Block 0012, lot 001
2739 Taylor St
- City’s use
- Commercial Retail
- Built
- 1953
- Stories
- 2
- Units
- 4
- Rooms
- 12 bathrooms
- Building
- 24,627 sq ft
- Lot
- 18,906 sq ft
- Zoning
- C2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
93 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2026 | Completed final sign-off Jul 2026 | 2739 Taylor St | Eagle's General Const Co | g/f only -newly built counter with a new steam table sets with sneeze guard. newly built counter for serving boba drinksDetails
g/f only -newly built counter with a new steam table sets with sneeze guard. newly built counter for serving boba drinks | $2,500 |
| Jun 17, 2026 | Completed final sign-off Sep 2026 | 2739 Taylor St | Elm Roofing Contractors Inc Dba Element | reroof no hot worksDetails
reroof no hot works | $59,000 |
| Jun 16, 2026 | Completed final sign-off Oct 2026 | 211 Jefferson St | Tracy Sign Inc | revision to pa #2025-0207-9962: size change from 1x7' to 2x12' 1/2" (one love)Details
revision to pa #2025-0207-9962: size change from 1x7' to 2x12' 1/2" (one love) | $500 |
| Jun 1, 2026 | Completed final sign-off Oct 2026 | 211 Jefferson St | Tracy Sign Inc | sign # 9,10, 11: 3 custom banners outside of building.Details
sign # 9,10, 11: 3 custom banners outside of building. | $3,000 |
| Apr 14, 2026 | Completed final sign-off Oct 2026 | 211 Jefferson St | Embree Construction Group Inc | revision to 202412176961, outline s the design revisions to door and storefront modificiations, existing door was removed and replaced, delta a changesDetails
revision to 202412176961, outline s the design revisions to door and storefront modificiations, existing door was removed and replaced, delta a changes | $7,000 |
| Apr 2, 2026 | Completed final sign-off Apr 2026 | 2739 Taylor St | Metropolitan Electrical Construction | to obtain final inspection for work approved under pa# 202406134416. all work is complete.Details
to obtain final inspection for work approved under pa# 202406134416. all work is complete. | |
| Feb 26, 2026 | In progress filed Feb 2026, not yet issued | 211 Jefferson St | sign #8 : interior digital media display. | $3,000 | |
| Feb 26, 2026 | In progress filed Feb 2026, not yet issued | 211 Jefferson St | sign #15 : canes flag pole and flag outside of building.Details
sign #15 : canes flag pole and flag outside of building. | $1,000 | |
| Feb 26, 2026 | Completed final sign-off Oct 2026 | 211 Jefferson St | Tracy Sign Inc | sign #12 & 13 : window display graphiscs on taylor st & jefferson st.Details
sign #12 & 13 : window display graphiscs on taylor st & jefferson st. | $2,000 |
| Feb 6, 2026 | In progress issued Feb 2026 | 223 Jefferson St | Rapid Fire Safety & Security Llc | replace (e) fire alarm system 1 for 1 installing 1 es-200xp , 16 sd365, 7 dnr, sd365r, dst - x-, 6 bg-rlx, 14 crf-300, 2 mdf-300, 2 mmf -300Details
replace (e) fire alarm system 1 for 1 installing 1 es-200xp , 16 sd365, 7 dnr, sd365r, dst - x-, 6 bg-rlx, 14 crf-300, 2 mdf-300, 2 mmf -300 | $17,000 |
| Jan 5, 2026 | Completed final sign-off Oct 2026 | 211 Jefferson St | Embree Construction Group Inc | reference to pa#202412176961, owner reflected exterior and interior changes.Details
reference to pa#202412176961, owner reflected exterior and interior changes. | $50,000 |
| Jan 2, 2026 | Completed final sign-off Oct 2026 | 211 Jefferson St | Embree Construction Group Inc | barricade for construction ref pa #2024-1217-6961Details
barricade for construction ref pa #2024-1217-6961 | |
| Oct 21, 2025 | Completed final sign-off Oct 2026 | 211 Jefferson St | Embree Construction Group Inc | 1/f -to include the construction of non bearing partitions that was graphically shown on permitted drawings but not detailed theirin. to perform mech and elec work in this adjacent tenant space (art gallery) necessitated by the previously permitted work.Details
