Block 0305, lot 009
550 Geary St
- City’s use
- Commercial Hotel
- Built
- 1929
- Stories
- 15
- Units
- 171
- Rooms
- 173 bathrooms
- Building
- 94,854 sq ft
- Lot
- 7,688 sq ft
- Zoning
- RC4
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
34 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 2, 2022 | Completed final sign-off Aug 2022 | 550 Geary St | Continental Contractors Inc | interior remodel of hotel public spaces on level 1 and 2. specific work includes new flooring, removal and addition of select doors and new built in cabinets. level 2 work is in (e) fitness center. level 1 work in (e) lounge, breakfast room and meeting room.Details
interior remodel of hotel public spaces on level 1 and 2. specific work includes new flooring, removal and addition of select doors and new built in cabinets. level 2 work is in (e) fitness center. level 1 work in (e) lounge, breakfast room and meeting room. | $120,000 |
| Jan 14, 2022 | Completed final sign-off Jun 2022 | 550 Geary St | Continental Contractors Inc | select work in 129 guestroom bathrooms. rooms in scope will feature a tub to shower conversion, including new tile & fixtures. fire life safety under separate permit. no exterior work.Details
select work in 129 guestroom bathrooms. rooms in scope will feature a tub to shower conversion, including new tile & fixtures. fire life safety under separate permit. no exterior work. | $150,000 |
| Dec 2, 2021 | Completed final sign-off Jun 2022 | 550 Geary St | Continental Contractors Inc | barrier removal permit: addiion of eight communication feature in (e) rooms. no exterior work. fire life safety under separated permit.Details
barrier removal permit: addiion of eight communication feature in (e) rooms. no exterior work. fire life safety under separated permit. | $30,000 |
| Feb 24, 2015 | Never finaled issued Feb 2015, no final | 550 Geary St | street spaceDetails
street space | ||
| Jan 26, 2015 | Never finaled issued Jan 2015, no final | 550 Geary St | street spaceDetails
street space | ||
| Dec 29, 2014 | Never finaled issued Dec 2014, no final | 550 Geary St | street space permitDetails
street space permit | ||
| Nov 21, 2014 | Never finaled issued Nov 2014, no final | 550 Geary St | street spaceDetails
street space | ||
| Oct 17, 2014 | Never finaled issued Oct 2014, no final | 550 Geary St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Sep 18, 2014 | Never finaled issued Sep 2014, no final | 550 Geary St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Feb 4, 2013 | Never finaled issued Mar 2013, no final | 550 Geary St | Fire Detection Unlimited | this is a voluntary upgrade of the (e) fire alarm tone to voice evacuation fire alarm system based on a2, b, and r-1 occupancies. ref pa# 2013/01/18/8266.Details
this is a voluntary upgrade of the (e) fire alarm tone to voice evacuation fire alarm system based on a2, b, and r-1 occupancies. ref pa# 2013/01/18/8266. | $114,540 |
| Jan 18, 2013 | Completed final sign-off Apr 2013 | 550 Geary St | Precision Hotel Interiors Inc | project proposes construction of partitions(rated and non rated) on the basement and second floor, and pressurization of extg stairwell (voluntary)Details
project proposes construction of partitions(rated and non rated) on the basement and second floor, and pressurization of extg stairwell (voluntary) | $23,632 |
| Sep 13, 2012 | Never finaled issued Sep 2012, no final | 550 Geary St | Signs America Inc Dba Sign A Rama | erect an electric double face projecting replacement signDetails
erect an electric double face projecting replacement sign | $3,800 |
| Jun 7, 2012 | Never finaled issued Jun 2012, no final | 550 Geary St | Fire Detection Unlimited | first floor restaurant - addition of (4) new smoke detectors & relocation of (5) exisitng fire alarm devices on an existing fci e3 fire alarm system. revision to fire alarm work done under 201205090066Details
first floor restaurant - addition of (4) new smoke detectors & relocation of (5) exisitng fire alarm devices on an existing fci e3 fire alarm system. revision to fire alarm work done under 201205090066 | $12,598 |
| May 9, 2012 | Completed final sign-off Jul 2012 | 550 Geary St | Fire Detection Unlimited | addition of 2 new smoke detectors and relocation of 9 extg fire alarm devices on an extg fci e3 fire alarm system. first floor lobby and restaurant.Details
addition of 2 new smoke detectors and relocation of 9 extg fire alarm devices on an extg fci e3 fire alarm system. first floor lobby and restaurant. | $12,598 |
| May 1, 2012 | Never finaled issued May 2012, no final | 550 Geary St | Simplexgrinnell Lp. | add 4-new fire sprinklers, demo 3-each fire sprinklers & relocate 7-each fire sprinklers per new tenant improvement plan.Details
add 4-new fire sprinklers, demo 3-each fire sprinklers & relocate 7-each fire sprinklers per new tenant improvement plan. | $7,500 |
| Feb 8, 2012 | Never finaled issued Mar 2012, no final | 550 Geary St | Precision Hotel Interiors Inc | interior remodel of (e) bar, (e) restrooms & (e) hotel lobby with (n) finishes throughout.Details
interior remodel of (e) bar, (e) restrooms & (e) hotel lobby with (n) finishes throughout. | $900,000 |
| Jan 17, 2012 | Never finaled issued Mar 2012, no final | 550 Geary St | Precision Hotel Interiors Inc | removal and replacement of extg wall and floor finishes in guest rooms and corridors on floors 2016. project to include minor alterations to extg accessible guest room suites to comply with current code requirements.Details
