Kenneth Mccracken
- Listed as
- architect, designer
- Firm
- Pm Design Architectural
- Based in
- Santa Rosa
- On San Francisco permits
- Jul 2019 to Apr 2026
15 permits since 2000 (architect on 14 permits, designer on 1 permit): 6 completed, 5 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 14, 2026 | In progress issued May 2026 | 211 Jefferson St | Embree Construction Group Inc | revision to 202412176961, outline s the design revisions to door and storefront modificiations, existing door was removed and replaced, delta a changesDetails
revision to 202412176961, outline s the design revisions to door and storefront modificiations, existing door was removed and replaced, delta a changes | $7,000 |
| Mar 10, 2026 | In progress issued Apr 2026 | 255 Winston Dr | Foresite Construction Inc | revision to bpa 2025.0428.5369 - revision includes demolition, dining interior, exterior facade, kitchen, and site changesDetails
revision to bpa 2025.0428.5369 - revision includes demolition, dining interior, exterior facade, kitchen, and site changes | $10,000 |
| Jan 5, 2026 | In progress issued Mar 2026 | 211 Jefferson St | Embree Construction Group Inc | reference to pa#202412176961, owner reflected exterior and interior changes.Details
reference to pa#202412176961, owner reflected exterior and interior changes. | $50,000 |
| May 12, 2025 | In progress issued Nov 2025 | 211 Jefferson St | Embree Construction Group Inc | change of use a3 to a2 occupancy-partial demo, renovation and conversion of 1st floor of (e) 3 story building from gallery to restaurant. (n) work includes remodel of 1st floor, mep work, minor structural scope, minor exterior storefront and utility improvementsDetails
change of use a3 to a2 occupancy-partial demo, renovation and conversion of 1st floor of (e) 3 story building from gallery to restaurant. (n) work includes remodel of 1st floor, mep work, minor structural scope, minor exterior storefront and utility improvements | $6,000,000 |
| Jun 20, 2023 | In progress issued Oct 2023 | 441 Sutter St | Holt Construction Inc | obtain permit to existing c02 tankDetails
obtain permit to existing c02 tank | |
| Dec 22, 2022 | Completed final sign-off Apr 2023 | 5411 03rd St | Holt Construction Inc | front counter upgrade, relocate equipment at front counter addition of equipment at area of work mentioned above. fix portion of walk for adaDetails
front counter upgrade, relocate equipment at front counter addition of equipment at area of work mentioned above. fix portion of walk for ada | $75,000 |
| Oct 11, 2022 | Completed final sign-off Mar 2023 | 5454 Mission St | Holt Construction Inc | (n) pick up counter and new order counter. relocate and addition of equipment in kitchen. fix entry doors for ada and fix hand rail for ada. update restroom for ada.Details
(n) pick up counter and new order counter. relocate and addition of equipment in kitchen. fix entry doors for ada and fix hand rail for ada. update restroom for ada. | $95,000 |
| Oct 11, 2022 | Never finaled issued Jun 2023, no final | 235 Front St | Holt Construction Inc | front counter updgrade, relocate and addition of kitchen equipment.Details
front counter updgrade, relocate and addition of kitchen equipment. | $95,000 |
| Sep 15, 2022 | Completed final sign-off Dec 2022 | 1100 Fillmore St | Holt Construction Inc | upgrade front counter, addition of kitchen equipments, addition of hand sink, and addition of pick up (walk up) window. no changes to hours of operation.Details
upgrade front counter, addition of kitchen equipments, addition of hand sink, and addition of pick up (walk up) window. no changes to hours of operation. | $95,000 |
| Aug 10, 2022 | Completed final sign-off Nov 2023 | 441 Sutter St | Holt Construction Inc | front counter upgrade, relocate & addition of kitchen equipment @ front counter areaDetails
front counter upgrade, relocate & addition of kitchen equipment @ front counter area | $95,000 |
| Aug 3, 2022 | Completed final sign-off May 2023 | 255 Winston Dr | Holt Construction Inc | upgrade front counter, relocate and addition of kitchen equipment at front counterDetails
upgrade front counter, relocate and addition of kitchen equipment at front counter | $95,000 |
| Jul 20, 2022 | Completed final sign-off Mar 2023 | 302 Potrero Av | Holt Construction Inc | upgrade front counter area. relocate and addition of kitchen equipment at front counter area. ada upgrade to entry doors, ada signage and restrooms.Details
upgrade front counter area. relocate and addition of kitchen equipment at front counter area. ada upgrade to entry doors, ada signage and restrooms. | $95,000 |
| Aug 8, 2019 | Expired or cancelled cancelled Jan 2026 | 52 California St | provide and install new nitrogen infused coffee dispenser.//the total amount of nitrogen is 18lbs, there are 6 kegs of 3 lbs each... this does not require an operational permit according to cfc 105.6.11Details
provide and install new nitrogen infused coffee dispenser.//the total amount of nitrogen is 18lbs, there are 6 kegs of 3 lbs each... this does not require an operational permit according to cfc 105.6.11 | $8,500 | |
| Jul 30, 2019 | Expired or cancelled cancelled Jan 2026 | 675 Portola Dr | provide and install new nitrogen infused coffee dispenserDetails
provide and install new nitrogen infused coffee dispenser | $8,500 | |
| Jul 30, 2019 | Expired or cancelled cancelled Jan 2026 | 1231 Market St | provide and install new nitrogen infused coffee dispenserDetails
provide and install new nitrogen infused coffee dispenser | $8,500 |