107 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 22, 2023 | Never finaled filed Jun 2023, never issued | 225 Powell St | new fire sprinkler ti inside of e building, adding pendent sprinklers for new ceiling planDetails
new fire sprinkler ti inside of e building, adding pendent sprinklers for new ceiling plan | $12,950 | |
| Apr 17, 2023 | Completed final sign-off Oct 2023 | 225 Powell St | Pyro-Comm Systems, Inc. | 2/f ste 200, 201, 220: as-built for fire alarm system t.i.installation; reference 202303173891Details
2/f ste 200, 201, 220: as-built for fire alarm system t.i.installation; reference 202303173891 | |
| Mar 17, 2023 | Completed final sign-off Oct 2023 | 225 Powell St | Pyro-Comm Systems, Inc. | 2/f: addition to the existing fire alarm system. new notification devices will be added to provide proper coverage for area of work. add 6 smoke detectors-sensor, 6 smoke detector base, 3 strobes, 6 speaker strobes, 1 manual pull station. ref f/a permit 202208261330.Details
2/f: addition to the existing fire alarm system. new notification devices will be added to provide proper coverage for area of work. add 6 smoke detectors-sensor, 6 smoke detector base, 3 strobes, 6 speaker strobes, 1 manual pull station. ref f/a permit 202208261330. | $11,000 |
| Feb 16, 2023 | Completed final sign-off Apr 2023 | 201 Powell St | Wells Construction Inc | revision to permit number 202204263011. changing swing on exterior store front back to out.Details
revision to permit number 202204263011. changing swing on exterior store front back to out. | |
| Jan 3, 2023 | Never finaled issued Jan 2023, no final | 225 Powell St | Alpha Architectural Signs & Lighting | reface 2 existing canopy signsDetails
reface 2 existing canopy signs | $2,000 |
| Dec 20, 2022 | Never finaled issued Mar 2023, no final | 201 Powell St | Alpha Architectural Signs & Lighting | install 1 new illuminated singled-faced 27" x 232" 3" thick exterior wall sign, 100lbs. "starbucks"Details
install 1 new illuminated singled-faced 27" x 232" 3" thick exterior wall sign, 100lbs. "starbucks" | $6,000 |
| Dec 20, 2022 | Never finaled issued Mar 2023, no final | 201 Powell St | Alpha Architectural Signs & Lighting | install 1 air vent cover on (e) air vent (exterior 163" x 27" 3" thick.)Details
install 1 air vent cover on (e) air vent (exterior 163" x 27" 3" thick.) | $2,000 |
| Dec 20, 2022 | Never finaled issued Mar 2023, no final | 201 Powell St | Alpha Architectural Signs & Lighting | install 2 new illuminated single-faced 24" x 24" interior window signs. 24" x 24" 5" thick. "starbucks"Details
install 2 new illuminated single-faced 24" x 24" interior window signs. 24" x 24" 5" thick. "starbucks" | $8,000 |
| Oct 4, 2022 | Never finaled issued Oct 2022, no final | 225 Powell St | Alpha Architectural Signs & Lighting | revision to pa# 202011179061 to change the wording and colors of the sign face. no other changes to approved plans are proposed. to comply with complaint #202293812 date 8/1/22.Details
revision to pa# 202011179061 to change the wording and colors of the sign face. no other changes to approved plans are proposed. to comply with complaint #202293812 date 8/1/22. | |
| Aug 26, 2022 | Completed final sign-off Apr 2023 | 225 Powell St | Pyro-Comm Systems, Inc. | voluntary addition to the (e) fas. new 1 notifier nfs2-2020 panel, 1 telguard, 1 psn-106 remote power supply, 6 psn-106 remote power supplies, 3 daa2-5070 digital audio amplifier, 189 smoke detector w/low freq sounder, 6 smoke detec., 16 control modules, 180 spkrs, 14 spkr strobes, 14 strobers.Details
voluntary addition to the (e) fas. new 1 notifier nfs2-2020 panel, 1 telguard, 1 psn-106 remote power supply, 6 psn-106 remote power supplies, 3 daa2-5070 digital audio amplifier, 189 smoke detector w/low freq sounder, 6 smoke detec., 16 control modules, 180 spkrs, 14 spkr strobes, 14 strobers. | $150,000 |
| Apr 13, 2021 | Completed final sign-off Apr 2023 | 225 Powell St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 2 pendent sprinklers on the ground floor soffit.Details
fire sprinklers; relocate 2 pendent sprinklers on the ground floor soffit. | $1,000 |
