Block 0199, lot 022
155 Jackson St
- City’s use
- Multi-Family Residential
- Built
- 1965
- Stories
- 25
- Units
- 378
- Rooms
- 452 bathrooms
- Lot
- 75,624 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
198 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit#: 1107; rehabiltate existing kitchen and bathroom install washer and dryer. no removal of structural walls.Details
unit#: 1107; rehabiltate existing kitchen and bathroom install washer and dryer. no removal of structural walls. | $100,000 |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 405 Davis Ct | General Air Technology | install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roofDetails
install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roof | $40,000 |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 155 Jackson St | General Air Technology | install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roofDetails
install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roof | $40,000 |
| Aug 5, 2026 | Completed final sign-off Sep 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1205: one kitchen and one bathroom remodel in kind, new fixtures, new counter tops, new flooring. no tub to shower conversions.Details
unit 1205: one kitchen and one bathroom remodel in kind, new fixtures, new counter tops, new flooring. no tub to shower conversions. | $64,000 |
| Aug 3, 2026 | Completed final sign-off Sep 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1501: one kitchen and one bathroom rmodel in kind, no tub conversions, new fixtures, new counter tops, new flooring, update plumbing and electrical.Details
unit 1501: one kitchen and one bathroom rmodel in kind, no tub conversions, new fixtures, new counter tops, new flooring, update plumbing and electrical. | $64,000 |
| Jul 21, 2026 | Completed final sign-off Jul 2026 | 155 Jackson St | Giampolini & Co Dba Giampolini/Courtney | concrete patching, crack repairs at exterior walls. patching will be completed at different levels of exterior bldg elevations. front of bldg, street facing.Details
concrete patching, crack repairs at exterior walls. patching will be completed at different levels of exterior bldg elevations. front of bldg, street facing. | $139,805 |
| Jul 20, 2026 | Completed final sign-off Sep 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1807- remodel (e) kitchen and (2) bathrooms. no removal of structural walls. install washer and dryer.Details
unit 1807- remodel (e) kitchen and (2) bathrooms. no removal of structural walls. install washer and dryer. | $60,000 |
| Jul 14, 2026 | Completed final sign-off Aug 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #2102: (1) kitchen, (1) bathroom remodel in kind, like for like. kitchen approximately 80sf, bathroom approximaltey 41sf.Details
unit #2102: (1) kitchen, (1) bathroom remodel in kind, like for like. kitchen approximately 80sf, bathroom approximaltey 41sf. | $60,000 |
| Jul 14, 2026 | Completed final sign-off Aug 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1104: (1) kitchen, (1) bathroom remodel in kind, like for like. kitchen approximately 80sf, bathroom approximaltey 41sf.Details
unit #1104: (1) kitchen, (1) bathroom remodel in kind, like for like. kitchen approximately 80sf, bathroom approximaltey 41sf. | $60,000 |
| Jun 23, 2026 | Completed final sign-off Jul 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1705: one kitchen and 1 bathroom remodel like for like.Details
unit 1705: one kitchen and 1 bathroom remodel like for like. | $60,000 |
| Jun 23, 2026 | Completed final sign-off Jul 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1105: one kitchen, one bathroom remodel in-kind; like for like.Details
unit 1105: one kitchen, one bathroom remodel in-kind; like for like. | $60,000 |
| Jun 4, 2026 | Completed final sign-off Aug 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 301: rehabilitate e kitchen and bathroom. replace existing washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements.Details
unit 301: rehabilitate e kitchen and bathroom. replace existing washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements. | $60,000 |
| May 28, 2026 | Completed final sign-off Jun 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1001: (1) kitchen, (1) bathroom remodel in kind, like for like.Details
unit #1001: (1) kitchen, (1) bathroom remodel in kind, like for like. | $60,000 |
| May 28, 2026 | Completed final sign-off Jun 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 2302: one kitchen and one bathroom remodel in kind, like for like.Details
unit 2302: one kitchen and one bathroom remodel in kind, like for like. | $60,000 |
| May 28, 2026 | Completed final sign-off Jul 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1907: rehabilitate (e) kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into (e) concrete elements.Details
unit 1907: rehabilitate (e) kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into (e) concrete elements. | $60,000 |
| May 19, 2026 | Completed final sign-off Jul 2026 | 405 Davis Ct | Giampolini & Co Dba Giampolini/Courtney | survery concrete patching and crack repairs at exterior walls and balconies. patching will be compelted at different levels of to exterior building elevationDetails
survery concrete patching and crack repairs at exterior walls and balconies. patching will be compelted at different levels of to exterior building elevation | $46,779 |
| Apr 28, 2026 | Completed final sign-off Jun 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: 2208. one kitchen one bathroom remodel in kind like for like.Details
unit#: 2208. one kitchen one bathroom remodel in kind like for like. | $60,000 |
| Apr 20, 2026 | In progress issued Sep 2026 | 405 Davis Ct | City Building Inc. | (leverl 1) t.i. includes interior re-finished of (e) residential tower main lobby. no change in use occupancy, occ. load or egress. replace in kind new front entry doors, new floor vocering and wall finishes. all new or revised mep's and life safety work will be design build and submited separately.Details
(leverl 1) t.i. includes interior re-finished of (e) residential tower main lobby. no change in use occupancy, occ. load or egress. replace in kind new front entry doors, new floor vocering and wall finishes. all new or revised mep's and life safety work will be design build and submited separately. | $340,000 |
| Apr 9, 2026 | Completed final sign-off May 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | #304: revision to pa#202602176000: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.Details
#304: revision to pa#202602176000: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. | $60,000 |
| Mar 10, 2026 | Completed final sign-off May 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #1504: one bathroom one kitchen remodel in kind like for like.Details
unit #1504: one bathroom one kitchen remodel in kind like for like. | $60,000 |
| Mar 10, 2026 | Completed final sign-off Apr 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #605: one bathroom one kitchen remodel in kind like for like.Details
unit #605: one bathroom one kitchen remodel in kind like for like. | $60,000 |
