Block 3706, lot 061
735 Market St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 6
- Rooms
- 7 bathrooms
- Building
- 59,300 sq ft
- Lot
- 9,199 sq ft
- Zoning
- C3R
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
70 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Sep 2026 | 735 Market St | Build Group Inc. | revision to bpa: 202603207976 - design originally calle out for (n) breakdown appliances. (meps) scope has been reduced to no longer include the construction/ installation of appliances.Details
revision to bpa: 202603207976 - design originally calle out for (n) breakdown appliances. (meps) scope has been reduced to no longer include the construction/ installation of appliances. | |
| Jul 28, 2026 | In progress issued Sep 2026 | 735 Market St | Tyko Sign Group | install (1) set of vinyl window graphics.Details
install (1) set of vinyl window graphics. | $2,000 |
| Jul 28, 2026 | In progress issued Sep 2026 | 735 Market St | Tyko Sign Group | install (1) illuminated projecting blade sign, double faced.Details
install (1) illuminated projecting blade sign, double faced. | $3,000 |
| Jul 28, 2026 | In progress issued Sep 2026 | 735 Market St | Tyko Sign Group | install (1) illuminated wall sign. "museum of illusions", single faced.cDetails
install (1) illuminated wall sign. "museum of illusions", single faced.c | $10,000 |
| Mar 20, 2026 | In progress issued Jun 2026 | 735 Market St | Build Group Inc. | t.i. for 1st flr + basement interior built out of existing sapce to create museum-style immersive exhibits. (n) non-load bearing partition, finishes, lighting, mep. fire sprinkler on separate permit.Details
t.i. for 1st flr + basement interior built out of existing sapce to create museum-style immersive exhibits. (n) non-load bearing partition, finishes, lighting, mep. fire sprinkler on separate permit. | $1,600,000 |
| Jun 21, 2019 | Never finaled issued Jun 2019, no final | 735 Market St | Bay City Mechanical Inc | duct modifications to 2 fancoils distribution, controls, insulation and air balancingDetails
duct modifications to 2 fancoils distribution, controls, insulation and air balancing | $21,300 |
| May 17, 2019 | Completed final sign-off May 2019 | 735 Market St | Johnson Controls Fire | 6th fl: installing 4 horn strobes on 6th fl controlled by fire alarm system in the building. ref ti #201901311760.Details
6th fl: installing 4 horn strobes on 6th fl controlled by fire alarm system in the building. ref ti #201901311760. | $2,535 |
| Apr 26, 2019 | Completed final sign-off May 2019 | 735 Market St | Eco Fire Sprinklers Inc | relocate (28) penedent sprinklers in area of work for t.i.Details
relocate (28) penedent sprinklers in area of work for t.i. | $12,000 |
| Apr 11, 2019 | Completed final sign-off Jun 2019 | 735 Market St | Pmn Design Elect Inc Dba Design Elc | 5th fl remodel commercial office space: new lighting, lighting controls, recept, t-24. ref ti #201901311757Details
5th fl remodel commercial office space: new lighting, lighting controls, recept, t-24. ref ti #201901311757 | |
| Apr 11, 2019 | Completed final sign-off Jun 2019 | 735 Market St | Pmn Design Elect Inc Dba Design Elc | 6th fl remodel commercial office space: new lighting, lighting controls, recept, t-24. ref ti #201902072340Details
6th fl remodel commercial office space: new lighting, lighting controls, recept, t-24. ref ti #201902072340 | |
| Apr 8, 2019 | Never finaled issued Apr 2019, no final | 735 Market St | C B F Inc | new downlight fixtures and controls new power outlets throughout space using currently @ (e) panel. reference p.a# 2019 0131 1760. electrical onlyDetails
new downlight fixtures and controls new power outlets throughout space using currently @ (e) panel. reference p.a# 2019 0131 1760. electrical only | $30,000 |