| Nov 30, 2020 | Never finaled issued Mar 2021, no final | 225 Powell St | Monolith Commercial Group Llc, Award Construction And Restoration Inc | room #307: barrier removal. convert one guestroom into an accessible suite to meet dispersion goals. no exterior work. all electrical and plumbing scope under defered submittal. fire sprinkler & fire alarm wokr under separate permit.Details
room #307: barrier removal. convert one guestroom into an accessible suite to meet dispersion goals. no exterior work. all electrical and plumbing scope under defered submittal. fire sprinkler & fire alarm wokr under separate permit. | $20,000 |
| Nov 17, 2020 | Never finaled issued Jan 2021, no final | 225 Powell St | Alpha Architectural Signs & Lighting | reface (2) existing projecting marquee signs and replace lighting with leds. "lydon hotel"Details
reface (2) existing projecting marquee signs and replace lighting with leds. "lydon hotel" | $8,000 |
| Oct 21, 2020 | Completed final sign-off Jul 2021 | 225 Powell St | Peacock Construction | addition of interior security grilles to an (e) retail space.Details
addition of interior security grilles to an (e) retail space. | $45,000 |
| Jul 8, 2020 | Never finaled issued Apr 2021, no final | 225 Powell St | Trainor Commercial Construction Inc. | the project scope includes the renovation of ground floor public space of an existing hotel. specific work includes the alteration of walls, ceilings, lighting, and finishes. the project also proposes a new canopy and storefront entrance doors. fire sprinkler & fire alarm work under separate permit.Details
the project scope includes the renovation of ground floor public space of an existing hotel. specific work includes the alteration of walls, ceilings, lighting, and finishes. the project also proposes a new canopy and storefront entrance doors. fire sprinkler & fire alarm work under separate permit. | $90,000 |
| Jun 10, 2020 | Never finaled issued Jan 2021, no final | 225 Powell St | Trainor Commercial Construction Inc. | the project scope consists of the renovation of the ground floor public space of an existing hotel. specific works includes the removal of an existing bar and the creation of new retail tenant space fronting powell street. no exterior work is proposed.Details
the project scope consists of the renovation of the ground floor public space of an existing hotel. specific works includes the removal of an existing bar and the creation of new retail tenant space fronting powell street. no exterior work is proposed. | $75,000 |
| May 20, 2020 | Completed final sign-off Jul 2020 | 225 Powell St | Bigham Taylor Roofing Co | reroof - commercial. 148 squares. overlay existing built-up roof with new 115 mil tpo fleeceback single-ply membrane. main flay roof only. excluding lower roof wells and upper penthouse section, satellite image of roof area is attached. esr-1463 is attached. crrc# 0628-0002. aged sri 85.Details
reroof - commercial. 148 squares. overlay existing built-up roof with new 115 mil tpo fleeceback single-ply membrane. main flay roof only. excluding lower roof wells and upper penthouse section, satellite image of roof area is attached. esr-1463 is attached. crrc# 0628-0002. aged sri 85. | $148,750 |
| Mar 26, 2018 | Completed final sign-off Jun 2018 | 225 Powell St | Seamless Fire Protection Llc | add 2 pendent sprinklers and 2 upright sprinklers to old elevator equipment room turned closet and open space. ref app#201705116393Details
add 2 pendent sprinklers and 2 upright sprinklers to old elevator equipment room turned closet and open space. ref app#201705116393 | $5,500 |
| Dec 7, 2017 | Never finaled issued Dec 2017, no final | 225 Powell St | Integrated Fire Systems Inc | as builts for permit app#201709188841 revise sequence of operation revise battery calcs and voice message.Details
as builts for permit app#201709188841 revise sequence of operation revise battery calcs and voice message. | |
| Nov 15, 2017 | Expired or cancelled cancelled Jan 2026 | 225 Powell St | revision to permits #201701268000 (ti) & #201708114563 (assembly occ load) to clarify delineation of lobby area vs. restaurant space. update occupant calcs for restaurant seating space. no demo or construction under this permit.Details
