Pmn Design Elect Inc Dba Design Elc
- Based in
- Pleasanton
- On San Francisco permits
- Jul 2013 to Oct 2024
- Last 24 months
- 1 permit filed
8 permits since 2000: 7 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2024 | Expired or cancelled withdrawn Mar 2025 | 52 Kirkwood Av | as-build drawings for the photovoltaic installation permitted under pa# 201910033486-s6.Details
as-build drawings for the photovoltaic installation permitted under pa# 201910033486-s6. | $35,000,000 |
| Dec 21, 2021 | Completed final sign-off Sep 2024 | 52 Kirkwood Av | install emergency responder radio coverage system.Details
install emergency responder radio coverage system. | $105,613 |
| Apr 11, 2019 | Completed final sign-off Jun 2019 | 735 Market St | 5th fl remodel commercial office space: new lighting, lighting controls, recept, t-24. ref ti #201901311757Details
5th fl remodel commercial office space: new lighting, lighting controls, recept, t-24. ref ti #201901311757 | |
| Apr 11, 2019 | Completed final sign-off Jun 2019 | 735 Market St | 6th fl remodel commercial office space: new lighting, lighting controls, recept, t-24. ref ti #201902072340Details
6th fl remodel commercial office space: new lighting, lighting controls, recept, t-24. ref ti #201902072340 | |
| Sep 14, 2018 | Completed final sign-off Sep 2018 | 626 Mission Bay Blvd North Bl | as-built revisions to 201507272485 s4, remove all (6) antennas from top floor as it passed test. changes to cover sheet errc1.0, errc1.2, and errc2.6. all other revision clouds from previousy approved permit. maher n/aDetails
as-built revisions to 201507272485 s4, remove all (6) antennas from top floor as it passed test. changes to cover sheet errc1.0, errc1.2, and errc2.6. all other revision clouds from previousy approved permit. maher n/a | |
| Dec 6, 2016 | Completed final sign-off Sep 2017 | 1201 Tennessee St | revise previously approved electrical plans under app#201312234917 to resolve discrepancies with fire/smoke detectors between prevously approved mechanical plans requester by fire department. revise addendum #5Details
revise previously approved electrical plans under app#201312234917 to resolve discrepancies with fire/smoke detectors between prevously approved mechanical plans requester by fire department. revise addendum #5 | |
| Apr 4, 2014 | Completed final sign-off Jun 2017 | 588 Mission Bay Blvd North Bl | erect 5 story 200 residential unit and commercial 5 story type iii construction.Details
erect 5 story 200 residential unit and commercial 5 story type iii construction. | $33,857,234 |
| Jul 25, 2013 | Completed final sign-off Dec 2013 | 2001 Market St | installation of a new 150 kvq 480/277 volt diesel gen set with a 335 gallon ul142 base tank, on the roof of 2001 market. ref pa# 201012206990, s-5 for fuel oil piping.Details
installation of a new 150 kvq 480/277 volt diesel gen set with a 335 gallon ul142 base tank, on the roof of 2001 market. ref pa# 201012206990, s-5 for fuel oil piping. | $100,000 |