Block 3708, lot 040
49 Stevenson St
- City’s use
- Commercial Office
- Built
- 1989
- Stories
- 15
- Building
- 137,747 sq ft
- Lot
- 8,960 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
197 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 11, 2024 | Completed final sign-off Jul 2024 | 49 Stevenson St | Tri-Signal Integration Inc. | change communication path of the (e) fire alarm systems to sole path cellular radio communicator.Details
change communication path of the (e) fire alarm systems to sole path cellular radio communicator. | $4,750 |
| Sep 28, 2023 | Completed final sign-off Feb 2024 | 49 Stevenson St | abate planning code violation# 2023-001179: to accurately document square footage & location of publicly accessible 2,660 sq ft open space (arcade) per motion #10162. provide seating w/in arcade, affix signage per section 138. restaurant encroach no more than 25% (up to 665 s.f.) in arcade.Details
abate planning code violation# 2023-001179: to accurately document square footage & location of publicly accessible 2,660 sq ft open space (arcade) per motion #10162. provide seating w/in arcade, affix signage per section 138. restaurant encroach no more than 25% (up to 665 s.f.) in arcade. | ||
| Apr 17, 2023 | Completed final sign-off May 2023 | 49 Stevenson St | Sabah International Incorporated | 11/f: as-builts ref pa# 202206085848, changing the name of huddle room 1106 to office 1106 and removing 1-ceiling mount speaker/strobe in office 1106.Details
11/f: as-builts ref pa# 202206085848, changing the name of huddle room 1106 to office 1106 and removing 1-ceiling mount speaker/strobe in office 1106. | |
| Jan 3, 2023 | Expired or cancelled withdrawn Oct 2023 | 49 Stevenson St | ste 1500: ti of a flr office space to include- partial demo of partitions, suspended ceilings and flr covering, installation of new partitions, new finishes throughout, paint & flr covering, ada upgrade to restrooms.Details
ste 1500: ti of a flr office space to include- partial demo of partitions, suspended ceilings and flr covering, installation of new partitions, new finishes throughout, paint & flr covering, ada upgrade to restrooms. | ||
| Nov 10, 2022 | Completed final sign-off May 2023 | 49 Stevenson St | Sabah International Incorporated | 11th fl tenent improvement modification of the existing fire alarm suystem. add (3) ceiling mount speaker/strobe. ref pa# 202206085848Details
11th fl tenent improvement modification of the existing fire alarm suystem. add (3) ceiling mount speaker/strobe. ref pa# 202206085848 | $9,700 |
| Sep 14, 2022 | Never finaled issued Sep 2022, no final | 49 Stevenson St | Sabah International Incorporated | voluntary modifiy (e) fire alarm system add (2) smoke detectors (1) heat detector (3) control relays, (1) high power control relays, 1 monitor moduleDetails
voluntary modifiy (e) fire alarm system add (2) smoke detectors (1) heat detector (3) control relays, (1) high power control relays, 1 monitor module | $24,921 |
| Jun 8, 2022 | Never finaled issued Oct 2022, no final | 49 Stevenson St | Gci, Inc | installation of life safety & seismic req for 2 (e) phone booths in (e) office. work not included any demo, mech & elec, plumbing. occupany and existing, egress are not affect by the work.Details
installation of life safety & seismic req for 2 (e) phone booths in (e) office. work not included any demo, mech & elec, plumbing. occupany and existing, egress are not affect by the work. | $10,000 |
| Feb 1, 2022 | Never finaled issued Oct 2022, no final | 49 Stevenson St | Pioneer Fire Inc. | add 2 concealed pendents in phone booths. ref permit 202206085848. ref electrical permit # ew202109138338.Details
add 2 concealed pendents in phone booths. ref permit 202206085848. ref electrical permit # ew202109138338. | $1,000 |
| Jun 8, 2021 | Completed final sign-off Jul 2021 | 49 Stevenson St | Sabah International Incorporated | ti #2019-1007-3701 modify existing fire alarm system. demo (4) heat detectors, (2) existing ceiling speaker/strobes. add (2) ceiling speaker/strobes.Details