revision to permits #201701268000 (ti) & #201708114563 (assembly occ load) to clarify delineation of lobby area vs. restaurant space. update occupant calcs for restaurant seating space. no demo or construction under this permit. | ||
| Oct 24, 2017 | Completed final sign-off Dec 2017 | 225 Powell St | Potter Fire Protection | relocate 2 fire sprinklers as part of an as built plan. ref app#201709198911Details
relocate 2 fire sprinklers as part of an as built plan. ref app#201709198911 | $1,280 |
| Oct 5, 2017 | Completed final sign-off Nov 2017 | 225 Powell St | Integrated Fire Systems Inc | resubmitting as-built drawings for an existing permit we added, 1 ansul system, 1 duct detector, 1 damper relay and (1) music relay. remove one smoke detector not needed. ref pa# 201705166727, 2017-07-18-2130(hood)Details
resubmitting as-built drawings for an existing permit we added, 1 ansul system, 1 duct detector, 1 damper relay and (1) music relay. remove one smoke detector not needed. ref pa# 201705166727, 2017-07-18-2130(hood) | $1,300 |
| Sep 19, 2017 | Completed final sign-off Dec 2017 | 225 Powell St | Potter Fire Protection | 1st fl f/s: relocate (6) and add (2) fire sprinklers. ref pa #2017-0214-9376Details
1st fl f/s: relocate (6) and add (2) fire sprinklers. ref pa #2017-0214-9376 | $4,500 |
| Sep 18, 2017 | Expired or cancelled withdrawn Dec 2017 | 225 Powell St | Integrated Fire Systems Inc | elevator - fire alarm, upgrade passenger elevator & service elevator fire alarm. fire alarm related devices are being updated. ti pa#201705116393Details
elevator - fire alarm, upgrade passenger elevator & service elevator fire alarm. fire alarm related devices are being updated. ti pa#201705116393 | $17,000 |
| Sep 18, 2017 | Completed final sign-off Dec 2017 | 225 Powell St | Integrated Fire Systems Inc | 1/f - fire alarm, new t.i. in 1/f suite, add 4 duct smokes & 3 strobes to system. ti pa#201702149376Details
1/f - fire alarm, new t.i. in 1/f suite, add 4 duct smokes & 3 strobes to system. ti pa#201702149376 | $3,700 |
| Sep 11, 2017 | Completed final sign-off Jan 2018 | 225 Powell St | Golden Gate Sign Company Inc. | install electrical wall single faced signDetails
install electrical wall single faced sign | $5,000 |
| Sep 11, 2017 | Completed final sign-off Jan 2018 | 225 Powell St | Golden Gate Sign Company Inc. | install electric projecting single faced signDetails
install electric projecting single faced sign | $5,000 |
| Aug 11, 2017 | Never finaled issued Aug 2017, no final | 225 Powell St | administrative permit is to confirm occupant load only. no demo or construction. ref #2017-0126-8000.Details
administrative permit is to confirm occupant load only. no demo or construction. ref #2017-0126-8000. | ||
| Jul 18, 2017 | Completed final sign-off Sep 2017 | 225 Powell St | International Fire Equip | install ul300 fire system. t.i. pa#201611223371Details
install ul300 fire system. t.i. pa#201611223371 | $5,500 |
| Jul 6, 2017 | Never finaled issued Jul 2017, no final | 225 Powell St | Potter Fire Protection | level 1 - relocate (4) & add (2) fire sprinklers. ref pa #201706220048.Details
level 1 - relocate (4) & add (2) fire sprinklers. ref pa #201706220048. | $3,150 |
| Jun 22, 2017 | Never finaled issued Jun 2017, no final | 225 Powell St | Trainor Commercial Construction Inc. | temporary storefront barricade in sidewalk, related to renovation pa#201701268000, not attached to building store frontDetails
temporary storefront barricade in sidewalk, related to renovation pa#201701268000, not attached to building store front | $8,000 |
| Jun 20, 2017 | Never finaled issued Jun 2017, no final | 225 Powell St | street space permitDetails
street space permit | ||
| May 16, 2017 | Never finaled issued Aug 2017, no final | 225 Powell St | Integrated Fire Systems Inc | fire alarm - tenant improvement.Details
fire alarm - tenant improvement. | $15,500 |
| May 11, 2017 | Never finaled issued Aug 2017, no final | 225 Powell St | Trainor Commercial Construction Inc. | basement- renovation of elevator control room at the basement level. specific work consists of the selective demo and reconstruction of walls, floors, ceilings and finishes. fire sprinkler and fire alarm under separate permitDetails