| Feb 25, 2019 | Completed final sign-off Apr 2019 | 735 Market St | Cosco Fire Protection Inc. | revision to pa 2019-0204-1944 to reflect the correct scope of work on permit. add and relocate sprinklers in area of work to accommodate new wall and ceiling layout. 5th flDetails
revision to pa 2019-0204-1944 to reflect the correct scope of work on permit. add and relocate sprinklers in area of work to accommodate new wall and ceiling layout. 5th fl | |
| Feb 25, 2019 | Completed final sign-off Apr 2019 | 735 Market St | Cosco Fire Protection Inc. | revision to pa 2019-0214-2900 to reflect the correct scope of work on application. add and relocate sprinklers in area of work to accommodate new wall and ceiling layout. 6th floorDetails
revision to pa 2019-0214-2900 to reflect the correct scope of work on application. add and relocate sprinklers in area of work to accommodate new wall and ceiling layout. 6th floor | |
| Feb 14, 2019 | Completed final sign-off Feb 2019 | 735 Market St | Cosco Fire Protection Inc. | f/s: delete sprinkler coverage for stairs from level 5 & 6 (removed from design). add coverage for level 6 corridor. ref arch pa #201902072340. ref sprink pa #201812107842.Details
f/s: delete sprinkler coverage for stairs from level 5 & 6 (removed from design). add coverage for level 6 corridor. ref arch pa #201902072340. ref sprink pa #201812107842. | $7,000 |
| Feb 13, 2019 | Completed final sign-off Apr 2019 | 735 Market St | Johnson Controls Fire | 5th and 6th flr. fire alarm tenant improvement. install 24 (n) horn / strobe appliances and 2 (n) sync control modulesDetails
5th and 6th flr. fire alarm tenant improvement. install 24 (n) horn / strobe appliances and 2 (n) sync control modules | $13,800 |
| Feb 7, 2019 | Completed final sign-off Jun 2019 | 735 Market St | Nibbi Bros Assoc Inc. | 6th fl. rev to pa# 201809109599; remove communicating stairs from scope of work, new corridor from elevator to sales office, new unisex rest roomDetails
6th fl. rev to pa# 201809109599; remove communicating stairs from scope of work, new corridor from elevator to sales office, new unisex rest room | $5,000 |
| Feb 4, 2019 | Never finaled issued Feb 2019, no final | 735 Market St | Cosco Fire Protection Inc. | 5th fl - delete sprinkler coverage for stairs from level 5 to 6 ref 2018-1210-7842 (sprinkler) and 2019-0131-1757Details
5th fl - delete sprinkler coverage for stairs from level 5 to 6 ref 2018-1210-7842 (sprinkler) and 2019-0131-1757 | $1,000 |
| Jan 31, 2019 | Completed final sign-off Jun 2019 | 735 Market St | 5th fl: sale office ti non-bearing partitions. ceiling finishes, sprinkler, fire alarm & mep under separate permit.Details
5th fl: sale office ti non-bearing partitions. ceiling finishes, sprinkler, fire alarm & mep under separate permit. | $5,000 | |
| Jan 31, 2019 | Completed final sign-off May 2019 | 735 Market St | Nibbi Bros Assoc Inc., Build Group Inc. | 6th fl: partial floor ti. new non-bearing partitions, ceilings, finishes, sprinkler, fire alarm & mep under separate permit.Details
6th fl: partial floor ti. new non-bearing partitions, ceilings, finishes, sprinkler, fire alarm & mep under separate permit. | $180,400 |
| Dec 10, 2018 | Expired or cancelled cancelled Mar 2019 | 735 Market St | Cosco Fire Protection Inc. | add/relocate sprinklers in area of work to accomodate new walls and ceiling layout on leave 5 and 6Details
add/relocate sprinklers in area of work to accomodate new walls and ceiling layout on leave 5 and 6 | $48,561 |
| Nov 7, 2018 | Never finaled issued Nov 2018, no final | 735 Market St | Webcor Construction Lp | 6th fl - demo only - north side of floor existing restroom to remain. selective demo of non bearing walls, finishes. maintain sprinkler & fire alarmDetails