1/f -to include the construction of non bearing partitions that was graphically shown on permitted drawings but not detailed theirin. to perform mech and elec work in this adjacent tenant space (art gallery) necessitated by the previously permitted work. | $100,000 |
| May 12, 2025 | Completed final sign-off Oct 2026 | 211 Jefferson St | Embree Construction Group Inc | change of use a3 to a2 occupancy-partial demo, renovation and conversion of 1st floor of (e) 3 story building from gallery to restaurant. (n) work includes remodel of 1st floor, mep work, minor structural scope, minor exterior storefront and utility improvementsDetails
change of use a3 to a2 occupancy-partial demo, renovation and conversion of 1st floor of (e) 3 story building from gallery to restaurant. (n) work includes remodel of 1st floor, mep work, minor structural scope, minor exterior storefront and utility improvements | $6,000,000 |
| Feb 7, 2025 | Completed final sign-off Oct 2026 | 211 Jefferson St | Tracy Sign Inc | sign 5 & 16 - install (2) illuminated interior single faced wall signs: "open" inside the building.Details
sign 5 & 16 - install (2) illuminated interior single faced wall signs: "open" inside the building. | $2,308 |
| Feb 7, 2025 | In progress issued Jun 2026 | 211 Jefferson St | Tracy Sign Inc | sign 14 - rc logo blade sign with arrowDetails
sign 14 - rc logo blade sign with arrow | $3,527 |
| Feb 7, 2025 | In progress issued May 2026 | 211 Jefferson St | Tracy Sign Inc | sign 7 - install (1) illuminated interior single faced wall sign: "chicken fingers" inside the building.Details
sign 7 - install (1) illuminated interior single faced wall sign: "chicken fingers" inside the building. | $2,015 |
| Feb 7, 2025 | Completed final sign-off Oct 2026 | 211 Jefferson St | Tracy Sign Inc | sign 1 & 17 - install (2) illuminated single faced wall signs: "raising canes's chichen fingers"Details
sign 1 & 17 - install (2) illuminated single faced wall signs: "raising canes's chichen fingers" | $5,270 |
| Feb 7, 2025 | Completed final sign-off Oct 2026 | 211 Jefferson St | Tracy Sign Inc | sign 3 & 4 - install (2) non-illuminated exterior double faced projecting signs: "raising cane's"Details
sign 3 & 4 - install (2) non-illuminated exterior double faced projecting signs: "raising cane's" | $4,620 |
| Feb 7, 2025 | Completed final sign-off Oct 2026 | 211 Jefferson St | Tracy Sign Inc | sign 14 - install (1) illuminated single faced interior wall sign: "one love"Details
sign 14 - install (1) illuminated single faced interior wall sign: "one love" | $1,044 |
| Feb 7, 2025 | Completed final sign-off Oct 2026 | 211 Jefferson St | Tracy Sign Inc | sign 2 - install (1) non-illuminated single faced wall sign: "raising canes's"Details
sign 2 - install (1) non-illuminated single faced wall sign: "raising canes's" | $3,230 |
| Jun 13, 2024 | Expired or cancelled expired Apr 2026 | 2739 Taylor St | Metropolitan Electrical Construction | remove, relocate, replace 9 antennas, install 4 new remove e radome/flagpole w steel flagpole, antennas within 2 frp screens, relocate rrus from ewuip rm to antenna area,install 3 new rectifiers in e dcpp 1 new battery rack with 8 190 ah lead acid batteries, 1 new 6673 baseband unit in e rack,1 newDetails
remove, relocate, replace 9 antennas, install 4 new remove e radome/flagpole w steel flagpole, antennas within 2 frp screens, relocate rrus from ewuip rm to antenna area,install 3 new rectifiers in e dcpp 1 new battery rack with 8 190 ah lead acid batteries, 1 new 6673 baseband unit in e rack,1 new | $80,000 |