basement- renovation of elevator control room at the basement level. specific work consists of the selective demo and reconstruction of walls, floors, ceilings and finishes. fire sprinkler and fire alarm under separate permit | $22,500 |
| Apr 7, 2017 | Never finaled issued Apr 2017, no final | 225 Powell St | Potter Fire Protection | 1st floor - relocate 16 & plug 7 fire sprinkelrs. ref pa #201611223371Details
1st floor - relocate 16 & plug 7 fire sprinkelrs. ref pa #201611223371 | $8,000 |
| Mar 7, 2017 | Completed final sign-off Jan 2018 | 225 Powell St | Trainor Commercial Construction Inc. | mep and kitchen scope only for 201611223371 for renovation of existing restaurantDetails
mep and kitchen scope only for 201611223371 for renovation of existing restaurant | $750,000 |
| Feb 14, 2017 | Completed final sign-off Jan 2018 | 225 Powell St | Marini Construction Inc | interior ti of (e) retail space. no change of occupancy, new finishes, fixtures, hvac, plumbing, modification to egress due to new store layout. historic material at interior to be retained. *signage and exterior, alarm & sprinkler under sep permitDetails
interior ti of (e) retail space. no change of occupancy, new finishes, fixtures, hvac, plumbing, modification to egress due to new store layout. historic material at interior to be retained. *signage and exterior, alarm & sprinkler under sep permit | $150,000 |
| Jan 26, 2017 | Completed final sign-off Jan 2018 | 225 Powell St | Trainor Commercial Construction Inc. | renovation of public space at grand level (entrance,lobby, storefront, canopy, back of house)includes selective demolation & reconstruction of walls, floors, ceilings and finishes for reconfiguration of public spaces. fire life safety under separate permit.Details
renovation of public space at grand level (entrance,lobby, storefront, canopy, back of house)includes selective demolation & reconstruction of walls, floors, ceilings and finishes for reconfiguration of public spaces. fire life safety under separate permit. | $350,000 |
| Nov 22, 2016 | Completed final sign-off Jan 2018 | 225 Powell St | Trainor Commercial Construction Inc. | interior renovation of e restaurant & kitchen at gr fl and basement. work includes selective demo & reconstruction of walls, floors, ceilings and finishes. no exterior work. fire life safety work under sep permitDetails
interior renovation of e restaurant & kitchen at gr fl and basement. work includes selective demo & reconstruction of walls, floors, ceilings and finishes. no exterior work. fire life safety work under sep permit | $116,000 |
| Aug 5, 2015 | Completed final sign-off May 2016 | 225 Powell St | Integrated Fire Systems Inc | update notification appliances and smoke detectors throughout the hotel. tie ne updates devices to (e) fire alarem panelDetails
update notification appliances and smoke detectors throughout the hotel. tie ne updates devices to (e) fire alarem panel | $85,000 |
| Mar 26, 2015 | Never finaled issued Apr 2015, no final | 225 Powell St | Champion Industrial Contractors Inc | add bath ventilation (mech work) for 6 guestrooms from level 2 - 7. ref to appl #2014.1003.8007 & 2015.0203.7376.Details
add bath ventilation (mech work) for 6 guestrooms from level 2 - 7. ref to appl #2014.1003.8007 & 2015.0203.7376. | $10,000 |
| Mar 2, 2015 | Expired or cancelled cancelled Jan 2026 | 225 Powell St | revision to appl #2014.0912.6189 - adding lighting fixture in ceilings of corridors form level 2 - 7.Details
revision to appl #2014.0912.6189 - adding lighting fixture in ceilings of corridors form level 2 - 7. | ||
| Mar 2, 2015 | Completed final sign-off Apr 2015 | 225 Powell St | Award Construction And Restoration Inc | revision to appl #2014.1003.8007 & 2015.0203.7376 - relocate proposed bathrooms from level 2 - 7.Details
revision to appl #2014.1003.8007 & 2015.0203.7376 - relocate proposed bathrooms from level 2 - 7. | |