6th fl - demo only - north side of floor existing restroom to remain. selective demo of non bearing walls, finishes. maintain sprinkler & fire alarm | $20,000 |
| Sep 19, 2018 | Never finaled issued May 2019, no final | 735 Market St | Golden Gate Sign Company Inc. | g/f: install a single faced illuminated aluminium sign above entrance "decathlon" on (e) 6in x 8in steel beam.Details
g/f: install a single faced illuminated aluminium sign above entrance "decathlon" on (e) 6in x 8in steel beam. | $15,000 |
| Sep 10, 2018 | Completed final sign-off Jun 2019 | 735 Market St | Nibbi Bros Assoc Inc. | update finishes on level 5 reception space. constructur new reception space and sales office on level 6 insertion of convience stairs between level 5 & 6. ,ep/sprinklers/fir alarm on sep permitDetails
update finishes on level 5 reception space. constructur new reception space and sales office on level 6 insertion of convience stairs between level 5 & 6. ,ep/sprinklers/fir alarm on sep permit | $700,000 |
| Aug 1, 2018 | Completed final sign-off Dec 2018 | 735 Market St | Webcor Construction Lp | permit is under ab-017 demo only selective demo of portions of level 5&6. finishes, non bearing wall, door, flooring sprinkler and fire alarm willnot not be impacted or altered during demoDetails
permit is under ab-017 demo only selective demo of portions of level 5&6. finishes, non bearing wall, door, flooring sprinkler and fire alarm willnot not be impacted or altered during demo | $8,000 |
| Jan 26, 2018 | Completed final sign-off Mar 2018 | 735 Market St | Johnson Controls Fire | basement tenant improvement consisting of adding 2 strobes for new restroom renovations ti pa#2017 0228 0350Details
basement tenant improvement consisting of adding 2 strobes for new restroom renovations ti pa#2017 0228 0350 | $1,200 |
| Aug 29, 2017 | Completed final sign-off Dec 2017 | 735 Market St | Allied Fire Protection | fire sprinkler ti basement level, restrooms, 2 added pendents, 4 add uprights. pa#201702280350.Details
fire sprinkler ti basement level, restrooms, 2 added pendents, 4 add uprights. pa#201702280350. | $3,200 |
| Aug 23, 2017 | Completed final sign-off Mar 2018 | 735 Market St | Critchfield Mechanical Inc | mechanical work for interior buildout of bathrooms in office space at basement level. two baths totaling ~300sf. ref pa #201702280350.Details
mechanical work for interior buildout of bathrooms in office space at basement level. two baths totaling ~300sf. ref pa #201702280350. | $10,000 |
| Jul 24, 2017 | Completed final sign-off Oct 2017 | 735 Market St | Baxter Construction | remove existing walls, doors, finishes. construct new walls, doors, sidelights and install new finishesDetails
remove existing walls, doors, finishes. construct new walls, doors, sidelights and install new finishes | $85,000 |
| Jun 6, 2017 | Never finaled issued Jan 2018, no final | 735 Market St | Craddaar Corp Dba Solano Signs | erect non-electric, projecting, double-faced, replacement signDetails
erect non-electric, projecting, double-faced, replacement sign | $3,000 |
| Jun 6, 2017 | Never finaled issued Jan 2018, no final | 735 Market St | Craddaar Corp Dba Solano Signs | erect electric, wall, single-faced, direct (n) signDetails
erect electric, wall, single-faced, direct (n) sign | $15,000 |
| Feb 28, 2017 | Completed final sign-off May 2018 | 735 Market St | Webcor Construction Lp | add a men's and woman's restroom on the basement level. mep and life safety under separate permitDetails
add a men's and woman's restroom on the basement level. mep and life safety under separate permit | $60,000 |