| Mar 5, 2026 | Completed final sign-off Apr 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1805: one kitchen and bathroom remodel like for like.Details
unit 1805: one kitchen and bathroom remodel like for like. | $60,000 |
| Feb 17, 2026 | In progress issued Feb 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #304: one kitchen, one bathroom. remodel in kind like for like.Details
unit #304: one kitchen, one bathroom. remodel in kind like for like. | $60,000 |
| Feb 17, 2026 | Completed final sign-off Apr 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #702: one kitchen, one bathroom. remodel in kind like for like.Details
unit #702: one kitchen, one bathroom. remodel in kind like for like. | $60,000 |
| Feb 12, 2026 | Completed final sign-off Jul 2026 | 405 Davis Ct | Pribuss Engineering Inc | demo existing sprinkler heads for removal of trash chute. repipe new supply for sprinklers in new trash chute on floors 3,5,7,9,11,13,15,17,19,21,23,25. sprinklers provied by trash chute contractor. (total heads 12) ref 2025-1126-0572Details
demo existing sprinkler heads for removal of trash chute. repipe new supply for sprinklers in new trash chute on floors 3,5,7,9,11,13,15,17,19,21,23,25. sprinklers provied by trash chute contractor. (total heads 12) ref 2025-1126-0572 | $12,600 |
| Jan 29, 2026 | Completed final sign-off Apr 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #2302: (1) kitchen, (1) bathroom remodel in kind, like for like.Details
unit #2302: (1) kitchen, (1) bathroom remodel in kind, like for like. | $60,000 |
| Jan 26, 2026 | Completed final sign-off Apr 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1007 - one kitchen, one bathroom remodel in kind, like for like.Details
unit #1007 - one kitchen, one bathroom remodel in kind, like for like. | $60,000 |
| Jan 26, 2026 | Completed final sign-off Apr 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #1802 - one kitchen, one bathroom remodel in kind, like for like.Details
unit #1802 - one kitchen, one bathroom remodel in kind, like for like. | $60,000 |
| Jan 6, 2026 | Completed final sign-off Feb 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 503: rehabilitate existing kitchen and bath. no removal of structural walls. install washer and dryer.Details
unit 503: rehabilitate existing kitchen and bath. no removal of structural walls. install washer and dryer. | $60,000 |
| Dec 18, 2025 | Completed final sign-off Mar 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #602: one kitchen, one bathroom. remodel in kind like for like.Details
unit #602: one kitchen, one bathroom. remodel in kind like for like. | $20,000 |
| Dec 18, 2025 | Completed final sign-off Mar 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1102: one kitchen, one bathroom remodel in kind like for like.Details
unit #1102: one kitchen, one bathroom remodel in kind like for like. | $60,000 |
| Dec 18, 2025 | Completed final sign-off Mar 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1301: (1) kitchen, (1) bathroom remodel in kind, like for like.Details
unit #1301: (1) kitchen, (1) bathroom remodel in kind, like for like. | $20,000 |
| Dec 18, 2025 | Completed final sign-off Mar 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #702: one kitchen, one bathroom. remodel in kind like for like.Details
unit #702: one kitchen, one bathroom. remodel in kind like for like. | $20,000 |
| Dec 11, 2025 | Completed final sign-off Mar 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1002; one kitchen, one bathroom remodel in kind like for like.Details
unit 1002; one kitchen, one bathroom remodel in kind like for like. | $60,000 |
| Dec 10, 2025 | Completed final sign-off Feb 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#604: rehabilitate existing kitchen and bathroom. no removal or structural wallsDetails
unit#604: rehabilitate existing kitchen and bathroom. no removal or structural walls | $60,000 |
| Dec 4, 2025 | Completed final sign-off Feb 2026 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #802: swap plumbing, electrical & finishes like for like. one kitchen and one bath remodel like for like.Details
unit #802: swap plumbing, electrical & finishes like for like. one kitchen and one bath remodel like for like. | $800 |
| Dec 2, 2025 | Completed final sign-off Jan 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit#: 2408. rehabilitate existing kitchen and bathroom. no removal of structrual walls.Details
unit#: 2408. rehabilitate existing kitchen and bathroom. no removal of structrual walls. | $60,000 |
| Nov 26, 2025 | Completed final sign-off Aug 2026 | 405 Davis Ct | C B 2 Builders Incorporated | maintenance and repair-replace existing trash chute with new discharge door and chute from basement through roof. remove and replace non-structural partitions with new rated partitions. no structural improvements, no increase in building area or conditioned spaceDetails
maintenance and repair-replace existing trash chute with new discharge door and chute from basement through roof. remove and replace non-structural partitions with new rated partitions. no structural improvements, no increase in building area or conditioned space | $200,000 |
| Nov 24, 2025 | In progress issued Dec 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: 2008. rehabilitate existing kitchen and bathroom. no removal of structrual walls.Details
unit#: 2008. rehabilitate existing kitchen and bathroom. no removal of structrual walls. | $60,000 |
| Nov 4, 2025 | Completed final sign-off Jan 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | #705: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
#705: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 4, 2025 | Completed final sign-off Jan 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | #1703: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.Details
#1703: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. | $60,000 |
| Nov 4, 2025 | Completed final sign-off Jan 2026 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | #506: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
#506: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Sep 23, 2025 | Completed final sign-off Nov 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1602: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1602: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Sep 18, 2025 | Completed final sign-off Nov 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2304; rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 2304; rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Sep 18, 2025 | Completed final sign-off Nov 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1105; rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1105; rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Sep 18, 2025 | Completed final sign-off Nov 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2205; rehabitate existing kitchen and bathroom. no removal of structural walls.Details