| Feb 27, 2015 | Completed final sign-off Mar 2015 | 225 Powell St | R L H Fire Protection Inc | sprinklers ti- revision appl. 2014.0930.7665. revised layout of 3rd through sixth floors. add work on floor 2 with 7 sprinklers and work on floor 7 with 2 sprinklers. 9 heads total. ref. t.i. appl. 2014.0912.6189 & 201502037376.Details
sprinklers ti- revision appl. 2014.0930.7665. revised layout of 3rd through sixth floors. add work on floor 2 with 7 sprinklers and work on floor 7 with 2 sprinklers. 9 heads total. ref. t.i. appl. 2014.0912.6189 & 201502037376. | $6,595 |
| Feb 3, 2015 | Completed final sign-off Apr 2015 | 225 Powell St | Award Construction And Restoration Inc | revision appl. #2014.1003.8007. selective demolition of walls/fixtures and replace with new on level 2-7. this is a revision to previously approved permit # 201410038007Details
revision appl. #2014.1003.8007. selective demolition of walls/fixtures and replace with new on level 2-7. this is a revision to previously approved permit # 201410038007 | |
| Oct 3, 2014 | Completed final sign-off Apr 2015 | 225 Powell St | Award Construction And Restoration Inc | project will increase the total room count by 7. scope of work consists of selective demo & reconstruction of interior walls & finishes on the 2nd to 7th level. scope of work will also consist of reconstructing 2 showers in 2(e) existing ada guestrooms to comply with current stds.Details
project will increase the total room count by 7. scope of work consists of selective demo & reconstruction of interior walls & finishes on the 2nd to 7th level. scope of work will also consist of reconstructing 2 showers in 2(e) existing ada guestrooms to comply with current stds. | $115,000 |
| Sep 30, 2014 | Completed final sign-off Apr 2015 | 225 Powell St | R L H Fire Protection Inc | upgrade existing fire sprinkler system on 3rd to 6th floors. add heads in bedrooms - 248 heads total (62 per floor). reference permit 2014-09-12-6189.Details
upgrade existing fire sprinkler system on 3rd to 6th floors. add heads in bedrooms - 248 heads total (62 per floor). reference permit 2014-09-12-6189. | $127,475 |
| Sep 12, 2014 | Completed final sign-off Jun 2016 | 225 Powell St | Award Construction And Restoration Inc | removal of e acoustical ceiling tile and grid system in coridors of levels 3-6 with new acoustical ceiling tile and grid system as ceiling rpair for the fire sprinkler system upgrade in building on a separate permitDetails
removal of e acoustical ceiling tile and grid system in coridors of levels 3-6 with new acoustical ceiling tile and grid system as ceiling rpair for the fire sprinkler system upgrade in building on a separate permit | $30,000 |
| Sep 3, 2013 | Never finaled issued Sep 2013, no final | 225 Powell St | street spaceDetails
street space | ||
| Nov 16, 2012 | Never finaled issued Nov 2012, no final | 225 Powell St | Double E D Construction Inc | remove & replace floor covering with red 6'x6" terravista tiles match to existing floor in the kitchen, 5'x40'= 200 sq.ft.Details
remove & replace floor covering with red 6'x6" terravista tiles match to existing floor in the kitchen, 5'x40'= 200 sq.ft. | $7,000 |
| Oct 19, 2012 | Never finaled issued Nov 2012, no final | 225 Powell St | Double E D Construction Inc | provide electrical wiring and outlets for front patio dining area. install 3 new commercial grade electric heaters as per plan. break/open walls and ceiling for access of work. patch and fix opened wall and ceiling to match extg paint. awning separte permit--Details
provide electrical wiring and outlets for front patio dining area. install 3 new commercial grade electric heaters as per plan. break/open walls and ceiling for access of work. patch and fix opened wall and ceiling to match extg paint. awning separte permit-- | $5,000 |
| Sep 14, 2011 | Completed final sign-off Sep 2011 | 225 Powell St | to obtain final inspection for work approved uner pa200810315619; all work is completeDetails
to obtain final inspection for work approved uner pa200810315619; all work is complete | ||
| Sep 14, 2011 | Completed final sign-off Sep 2011 | 225 Powell St | to obtain final inspection for work approved under pa 200810315618; all work is compelteDetails