| Sep 12, 2018 | Expired or cancelled cancelled Jan 2023 | 2739 Taylor St | Ericsson Inc Dba E U S Inc | add 2 antennas at the roof of building. swap 5 antenntas at roof. install 9 rrus 2 5216 and 2 xmu, install 4 diplexers, 1 gps antenna w 1/2 coax, 1 indoor dc12 1 outdoor dc 12, remove 4 tmas install 1 power plant, 3 strings of battries, 6 power trunks, 1 dc6 unit ,n 48" radome, paint to match radomeDetails
add 2 antennas at the roof of building. swap 5 antenntas at roof. install 9 rrus 2 5216 and 2 xmu, install 4 diplexers, 1 gps antenna w 1/2 coax, 1 indoor dc12 1 outdoor dc 12, remove 4 tmas install 1 power plant, 3 strings of battries, 6 power trunks, 1 dc6 unit ,n 48" radome, paint to match radome | $15,000 |
| Jun 6, 2018 | Expired or cancelled withdrawn Jul 2022 | 2739 Taylor St | at&t add 2 new anteannas, install 9 new radio units (rru's), install 2 new 5216 units, 2 tma's 6 new power trunks, 1 48 radome to existing screened antennasDetails
at&t add 2 new anteannas, install 9 new radio units (rru's), install 2 new 5216 units, 2 tma's 6 new power trunks, 1 48 radome to existing screened antennas | $42,300 | |
| Aug 1, 2016 | Completed final sign-off Jan 2017 | 2739 Taylor St | Electric Tech Construction Inc | att modification: r&r 4(e) antennas w/(4) new antenna; install (3) new rrus-32; r&r 3(e) rrus-11 w/(3) new rrus-32; r&r (e) radome w/new radom; install other minor equip maher n/aDetails
att modification: r&r 4(e) antennas w/(4) new antenna; install (3) new rrus-32; r&r 3(e) rrus-11 w/(3) new rrus-32; r&r (e) radome w/new radom; install other minor equip maher n/a | $32,000 |
| Jun 21, 2016 | Completed final sign-off Jul 2016 | 211 Jefferson St | Triton Tower Inc | to obtain final inspection for work approved under pa#201310280385 all work is complete. n/a ordinance #155-13Details
to obtain final inspection for work approved under pa#201310280385 all work is complete. n/a ordinance #155-13 | |
| May 23, 2016 | Never finaled issued May 2016, no final | 2739 Taylor St | street space | ||
| Apr 15, 2016 | Completed final sign-off Oct 2016 | 2739 Taylor St | Metropolitan Electrical Construction | nextnev e-911 project, install 1 equipment cabinet, 1 gps unit, and 1 omni-directional antenna, all on rooftop. connect power to 9e) electrical panel.Details
nextnev e-911 project, install 1 equipment cabinet, 1 gps unit, and 1 omni-directional antenna, all on rooftop. connect power to 9e) electrical panel. | $5,000 |
| Nov 16, 2015 | Completed final sign-off Mar 2016 | 2739 Taylor St | Electric Tech Construction Inc | at&t modification to (e)unmaned telecomm facility: install 3 (n) rrus-32; install (n)dc6 surge suppressor,install (n)dc12 inside,(n) dus 41,(n)2 inner duct,install gps antenna,r&r (e)(e)antennas w/5(n)antennas,remove (e)dc6 surge suppressors,remove (6)(e)diplexes @ equipment.;maher n/aDetails
at&t modification to (e)unmaned telecomm facility: install 3 (n) rrus-32; install (n)dc6 surge suppressor,install (n)dc12 inside,(n) dus 41,(n)2 inner duct,install gps antenna,r&r (e)(e)antennas w/5(n)antennas,remove (e)dc6 surge suppressors,remove (6)(e)diplexes @ equipment.;maher n/a | $22,000 |
| Jul 25, 2014 | Never finaled issued Aug 2014, no final | 211 Jefferson St | Douglas J Burrows | install new atm machine | $500 |
| Apr 16, 2014 | Never finaled issued May 2014, no final | 213 Jefferson St | Zion Engineering | replace part of existing storefront refinish floors, new lightin for gallery interior ti. maher 155-13 not requiredDetails
replace part of existing storefront refinish floors, new lightin for gallery interior ti. maher 155-13 not required | $35,000 |
| Jan 9, 2014 | Completed final sign-off Jan 2014 | 2739 Taylor St | Fire Guard Protection Inc. | re-install 2 dry pendent heads back in new walk-in cooler, add 1 pendent head outside new office wall. t.i. pa# 201306179761Details
