Joseph Lee Holt

License
911804
Contractor
About the Contractors State License Board
State contractor license record
Listed as
authorized agent-others, contractor
Firm
Holt Construction Inc
Based in
Chico
On San Francisco permits
Jun 2021 to Jun 2023

9 permits since 2000 (contractor on 9 permits, authorized agent-others on 3 permits): 7 completed, 2 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Architects
Kenneth Mccracken (8), Gary Semling
Engineers
James A. Ybarra (6), Mark Manglicmot (2), Mark D. Robison

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 20, 2023Never finaled
issued Oct 2023, no final
441 Sutter StHolt Construction Incobtain permit to existing c02 tank
Details
Permit
202306200411
Permit issued
Oct 27, 2023

obtain permit to existing c02 tank

Open the permit page

Dec 22, 2022Completed
final sign-off Apr 2023
5411 03rd StHolt Construction Incfront counter upgrade, relocate equipment at front counter addition of equipment at area of work mentioned above. fix portion of walk for ada
Details
Permit
202212228939
Permit issued
Mar 23, 2023
Final sign-off
Apr 7, 2023

front counter upgrade, relocate equipment at front counter addition of equipment at area of work mentioned above. fix portion of walk for ada

Open the permit page

$75,000
Oct 11, 2022Completed
final sign-off Mar 2023
5454 Mission StHolt Construction Inc(n) pick up counter and new order counter. relocate and addition of equipment in kitchen. fix entry doors for ada and fix hand rail for ada. update restroom for ada.
Details
Permit
202210114066
Permit issued
Jan 17, 2023
Final sign-off
Mar 30, 2023

(n) pick up counter and new order counter. relocate and addition of equipment in kitchen. fix entry doors for ada and fix hand rail for ada. update restroom for ada.

Open the permit page

$95,000
Oct 11, 2022Never finaled
issued Jun 2023, no final
235 Front StHolt Construction Incfront counter updgrade, relocate and addition of kitchen equipment.
Details
Permit
202210114063
Permit issued
Jun 22, 2023

front counter updgrade, relocate and addition of kitchen equipment.

Open the permit page

$95,000
Sep 15, 2022Completed
final sign-off Dec 2022
1100 Fillmore StHolt Construction Incupgrade front counter, addition of kitchen equipments, addition of hand sink, and addition of pick up (walk up) window. no changes to hours of operation.
Details
Permit
202209152569
Permit issued
Nov 14, 2022
Final sign-off
Dec 30, 2022

upgrade front counter, addition of kitchen equipments, addition of hand sink, and addition of pick up (walk up) window. no changes to hours of operation.

Open the permit page

$95,000
Aug 10, 2022Completed
final sign-off Nov 2023
441 Sutter StHolt Construction Incfront counter upgrade, relocate & addition of kitchen equipment @ front counter area
Details
Permit
202208100251
Permit issued
Jan 17, 2023
Final sign-off
Nov 16, 2023

front counter upgrade, relocate & addition of kitchen equipment @ front counter area

Open the permit page

$95,000
Aug 3, 2022Completed
final sign-off May 2023
255 Winston DrHolt Construction Incupgrade front counter, relocate and addition of kitchen equipment at front counter
Details
Permit
202208039797
Permit issued
Dec 27, 2022
Final sign-off
May 19, 2023

upgrade front counter, relocate and addition of kitchen equipment at front counter

Open the permit page

$95,000
Jul 20, 2022Completed
final sign-off Mar 2023
302 Potrero AvHolt Construction Incupgrade front counter area. relocate and addition of kitchen equipment at front counter area. ada upgrade to entry doors, ada signage and restrooms.
Details
Permit
202207208933
Permit issued
Jan 17, 2023
Final sign-off
Mar 30, 2023

upgrade front counter area. relocate and addition of kitchen equipment at front counter area. ada upgrade to entry doors, ada signage and restrooms.

Open the permit page

$95,000
Jun 14, 2021Completed
final sign-off Jul 2022
609 Market StHolt Construction Incmain floor dining and front counter remodel.no increase in occupant load.relocation of existing non-grease kitchen equipment.replacement of existing split system hvac unit-like for like.install (n) gender neutral bath in bsmt.remove (e) dining fixtures in basement. convert dining to storage in bsmt.
Details
Permit
202106142326
Permit issued
Feb 17, 2022
Final sign-off
Jul 5, 2022

main floor dining and front counter remodel.no increase in occupant load.relocation of existing non-grease kitchen equipment.replacement of existing split system hvac unit-like for like.install (n) gender neutral bath in bsmt.remove (e) dining fixtures in basement. convert dining to storage in bsmt.

Open the permit page

$325,000