unit 2205; rehabitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Sep 9, 2025 | Completed final sign-off Oct 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 1605: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit# 1605: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Sep 9, 2025 | Completed final sign-off Oct 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 2408: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit# 2408: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Aug 26, 2025 | Completed final sign-off Oct 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #1405: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit #1405: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $60,000 |
| Aug 26, 2025 | Completed final sign-off Oct 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #1007: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit #1007: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $60,000 |
| Aug 12, 2025 | Completed final sign-off Oct 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1803 - remodel (e) kitchen and bathroom. no removal of structural walls. install washer and dryerDetails
unit 1803 - remodel (e) kitchen and bathroom. no removal of structural walls. install washer and dryer | $60,000 |
| Aug 12, 2025 | Completed final sign-off Oct 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1903: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit 1903: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Jul 15, 2025 | Completed final sign-off Sep 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 806 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 806 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Jul 1, 2025 | Completed final sign-off Sep 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #25: rehabilitate existing kitchen and bathroom. no removal of structural walls. replace existing washer and dryer.Details
unit #25: rehabilitate existing kitchen and bathroom. no removal of structural walls. replace existing washer and dryer. | $60,000 |
| Jun 12, 2025 | Completed final sign-off Sep 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2403; rehabilitate exisintg kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit 2403; rehabilitate exisintg kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Jun 3, 2025 | Completed final sign-off Aug 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #1607: rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #1607: rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Jun 3, 2025 | Completed final sign-off Aug 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #1701: rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #1701: rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Apr 15, 2025 | Completed final sign-off Jul 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #1507 rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #1507 rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Apr 10, 2025 | Completed final sign-off Oct 2025 | 155 Jackson St | Lynn Safety Inc. | installing rooftop equipment for exterior building maintenaceDetails
installing rooftop equipment for exterior building maintenace | $47,569 |
| Apr 10, 2025 | Completed final sign-off Jun 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1201- remodel (e) kitchen and bathroom. no removal of structrual wallsDetails
unit 1201- remodel (e) kitchen and bathroom. no removal of structrual walls | $60,000 |
| Apr 10, 2025 | Completed final sign-off Oct 2025 | 405 Davis Ct | Lynn Safety Inc. | installing rooftop equipment for exterior building maintenanceDetails
installing rooftop equipment for exterior building maintenance | $47,882 |
| Apr 7, 2025 | Completed final sign-off May 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #803: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit #803: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Apr 1, 2025 | Completed final sign-off Jun 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 2307: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 2307: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Apr 1, 2025 | Completed final sign-off Jun 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 2208: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 2208: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Mar 20, 2025 | Completed final sign-off May 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1504: rehabilitate (e) kitchen & bathroom. no removal of structural walls, no change in plumbing fixture count.Details
unit #1504: rehabilitate (e) kitchen & bathroom. no removal of structural walls, no change in plumbing fixture count. | $60,000 |
| Mar 20, 2025 | In progress issued Mar 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #808: rehabilitate (e) kitchen & bathroom. no removal of structural walls, no change in plumbing fixture count.ccDetails
unit #808: rehabilitate (e) kitchen & bathroom. no removal of structural walls, no change in plumbing fixture count.cc | $60,000 |
| Mar 13, 2025 | Completed final sign-off May 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1801 - rehabilitate existing kitchen and bathroom; no removal of structural wallsDetails
unit 1801 - rehabilitate existing kitchen and bathroom; no removal of structural walls | $60,000 |
| Feb 27, 2025 | Completed final sign-off Apr 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2306: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 2306: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Feb 13, 2025 | Completed final sign-off Apr 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1003 - rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer & dryerDetails
unit 1003 - rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer & dryer | $60,000 |
| Jan 16, 2025 | Completed final sign-off Mar 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit#606: rehabilitate (e) kitchen and bathroom no removal of structural wallsDetails
unit#606: rehabilitate (e) kitchen and bathroom no removal of structural walls | $60,000 |
| Dec 3, 2024 | Completed final sign-off Feb 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 2301- remodel (e) kitchen and bathroom. no removal of structural wallsDetails
unit 2301- remodel (e) kitchen and bathroom. no removal of structural walls | $60,000 |
| Dec 3, 2024 | In progress issued Jan 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 17- remodel (e) kitchen and bathroom. no removal of structural walls.replace (e) w&d in kindDetails
unit 17- remodel (e) kitchen and bathroom. no removal of structural walls.replace (e) w&d in kind | $60,000 |
| Nov 21, 2024 | Completed final sign-off Feb 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1306- remodel (e) kitchen and bathjroom . no removal of structrual wallsDetails
unit 1306- remodel (e) kitchen and bathjroom . no removal of structrual walls | $60,000 |
| Nov 19, 2024 | Completed final sign-off Feb 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #1605: rehabilitate (e) kitchen and bathroom no removal of structural wallsDetails
unit #1605: rehabilitate (e) kitchen and bathroom no removal of structural walls | $60,000 |
