and outlets, relocation of (e) hvac ductwork and new finishes.

Open the permit page

$475,000
Jul 8, 2020Never finaled
issued Apr 2021, no final
225 Powell StTrainor Commercial Construction Inc.the project scope includes the renovation of ground floor public space of an existing hotel. specific work includes the alteration of walls, ceilings, lighting, and finishes. the project also proposes a new canopy and storefront entrance doors. fire sprinkler & fire alarm work under separate permit.
Details
Permit
202007089799
Status
issued
Filed
Jul 8, 2020
Permit issued
Apr 22, 2021
Declared cost
$90,000
Address
225 Powell St

the project scope includes the renovation of ground floor public space of an existing hotel. specific work includes the alteration of walls, ceilings, lighting, and finishes. the project also proposes a new canopy and storefront entrance doors. fire sprinkler & fire alarm work under separate permit.

Open the permit page

$90,000
Jul 7, 2020Completed
final sign-off Jan 2021
165 Steuart StM C S Construction Servicespermit consist of cosmetic modifications to the 1st fl lobby, including new wall finishes, casework, lighting & electrical. no work to exterior. no demo or modification of historic elements. maher na
Details
Permit
202007079749
Status
complete
Filed
Jul 7, 2020
Permit issued
Oct 5, 2020
Final sign-off
Jan 22, 2021
Declared cost
$400,000
Address
165 Steuart St

permit consist of cosmetic modifications to the 1st fl lobby, including new wall finishes, casework, lighting & electrical. no work to exterior. no demo or modification of historic elements. maher na

Open the permit page

$400,000
Feb 19, 2019Completed
final sign-off Jan 2021
450 Powell StCentric Construction Inc21st fl: new non-structural, non-bearing walls, relocation of bar, reconfig of (e) pantry area, reconfig (e) mens & womens restroom for ada compliance, new acoustical raised floor, new operable partitions, new lighting, electrical, hvac & finishes.
Details
Permit
201902193179
Status
complete
Filed
Feb 19, 2019
Permit issued
May 13, 2019
Final sign-off
Jan 21, 2021
Declared cost
$950,000
Address
450 Powell St

21st fl: new non-structural, non-bearing walls, relocation of bar, reconfig of (e) pantry area, reconfig (e) mens & womens restroom for ada compliance, new acoustical raised floor, new operable partitions, new lighting, electrical, hvac & finishes.

Open the permit page

$950,000
Nov 14, 2018Completed
final sign-off Feb 2019
655 08th StParadigm General Contractorsrev to pa# 201806141916 & 201809251302 minor changes to mechanical & electrical per sffd
Details
Permit
201811145806
Status
complete
Filed
Nov 14, 2018
Permit issued
Nov 14, 2018
Final sign-off
Feb 20, 2019
Address
655 08th St

rev to pa# 201806141916 & 201809251302 minor changes to mechanical & electrical per sffd

Open the permit page

Oct 9, 2018Never finaled
filed Oct 2018, never issued
1055 Market Stto erect a 10-story w/ one basement, type 1b, mixed use bldg w/ 157 hotel rooms.
Details
Permit
201810092664
Status
filed
Filed
Oct 9, 2018
Declared cost
$25,250,000
Address
1055 Market St

to erect a 10-story w/ one basement, type 1b, mixed use bldg w/ 157 hotel rooms.

Open the permit page

$25,250,000
Oct 30, 2017Completed
final sign-off Nov 2018
165 Steuart StAward Construction And Restoration Increvision to pa #201706209811 - mechanical, plumbing & electrical revision to include: removal of heat pumps, removal of new waste & vent piping, existing to remain. removal of new receptacles & removal of new light fixtures, exisitng to remain. revision to switching.
Details
Permit
201710302669
Status
complete
Filed
Oct 30, 2017
Permit issued
Nov 6, 2017
Final sign-off
Nov 30, 2018
Address
165 Steuart St

revision to pa #201706209811 - mechanical, plumbing & electrical revision to include: removal of heat pumps, removal of new waste & vent piping, existing to remain. removal of new receptacles & removal of new light fixtures, exisitng to remain. revision to switching.

Open the permit page

Aug 7, 2017Expired or cancelled
expired Sep 2022
405 Taylor StCw Horton General Contractoraccesible rooms ref bpa#201706300767. renovation of non-accessible guestrooms in a 16 story hotel. work on floors 2-17. includes select demolition and construction of walls, ceilings, fixtures and finishes. no change in egress.
Details
Permit
201708074019
Status
expired
Filed
Aug 7, 2017
Permit issued
Aug 31, 2017
Declared cost
$1,100,000
Address
405 Taylor St

accesible rooms ref bpa#201706300767. renovation of non-accessible guestrooms in a 16 story hotel. work on floors 2-17. includes select demolition and construction of walls, ceilings, fixtures and finishes. no change in egress.