to obtain final inspection for work approved under pa 200810315618; all work is compelte | ||
| Sep 14, 2011 | Completed final sign-off Sep 2011 | 225 Powell St | to obtain final inspection for work approved under pa 200810315615, all work is completeDetails
to obtain final inspection for work approved under pa 200810315615, all work is complete | ||
| Sep 14, 2011 | Completed final sign-off Sep 2011 | 225 Powell St | to obtain final inspection for work approved uner pa 200810315616; all work is completeDetails
to obtain final inspection for work approved uner pa 200810315616; all work is complete | ||
| Sep 13, 2011 | Never finaled issued Sep 2011, no final | 225 Powell St | to obtain final inspection for work approved under app200710185809. all work is complete.Details
to obtain final inspection for work approved under app200710185809. all work is complete. | ||
| Sep 13, 2011 | Expired or cancelled cancelled Sep 2011 | 225 Powell St | to obtain final inspection for work approved under app#200801082061. all work is complete.Details
to obtain final inspection for work approved under app#200801082061. all work is complete. | ||
| Sep 13, 2011 | Completed final sign-off Sep 2011 | 225 Powell St | to obtain final inspection for work approved under app#200810315613. all work is complete.Details
to obtain final inspection for work approved under app#200810315613. all work is complete. | ||
| Jun 14, 2010 | Completed final sign-off Jun 2010 | 225 Powell St | to obtain final inspection for work approved under app #200710185809. all work completeDetails
to obtain final inspection for work approved under app #200710185809. all work complete | ||
| Mar 18, 2010 | Completed final sign-off Jun 2010 | 225 Powell St | Zebra Awning Co Inc | to obtain final inspection for work approved under app#200809091165Details
to obtain final inspection for work approved under app#200809091165 | |
| Jul 21, 2009 | Completed final sign-off Aug 2009 | 225 Powell St | Tri-Signal Integration Inc. | to obtain final inspection for work approved under pa #200803217672. all work is complete.Details
to obtain final inspection for work approved under pa #200803217672. all work is complete. | |
| Apr 29, 2009 | Never finaled issued Apr 2009, no final | 225 Powell St | street space only.Details
street space only. | ||
| Apr 13, 2009 | Never finaled issued Apr 2009, no final | 225 Powell St | Arrow Sign Company | erect a double faced electric sign.Details
erect a double faced electric sign. | $4,000 |
| Oct 31, 2008 | Never finaled issued Dec 2008, no final | 225 Powell St | erect an electric, illuminated, double faced, projecting sign.Details
erect an electric, illuminated, double faced, projecting sign. | $10,000 | |
| Oct 31, 2008 | Expired or cancelled expired Sep 2011 | 225 Powell St | to erect an electric, projecting , double faced, sign.Details
to erect an electric, projecting , double faced, sign. | $7,000 | |
| Oct 31, 2008 | Expired or cancelled expired Sep 2011 | 225 Powell St | erect an electric, illuminated, double faced, projecting sign.Details
erect an electric, illuminated, double faced, projecting sign. | $4,000 | |
| Oct 31, 2008 | Expired or cancelled expired Sep 2011 | 225 Powell St | erect an electric, illuminated, double faced, projecting sign.Details
erect an electric, illuminated, double faced, projecting sign. | $7,000 | |
| Oct 31, 2008 | Completed final sign-off Sep 2009 | 225 Powell St | erect an electric, illuminated, single faced, door sign.Details
erect an electric, illuminated, single faced, door sign. | $5,000 | |
| Oct 31, 2008 | Expired or cancelled expired Sep 2011 | 225 Powell St | erect an electric, illuminated, double faced, projecting sign.Details
erect an electric, illuminated, double faced, projecting sign. | $1,500 | |
| Sep 9, 2008 | Expired or cancelled expired Jun 2013 | 225 Powell St | Zebra Awning Co Inc | fabricate and install 8 awning, stell frame fabric cover awnings with graphics.Details
fabricate and install 8 awning, stell frame fabric cover awnings with graphics. | $6,000 |
| Sep 9, 2008 | Completed final sign-off Jun 2010 | 225 Powell St | Zebra Awning Co Inc | to erect non-electrical, double faced, projecting sign.Details
