James A. Ybarra
- Listed as
- engineer
- Firm
- Robison Engineering
- Based in
- Ly7nnwood
- On San Francisco permits
- Jun 2021 to Jun 2023
11 permits since 2000 (engineer on 11 permits): 8 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 15, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | Centric Construction Inc | renovation of (e) restaurant seating area. add new lobby bar + finishes. replace interior storefront at private dining room entry. fire sprinkler + alarm under separate permit. **associated with 2023-001338prv project review meeting with rebecca salgado.Details
renovation of (e) restaurant seating area. add new lobby bar + finishes. replace interior storefront at private dining room entry. fire sprinkler + alarm under separate permit. **associated with 2023-001338prv project review meeting with rebecca salgado. | $527,000 |
| Jun 1, 2023 | Never finaled filed Jun 2023, never issued | 55 Cyril Magnin St | 30/f, 31f & 32/f: add (15)guestrooms to (e) hotels by establishing new rooms. alterations to guestroom level corridors and elevator lobbies. remove/replace interior finishes/furnishings. total guestroom count after construction will be (1039)Details
30/f, 31f & 32/f: add (15)guestrooms to (e) hotels by establishing new rooms. alterations to guestroom level corridors and elevator lobbies. remove/replace interior finishes/furnishings. total guestroom count after construction will be (1039) | $30,000,000 | |
| May 30, 2023 | Completed final sign-off Sep 2024 | 55 Cyril Magnin St | Hathaway Dinwiddie Co. | 18 & 19/f guestrooms 1872 & 1972: removal and replacement of interior finishes and furnishings.Details
18 & 19/f guestrooms 1872 & 1972: removal and replacement of interior finishes and furnishings. | $60,000 |
| May 23, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | Centric Construction Inc | renovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prepDetails
renovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prep | $148,850 |
| May 1, 2023 | Expired or cancelled cancelled Oct 2024 | 335 Powell St | Centric Construction Inc | lobby level: convert (6) stall women restroom to (9) single occupant all-gender restrooms.Details
lobby level: convert (6) stall women restroom to (9) single occupant all-gender restrooms. | $128,000 |
| Oct 11, 2022 | Never finaled issued Jun 2023, no final | 235 Front St | Holt Construction Inc | front counter updgrade, relocate and addition of kitchen equipment.Details
front counter updgrade, relocate and addition of kitchen equipment. | $95,000 |
| Oct 11, 2022 | Completed final sign-off Mar 2023 | 5454 Mission St | Holt Construction Inc | (n) pick up counter and new order counter. relocate and addition of equipment in kitchen. fix entry doors for ada and fix hand rail for ada. update restroom for ada.Details
(n) pick up counter and new order counter. relocate and addition of equipment in kitchen. fix entry doors for ada and fix hand rail for ada. update restroom for ada. | $95,000 |
| Sep 15, 2022 | Completed final sign-off Dec 2022 | 1100 Fillmore St | Holt Construction Inc | upgrade front counter, addition of kitchen equipments, addition of hand sink, and addition of pick up (walk up) window. no changes to hours of operation.Details
upgrade front counter, addition of kitchen equipments, addition of hand sink, and addition of pick up (walk up) window. no changes to hours of operation. | $95,000 |
| Aug 10, 2022 | Completed final sign-off Nov 2023 | 441 Sutter St | Holt Construction Inc | front counter upgrade, relocate & addition of kitchen equipment @ front counter areaDetails
front counter upgrade, relocate & addition of kitchen equipment @ front counter area | $95,000 |
| Jul 20, 2022 | Completed final sign-off Mar 2023 | 302 Potrero Av | Holt Construction Inc | upgrade front counter area. relocate and addition of kitchen equipment at front counter area. ada upgrade to entry doors, ada signage and restrooms.Details
upgrade front counter area. relocate and addition of kitchen equipment at front counter area. ada upgrade to entry doors, ada signage and restrooms. | $95,000 |
| Jun 14, 2021 | Completed final sign-off Jul 2022 | 609 Market St | Holt Construction Inc | main floor dining and front counter remodel.no increase in occupant load.relocation of existing non-grease kitchen equipment.replacement of existing split system hvac unit-like for like.install (n) gender neutral bath in bsmt.remove (e) dining fixtures in basement. convert dining to storage in bsmt.Details
main floor dining and front counter remodel.no increase in occupant load.relocation of existing non-grease kitchen equipment.replacement of existing split system hvac unit-like for like.install (n) gender neutral bath in bsmt.remove (e) dining fixtures in basement. convert dining to storage in bsmt. | $325,000 |