Donald Hodson
- License
- C78817
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C78817 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Langan
- Based in
- San Francisco
- On San Francisco permits
- Nov 2013 to Jan 2026
14 permits since 2000 (engineer on 11 permits, architect on 3 permits): 5 completed, 1 in progress, 1 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Lennar Homes Of California Inc. (2), Build Group Inc., Devcon Construction, Preston Pipelines Infrastructure Llc., Sabah International Incorporated, Suffolk Constr Co. Inc. Dba Suffolk-Roel, Swinerton Builders
- Architects
- Veronica Reck (5), Clifton K. Boswell, Michael Stanton
- Engineers
- Christopher Kent (5), Alan Robinson, Brice Casebeer, Mark Robison, Mark Robison, Paul Kenneth Zacher
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 8
- Commercial 2
- Other or unknown 4
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 14 have no building type on record and are shown as other.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 29, 2026 | In progress issued Feb 2026 | 449 Avenue H | Preston Pipelines Infrastructure Llc. | fire service underground for future professional soccer training facility. ref bpa: 202509034495Details
fire service underground for future professional soccer training facility. ref bpa: 202509034495 | $6,000 |
| Oct 6, 2025 | Completed final sign-off Apr 2026 | 449 Avenue H | Devcon Construction | treasure island. rough grading to excavate approx 20,000 cubic yard of soil & transport material to dumpsite @ 4th st/avenue h locate 1/4 mile se. depth of excavation varies from 0.1 to 5.7'. additionally 5,000 cubic yard of soil (depths rang from 0.1 to 5.6') will be placed as compact fill.Details
treasure island. rough grading to excavate approx 20,000 cubic yard of soil & transport material to dumpsite @ 4th st/avenue h locate 1/4 mile se. depth of excavation varies from 0.1 to 5.7'. additionally 5,000 cubic yard of soil (depths rang from 0.1 to 5.6') will be placed as compact fill. | $560,000 |
| Sep 29, 2022 | Expired or cancelled withdrawn May 2023 | 851 California St | configuration of ground fl, public spaces, & guestrooms. individual bathrooms will be added to each guestroom. egress will be updated to include 2 code-compliant stairs & elevator with roof access to new roof deck. remove (e) exterior fire escapes & stairs. accessible, seismic, structural & mepf.Details
configuration of ground fl, public spaces, & guestrooms. individual bathrooms will be added to each guestroom. egress will be updated to include 2 code-compliant stairs & elevator with roof access to new roof deck. remove (e) exterior fire escapes & stairs. accessible, seismic, structural & mepf. | $7,500,000 | |
| Feb 13, 2020 | Completed final sign-off Apr 2025 | 52 Kirkwood Av | Lennar Homes Of California Inc. | mayor dir# 17-02. to erect a one story type five construction fitness center. ** maher: yes, route to dph **Details
mayor dir# 17-02. to erect a one story type five construction fitness center. ** maher: yes, route to dph ** | $7,500 |
| Oct 3, 2019 | Completed final sign-off Apr 2025 | 52 Kirkwood Av | Sabah International Incorporated, Lennar Homes Of California Inc. | mayor dir# 17-02. to erect 4 stories, no basement, type i-a & type v-a, 77 units residential condominiums with mixed use building. (r-2,b,a-3,s-2) ** maher: yes, route to dph **Details
mayor dir# 17-02. to erect 4 stories, no basement, type i-a & type v-a, 77 units residential condominiums with mixed use building. (r-2,b,a-3,s-2) ** maher: yes, route to dph ** | $25,378,500 |
| Sep 5, 2019 | Never finaled issued Dec 2022, no final | 350 02nd St | to erect a type 1-a, 14 story with one basement, 299 unit hotel, restaurant/bar and parking.Details
to erect a type 1-a, 14 story with one basement, 299 unit hotel, restaurant/bar and parking. | $90,000,000 | |
| Dec 4, 2017 | Completed final sign-off May 2020 | 770 Powell St | Swinerton Builders | no grading & excavation. clean up site by removing existing asphalt, steps, signs and gates within property line. not included in demo permit 2016-1005-9636. issuance of permit pending approval & issuance of site permit 2016-0309-1627Details
no grading & excavation. clean up site by removing existing asphalt, steps, signs and gates within property line. not included in demo permit 2016-1005-9636. issuance of permit pending approval & issuance of site permit 2016-0309-1627 | $700 |
| Jun 27, 2014 | Expired or cancelled withdrawn Dec 2016 | 11 Jerrold Av | building# 2. to erect 3 stories, no basement, 9 residential units building.Details
building# 2. to erect 3 stories, no basement, 9 residential units building. | $3,657,807 | |
| Jun 27, 2014 | Expired or cancelled withdrawn Dec 2016 | 11 Jerrold Av | building# 5. to erect 5 stories, 1 basement, 38 residential units building.Details
building# 5. to erect 5 stories, 1 basement, 38 residential units building. | $15,575,972 | |
| Jun 27, 2014 | Expired or cancelled withdrawn Jan 2017 | 300 Avocet Wy | building# 3. to erect 3 stories, no basement, 9 residential units building.Details
building# 3. to erect 3 stories, no basement, 9 residential units building. | $4,258,053 | |
| Jun 27, 2014 | Expired or cancelled withdrawn Dec 2016 | 11 Jerrold Av | building# 1. to erect 3 stories, no basement, 9 residential units building.Details
building# 1. to erect 3 stories, no basement, 9 residential units building. | $3,657,807 | |
| Jun 27, 2014 | Expired or cancelled withdrawn Dec 2016 | 301 Avocet Wy | building# 4. to erect 3 stories, no basement, 9 residential units building.Details
building# 4. to erect 3 stories, no basement, 9 residential units building. | $4,258,053 | |
| Jun 23, 2014 | Completed final sign-off Dec 2020 | 2000 Bryant St | Build Group Inc. | erect 6-story, no basemeny, type 3a over 1a, 194 dwelling units residential/retail building (r-2, m, b, s-2). comply maher ord #155-13.Details
erect 6-story, no basemeny, type 3a over 1a, 194 dwelling units residential/retail building (r-2, m, b, s-2). comply maher ord #155-13. | $50,000,000 |
| Nov 14, 2013 | Expired or cancelled withdrawn Apr 2014 | 350 Fremont St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | demolish 3 story commercial & residential building. | $110,000 |