to erect non-electrical, double faced, projecting sign. | $3,000 |
| Jul 31, 2008 | Completed final sign-off Oct 2008 | 225 Powell St | Zebra Awning Co Inc | to fabricate and install 2 new triangle awning, steel tube frame, fabric cover on valance to read: bar norciniDetails
to fabricate and install 2 new triangle awning, steel tube frame, fabric cover on valance to read: bar norcini | $1,225 |
| Jul 31, 2008 | Completed final sign-off Oct 2008 | 225 Powell St | Zebra Awning Co Inc | erect non electric, single faced sign. apply printed graphics to 2 valancesDetails
erect non electric, single faced sign. apply printed graphics to 2 valances | $300 |
| Jul 18, 2008 | Completed final sign-off Sep 2008 | 225 Powell St | revision to pa# 2007/10/18/5809 for structural revision to storefront and entry canopy details. structural work only. no architectural changes.Details
revision to pa# 2007/10/18/5809 for structural revision to storefront and entry canopy details. structural work only. no architectural changes. | $35,000 | |
| Jul 11, 2008 | Never finaled issued Jul 2008, no final | 225 Powell St | street spaceDetails
street space | ||
| May 30, 2008 | Never finaled issued May 2008, no final | 225 Powell St | street space permit only.Details
street space permit only. | ||
| May 6, 2008 | Expired or cancelled expired Jan 2011 | 225 Powell St | Airtec Service | relocation of (1) supply duct. installlation of 1 new lobby split system heat pump with ductwork.Details
relocation of (1) supply duct. installlation of 1 new lobby split system heat pump with ductwork. | $14,421 |
| Mar 21, 2008 | Expired or cancelled expired Aug 2009 | 225 Powell St | Tri-Signal Integration Inc. | fire alarm ti to add 1 smoke detector, 2 speaker/strobes, 3 strobes and 1 sync module to ex. system.Details
fire alarm ti to add 1 smoke detector, 2 speaker/strobes, 3 strobes and 1 sync module to ex. system. | $3,800 |
| Feb 29, 2008 | Completed final sign-off Sep 2008 | 225 Powell St | interior demo on the ground floor area. ref. pa# 2007/10/18/5809 for ti must be approved for any construction of ti to begin.Details
interior demo on the ground floor area. ref. pa# 2007/10/18/5809 for ti must be approved for any construction of ti to begin. | $5,000 | |
| Feb 25, 2008 | Never finaled issued Feb 2008, no final | 225 Powell St | street spaceDetails
street space | ||
| Feb 22, 2008 | Never finaled issued Feb 2008, no final | 225 Powell St | street space permit only.Details
street space permit only. | ||
| Jan 8, 2008 | Never finaled issued Feb 2009, no final | 225 Powell St | extend (e) sprinkler system from corridor into guestrooms. 770 new sprinkler heads.Details
extend (e) sprinkler system from corridor into guestrooms. 770 new sprinkler heads. | $75,000 | |
| Oct 18, 2007 | Expired or cancelled expired Sep 2011 | 225 Powell St | Bcci Construction Company | ground floor remodel of (e) hotel lobby. replace (e) coffee shop w/ (n) wine bar in hotel. no work in adjacent restaurant space.Details
ground floor remodel of (e) hotel lobby. replace (e) coffee shop w/ (n) wine bar in hotel. no work in adjacent restaurant space. | $400,000 |
| Feb 1, 2007 | Never finaled issued Feb 2007, no final | 225 Powell St | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Jan 5, 2007 | Completed final sign-off Jan 2007 | 201 Powell St | renew for final 200104197205Details
renew for final 200104197205 | ||
| Dec 11, 2006 | Completed final sign-off Jan 2007 | 201 Powell St | renew 200107163731, 200109077820 & 200109249090 for final inspection only.Details
renew 200107163731, 200109077820 & 200109249090 for final inspection only. | ||
| Dec 11, 2006 | Completed final sign-off Jan 2007 | 201 Powell St | renew 200107163732, 200105018065 for final inspection only.Details
renew 200107163732, 200105018065 for final inspection only. | ||
| Dec 7, 2006 | Completed final sign-off Mar 2007 | 225 Powell St | correct app #200611308838 by removing app#200009069842 from scope of work under that permit and applying. the scope of work to this permit for final inspectionDetails