| Dec 21, 2016 | Never finaled issued Jan 2017, no final | 735 Market St | Plant Construction Co, Lp | ti on 5th floor consisting of a business center to board room conversion). modifications to fire alarm, fire sprinklers, electrical and mechanical will be delegated design and permitted separately by others as deferred submittalsDetails
ti on 5th floor consisting of a business center to board room conversion). modifications to fire alarm, fire sprinklers, electrical and mechanical will be delegated design and permitted separately by others as deferred submittals | $25,000 |
| Nov 20, 2015 | Completed final sign-off Jan 2016 | 735 Market St | Plant Construction Co, Lp | 4th fl ti. minor demo of 1 wall and finishes. minor counter work in pantryDetails
4th fl ti. minor demo of 1 wall and finishes. minor counter work in pantry | $60,000 |
| Oct 30, 2015 | Never finaled issued Oct 2015, no final | 735 Market St | Plant Construction Co, Lp | to obtain final inspection for work approved under pa# 200803278180. all work is complete.Details
to obtain final inspection for work approved under pa# 200803278180. all work is complete. | |
| Oct 8, 2015 | Completed final sign-off Oct 2015 | 735 Market St | Plant Construction Co, Lp | to obtain final inspection for work approved under pa#200606295339 all work is completed.Details
to obtain final inspection for work approved under pa#200606295339 all work is completed. | |
| Oct 8, 2015 | Completed final sign-off Oct 2015 | 735 Market St | Plant Construction Co, Lp | to obtain final inspection for work approved under pa#200607116147 & 200609142316. all work is completed.Details
to obtain final inspection for work approved under pa#200607116147 & 200609142316. all work is completed. | |
| Oct 20, 2014 | Expired or cancelled cancelled Jan 2026 | 735 Market St | Muratore Inc | unit #302: as builts, relocate non bearing partition walls to create larger conference room, file drawings per correction notice, work done under application 201303041422Details
unit #302: as builts, relocate non bearing partition walls to create larger conference room, file drawings per correction notice, work done under application 201303041422 | |
| Mar 4, 2013 | Never finaled issued Mar 2013, no final | 735 Market St | Muratore Inc | install new carpet, new hardwood flooring, relocate existing lights, open dry wall to accommodate elec work, no structural work, work in #302 only, no change of useDetails
install new carpet, new hardwood flooring, relocate existing lights, open dry wall to accommodate elec work, no structural work, work in #302 only, no change of use | $20,000 |
| Oct 1, 2012 | Completed final sign-off Jul 2015 | 735 Market St | Plant Construction Company Lp | 5th floor-interior remodel of 9e) restaurant lounge-work include new partitions, convert bar to private dining room, new furniture & data connections. no change of useDetails
5th floor-interior remodel of 9e) restaurant lounge-work include new partitions, convert bar to private dining room, new furniture & data connections. no change of use | $20,000 |
| Mar 27, 2008 | Never finaled issued Mar 2008, no final | 735 Market St | Plant Construction Company Lp | 3rd floor,ste 302: soft demo & subdivision of an (e) reception area to add a managers office,an assistant's work area. construct non-rated full height partition & partial height partition is proposed. add (1) new fluorescent light is also rpoposed others include improvement to finishes.Details
3rd floor,ste 302: soft demo & subdivision of an (e) reception area to add a managers office,an assistant's work area. construct non-rated full height partition & partial height partition is proposed. add (1) new fluorescent light is also rpoposed others include improvement to finishes. | $33,499 |
| Dec 28, 2007 | Completed final sign-off Jun 2008 | 735 Market St | Plant Construction Company Lp | renew pa# 2006/06/29/5339, pa# 2006/09/14/2316 & pa# 2006/07/11/6147 for final inspection only.Details