ti #2019-1007-3701 modify existing fire alarm system. demo (4) heat detectors, (2) existing ceiling speaker/strobes. add (2) ceiling speaker/strobes. | $13,800 |
| May 25, 2021 | Completed final sign-off Dec 2021 | 49 Stevenson St | Terra Nova Industries | basement: revision to pa 201910073701. reduced scope from original approved plans. install (n) walk-in coolers, (2) 3-compartment sinks, ventless dishwasher and hand sink. all mep work under separate deferred trade permitsDetails
basement: revision to pa 201910073701. reduced scope from original approved plans. install (n) walk-in coolers, (2) 3-compartment sinks, ventless dishwasher and hand sink. all mep work under separate deferred trade permits | |
| Apr 20, 2021 | Completed final sign-off Jul 2021 | 49 Stevenson St | Aaa Restaurant Fire Control/Dba Aaa Fire | add (13) new pendent 4dry pendents for new wall layout. sprinkler tiDetails
add (13) new pendent 4dry pendents for new wall layout. sprinkler ti | $12,000 |
| Oct 16, 2020 | Completed final sign-off Feb 2021 | 49 Stevenson St | Sabah International Incorporated | 3rd flr - ref ti 202002134417/202006269242: modify (e) fire alarm sys: reloc (1)contrl relay. add (1)dual input mod, (2)contrl relays, (24)ceiling spkr/strbs and provide (n) 2-way comm sys: (1)main contrl, (1)master console, (1)tele interface, (1)relay iso mod, (1)call stn, (2)cic to cat5 adpters.Details
3rd flr - ref ti 202002134417/202006269242: modify (e) fire alarm sys: reloc (1)contrl relay. add (1)dual input mod, (2)contrl relays, (24)ceiling spkr/strbs and provide (n) 2-way comm sys: (1)main contrl, (1)master console, (1)tele interface, (1)relay iso mod, (1)call stn, (2)cic to cat5 adpters. | $18,845 |
| Aug 4, 2020 | Never finaled issued Aug 2020, no final | 49 Stevenson St | C B F Inc | suite 300: t-24 - new electrical lighting / power for t.i. pa202002134417. maher n/a.Details
suite 300: t-24 - new electrical lighting / power for t.i. pa202002134417. maher n/a. | $135,000 |
| Jun 26, 2020 | Never finaled issued Jul 2020, no final | 49 Stevenson St | R M I Mechanical Contractors | replace/add 12 vavs, add one exhaust fan, add one wshp, add one water pump, new ductwork, new water piping, temperature controls, and air balance. ref pa#202002134417Details
replace/add 12 vavs, add one exhaust fan, add one wshp, add one water pump, new ductwork, new water piping, temperature controls, and air balance. ref pa#202002134417 | $150,000 |
| Jun 2, 2020 | Completed final sign-off Aug 2020 | 49 Stevenson St | R L H Fire Protection Inc | suite 300/3rd fl: fire sprinkler tenant improvement relocate 69, add 16, and delete 19 sprinklers on the 3rd floor reference building permit 2020-0213-4417Details
suite 300/3rd fl: fire sprinkler tenant improvement relocate 69, add 16, and delete 19 sprinklers on the 3rd floor reference building permit 2020-0213-4417 | $22,000 |
| Feb 13, 2020 | Completed final sign-off Mar 2021 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | suite 300: tenant improvement, demo partitions, ceiling, floor coverings and install new. add new single user ada restroom.Details
suite 300: tenant improvement, demo partitions, ceiling, floor coverings and install new. add new single user ada restroom. | $850,000 |
| Oct 7, 2019 | Expired or cancelled cancelled Jan 2026 | 49 Stevenson St | tenant improvement of (e) basement restrooms, corridor, stairway & ground floor dining & take-out areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, lighting, mechanical, electrical, & plumbing.Details
tenant improvement of (e) basement restrooms, corridor, stairway & ground floor dining & take-out areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, lighting, mechanical, electrical, & plumbing. | $285,000 | |