correct app #200611308838 by removing app#200009069842 from scope of work under that permit and applying. the scope of work to this permit for final inspection | ||
| Nov 30, 2006 | Never finaled issued Nov 2006, no final | 225 Powell St | renew expired pa#2000/09/06/9842, 2000/12/12/7779, 2000/12/12/7783 for final insp.onlyDetails
renew expired pa#2000/09/06/9842, 2000/12/12/7779, 2000/12/12/7783 for final insp.only | ||
| Nov 30, 2006 | Completed final sign-off Dec 2006 | 225 Powell St | renew expired pa#2005/06/19/0371, 2005/04/19/0374, 2005/05/02/1381 for final inspection.Details
renew expired pa#2005/06/19/0371, 2005/04/19/0374, 2005/05/02/1381 for final inspection. | ||
| Nov 30, 2006 | Completed final sign-off Feb 2007 | 225 Powell St | renew expired pa#8511487, 9302724, 9307431 for final insp.Details
renew expired pa#8511487, 9302724, 9307431 for final insp. | ||
| Mar 1, 2006 | Expired or cancelled expired Mar 2007 | 201 Powell St | Menemsha Development Group Inc | replace counter top and undercounter cabinet and install new. one new refrigerator and microwave with 2 new dedicated outletsDetails
replace counter top and undercounter cabinet and install new. one new refrigerator and microwave with 2 new dedicated outlets | $7,500 |
| Jun 1, 2005 | Expired or cancelled expired Dec 2006 | 225 Powell St | Tri-Signal Integration Inc. | basement fire alarm upgrade installation of fire alarm devices, conduict wire, and programming/Details
basement fire alarm upgrade installation of fire alarm devices, conduict wire, and programming/ | $18,000 |
| May 19, 2005 | Never finaled issued May 2005, no final | 225 Powell St | street space permitDetails
street space permit | ||
| May 2, 2005 | Expired or cancelled expired Apr 2006 | 225 Powell St | single faced non electric (e) awning signDetails
single faced non electric (e) awning sign | ||
| Apr 19, 2005 | Expired or cancelled expired Mar 2006 | 225 Powell St | Fluoresco Lighting & Sign | non structural signDetails
non structural sign | |
| Apr 19, 2005 | Expired or cancelled expired Apr 2006 | 225 Powell St | Fluoresco Lighting & Sign | non structural signDetails
non structural sign | |
| Aug 16, 2002 | Never finaled issued Aug 2002, no final | 225 Powell St | street spaceDetails
street space | ||
| Jun 4, 2002 | Completed final sign-off May 2003 | 201 Powell St | rev. to appl#200102142166 umb off set column,Details
rev. to appl#200102142166 umb off set column, | ||
| Sep 24, 2001 | Expired or cancelled expired Mar 2002 | 201 Powell St | revision to 200104197205 install new power door operator at primary entrance in lieu of level landinDetails
revision to 200104197205 install new power door operator at primary entrance in lieu of level landin | $6,500 | |
| Jul 16, 2001 | Expired or cancelled expired Nov 2001 | 201 Powell St | J S J Electrical Display Corp | sign permit - electric, projecting .Details
sign permit - electric, projecting . | |
| Jul 16, 2001 | Expired or cancelled expired Jan 2002 | 201 Powell St | J S J Electrical Display Corp | four (4) awningsDetails
four (4) awnings | $8,000 |
| May 25, 2001 | Expired or cancelled expired May 2002 | 201 Powell St | Metropolitan Electrical Construction | install 2 omni directionalantennas behind existing awning & 2 bts cabinets.Details
install 2 omni directionalantennas behind existing awning & 2 bts cabinets. | $35,000 |
| May 10, 2001 | Expired or cancelled expired Nov 2001 | 225 Powell St | street spaceDetails
street space | ||
| Apr 19, 2001 | Expired or cancelled expired Apr 2002 | 201 Powell St | interior soft demo & remodel for new coffee cafe include (n) partitions, flooring finishes, caseworkDetails
interior soft demo & remodel for new coffee cafe include (n) partitions, flooring finishes, casework | $175,000 | |
| Dec 12, 2000 | Expired or cancelled expired Apr 2002 | 225 Powell St | California Fire Security | install fire alarm systemDetails
install fire alarm system | $55,000 |
| Dec 12, 2000 | Expired or cancelled expired Aug 2003 | 225 Powell St | California Fire Security | emergency replacement of fire alarm sys corrective plan to be submittd to fire marshalDetails
emergency replacement of fire alarm sys corrective plan to be submittd to fire marshal | $10,000 |