renew pa# 2006/06/29/5339, pa# 2006/09/14/2316 & pa# 2006/07/11/6147 for final inspection only. | |
| Oct 13, 2006 | Expired or cancelled expired Aug 2008 | 735 Market St | Simplex Grinnell | renew appl#200506155197, 200506225808 for final inspection only.Details
renew appl#200506155197, 200506225808 for final inspection only. | |
| Sep 14, 2006 | Expired or cancelled expired Jun 2008 | 735 Market St | Acco Engineered Systems Inc. Dba Acco En | oti-2 4th floor meDetails
oti-2 4th floor me | $90,000 |
| Jul 11, 2006 | Expired or cancelled expired Jun 2008 | 735 Market St | Simplex Grinnell | a fire alarm t.i. on the 4th floor. adding the following; 1 nac panel. 1 smoke detector, 10 horn strobes. 4 strobes.Details
a fire alarm t.i. on the 4th floor. adding the following; 1 nac panel. 1 smoke detector, 10 horn strobes. 4 strobes. | $6,000 |
| Jun 29, 2006 | Expired or cancelled expired Jun 2008 | 735 Market St | Plant Construction Company Lp | oti-3 4th floor spDetails
oti-3 4th floor sp | $13,000 |
| Apr 24, 2006 | Completed final sign-off Jun 2008 | 735 Market St | oti-1, 4th floor, spDetails
oti-1, 4th floor, sp | $385,000 | |
| Feb 8, 2006 | Completed final sign-off Feb 2006 | 735 Market St | Acg Construction Inc | renew pa#200506225808,3200506155197,#200507056862 for final inspection.Details
renew pa#200506225808,3200506155197,#200507056862 for final inspection. | |
| Jul 5, 2005 | Expired or cancelled expired Feb 2006 | 735 Market St | Johnston Sign Company | install 1 set of illuminated wall letters with raceway on storefront.Details
install 1 set of illuminated wall letters with raceway on storefront. | |
| Jun 22, 2005 | Completed final sign-off Feb 2006 | 735 Market St | Bal Aire Mechanical Inc | hvac adding 1-f/c unit with related duct work etc. and revisions 2 existing fan coil units ground flDetails
hvac adding 1-f/c unit with related duct work etc. and revisions 2 existing fan coil units ground fl | $60,000 |
| Jun 22, 2005 | Expired or cancelled expired Feb 2006 | 735 Market St | Simplex Grinnell | fire alarm t.i. to 1st floor adding (4) duct detectors, (1) pull station, (3) strobes, (5) horn stroDetails
fire alarm t.i. to 1st floor adding (4) duct detectors, (1) pull station, (3) strobes, (5) horn stro | $8,000 |
| Jun 15, 2005 | Expired or cancelled expired Feb 2006 | 735 Market St | Simplex Grinnell | add 9 each new fire sprinklers quick response to accommodate new ceiling tile layout forDetails
add 9 each new fire sprinklers quick response to accommodate new ceiling tile layout for | $2,526 |
| Apr 27, 2005 | Completed final sign-off Feb 2006 | 735 Market St | Acg Construction Inc | remodel existing space to include partitions new furniture fixtures and finishes no exterior workDetails
remodel existing space to include partitions new furniture fixtures and finishes no exterior work | $275,500 |
| Dec 28, 2004 | Completed final sign-off Feb 2005 | 735 Market St | interior non-structural demo of 1st fl, space to remain vacant intil it completed.Details
interior non-structural demo of 1st fl, space to remain vacant intil it completed. | $10,000 | |
| Sep 8, 2004 | Completed final sign-off Oct 2004 | 735 Market St | Plant Construction Company Lp | relocate 2 existing f/c, 4 pipe, add 2 new f/c coils (4 pipe system)Details
relocate 2 existing f/c, 4 pipe, add 2 new f/c coils (4 pipe system) | $37,000 |
| Aug 11, 2004 | Completed final sign-off Oct 2004 | 735 Market St | Simplex Grinnell | one new 4009 panel with 14 new horn/strobes and 5 new strobes on two new horns/strobe nac circuitsDetails
one new 4009 panel with 14 new horn/strobes and 5 new strobes on two new horns/strobe nac circuits | $12,000 |