re-install 2 dry pendent heads back in new walk-in cooler, add 1 pendent head outside new office wall. t.i. pa# 201306179761 | $2,500 |
| Jan 7, 2014 | Completed final sign-off Jan 2014 | 2739 Taylor St | Certified Fire & Safety Co | 1st floor:install of ul 300 hood and duct suppression system. ref app#201306179761Details
1st floor:install of ul 300 hood and duct suppression system. ref app#201306179761 | $3,000 |
| Dec 9, 2013 | Never finaled issued Dec 2013, no final | 229 Jefferson St | Zion Engineering | remove (e) escalator. | $5,000 |
| Oct 30, 2013 | Completed final sign-off Jan 2014 | 2739 Taylor St | Viking Sign Installations | erect an electric projecting double faced direct new signDetails
erect an electric projecting double faced direct new sign | $10,000 |
| Oct 30, 2013 | Completed final sign-off Jan 2014 | 2739 Taylor St | Viking Sign Installations | instllation of 2 3'x3'x7'-6" awningsDetails
instllation of 2 3'x3'x7'-6" awnings | $2,500 |
| Oct 30, 2013 | Never finaled issued Oct 2013, no final | 2739 Taylor St | Viking Sign Installations | erect an electric wall projecting double faced direct new signDetails
erect an electric wall projecting double faced direct new sign | $10,000 |
| Oct 28, 2013 | Completed final sign-off Aug 2022 | 211 Jefferson St | Triton Tower Inc | a modification to an(e)unmanned at&t telecommuinication facility consist of relocate 2(e)at$t antennas,2(e)tma's an(e)rruw, an(e)filter.also adding 1 new antenna,new cable tray also remove&replace(e)travel mats w/new mats. compliance with ordinance no.155-13 not required.Details
a modification to an(e)unmanned at&t telecommuinication facility consist of relocate 2(e)at$t antennas,2(e)tma's an(e)rruw, an(e)filter.also adding 1 new antenna,new cable tray also remove&replace(e)travel mats w/new mats. compliance with ordinance no.155-13 not required. | $10,000 |
| Aug 27, 2013 | Expired or cancelled cancelled Jul 2022 | 211 Jefferson St | Technical Solutions West Llc | a modification of an (e) unmanned telecommunication facility consistin gof adding 2 new 6 port isco filters to an new 19" rack, 2 new 6 port isco filters on a wall in existing at&t equipment room and 1 new 6 port isco filter near antennas at section c, no other scope. no change to rf reportDetails
a modification of an (e) unmanned telecommunication facility consistin gof adding 2 new 6 port isco filters to an new 19" rack, 2 new 6 port isco filters on a wall in existing at&t equipment room and 1 new 6 port isco filter near antennas at section c, no other scope. no change to rf report | $5,000 |
| Aug 14, 2013 | Expired or cancelled cancelled Jan 2026 | 2739 Taylor St | $10,000 | ||
| Jun 17, 2013 | Completed final sign-off Jan 2014 | 2739 Taylor St | Ybj Construction Services | change ownership from burger king to jack in the box, new interior walls on each side of (e) counter. signage under separate permit. dining rm-remove & replace furniture & art work. no work is stated for 2nd floor. utilitize (e) electrical for new equipment. exterior signage under separate permit.Details
change ownership from burger king to jack in the box, new interior walls on each side of (e) counter. signage under separate permit. dining rm-remove & replace furniture & art work. no work is stated for 2nd floor. utilitize (e) electrical for new equipment. exterior signage under separate permit. | $100,000 |
| Mar 19, 2013 | Completed final sign-off Mar 2013 | 225 Jefferson St | Fire Technologies | change extg upright fire sprinkler to pendent sprinklers to accomodate new ceiling through out space. 16 sprinklers. ref app#201302250854Details
change extg upright fire sprinkler to pendent sprinklers to accomodate new ceiling through out space. 16 sprinklers. ref app#201302250854 | $2,800 |