| Oct 31, 2024 | Completed final sign-off Feb 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit # 1904: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit # 1904: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Oct 31, 2024 | Completed final sign-off Jan 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit # 1601: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit # 1601: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Oct 17, 2024 | Completed final sign-off Jan 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit # 404 -rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit # 404 -rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Oct 17, 2024 | Completed final sign-off Dec 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #2204 rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #2204 rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Oct 15, 2024 | In progress issued Oct 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1101 rehabilitate e kitchen and bath. no removal of structural walls.Details
unit 1101 rehabilitate e kitchen and bath. no removal of structural walls. | $60,000 |
| Oct 15, 2024 | Completed final sign-off Jun 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 2207 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 2207 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Oct 10, 2024 | Completed final sign-off Dec 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 706- remodel (e) kitchen and bathroom no removal of structural walls.Details
unit 706- remodel (e) kitchen and bathroom no removal of structural walls. | $60,000 |
| Oct 1, 2024 | Completed final sign-off Nov 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #302: rehabilitate existing kitchen and bathroom. no removal of structural walls install washer dryerDetails
unit #302: rehabilitate existing kitchen and bathroom. no removal of structural walls install washer dryer | $60,000 |
| Sep 26, 2024 | Completed final sign-off Oct 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | #2405: rehabilitate existing kitchen and bathroom. no removal of walls.Details
#2405: rehabilitate existing kitchen and bathroom. no removal of walls. | $60,000 |
| Sep 26, 2024 | Completed final sign-off Nov 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | #2240: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
#2240: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Sep 26, 2024 | Completed final sign-off Nov 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | #601: rehabilitate existing kitchen and bathroom. no removal of walls.Details
#601: rehabilitate existing kitchen and bathroom. no removal of walls. | $60,000 |
| Sep 12, 2024 | Completed final sign-off Nov 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #1102 rehabilitate existing kitchen & bathroom. no removal of structural wallsDetails
unit #1102 rehabilitate existing kitchen & bathroom. no removal of structural walls | $60,000 |
| Sep 11, 2024 | Completed final sign-off Aug 2025 | 155 Jackson St | G Legarte Construction | replace existing fencing, repair rellises slats (all work in kind)Details
replace existing fencing, repair rellises slats (all work in kind) | $175,000 |
| Sep 3, 2024 | Completed final sign-off Oct 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2404 - rehabilitate (e) kitchen and bathroom. no removal of structural wallsDetails
unit 2404 - rehabilitate (e) kitchen and bathroom. no removal of structural walls | $50,000 |
| Sep 3, 2024 | Completed final sign-off Oct 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #401: rehabilitate (e) kitchen and batroom no removal of structural wallsDetails
unit #401: rehabilitate (e) kitchen and batroom no removal of structural walls | $50,000 |
| Aug 22, 2024 | Completed final sign-off Oct 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 408- remodel (e) kitchen and bathroom. no removal of stuructual wallsDetails
unit 408- remodel (e) kitchen and bathroom. no removal of stuructual walls | $50,000 |
| Aug 15, 2024 | Completed final sign-off Nov 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | #2203: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
#2203: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| Aug 15, 2024 | Completed final sign-off Oct 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | #1406: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
#1406: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| Aug 9, 2024 | Completed final sign-off Oct 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1803: rehabilitate existing kitchen & bathroom. no removal of existing wallsDetails
unit #1803: rehabilitate existing kitchen & bathroom. no removal of existing walls | $50,000 |
| Jul 5, 2024 | Completed final sign-off Jul 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit # 2402: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit # 2402: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Jul 2, 2024 | Completed final sign-off Oct 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1402 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 1402 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Jul 2, 2024 | In progress issued Jul 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2004 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 2004 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Jun 18, 2024 | Completed final sign-off Oct 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | #1702: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
#1702: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| Jun 18, 2024 | Completed final sign-off Aug 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | #1008: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
#1008: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| Jun 17, 2024 | In progress issued Jun 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit th21- rehabilitate (e) kitchen and bathroom. replace (e) w&d in kind. no removal of structural wall.Details
unit th21- rehabilitate (e) kitchen and bathroom. replace (e) w&d in kind. no removal of structural wall. | $50,000 |
| Jun 17, 2024 | In progress issued Jun 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit th29- rehabilitate (e) kitchen and bathroom. replace (e) w&d in kind. no removal of structural wall.Details
unit th29- rehabilitate (e) kitchen and bathroom. replace (e) w&d in kind. no removal of structural wall. | $50,000 |
| May 20, 2024 | In progress issued May 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1503 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 1503 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| May 20, 2024 | In progress issued May 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2401 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 2401 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| May 3, 2024 | In progress issued May 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1305 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 1305 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| May 3, 2024 | Completed final sign-off Oct 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 905 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 905 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| May 3, 2024 | In progress issued May 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1802 - rehavilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 1802 - rehavilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Apr 25, 2024 | Completed final sign-off Oct 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1808: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1808: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| Apr 25, 2024 | Completed final sign-off Aug 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 804 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 804 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Apr 8, 2024 | Completed final sign-off Aug 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 701 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 701 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Apr 8, 2024 | Completed final sign-off Oct 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 902 - rehabilitate existing kitchen and bathroom. no remal of structural wallsDetails
