Embree Construction Group Inc
- Based in
- Georgetown
- On San Francisco permits
- Sep 2017 to Apr 2026
- Last 24 months
- 7 permits filed
11 permits since 2000: 4 completed, 5 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2026 | In progress issued May 2026 | 211 Jefferson St | revision to 202412176961, outline s the design revisions to door and storefront modificiations, existing door was removed and replaced, delta a changesDetails
revision to 202412176961, outline s the design revisions to door and storefront modificiations, existing door was removed and replaced, delta a changes | $7,000 |
| Jan 5, 2026 | In progress issued Mar 2026 | 211 Jefferson St | reference to pa#202412176961, owner reflected exterior and interior changes.Details
reference to pa#202412176961, owner reflected exterior and interior changes. | $50,000 |
| Jan 2, 2026 | In progress issued Jan 2026 | 211 Jefferson St | barricade for construction ref pa #2024-1217-6961Details
barricade for construction ref pa #2024-1217-6961 | |
| Oct 21, 2025 | In progress issued Jan 2026 | 211 Jefferson St | 1/f -to include the construction of non bearing partitions that was graphically shown on permitted drawings but not detailed theirin. to perform mech and elec work in this adjacent tenant space (art gallery) necessitated by the previously permitted work.Details
1/f -to include the construction of non bearing partitions that was graphically shown on permitted drawings but not detailed theirin. to perform mech and elec work in this adjacent tenant space (art gallery) necessitated by the previously permitted work. | $100,000 |
| Aug 1, 2025 | Completed final sign-off Aug 2025 | 2066 Chestnut St | deferred electrical and lighting. ref pa #202505277256.Details
deferred electrical and lighting. ref pa #202505277256. | $10,000 |
| May 27, 2025 | Completed final sign-off Aug 2025 | 2066 Chestnut St | interior t.i. of demised space for retail. new partitions, finishes and fixtures. no mechanical, no plumbing, no exterior work. no changes in use. electrical under seperate permit.Details
interior t.i. of demised space for retail. new partitions, finishes and fixtures. no mechanical, no plumbing, no exterior work. no changes in use. electrical under seperate permit. | $188 |
| May 12, 2025 | In progress issued Nov 2025 | 211 Jefferson St | change of use a3 to a2 occupancy-partial demo, renovation and conversion of 1st floor of (e) 3 story building from gallery to restaurant. (n) work includes remodel of 1st floor, mep work, minor structural scope, minor exterior storefront and utility improvementsDetails
change of use a3 to a2 occupancy-partial demo, renovation and conversion of 1st floor of (e) 3 story building from gallery to restaurant. (n) work includes remodel of 1st floor, mep work, minor structural scope, minor exterior storefront and utility improvements | $6,000,000 |
| Sep 5, 2018 | Never finaled issued Jul 2019, no final | 3 Embarcadero Center | unit #3111a: shoe rack permit: removing extg furniture and installing new freestanding fixture being bolted into the ground. just a curved fixture being added. 300 sqftDetails
unit #3111a: shoe rack permit: removing extg furniture and installing new freestanding fixture being bolted into the ground. just a curved fixture being added. 300 sqft | $2,000 |
| Feb 7, 2018 | Completed final sign-off May 2018 | 2630 Mission St | revision to 201710100775 - elevator framimg from fire rated to regular pine boardsDetails
revision to 201710100775 - elevator framimg from fire rated to regular pine boards | |
| Oct 10, 2017 | Completed final sign-off May 2018 | 2630 Mission St | construction and installation of elevator & shaft between basemant & 1st floor of existing building. change of use from retail to dental clinic under permit #2017-1010-0775.Details
construction and installation of elevator & shaft between basemant & 1st floor of existing building. change of use from retail to dental clinic under permit #2017-1010-0775. | $80,000 |
| Sep 21, 2017 | Never finaled issued Dec 2017, no final | 2630 Mission St | demo and removal of existing interior finish out elements. per ab-017 no change of us under separate permit.Details
demo and removal of existing interior finish out elements. per ab-017 no change of us under separate permit. | $8,000 |