10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2020 | Never finaled issued Mar 2021, no final | 225 Powell St | room #307: barrier removal. convert one guestroom into an accessible suite to meet dispersion goals. no exterior work. all electrical and plumbing scope under defered submittal. fire sprinkler & fire alarm wokr under separate permit.Details
room #307: barrier removal. convert one guestroom into an accessible suite to meet dispersion goals. no exterior work. all electrical and plumbing scope under defered submittal. fire sprinkler & fire alarm wokr under separate permit. | $20,000 |
| Dec 6, 2017 | Completed final sign-off Nov 2018 | 165 Steuart St | 4,5,6,7,8 flrs: revision to 201706209811 & 201710302669 arch and mep revision to x16 stack due to unforseen site conditions on the chase wall. 416 layout change removed from scope, (e) room layout to remain. 516-816 chase wall be be remove from scope. demo of doors added rm layout revised 531-831Details
4,5,6,7,8 flrs: revision to 201706209811 & 201710302669 arch and mep revision to x16 stack due to unforseen site conditions on the chase wall. 416 layout change removed from scope, (e) room layout to remain. 516-816 chase wall be be remove from scope. demo of doors added rm layout revised 531-831 | |
| Nov 22, 2017 | Completed final sign-off Apr 2018 | 562 Sutter St | rooms #710 & 711. renovation of a single hotel guestroom and 2 guest bathrooms. work shall include replacement of plumbing fixtures and finishes. replacement of corrodor lights. maher naDetails
rooms #710 & 711. renovation of a single hotel guestroom and 2 guest bathrooms. work shall include replacement of plumbing fixtures and finishes. replacement of corrodor lights. maher na | $10,000 |
| Oct 30, 2017 | Completed final sign-off Nov 2018 | 165 Steuart St | revision to pa #201706209811 - mechanical, plumbing & electrical revision to include: removal of heat pumps, removal of new waste & vent piping, existing to remain. removal of new receptacles & removal of new light fixtures, exisitng to remain. revision to switching.Details
revision to pa #201706209811 - mechanical, plumbing & electrical revision to include: removal of heat pumps, removal of new waste & vent piping, existing to remain. removal of new receptacles & removal of new light fixtures, exisitng to remain. revision to switching. | |
| Jul 25, 2017 | Completed final sign-off Jan 2019 | 165 Steuart St | lobby reception to provide accessible check-in, installation of an accessible single unisex restrm & 2 conference rooms within lobby/lounge area. general cosmetic upgrades & refurbishment throughout-the lobby/lounge area. conversion of e. reception counter to a combination grab & go check-in counterDetails
lobby reception to provide accessible check-in, installation of an accessible single unisex restrm & 2 conference rooms within lobby/lounge area. general cosmetic upgrades & refurbishment throughout-the lobby/lounge area. conversion of e. reception counter to a combination grab & go check-in counter | $300,000 |
| Jun 20, 2017 | Completed final sign-off Jan 2019 | 165 Steuart St | on levels 4-8 - upgrades to accessible guestrooms & conversion of tub to showers on all the hotel guestrooms. minor cosmetic upgrades throughoutDetails
on levels 4-8 - upgrades to accessible guestrooms & conversion of tub to showers on all the hotel guestrooms. minor cosmetic upgrades throughout | $340,000 |
| Mar 2, 2015 | Completed final sign-off Apr 2015 | 225 Powell St | revision to appl #2014.1003.8007 & 2015.0203.7376 - relocate proposed bathrooms from level 2 - 7.Details
revision to appl #2014.1003.8007 & 2015.0203.7376 - relocate proposed bathrooms from level 2 - 7. | |
| Feb 3, 2015 | Completed final sign-off Apr 2015 | 225 Powell St | revision appl. #2014.1003.8007. selective demolition of walls/fixtures and replace with new on level 2-7. this is a revision to previously approved permit # 201410038007Details
revision appl. #2014.1003.8007. selective demolition of walls/fixtures and replace with new on level 2-7. this is a revision to previously approved permit # 201410038007 | |
| Oct 3, 2014 | Completed final sign-off Apr 2015 | 225 Powell St | project will increase the total room count by 7. scope of work consists of selective demo & reconstruction of interior walls & finishes on the 2nd to 7th level. scope of work will also consist of reconstructing 2 showers in 2(e) existing ada guestrooms to comply with current stds.Details
project will increase the total room count by 7. scope of work consists of selective demo & reconstruction of interior walls & finishes on the 2nd to 7th level. scope of work will also consist of reconstructing 2 showers in 2(e) existing ada guestrooms to comply with current stds. | $115,000 |
| Sep 12, 2014 | Completed final sign-off Jun 2016 | 225 Powell St | removal of e acoustical ceiling tile and grid system in coridors of levels 3-6 with new acoustical ceiling tile and grid system as ceiling rpair for the fire sprinkler system upgrade in building on a separate permitDetails
removal of e acoustical ceiling tile and grid system in coridors of levels 3-6 with new acoustical ceiling tile and grid system as ceiling rpair for the fire sprinkler system upgrade in building on a separate permit | $30,000 |