unit 902 - rehabilitate existing kitchen and bathroom. no remal of structural walls | $50,000 |
| Apr 5, 2024 | Completed final sign-off Oct 2025 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1005 rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit #1005 rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Apr 2, 2024 | In progress issued Apr 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1906: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1906: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| Apr 2, 2024 | Completed final sign-off Oct 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 2006: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 2006: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| Mar 28, 2024 | Completed final sign-off May 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #2008: rehabilitate (e) kitchen and bathroom no removal of structural wallsDetails
unit #2008: rehabilitate (e) kitchen and bathroom no removal of structural walls | $50,000 |
| Mar 28, 2024 | Completed final sign-off Aug 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #2402: rehabilitate (e) kitchen and bathroom no removal of structural wallsDetails
unit #2402: rehabilitate (e) kitchen and bathroom no removal of structural walls | $50,000 |
| Mar 25, 2024 | Completed final sign-off Aug 2025 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1808: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1808: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| Mar 1, 2024 | Completed final sign-off May 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #503: rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #503: rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Feb 26, 2024 | Completed final sign-off May 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit# 1005: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit# 1005: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $50,000 |
| Feb 2, 2024 | Completed final sign-off Apr 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit #1302: rehabilitate extg kitchen and bathroom. no removal of structural wallsDetails
unit #1302: rehabilitate extg kitchen and bathroom. no removal of structural walls | $60,000 |
| Dec 26, 2023 | Completed final sign-off May 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit # 1403: rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit # 1403: rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Nov 30, 2023 | Completed final sign-off Feb 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 2308: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit 2308: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 30, 2023 | Completed final sign-off Feb 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 2405: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit 2405: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 30, 2023 | Completed final sign-off Feb 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1402: rehab (e) kitchen and bathroom. no removal of structural walls.Details
unit 1402: rehab (e) kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 29, 2023 | Completed final sign-off Feb 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit#1304: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit#1304: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 29, 2023 | Completed final sign-off Feb 2024 | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit2301: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit2301: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 1, 2023 | Completed final sign-off May 2026 | 155 Jackson St | Commercial Fire Protection Llc | as built revision to pa #201812148408. per owners request, voluntary upgrading (e) fire alarm system, initiating devices, modules & amplifiers to supersed (e) permit #201812148408Details
as built revision to pa #201812148408. per owners request, voluntary upgrading (e) fire alarm system, initiating devices, modules & amplifiers to supersed (e) permit #201812148408 | $180,000 |
| Nov 1, 2023 | Completed final sign-off Mar 2025 | 405 Davis Ct | Commercial Fire Protection Llc | as built revision to pa #201812077825. per owners request, voluntary upgrade the (e) fire alarm system, initiating devices, modules & amplifiers to supersede (e) pa #201812077825Details
as built revision to pa #201812077825. per owners request, voluntary upgrade the (e) fire alarm system, initiating devices, modules & amplifiers to supersede (e) pa #201812077825 | $180,000 |
| Aug 25, 2023 | Completed final sign-off Nov 2023 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1606: rehabilitate existing kitchen and (2) existing bathrooms. no removal of structural walls.Details
unit 1606: rehabilitate existing kitchen and (2) existing bathrooms. no removal of structural walls. | $44,000 |
| Aug 15, 2023 | Completed final sign-off Jan 2024 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 1502: rehabilitate (e) kitchen & bathroom. no removal of structural walls.Details
unit 1502: rehabilitate (e) kitchen & bathroom. no removal of structural walls. | $66,000 |
| Aug 15, 2023 | Completed final sign-off Nov 2023 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | unit 901: rehabilitate e kitchen, rehabilitate e bath, no removal of structural wallsDetails
unit 901: rehabilitate e kitchen, rehabilitate e bath, no removal of structural walls | $68,000 |
| Apr 28, 2023 | Completed final sign-off Jul 2023 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | #1303. rehabilitate existing kitchen, rehab existing bathroom, no removal of structural walls.Details
#1303. rehabilitate existing kitchen, rehab existing bathroom, no removal of structural walls. | $44,000 |
| Apr 28, 2023 | Never finaled issued May 2023, no final | 405 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2107 rehabilitate (e) kitchen and bathroom; no removal of structural wallsDetails
unit 2107 rehabilitate (e) kitchen and bathroom; no removal of structural walls | $44,000 |
| Apr 28, 2023 | Completed final sign-off Jul 2023 | 155 Jackson St | Camp Roofing Ltd Dba Camp Construction | #2202. rehabilitate existing kitchen, rehab existing bathroom, no removal of structural walls.Details
#2202. rehabilitate existing kitchen, rehab existing bathroom, no removal of structural walls. | $44,000 |
