Integrated Fire Systems Inc

Contractor license
908904
State license record
Based in
Rocklin
On San Francisco permits
Aug 2015 to Mar 2019
Last 24 months
0 permits filed

15 permits since 2000: 12 completed, 2 never finaled, 1 expired or cancelled.

Of the 2 never-finaled permits, 2 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

AllStairs 2Kitchen remodel 1
FiledOutcomeAddressWork described on the permitDeclared cost
Mar 19, 2019Completed
final sign-off Apr 2019
125 Ellis Strev to pa# 201902193192; revision to drawings for co detector install
Details
Permit
201903195608
Permit issued
Mar 19, 2019
Final sign-off
Apr 30, 2019

rev to pa# 201902193192; revision to drawings for co detector install

Open the permit page

Feb 19, 2019Completed
final sign-off Apr 2019
125 Ellis Stadd co detectors to (e) fire alarm system for restaurant
Details
Permit
201902193192
Permit issued
Feb 19, 2019
Final sign-off
Apr 30, 2019

add co detectors to (e) fire alarm system for restaurant

Open the permit page

$2,100
Jan 16, 2019Completed
final sign-off Apr 2019
125 Ellis Stfire: installing monitor module for kitchen hood shut down. installing relay for make-up air shutdown.
Details
Permit
201901160500
Permit issued
Feb 1, 2019
Final sign-off
Apr 30, 2019

fire: installing monitor module for kitchen hood shut down. installing relay for make-up air shutdown.

Open the permit page

$3,100
Dec 19, 2018Completed
final sign-off May 2019
127 Ellis Stinstalling fire curtain to basement elevator lobby, installing relay to fire alarm system to close elevator curtain on alarm
Details
Permit
201812198768
Permit issued
Feb 1, 2019
Final sign-off
May 28, 2019

installing fire curtain to basement elevator lobby, installing relay to fire alarm system to close elevator curtain on alarm

Open the permit page

$3,100
Jul 23, 2018Completed
final sign-off Oct 2026
1050 Van Ness Avlobby: relocate and add 45 fire sprinklers in the lobby level guestrooms. ref ti 2015-1119-3095.
Details
Permit
201807235228
Permit issued
Jul 23, 2018
Final sign-off
Oct 26, 2026

lobby: relocate and add 45 fire sprinklers in the lobby level guestrooms. ref ti 2015-1119-3095.

Open the permit page

$35,000
Dec 7, 2017Never finaled
issued Dec 2017, no final
225 Powell Stas builts for permit app#201709188841 revise sequence of operation revise battery calcs and voice message.
Details
Permit
201712075832
Permit issued
Dec 7, 2017

as builts for permit app#201709188841 revise sequence of operation revise battery calcs and voice message.

Open the permit page

Oct 5, 2017Completed
final sign-off Nov 2017
225 Powell Stresubmitting as-built drawings for an existing permit we added, 1 ansul system, 1 duct detector, 1 damper relay and (1) music relay. remove one smoke detector not needed. ref pa# 201705166727, 2017-07-18-2130(hood)
Details
Permit
201710050541
Permit issued
Oct 5, 2017
Final sign-off
Nov 13, 2017

resubmitting as-built drawings for an existing permit we added, 1 ansul system, 1 duct detector, 1 damper relay and (1) music relay. remove one smoke detector not needed. ref pa# 201705166727, 2017-07-18-2130(hood)

Open the permit page

$1,300
Sep 18, 2017Completed
final sign-off Dec 2017
225 Powell St1/f - fire alarm, new t.i. in 1/f suite, add 4 duct smokes & 3 strobes to system. ti pa#201702149376
Details
Permit
201709188841
Permit issued
Nov 1, 2017
Final sign-off
Dec 4, 2017

1/f - fire alarm, new t.i. in 1/f suite, add 4 duct smokes & 3 strobes to system. ti pa#201702149376

Open the permit page

$3,700
Sep 18, 2017Expired or cancelled
withdrawn Dec 2017
225 Powell Stelevator - fire alarm, upgrade passenger elevator & service elevator fire alarm. fire alarm related devices are being updated. ti pa#201705116393
Details
Permit
201709188839

elevator - fire alarm, upgrade passenger elevator & service elevator fire alarm. fire alarm related devices are being updated. ti pa#201705116393

Open the permit page

$17,000
Sep 6, 2017Completed
final sign-off Oct 2026
1050 Van Ness Avrelocate 54 fire sprinklers in the lobby/mezzanine level. ref app#201612013978. n/a for maher
Details
Permit
201709066997
Permit issued
Sep 6, 2017
Final sign-off
Oct 26, 2026

relocate 54 fire sprinklers in the lobby/mezzanine level. ref app#201612013978. n/a for maher

Open the permit page

$32,000
May 16, 2017Never finaled
issued Aug 2017, no final
225 Powell Stfire alarm - tenant improvement.
Details
Permit
201705166727
Permit issued
Aug 17, 2017

fire alarm - tenant improvement.

Open the permit page

$15,500
Apr 5, 2017Completed
final sign-off Oct 2026
1050 Van Ness Avinstall 2 new pendent sprinklers and 3 new side wall fire sprinkler at the basement level due to new stairway addition. ref app#201703101170. n/a for maher
Details
Permit
201704053224
Permit issued
Apr 5, 2017
Final sign-off
Oct 26, 2026

install 2 new pendent sprinklers and 3 new side wall fire sprinkler at the basement level due to new stairway addition. ref app#201703101170. n/a for maher

Open the permit page

$600
Mar 10, 2017Completed
final sign-off Oct 2026
1050 Van Ness Avinstall 4 new residential pendent sprinklers at the lobby level. install 3 new pendent sprinkler at the basement level per new stairway addition under ref app#201506027875 guest room 433 not in the right permit
Details
Permit
201703101170
Permit issued
Mar 10, 2017
Final sign-off
Oct 26, 2026

install 4 new residential pendent sprinklers at the lobby level. install 3 new pendent sprinkler at the basement level per new stairway addition under ref app#201506027875 guest room 433 not in the right permit

Open the permit page

$10,000
May 2, 2016Completed
final sign-off Oct 2026
1050 Van Ness Avdemo 1 sprinkler and add 3 in each of 12 rooms on floor 2 thru 5th floor - 525, 526, 527, 425, 426, 427, 325, 326, 327, 225, 226 & 227. also, replace all sprinkler throughout common hallways (100 heads) floors 2 thru 5.
Details
Permit
201605026289
Permit issued
May 2, 2016
Final sign-off
Oct 26, 2026

demo 1 sprinkler and add 3 in each of 12 rooms on floor 2 thru 5th floor - 525, 526, 527, 425, 426, 427, 325, 326, 327, 225, 226 & 227. also, replace all sprinkler throughout common hallways (100 heads) floors 2 thru 5.

Open the permit page

$30,000
Aug 5, 2015Completed
final sign-off May 2016
225 Powell Stupdate notification appliances and smoke detectors throughout the hotel. tie ne updates devices to (e) fire alarem panel
Details
Permit
201508053418
Permit issued
Sep 23, 2015
Final sign-off
May 3, 2016

update notification appliances and smoke detectors throughout the hotel. tie ne updates devices to (e) fire alarem panel

Open the permit page

$85,000