| Aug 6, 2004 | Completed final sign-off Oct 2004 | 735 Market St | Pribuss Engineering Inc | 3/f- fire sprinkler t.i.Details
3/f- fire sprinkler t.i. | $3,500 |
| Aug 4, 2004 | Completed final sign-off Oct 2004 | 735 Market St | rev. to pa#2004/06/23/7192 - one hour wall was not (e0 and will not beDetails
rev. to pa#2004/06/23/7192 - one hour wall was not (e0 and will not be | ||
| Jun 23, 2004 | Completed final sign-off Oct 2004 | 735 Market St | partial remodel of offices on 3rd floor removal of condo "model" features (from sales office)Details
partial remodel of offices on 3rd floor removal of condo "model" features (from sales office) | $90,000 | |
| Mar 28, 2003 | Completed final sign-off Apr 2017 | 735 Market St | rev. of accessible counter @ hotel reception area per nov #200235186Details
rev. of accessible counter @ hotel reception area per nov #200235186 | $5,000 | |
| Aug 16, 2002 | Completed final sign-off Oct 2002 | 735 Market St | remodel (e) t.i.Details
remodel (e) t.i. | $15,000 | |
| Dec 5, 2000 | Completed final sign-off Sep 2001 | 735 Market St | Thunder Electric Inc. | add to existing fire alarm system on 1st floorDetails
add to existing fire alarm system on 1st floor | $3,000 |
| Nov 9, 2000 | Completed final sign-off Sep 2001 | 735 Market St | fire sprinkler systemDetails
fire sprinkler system | ||
| Oct 24, 2000 | Completed final sign-off Sep 2001 | 735 Market St | Swinerton Builders | oti-2 1st fl me.elDetails
oti-2 1st fl me.el | $50,000 |
| Sep 19, 2000 | Expired or cancelled expired Mar 2004 | 735 Market St | lifesafty 6th floor office spaceDetails
lifesafty 6th floor office space | $16,000 | |
| Sep 19, 2000 | Expired or cancelled expired Sep 2003 | 735 Market St | life safety 5th floor (shell & core provided by others)Details
life safety 5th floor (shell & core provided by others) | $16,000 | |
| Sep 18, 2000 | Expired or cancelled expired Sep 2003 | 735 Market St | Cosco Fire Protection Inc. | fire sprinkler system for ti to accommodate new officesDetails
fire sprinkler system for ti to accommodate new offices | $53,800 |
| Sep 15, 2000 | Completed final sign-off Sep 2001 | 735 Market St | Swinerton Builders | oti-1 el, me,ls,sp at 1st flDetails
oti-1 el, me,ls,sp at 1st fl | $40,000 |
| May 30, 2000 | Expired or cancelled expired Mar 2004 | 735 Market St | remodel (e) 5th & 6th floors new interior partitions & mechDetails
remodel (e) 5th & 6th floors new interior partitions & mech | $500,000 | |
| Jan 24, 2000 | Expired or cancelled expired Sep 2003 | 735 Market St | revision to -9825171-change to roofing -built up work only-no strucural workDetails
revision to -9825171-change to roofing -built up work only-no strucural work | ||
| Jan 19, 2000 | Expired or cancelled expired Sep 2003 | 735 Market St | built sprinkler addendum to app #9917892Details
built sprinkler addendum to app #9917892 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cosco Fire Protection Inc. (6), Plant Construction Co, Lp (5), Plant Construction Company Lp (5), Simplex Grinnell (5), Build Group Inc. (3), Johnson Controls Fire (3), Nibbi Bros Assoc Inc. (3), Tyko Sign Group (3), Webcor Construction Lp (3), Acg Construction Inc (2), Craddaar Corp Dba Solano Signs (2), Muratore Inc (2), Pmn Design Elect Inc Dba Design Elc (2), Swinerton Builders (2), Acco Engineered Systems Inc. Dba Acco En, Allied Fire Protection, Bal Aire Mechanical Inc, Baxter Construction, Bay City Mechanical Inc, C B F Inc, Critchfield Mechanical Inc, Eco Fire Sprinklers Inc, Golden Gate Sign Company Inc., Johnston Sign Company, Pribuss Engineering Inc, Thunder Electric Inc.
- Architects
- Glenn G. Rescalvo (9), Jon Lenoble (2), Barry Bourbon, Robert Roth
- Engineers
- Michael Webert (2), Alexander F. Graebe, Edward J Brady, Theodore Garcia