Open the permit page

$1,100,000
Jul 25, 2017Completed
final sign-off Jan 2019
165 Steuart StAward Construction And Restoration Inclobby reception to provide accessible check-in, installation of an accessible single unisex restrm & 2 conference rooms within lobby/lounge area. general cosmetic upgrades & refurbishment throughout-the lobby/lounge area. conversion of e. reception counter to a combination grab & go check-in counter
Details
Permit
201707252864
Status
complete
Filed
Jul 25, 2017
Permit issued
Dec 21, 2017
Final sign-off
Jan 25, 2019
Declared cost
$300,000
Address
165 Steuart St

lobby reception to provide accessible check-in, installation of an accessible single unisex restrm & 2 conference rooms within lobby/lounge area. general cosmetic upgrades & refurbishment throughout-the lobby/lounge area. conversion of e. reception counter to a combination grab & go check-in counter

Open the permit page

$300,000
Jun 20, 2017Completed
final sign-off Jan 2019
165 Steuart StAward Construction And Restoration Incon levels 4-8 - upgrades to accessible guestrooms & conversion of tub to showers on all the hotel guestrooms. minor cosmetic upgrades throughout
Details
Permit
201706209811
Status
complete
Filed
Jun 20, 2017
Permit issued
Oct 11, 2017
Final sign-off
Jan 25, 2019
Declared cost
$340,000
Address
165 Steuart St

on levels 4-8 - upgrades to accessible guestrooms & conversion of tub to showers on all the hotel guestrooms. minor cosmetic upgrades throughout

Open the permit page

$340,000
May 17, 2017Completed
final sign-off Aug 2018
250 Beach StCentric Construction Incdemo of (e) hvac system. tenant space facade & updating utilities to future tenants consisting of hvac, plumbing & electrical. new employee restroom. maher na
Details
Permit
201705176868
Status
complete
Filed
May 17, 2017
Permit issued
Aug 16, 2017
Final sign-off
Aug 13, 2018
Declared cost
$2,800,000
Address
250 Beach St

demo of (e) hvac system. tenant space facade & updating utilities to future tenants consisting of hvac, plumbing & electrical. new employee restroom. maher na

Open the permit page

$2,800,000
Mar 3, 2017Completed
final sign-off Apr 2019
345 Bay Shore BlYbj Construction Servicesnew exterior facade upgrade, refresh dining area and ceiling. ada barrier removal, signage and canopy under seperate permit. future canopy loads on brand walls have not been checked. maher na
Details
Permit
201703030624
Status
complete
Filed
Mar 3, 2017
Permit issued
Feb 7, 2018
Final sign-off
Apr 11, 2019
Declared cost
$375,000
Address
345 Bay Shore Bl

new exterior facade upgrade, refresh dining area and ceiling. ada barrier removal, signage and canopy under seperate permit. future canopy loads on brand walls have not been checked. maher na

Open the permit page

$375,000
Jan 26, 2017Completed
final sign-off Jan 2018
225 Powell StTrainor Commercial Construction Inc.renovation of public space at grand level (entrance,lobby, storefront, canopy, back of house)includes selective demolation & reconstruction of walls, floors, ceilings and finishes for reconfiguration of public spaces. fire life safety under separate permit.
Details
Permit
201701268000
Status
complete
Filed
Jan 26, 2017
Permit issued
Jun 28, 2017
Final sign-off
Jan 24, 2018
Declared cost
$350,000
Address
225 Powell St

renovation of public space at grand level (entrance,lobby, storefront, canopy, back of house)includes selective demolation & reconstruction of walls, floors, ceilings and finishes for reconfiguration of public spaces. fire life safety under separate permit.

Open the permit page

$350,000
May 16, 2016Completed
final sign-off Aug 2019
952 Sutter StTrim Fit Constr. - O'reilly Engineering, Delta General Engineering Pcnon-structural interior remodel of existing dwelling unit 101 on level 1. addition of five (n) dwelling units in basement.
Details
Permit
201605167516
Status
complete
Filed
May 16, 2016
Permit issued
Nov 1, 2018
Final sign-off
Aug 28, 2019
Declared cost
$585,858
Address
952 Sutter St

non-structural interior remodel of existing dwelling unit 101 on level 1. addition of five (n) dwelling units in basement.

Open the permit page

$585,858
Apr 6, 2015Never finaled
issued Jul 2015, no final
545 Post StCentric Construction Incinstallation of (n) wheelchair lift and new (4) stop elevator serving the public space. fire alarm & sprinklers under seperate permit
Details
Permit
201504062895
Status
issued
Filed
Apr 6, 2015
Permit issued
Jul 10, 2015
Declared cost
$150,000
Address
545 Post St

installation of (n) wheelchair lift and new (4) stop elevator serving the public space. fire alarm & sprinklers under seperate permit

Open the permit page

$150,000
Mar 26, 2015Never finaled
issued Apr 2015, no final
225 Powell StChampion Industrial Contractors Incadd bath ventilation (mech work) for 6 guestrooms from level 2 - 7. ref to appl #2014.1003.8007 & 2015.0203.7376.
Details
Permit
201503262007
Status
issued
Filed
Mar 26, 2015
Permit issued
Apr 16, 2015
Declared cost
$10,000
Address
225 Powell St

add bath ventilation (mech work) for 6 guestrooms from level 2 - 7. ref to appl #2014.1003.8007 & 2015.0203.7376.

Open the permit page

$10,000