| Mar 12, 2013 | Expired or cancelled cancelled Mar 2020 | 211 Jefferson St | a modification to an existing unmanned telecomunication facility consisting of a new a t & t antenna and relocating an existing rrh.Details
a modification to an existing unmanned telecomunication facility consisting of a new a t & t antenna and relocating an existing rrh. | $15,000 | |
| Feb 25, 2013 | Never finaled issued Mar 2013, no final | 225 Jefferson St | Zion Engineering | replace extg storefront. door relocation interior t.i. new flooring and lighting at ground floor only.Details
replace extg storefront. door relocation interior t.i. new flooring and lighting at ground floor only. | $60,000 |
| Sep 19, 2012 | Never finaled issued Sep 2012, no final | 211 Jefferson St | to obtain final inspection for work approved under pa# 200601242942. all work is complete.Details
to obtain final inspection for work approved under pa# 200601242942. all work is complete. | ||
| Aug 2, 2012 | Completed final sign-off May 2013 | 211 Jefferson St | Becon Construction Company Inc. | modification including adding one 6601 rbs unite to an (e) 19" rack in the equipment area, adding three remote radio units, four tower mountedamplifiers and hybrid cables for fiber and power.Details
modification including adding one 6601 rbs unite to an (e) 19" rack in the equipment area, adding three remote radio units, four tower mountedamplifiers and hybrid cables for fiber and power. | $15,000 |
| Apr 21, 2011 | Completed final sign-off Apr 2012 | 211 Jefferson St | Cba Site Services Inc. | a modification to an (e) unmanned tele communication facility consisting of adding (3)(n) lte antennas. (6)(n) pros, a (n) splice box, (3)(n) surge suppressors, (n)6601 rbs equipment w an (e)19" equipment rack & (n) innerduct. also removing and replacing an (e) radome with (n) 10'6" radome.Details
a modification to an (e) unmanned tele communication facility consisting of adding (3)(n) lte antennas. (6)(n) pros, a (n) splice box, (3)(n) surge suppressors, (n)6601 rbs equipment w an (e)19" equipment rack & (n) innerduct. also removing and replacing an (e) radome with (n) 10'6" radome. | $72,000 |
| May 18, 2010 | Expired or cancelled withdrawn Oct 2025 | 213 Jefferson St | construct a full service restaurant, include hood and exhaust fan, elec/plumbing work. convert 1/3 of e retail space to a restaurant. install 1 hour rated wall between spaces to divide a spaceinto 2. request address 213 if approvedDetails
construct a full service restaurant, include hood and exhaust fan, elec/plumbing work. convert 1/3 of e retail space to a restaurant. install 1 hour rated wall between spaces to divide a spaceinto 2. request address 213 if approved | $95,000 | |
| Apr 20, 2009 | Completed final sign-off Aug 2009 | 2739 Taylor St | Sac Wireless Inc. | modify (e) telecom facility consisting of adding 6 new runs of 7/8 coax cable inside (e) cable tray. remove & replace (like for like swap) 2 anntennas & install new ret's (remote electronic tilts) as needed.Details
modify (e) telecom facility consisting of adding 6 new runs of 7/8 coax cable inside (e) cable tray. remove & replace (like for like swap) 2 anntennas & install new ret's (remote electronic tilts) as needed. | $5,000 |
| Apr 13, 2009 | Completed final sign-off Apr 2009 | 2739 Taylor St | Santa Rosa Fire Equipment Service Inc. | to obtain final inspecytion for work approved under pa#200610266149. all work has been completed.Details
to obtain final inspecytion for work approved under pa#200610266149. all work has been completed. | |
| Feb 24, 2009 | Completed final sign-off Nov 2009 | 211 Jefferson St | Metropolitan Electrical Construction | to obtain final inspection for work approved under permit #200601242942. all work has been completed.Details
