Permit 201705116393
225 Powell St
basement- renovation of elevator control room at the basement level. specific work consists of the selective demo and reconstruction of walls, floors, ceilings and finishes. fire sprinkler and fire alarm under separate permit
- Outcome
- Never finaled (city status: issued, Aug 2, 2017)
- Filed
- May 11, 2017
- Permit issued
- Aug 2, 2017
- Declared cost
- $22,500
- Building use
- tourist hotel/motel
- Neighborhood
- Tenderloin (how long permits take there)
- Contractor
- Trainor Commercial Construction Inc. (license 453991)
- Property
- All permits at this address (block 0315, lot 003)
Everyone on the permit
The parties and license numbers written on the permit, as the city lists them; not a check with any state board. The person who paid the fee and the project contact are not shown.
- Contractor
- Trainor Commercial Construction Inc. (license 453991), applicant
- Architect
- Michael Stanton, Stanton Architecture (license C11562)
- Engineer
- Eugene Tuan, Tuan & Robinson Str. Engineer (license S3982)
- Engineer
- Mark Robison, Robison Engineering, Inc. (license E15095)