removal and replacement of extg wall and floor finishes in guest rooms and corridors on floors 2016. project to include minor alterations to extg accessible guest room suites to comply with current code requirements. | $400,000 |
| Dec 22, 2011 | Never finaled issued Mar 2012, no final | 550 Geary St | Precision Hotel Interiors Inc | installation of a new chiller system and 4 pipe fan coils.Details
installation of a new chiller system and 4 pipe fan coils. | $140,000 |
| Dec 13, 2011 | Never finaled issued Mar 2012, no final | 550 Geary St | Precision Hotel Interiors Inc | demo 6 satellite dishes and install new mechanical platform and mechanical screen on roof for new chiller that is installed under separate application. also, install electrical service for chiller that is install under separate applicationDetails
demo 6 satellite dishes and install new mechanical platform and mechanical screen on roof for new chiller that is installed under separate application. also, install electrical service for chiller that is install under separate application | $250,000 |
| Mar 19, 2009 | Completed final sign-off Mar 2009 | 550 Geary St | compliance w/ the high-rise sprinkler, ordinance #377-93, no work. 16 stories, 1 basement.Details
compliance w/ the high-rise sprinkler, ordinance #377-93, no work. 16 stories, 1 basement. | ||
| Aug 24, 2007 | Completed final sign-off Jun 2008 | 550 Geary St | Narrowback Construction Co. | new sidewalk canopy at main entranceDetails
new sidewalk canopy at main entrance | $60,000 |
| Jun 13, 2005 | Completed final sign-off Jan 2006 | 550 Geary St | Metal Air Systems | demo & replace hvac equipment on lower roof, add new sound attenuators to reduck ambient noise,.Details
demo & replace hvac equipment on lower roof, add new sound attenuators to reduck ambient noise,. | $50,000 |
| Apr 13, 2005 | Expired or cancelled cancelled Nov 2007 | 550 Geary St | install mech penthouse to enclose mech equip at 2/fl lower roof level.comprise 6 stru steel columns&Details
install mech penthouse to enclose mech equip at 2/fl lower roof level.comprise 6 stru steel columns& | $25,500 | |
| Nov 17, 2003 | Expired or cancelled cancelled Nov 2005 | 550 Geary St | install (n) mechanical penthouse at mezz level w/(n) acoustical panels. penthouse to encase & reduceDetails
install (n) mechanical penthouse at mezz level w/(n) acoustical panels. penthouse to encase & reduce | $50,000 | |
| Sep 8, 2003 | Completed final sign-off Nov 2003 | 550 Geary St | Arrow Sign Company | erect signDetails
erect sign | |
| Jun 6, 2003 | Completed final sign-off Aug 2003 | 550 Geary St | Howard S Wright Construction Co. | revision to clarify exit path at (e) stair #2, (n) 2hr rated wall at west property line, (e) employeDetails
revision to clarify exit path at (e) stair #2, (n) 2hr rated wall at west property line, (e) employe | |
| May 30, 2003 | Completed final sign-off Aug 2003 | 550 Geary St | Arrow Sign Company | to erect single face electric wall signDetails
to erect single face electric wall sign | |
| Apr 30, 2003 | Completed final sign-off Aug 2003 | 550 Geary St | Howard S Wright Construction Co. | sprinkler work as required per application 200211010584 sprinkler building per sbo ordinate 170-02Details
sprinkler work as required per application 200211010584 sprinkler building per sbo ordinate 170-02 | $50,000 |
| Apr 23, 2003 | Completed final sign-off Aug 2003 | 550 Geary St | build out of (e)restaurant space. work includes new finishes throughout, new lighting, new bar,Details
build out of (e)restaurant space. work includes new finishes throughout, new lighting, new bar, | $200,000 | |
| Apr 18, 2003 | Completed final sign-off Aug 2003 | 550 Geary St | Fire Detection Unlimited | new life safety system with smoke detection and ada signaling throughoutDetails
new life safety system with smoke detection and ada signaling throughout | $225,000 |
| Mar 13, 2003 | Completed final sign-off Nov 2003 | 550 Geary St | application for use of power door operatorsDetails
application for use of power door operators | $3,000 | |
| Jan 16, 2003 | Completed final sign-off Aug 2003 | 550 Geary St | Howard S Wright Construction Co. | non structural & selective demo at lobby & basement &2,3,4,5,6,7,8,9,10,11,12,14,15,16 flr levels;Details
non structural & selective demo at lobby & basement &2,3,4,5,6,7,8,9,10,11,12,14,15,16 flr levels; | $20,000 |
| Mar 30, 2001 | Expired or cancelled expired Jan 2003 | 550 Geary St | Mountain Bay Construction | install sprinkler at 16th floor as show & move hallway main & change hallway headDetails
install sprinkler at 16th floor as show & move hallway main & change hallway head | $42,000 |
| Feb 13, 2001 | Expired or cancelled expired Jan 2003 | 550 Geary St | install sprinklers @2-16th floors & move sprinkler main from hallways into roomsDetails
install sprinklers @2-16th floors & move sprinkler main from hallways into rooms | $42,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Precision Hotel Interiors Inc (5), Fire Detection Unlimited (4), Continental Contractors Inc (3), Howard S Wright Construction Co. (3), Arrow Sign Company (2), Metal Air Systems, Mountain Bay Construction, Narrowback Construction Co., Signs America Inc Dba Sign A Rama, Simplexgrinnell Lp.
- Architects
- Michael Stanton (3), Brian Milford, Bruce David Bradsby & Assoc, Harvey Hacker
- Engineers
- Mark Robison