to obtain final inspection for work approved under permit #200601242942. all work has been completed. | |
| Apr 27, 2007 | Expired or cancelled expired Feb 2009 | 229 Jefferson St | renovate (e) storefront, replace flooring & lightingDetails
renovate (e) storefront, replace flooring & lighting | $50,000 | |
| Nov 9, 2006 | Completed final sign-off Feb 2007 | 2739 Taylor St | revision to appl#200605192079 per plan to comply and abate nov#200119102 (dad) & nov#200229190 (bid): provide automatic opener & change restroom door hardware to lever handle.Details
revision to appl#200605192079 per plan to comply and abate nov#200119102 (dad) & nov#200229190 (bid): provide automatic opener & change restroom door hardware to lever handle. | $3,000 | |
| Oct 30, 2006 | Completed final sign-off Feb 2007 | 2739 Taylor St | Ruby Plumbing & Electrical | revision to pa# 2006/07/31/8081 to omit 14 upright fire sprinklers at 2nd floor is no attic space. total fire sprinkler is 87.Details
revision to pa# 2006/07/31/8081 to omit 14 upright fire sprinklers at 2nd floor is no attic space. total fire sprinkler is 87. | |
| Oct 26, 2006 | Expired or cancelled expired Feb 2009 | 2739 Taylor St | Santa Rosa Fire Equipment Service Inc. | re-install hood & duct fire suppression system for burger king restaurant.Details
re-install hood & duct fire suppression system for burger king restaurant. | $4,500 |
| Aug 8, 2006 | Completed final sign-off Feb 2007 | 2739 Taylor St | Ruby Plumbing & Electrical | revision to 200607318081 to remove "underground pipe existing" to change "underground pipe new 4" dultile iron pipe"Details
revision to 200607318081 to remove "underground pipe existing" to change "underground pipe new 4" dultile iron pipe" | |
| Jul 31, 2006 | Completed final sign-off Feb 2007 | 2739 Taylor St | Ruby Plumbing & Electrical | installation fire sprinkler system per nfpa-13 1999. 101 new heads.Details
installation fire sprinkler system per nfpa-13 1999. 101 new heads. | $18,000 |
| Jun 7, 2006 | Never finaled issued Jun 2006, no final | 2739 Taylor St | streetspace | ||
| May 19, 2006 | Completed final sign-off Feb 2007 | 2739 Taylor St | removal existing restaurant & install new kitchen equipment & hood. replace existing front facade, front roof tile. to verify occupancy load.Details
removal existing restaurant & install new kitchen equipment & hood. replace existing front facade, front roof tile. to verify occupancy load. | $200,000 | |
| Jan 24, 2006 | Expired or cancelled expired Oct 2008 | 211 Jefferson St | installation of an unmanned wireless facility. a total of 4 panel antennas and associated equipment cabinets. complaint# 200119102 pad & complaint# 200229190 bid. no penalties due as of 03/30/06 by tv.Details
installation of an unmanned wireless facility. a total of 4 panel antennas and associated equipment cabinets. complaint# 200119102 pad & complaint# 200229190 bid. no penalties due as of 03/30/06 by tv. | $35,000 | |
| May 5, 2005 | Never finaled issued May 2005, no final | 229 Jefferson St | street space | ||
| Apr 7, 2005 | Expired or cancelled expired Oct 2008 | 211 Jefferson St | Siemens Industry, Inc. | additions of smoke/duct detectors, horn strobes, & strobes onto the (e) fire alarm system.Details
additions of smoke/duct detectors, horn strobes, & strobes onto the (e) fire alarm system. | $6,900 |
| Mar 11, 2005 | Completed final sign-off Jun 2005 | 229 Jefferson St | D & S Leong Associates | complete fire sprinkler work as extend existing head to new t bar ceiling (total of 46 heads). workDetails
complete fire sprinkler work as extend existing head to new t bar ceiling (total of 46 heads). work | $5,000 |
