General Air Technology
- Based in
- Modesto
- On San Francisco permits
- Sep 2026 to Sep 2026
- Last 24 months
- 4 permits filed
4 permits since 2000: 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 4
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Oct 2026 | 550 Battery St | install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roofDetails
install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roof | $40,000 |
| Sep 2, 2026 | In progress issued Oct 2026 | 155 Jackson St | install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roofDetails
install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roof | $40,000 |
| Sep 2, 2026 | In progress issued Oct 2026 | 440 Davis Ct | install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roofDetails
install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roof | $40,000 |
| Sep 2, 2026 | In progress issued Oct 2026 | 405 Davis Ct | install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roofDetails
install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roof | $40,000 |