| Jan 31, 2023 | Completed final sign-off May 2023 | 405 Davis Ct | Axel8 Construction | unit #2002: rehab (e) kitchen & (e) bathroom. no removal of structural wall. no structural work is proposed.Details
unit #2002: rehab (e) kitchen & (e) bathroom. no removal of structural wall. no structural work is proposed. | $38,000 |
| Jan 26, 2023 | Completed final sign-off Mar 2023 | 155 Jackson St | Axel8 Construction | unit 608 - rehabilitate (e) kitchen and (e) bathroom; no removal of structural walls. no structural work is proposedDetails
unit 608 - rehabilitate (e) kitchen and (e) bathroom; no removal of structural walls. no structural work is proposed | $36,000 |
| Nov 17, 2022 | Completed final sign-off Mar 2023 | 405 Davis Ct | Axel8 Construction | unit 27: rehab e kitchen, 2 and 1/2 baths, replace washer dryer. no structural wall demoDetails
unit 27: rehab e kitchen, 2 and 1/2 baths, replace washer dryer. no structural wall demo | $31,000 |
| Nov 4, 2022 | Completed final sign-off Feb 2023 | 405 Davis Ct | Axel8 Construction | th #14: rehabilitate extg kitchen. rehabilitate extg 2 and a half bathrooms. replace washer and dryer. no structural wall demo.Details
th #14: rehabilitate extg kitchen. rehabilitate extg 2 and a half bathrooms. replace washer and dryer. no structural wall demo. | $35,000 |
| Sep 19, 2022 | Completed final sign-off Dec 2022 | 155 Jackson St | Axel8 Construction | unit #2406. rehab (e) kitchen and 2 bathrooms. no removal of structural walls. no structural work is proposed.Details
unit #2406. rehab (e) kitchen and 2 bathrooms. no removal of structural walls. no structural work is proposed. | $15,000 |
| Jun 3, 2022 | Completed final sign-off Nov 2022 | 155 Jackson St | Axel8 Construction | #601: rehab extg kitchen. rehab extg bathroom. note: no removal of structural walls and no structural work is proposedDetails
#601: rehab extg kitchen. rehab extg bathroom. note: no removal of structural walls and no structural work is proposed | $18,000 |
| Oct 21, 2021 | Completed final sign-off Mar 2022 | 405 Davis Ct | Axel8 Construction | unit #1506: remodel 1 (e) kitchen in kind remodel 2 (e) bathroom in kind. no wall layout changes.Details
unit #1506: remodel 1 (e) kitchen in kind remodel 2 (e) bathroom in kind. no wall layout changes. | $30,000 |
| Oct 28, 2020 | Completed final sign-off Mar 2025 | 155 Jackson St | C B F Inc | building 2: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista north, west east and south. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required.Details
building 2: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista north, west east and south. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required. | $25,000 |
| Oct 28, 2020 | Completed final sign-off Mar 2025 | 405 Davis Ct | C B F Inc | building #3: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista south. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required.Details
building #3: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista south. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required. | $25,000 |
| Sep 23, 2020 | Expired or cancelled cancelled Jul 2024 | 465 Davis Ct | minor finish+lighting upgrade to the arcade of (e) build.replacment non-original(e)scones with globe scones that reflects original light fixtrue; barrier removal by means of replacement of a mix of(e)retail stroefront doors with(n)doors; infill walls below(e)exterior stairs. new mosaic accent tile.Details
minor finish+lighting upgrade to the arcade of (e) build.replacment non-original(e)scones with globe scones that reflects original light fixtrue; barrier removal by means of replacement of a mix of(e)retail stroefront doors with(n)doors; infill walls below(e)exterior stairs. new mosaic accent tile. | $60,000 | |
| May 29, 2020 | Completed final sign-off May 2021 | 155 Jackson St | 1 Original Construction Inc | apt #2501-interior remodel in-kind, new finishes of apt in residential tower. no change in occupancy or changes to structure. new non rated partitions, new floor coverings, new wall & ceiling finishes. kitchen & bathroom fixtures, new t-24 compliant lighting. no changes to hvac.Details
apt #2501-interior remodel in-kind, new finishes of apt in residential tower. no change in occupancy or changes to structure. new non rated partitions, new floor coverings, new wall & ceiling finishes. kitchen & bathroom fixtures, new t-24 compliant lighting. no changes to hvac. | $107,800 |
| Dec 5, 2019 | Never finaled issued Dec 2019, no final | 465 Davis Ct | G A Higgins, Inc | revision to pa 2019-1118-7573 remove requirement "no ceiling demo work under this permit"Details
revision to pa 2019-1118-7573 remove requirement "no ceiling demo work under this permit" | |
| Nov 18, 2019 | Completed final sign-off May 2022 | 465 Davis Ct | G A Higgins, Inc | 1/f: demo ceiling grid, (e) t.i., protect structural components & fire rated separation partitions. maher ord 155-13 na. remain vacancy under ab-017Details
1/f: demo ceiling grid, (e) t.i., protect structural components & fire rated separation partitions. maher ord 155-13 na. remain vacancy under ab-017 | $25,000 |
| Sep 12, 2019 | Expired or cancelled cancelled Jan 2026 | 145 Jackson St | installing self contained reachin refrigerated case and freezer case. install of shelving unit. n/a for maherDetails
installing self contained reachin refrigerated case and freezer case. install of shelving unit. n/a for maher | $10,000 | |
| Jun 11, 2019 | Never finaled issued Jun 2019, no final | 405 Davis Ct | street space w/mtaDetails
street space w/mta | ||
| May 21, 2019 | Completed final sign-off Dec 2021 | 405 Davis Ct | G A Higgins, Inc | replace in kind (e) fence glass to be replaced with laminated glassDetails
replace in kind (e) fence glass to be replaced with laminated glass | $175,000 |
| Apr 8, 2019 | Never finaled issued Apr 2019, no final | 405 Davis Ct | street spaceDetails
street space | ||
| Apr 4, 2019 | Completed final sign-off Sep 2019 | 405 Davis Ct | Jon K Takata Corp Dba Restoration Mgmt | replacement in kind of fir damaged interior finishes and mep 4 apratment units total maher naDetails
replacement in kind of fir damaged interior finishes and mep 4 apratment units total maher na | $425,000 |
| Mar 27, 2019 | Never finaled issued Mar 2019, no final | 405 Davis Ct | street spaceDetails
street space | ||
| Mar 13, 2019 | Completed final sign-off Jun 2019 | 405 Davis Ct | Robert L Brown Construction Inc. | 12th and 13th floor:guardrail replacement front fire damage. replace in kind.Details
12th and 13th floor:guardrail replacement front fire damage. replace in kind. | $25,000 |
| Feb 6, 2019 | Completed final sign-off Oct 2019 | 405 Davis Ct | Urban Waterproofing Inc. | fire damage repair to concrete, windows and doors replace in kind. n/a maherDetails
fire damage repair to concrete, windows and doors replace in kind. n/a maher | $75,000 |
| Jan 17, 2019 | Never finaled issued Jan 2019, no final | 405 Davis Ct | street spaceDetails
street space | ||
| Dec 14, 2018 | Never finaled issued Jun 2019, no final | 155 Jackson St | Commercial Fire Protection Inc | new speaker in every bedroom to meet 75 dba requirement (229 total new speakers) per owner's request this work is done by a diffrent contarctor per previously approved fa permit # 2018-0226-2176.Details