| Dec 1, 2004 | Expired or cancelled expired Oct 2008 | 211 Jefferson St | Vintage Fire Protection | relocate 8 and add 23 fire sprinklersDetails
relocate 8 and add 23 fire sprinklers | $4,000 |
| Oct 6, 2004 | Expired or cancelled expired Feb 2009 | 225 Jefferson St | Steven David Dobson | construct a partition wall for electrical equipment - 1st floor. box off mechanical duct on 3rd florDetails
construct a partition wall for electrical equipment - 1st floor. box off mechanical duct on 3rd flor | $50,000 |
| Jul 16, 2003 | Never finaled issued Jul 2003, no final | 225 Jefferson St | Steven David Dobson | add subpanel in 225 and move existing panels for 229 to 229; rev to 200304021297Details
add subpanel in 225 and move existing panels for 229 to 229; rev to 200304021297 | $2,900 |
| Jun 26, 2003 | Expired or cancelled expired Oct 2008 | 211 Jefferson St | Siemens Industry, Inc. | add 3 fsd duct detectors & 1 horn/strobe to approx. 1100 sq.ft. on 1/f. all to be connected to (e)Details
add 3 fsd duct detectors & 1 horn/strobe to approx. 1100 sq.ft. on 1/f. all to be connected to (e) | $2,600 |
| Apr 2, 2003 | Never finaled issued May 2003, no final | 225 Jefferson St | Steven David Dobson | ti on g/f retail space -install cash wraps, hvac, electrical. orig bldg under 211 jefferson).Details
ti on g/f retail space -install cash wraps, hvac, electrical. orig bldg under 211 jefferson). | $90,000 |
| Jan 14, 2003 | Completed final sign-off Apr 2003 | 211 Jefferson St | renew 200111082734,200107304774, 200206259945 f0or final inspectionDetails
renew 200111082734,200107304774, 200206259945 f0or final inspection | ||
| Jan 13, 2003 | Completed final sign-off Apr 2003 | 211 Jefferson St | renew 200106272427, 200110221389, 2001110312219 for final inspectionDetails
renew 200106272427, 200110221389, 2001110312219 for final inspection | ||
| Jan 13, 2003 | Completed final sign-off Mar 2003 | 2739 Taylor St | renew permit for final 200102011105Details
renew permit for final 200102011105 | ||
| Jan 13, 2003 | Completed final sign-off Apr 2003 | 225 Jefferson St | renewal for app 200006223403 for final insDetails
renewal for app 200006223403 for final ins | ||
| Dec 18, 2002 | Completed final sign-off Mar 2003 | 211 Jefferson St | Steven David Dobson | renew permit for final inspection 200203121210,200206219628, 200205247473Details
renew permit for final inspection 200203121210,200206219628, 200205247473 | |
| Dec 18, 2002 | Completed final sign-off Apr 2003 | 211 Jefferson St | Steven David Dobson | renew building permit for final inspection 200205075977Details
renew building permit for final inspection 200205075977 | |
| Dec 18, 2002 | Completed final sign-off Mar 2003 | 211 Jefferson St | Steven David Dobson | renew permits for final inspection 200204083367, 200203080964Details
renew permits for final inspection 200204083367, 200203080964 | |
| Nov 21, 2002 | Never finaled issued Nov 2002, no final | 2739 Taylor St | street space | ||
| Oct 11, 2002 | Never finaled issued Oct 2002, no final | 211 Jefferson St | Steven David Dobson | 1/f-, rev. to appl#200202229808 change location of north-east cashwrapDetails
1/f-, rev. to appl#200202229808 change location of north-east cashwrap | $600 |
| Jun 21, 2002 | Expired or cancelled expired Oct 2002 | 211 Jefferson St | rev. appl#200102081605 3rd floor ceiling planDetails
rev. appl#200102081605 3rd floor ceiling plan | $1,000 | |
| Jun 18, 2002 | Never finaled issued Jun 2002, no final | 211 Jefferson St | street space permit | ||
| May 24, 2002 | Expired or cancelled expired Dec 2002 | 211 Jefferson St | Steven David Dobson | sign | $3,000 |
| May 24, 2002 | Expired or cancelled expired Apr 2003 | 211 Jefferson St | Steven David Dobson | rev to (e)canopy per base bldg plan w/signDetails
rev to (e)canopy per base bldg plan w/sign | $20,000 |
