Airtec Service
- Based in
- Watsonville
- On San Francisco permits
- Feb 2008 to May 2008
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2008 | Expired or cancelled expired Apr 2018 | 127 Ellis St | replacement of 1 existing split system heat-pump connect to (e) ductwork. installation of 2 new split system heat pumps w/ductwork. installation of 1 new restroom exhaust.Details
replacement of 1 existing split system heat-pump connect to (e) ductwork. installation of 2 new split system heat pumps w/ductwork. installation of 1 new restroom exhaust. | $28,530 |
| May 6, 2008 | Expired or cancelled expired Jan 2011 | 225 Powell St | relocation of (1) supply duct. installlation of 1 new lobby split system heat pump with ductwork.Details
relocation of (1) supply duct. installlation of 1 new lobby split system heat pump with ductwork. | $14,421 |
| Feb 5, 2008 | Completed final sign-off Jan 2009 | 524 Sutter St | replacement of 3 (e) heat pumps with remodel ductwork. addition of 2 heat pump w/ductwork. hvac for lobby/meeting & common area only.Details
replacement of 3 (e) heat pumps with remodel ductwork. addition of 2 heat pump w/ductwork. hvac for lobby/meeting & common area only. | $40,000 |