new speaker in every bedroom to meet 75 dba requirement (229 total new speakers) per owner's request this work is done by a diffrent contarctor per previously approved fa permit # 2018-0226-2176. | $83,000 |
| Dec 7, 2018 | Never finaled issued Dec 2018, no final | 405 Davis Ct | street space onlyDetails
street space only | ||
| Dec 7, 2018 | Never finaled issued Jun 2019, no final | 405 Davis Ct | Commercial Fire Protection Inc | upgrade of (e) fire alarm system to meet 75 dba level in bedroom. installation of (n) 229 speaker in every bedroom per owner's request this work is done by a diffrent contarctor per previously approved fa permit # 2018-0226-2177Details
upgrade of (e) fire alarm system to meet 75 dba level in bedroom. installation of (n) 229 speaker in every bedroom per owner's request this work is done by a diffrent contarctor per previously approved fa permit # 2018-0226-2177 | $81,000 |
| Dec 3, 2018 | Completed final sign-off Sep 2019 | 405 Davis Ct | Russell Hinton Company, Jon K Takata Corp Dba Restoration Mgmt | fire damage repair to partition and ceilings- replace in kind. floors 12-20.Details
fire damage repair to partition and ceilings- replace in kind. floors 12-20. | $61,000 |
| Nov 27, 2018 | Completed final sign-off Sep 2019 | 405 Davis Ct | Russell Hinton Company, Jon K Takata Corp Dba Restoration Mgmt | fire damage repair to partitions and ceilings. replace in kind. 11th floor. n/a for maher.Details
fire damage repair to partitions and ceilings. replace in kind. 11th floor. n/a for maher. | $50,000 |
| Nov 20, 2018 | Completed final sign-off Sep 2019 | 405 Davis Ct | Russell Hinton Company, Jon K Takata Corp Dba Restoration Mgmt | repair in kind fire damage, floors 7-10.Details
repair in kind fire damage, floors 7-10. | $270,000 |
| Oct 24, 2018 | Never finaled issued Oct 2018, no final | 405 Davis Ct | Russell Hinton Company, Jon K Takata Corp Dba Restoration Mgmt | demolition of approx 5000 sq ft of sheetrock and carpet due to fire and waer damage on floors 8,9,10,11 (2 units per floor) and floors 12 and 13 (8 units per floor) and floor 14(4 units). tenant improvement under separate permitDetails
demolition of approx 5000 sq ft of sheetrock and carpet due to fire and waer damage on floors 8,9,10,11 (2 units per floor) and floors 12 and 13 (8 units per floor) and floor 14(4 units). tenant improvement under separate permit | $100,000 |
| Aug 9, 2018 | Expired or cancelled cancelled Jan 2026 | 145 Jackson St | installation of new mochi and maven cases in retail areaDetails
installation of new mochi and maven cases in retail area | $5,000 | |
| Mar 27, 2018 | Completed final sign-off Mar 2018 | 155 Jackson St | Tri-Signal Integration Inc. | add 3 speakers in unit 2504Details
add 3 speakers in unit 2504 | $2,000 |
| Feb 26, 2018 | Never finaled issued Feb 2018, no final | 405 Davis Ct | Tri-Signal Integration Inc. | fa ti includes: upgrade residential units at 405 davis st to meet sound level required by nfpa-72 p.18.4.1 per meeting minutes. install 229 speakers in sleeping area. readjust speakers in each one and multi bedroom unitsDetails
fa ti includes: upgrade residential units at 405 davis st to meet sound level required by nfpa-72 p.18.4.1 per meeting minutes. install 229 speakers in sleeping area. readjust speakers in each one and multi bedroom units | $140,000 |
| Feb 26, 2018 | Never finaled issued Feb 2018, no final | 155 Jackson St | Tri-Signal Integration Inc. | fa ti includes: upgrade residential units at 155 jackson st to meet sound level required by nfpa-72 p.18.4.1 per meeting minutes from 9/13/17. install 229 speakers in sleeping area. readjust speakers in each one and multi bedroom units. n/a maherDetails
fa ti includes: upgrade residential units at 155 jackson st to meet sound level required by nfpa-72 p.18.4.1 per meeting minutes from 9/13/17. install 229 speakers in sleeping area. readjust speakers in each one and multi bedroom units. n/a maher | $140,000 |
| Jan 26, 2018 | Completed final sign-off Mar 2018 | 155 Jackson St | C B 2 Builders Incorporated | apt 2504: to comply with complaint 201833171: remove (e) door between bed 2 & living room,in-fill door opening with gyp board partition,construct new partition in bedroom 2 to create 3rd bedroom.replace (e) toilets with h.e, new shower finishes & water proofing. maher n/a.Details
apt 2504: to comply with complaint 201833171: remove (e) door between bed 2 & living room,in-fill door opening with gyp board partition,construct new partition in bedroom 2 to create 3rd bedroom.replace (e) toilets with h.e, new shower finishes & water proofing. maher n/a. | $10,000 |
| Jul 3, 2017 | Expired or cancelled cancelled Jan 2026 | 465 Davis Ct | soft demo (e) vacant restaurant, demo all (e) non-structural walls, wall decorations, floor finishes, plumbing fixtures, kitchen equipment and shelves. existing cooking hood to remain. ab-017 deferred ada compliance. maher na. no sprinkler work. no ceiling removalDetails
soft demo (e) vacant restaurant, demo all (e) non-structural walls, wall decorations, floor finishes, plumbing fixtures, kitchen equipment and shelves. existing cooking hood to remain. ab-017 deferred ada compliance. maher na. no sprinkler work. no ceiling removal | $40,000 | |
| Nov 20, 2014 | Never finaled issued Nov 2014, no final | 145 Jackson St | Aaa Restaurant Fire Control/Dba Aaa Fire | installation of ansul r-102 fire suppression system in the deli kitchen hood and duct; fire alarm sep. permit. maher n/aDetails
installation of ansul r-102 fire suppression system in the deli kitchen hood and duct; fire alarm sep. permit. maher n/a | $3,000 |
| Aug 27, 2014 | Never finaled issued Aug 2014, no final | 405 Davis Ct | Emcor Services/Mesa Energy Systems Inc | revision to 201407171530: to correct address from 460 davis to 405 davis 2nd bldg at 155 jackson on a sep permit. same site. maher not reqDetails
revision to 201407171530: to correct address from 460 davis to 405 davis 2nd bldg at 155 jackson on a sep permit. same site. maher not req | |
| Aug 27, 2014 | Never finaled issued Aug 2014, no final | 155 Jackson St | Emcor Services/Mesa Energy Systems Inc | revision to 201407171530 to correct address from 460 davis to 155 jackson st. 2nd bldg, 405 davis on a separate permit (shared plans) n/a maher ordinance # 155-13Details
revision to 201407171530 to correct address from 460 davis to 155 jackson st. 2nd bldg, 405 davis on a separate permit (shared plans) n/a maher ordinance # 155-13 | |
| Aug 5, 2014 | Completed final sign-off Oct 2014 | 155 Jackson St | Bilcor Inc | install 2 wall mount speaker-strobes. install 4 heat detectors with bases.Details
install 2 wall mount speaker-strobes. install 4 heat detectors with bases. | $2,400 |
| Dec 15, 2011 | Completed final sign-off Jun 2012 | 155 Jackson St | Stroub Construction | unit #2502-interior remodel, new finishes of apt in residential tower. no change in occupancy or changes to structure. new non rated partitoons, new floor coverings, new wall & ceiling finishes. kitchen & bathroom fixtures, new t-24 complaint lighting. no changes to hvac.Details