| May 2, 2002 | Expired or cancelled expired Jan 2003 | 211 Jefferson St | Ayoob & Peery Plumbing Co Inc | relocate & add fire sprinkler hds per tiDetails
relocate & add fire sprinkler hds per ti | $1,800 |
| Apr 8, 2002 | Expired or cancelled expired Jan 2003 | 211 Jefferson St | Steven David Dobson | install framing support brackets for 4 air cond units between gridlines 4 & 6.2 and d & e rvsn 20000Details
install framing support brackets for 4 air cond units between gridlines 4 & 6.2 and d & e rvsn 20000 | $8,000 |
| Feb 22, 2002 | Completed final sign-off Mar 2003 | 211 Jefferson St | Steven David Dobson | electrical work and hvac, sheet rocking over octagon ceiling, finish floor installation, ti wall panDetails
electrical work and hvac, sheet rocking over octagon ceiling, finish floor installation, ti wall pan | $85,000 |
| Oct 22, 2001 | Expired or cancelled expired Jan 2003 | 211 Jefferson St | rev. disignated construction type from type ii 1 hr. to type iii 1 hr as allowed by cbc, no alterDetails
rev. disignated construction type from type ii 1 hr. to type iii 1 hr as allowed by cbc, no alter | ||
| Jul 30, 2001 | Expired or cancelled expired Jan 2003 | 211 Jefferson St | Siemens Industry, Inc. | new 3 story bldg w/future tenant remodels, this permit is for the new fire alarm systemDetails
new 3 story bldg w/future tenant remodels, this permit is for the new fire alarm system | $15,400 |
| Jul 30, 2001 | Expired or cancelled expired Nov 2001 | 2739 Taylor St | street space | ||
| Feb 1, 2001 | Expired or cancelled expired Mar 2002 | 2739 Taylor St | provide underpinning per plans | $35,000 | |
| Oct 12, 2000 | Never finaled filed Oct 2000, never issued | 2739 Taylor St | Mc Carthy Building Companies Inc | to demolish fast food building | |
| Jun 22, 2000 | Completed final sign-off Apr 2001 | 211 Jefferson St | Mc Carthy Building Companies Inc | demolish a two story retail structureDetails
demolish a two story retail structure | |
| Jun 22, 2000 | Completed final sign-off Apr 2001 | 2755 Taylor St | Mc Carthy Building Companies Inc | to demolish 1 1/2 story retail bldngDetails
to demolish 1 1/2 story retail bldng | |
| Jun 22, 2000 | Completed final sign-off Apr 2001 | 225 Jefferson St | Mc Carthy Building Companies Inc | to demolish a 2 story warehouseDetails
to demolish a 2 story warehouse | |
| Jun 19, 2000 | Completed final sign-off Apr 2003 | 211 Jefferson St | Mc Carthy Building Companies Inc | to erect retail/restaurantDetails
to erect retail/restaurant | $5,000,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Steven David Dobson (11), Tracy Sign Inc (10), Embree Construction Group Inc (5), Mc Carthy Building Companies Inc (5), Metropolitan Electrical Construction (4), Ruby Plumbing & Electrical (3), Siemens Industry, Inc. (3), Viking Sign Installations (3), Zion Engineering (3), Electric Tech Construction Inc (2), Santa Rosa Fire Equipment Service Inc. (2), Triton Tower Inc (2), Ayoob & Peery Plumbing Co Inc, Becon Construction Company Inc., Cba Site Services Inc., Certified Fire & Safety Co, D & S Leong Associates, Douglas J Burrows, Eagle's General Const Co, Elm Roofing Contractors Inc Dba Element, Ericsson Inc Dba E U S Inc, Fire Guard Protection Inc., Fire Technologies, Rapid Fire Safety & Security Llc, Sac Wireless Inc., Technical Solutions West Llc, Vintage Fire Protection, Ybj Construction Services
- Architects
- Kenneth Mccracken (3), Moshe Dinar (3), Charles Li, James Spore, Jeffrey Liederman, Kevin E Stong
- Engineers
- Srdjan Rebraca (4), Tomas Gajic (4), James Spore (3), Wesley S. Cullumber (2), Brett Saunders, Seung Oh, Steve Marquis
- Authorized agents
- Dale Thomson
- Designers
- James Spore
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.