unit #2502-interior remodel, new finishes of apt in residential tower. no change in occupancy or changes to structure. new non rated partitoons, new floor coverings, new wall & ceiling finishes. kitchen & bathroom fixtures, new t-24 complaint lighting. no changes to hvac. | $107,800 |
| Dec 14, 2011 | Completed final sign-off May 2012 | 200 Washington St | Glen-Crete Products, Inc. | to comply with complaint #201168773- install cross-traffix metal barriers for cane detection and overhead hazard area underneath an existing exterior stairs only.Details
to comply with complaint #201168773- install cross-traffix metal barriers for cane detection and overhead hazard area underneath an existing exterior stairs only. | $1,500 |
| Mar 25, 2010 | Completed final sign-off Jun 2010 | 145 Jackson St | Tri-Signal Integration Inc. | 1st floor. add 1 power supply, 7 speaker/strobes, 6 strobes, 1 annunciator, 1 control module, 3 monitor module to (e) f.a. system in "m" occupancyDetails
1st floor. add 1 power supply, 7 speaker/strobes, 6 strobes, 1 annunciator, 1 control module, 3 monitor module to (e) f.a. system in "m" occupancy | $5,500 |
| Jun 2, 2009 | Never finaled issued Jun 2009, no final | 405 Davis St | street space permit only.Details
street space permit only. | ||
| Apr 2, 2009 | Never finaled issued Apr 2009, no final | 405 Davis St | strete space permit only.Details
strete space permit only. | ||
| Mar 23, 2009 | Completed final sign-off Sep 2009 | 155 Jackson St | reroofingDetails
reroofing | $287,422 | |
| Mar 23, 2009 | Completed final sign-off May 2009 | 405 Davis St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $279,217 |
| Feb 9, 2009 | Completed final sign-off Jun 2010 | 145 Jackson St | Eric F Anderson Incorporated | patch & paint per new decor, replace & refurbish some fixtures/equipment, new perimeter lighting in sales area, modify plumbing as required, modify frame wall at deli area & remove & replace new hood at new location.Details
patch & paint per new decor, replace & refurbish some fixtures/equipment, new perimeter lighting in sales area, modify plumbing as required, modify frame wall at deli area & remove & replace new hood at new location. | $500,000 |
| Nov 10, 2008 | Never finaled issued Nov 2008, no final | 465 Davis St | for administrative purposes only, to provide documentation for s.f.f.d. public assembly permit. verification of emergency exit components by fire inspector per drawing comments - restaurant.Details
for administrative purposes only, to provide documentation for s.f.f.d. public assembly permit. verification of emergency exit components by fire inspector per drawing comments - restaurant. | ||
| Jul 17, 2008 | Completed final sign-off Apr 2009 | 405 Davis St | Pankow Special Projects Lp | interior refinishing of ex'g residential tower main lobby, no change in use or occupancy, occ loan or egress. new front entry doors in ex'g openings, new floor & wall coverings, new title 24 compliant lighting & exit signage.Details
interior refinishing of ex'g residential tower main lobby, no change in use or occupancy, occ loan or egress. new front entry doors in ex'g openings, new floor & wall coverings, new title 24 compliant lighting & exit signage. | $159,000 |
| Jul 7, 2008 | Never finaled issued Jul 2008, no final | 155 Jackson St | Pankow Special Projects Lp | interior refinishing of (e) residential tower main lobby-no change in use, occupancy, occ load or egress. no change to (e) structure, hvac or plumbing. new front entry doors in (e) openings, flooring coverings & wall finishes. relocate f.a. panel, new t-24 compliant lighting. sep permits for electDetails
interior refinishing of (e) residential tower main lobby-no change in use, occupancy, occ load or egress. no change to (e) structure, hvac or plumbing. new front entry doors in (e) openings, flooring coverings & wall finishes. relocate f.a. panel, new t-24 compliant lighting. sep permits for elect | $179,100 |
| Dec 18, 2007 | Never finaled issued Jan 2008, no final | 405 Davis St | Bei Construction Inc. | replace two existing 35kw emergency generators with two (n) 35kw emergency grenerators. all generators in basement level of parking garage.Details
replace two existing 35kw emergency generators with two (n) 35kw emergency grenerators. all generators in basement level of parking garage. | $100,000 |
| Apr 19, 2007 | Never finaled issued Sep 2007, no final | 405 Davis St | Bei Construction Inc. | replace existing 35 kw emergency generator with new 35kw emergency generatorDetails
replace existing 35 kw emergency generator with new 35kw emergency generator | $50,000 |
| Aug 1, 2002 | Completed final sign-off Oct 2002 | 145 Jackson St | J S J Electrical Display Corp | sign permit - 1 electric and 2 non-electric wall single face signs.Details
sign permit - 1 electric and 2 non-electric wall single face signs. | |
| Jun 17, 2002 | Never finaled issued Jun 2002, no final | 145 Jackson St | streetspaceDetails
streetspace | ||
| Mar 19, 2002 | Completed final sign-off Sep 2002 | 145 Jackson St | expansion of (e)(store sprinkler system on 1st flr only (200109077849)Details
expansion of (e)(store sprinkler system on 1st flr only (200109077849) | $20,000 | |
| Mar 11, 2002 | Expired or cancelled expired Dec 2003 | 155 Jackson St | Intellisec | install new fire alarm system conduit,wire and installation by electrical contractorDetails
install new fire alarm system conduit,wire and installation by electrical contractor | $180,000 |
| Mar 11, 2002 | Expired or cancelled expired Mar 2004 | 405 Davis St | Intellisec | installation of new fire alarm system conduit,wire and installation by electrical contractorDetails
installation of new fire alarm system conduit,wire and installation by electrical contractor | $180,000 |
| Feb 19, 2002 | Never finaled issued Feb 2002, no final | 145 Jackson St | street space permitDetails
street space permit | ||
| Feb 1, 2002 | Expired or cancelled expired Mar 2004 | 405 Davis St | Intellisec | install fire alarmDetails
install fire alarm | $70,000 |
| Sep 7, 2001 | Never finaled issued Dec 2001, no final | 145 Jackson St | remodel existing store, extend storefront to adjacent tenantDetails
remodel existing store, extend storefront to adjacent tenant | $1,037,000 | |
| Jul 27, 2000 | Expired or cancelled expired Jul 2001 | 405 Davis St | street space useDetails
street space use | ||
| Jun 21, 2000 | Expired or cancelled expired Jun 2001 | 405 Davis St | exterior concrete repair, paint, new deck coating, anu structural repairs will be performed under seDetails
exterior concrete repair, paint, new deck coating, anu structural repairs will be performed under se | $250,000 | |
| Jun 21, 2000 | Expired or cancelled expired Jun 2001 | 155 Jackson St | Alpha Restoration & Wateproof | exterior concrete repair, new deck coltings, paintDetails
exterior concrete repair, new deck coltings, paint | $250,000 |
| Apr 17, 2000 | Expired or cancelled expired Aug 2000 | 155 Jackson St | street spaceDetails
street space | ||
| Feb 29, 2000 | Expired or cancelled expired Jun 2000 | 155 Jackson St | space streetDetails
space street | ||
| Feb 14, 2000 | Expired or cancelled expired Jun 2000 | 155 Jackson St | street spaceDetails
street space |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.