| Oct 7, 2019 | Completed final sign-off Dec 2021 | 49 Stevenson St | Terra Nova Industries | tenant improvement of (e) basement kitchen space. no work to ground floor dining or ground floor kitchen areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, and lighting, mep associated w/all kitchen equipment. addition of employee use restroom.Details
tenant improvement of (e) basement kitchen space. no work to ground floor dining or ground floor kitchen areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, and lighting, mep associated w/all kitchen equipment. addition of employee use restroom. | $230,000 |
| Aug 8, 2019 | Completed final sign-off Oct 2019 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | new power data for conf rms & ofc. new break room., new lighting & controls ref 201906102948Details
new power data for conf rms & ofc. new break room., new lighting & controls ref 201906102948 | $284,696 |
| Aug 8, 2019 | Completed final sign-off Oct 2019 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | modification of (e) hvac system to match new arch layout. the replacemnt of 10 vav terminal units the addition of 1 exhaust fan, air balance ref 201906102948Details
modification of (e) hvac system to match new arch layout. the replacemnt of 10 vav terminal units the addition of 1 exhaust fan, air balance ref 201906102948 | $149,348 |
| Jul 25, 2019 | Completed final sign-off Dec 2019 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | ti- partial demo of paritions & floor coverins, new finishes throughout and ada upgrade to restroomDetails
ti- partial demo of paritions & floor coverins, new finishes throughout and ada upgrade to restroom | $153,081 |
| Jul 9, 2019 | Completed final sign-off Oct 2022 | 49 Stevenson St | Ayoob & Peery Plumbing Co Inc | fire ti on 11th fl: add 2, relocate 39, and change out 27 sprinklers to conform wit hthe new wall/ceiling layout of the ti. ref pa #201906102948Details
fire ti on 11th fl: add 2, relocate 39, and change out 27 sprinklers to conform wit hthe new wall/ceiling layout of the ti. ref pa #201906102948 | $15,900 |
| Jul 3, 2019 | Completed final sign-off Sep 2019 | 49 Stevenson St | Sabah International Incorporated | 11th fl: ref p# 201906102948; 1 smoke detector, 28 speaker /strobes,1 sync module, 4 speaker /strobes weather proof, 1 power supplyDetails
11th fl: ref p# 201906102948; 1 smoke detector, 28 speaker /strobes,1 sync module, 4 speaker /strobes weather proof, 1 power supply | $18,219 |
| Jun 20, 2019 | Completed final sign-off Jul 2019 | 49 Stevenson St | Sabah International Incorporated | 7th floor: add 1 smoke detector, synchronization modules, booster power supply, 22 speaker/strobes. ref app#201904117705Details
7th floor: add 1 smoke detector, synchronization modules, booster power supply, 22 speaker/strobes. ref app#201904117705 | $16,969 |
| Jun 20, 2019 | Never finaled issued Jun 2019, no final | 49 Stevenson St | R L H Fire Protection Inc | 7th fl - fire sprinkler permit. relocate 61, add 6 and delete 17 sprinklers. ref pa 2019-0411-7705Details
7th fl - fire sprinkler permit. relocate 61, add 6 and delete 17 sprinklers. ref pa 2019-0411-7705 | $16,000 |
| Jun 17, 2019 | Completed final sign-off Oct 2019 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | 7th flr. mechanical work for pa 201904117705. demo lowside duct work, piping and equipment. install (n) vav boxes and ductwork. add one fsd and dsd to rated penetration in the lobby.Details
7th flr. mechanical work for pa 201904117705. demo lowside duct work, piping and equipment. install (n) vav boxes and ductwork. add one fsd and dsd to rated penetration in the lobby. | $193,000 |
| Jun 17, 2019 | Completed final sign-off Oct 2019 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | 7th flr. electrical for pa 201904117705. (n) break room, (n) power and data at offices and conference room. (n) lighting and controls. electrical onlyDetails
7th flr. electrical for pa 201904117705. (n) break room, (n) power and data at offices and conference room. (n) lighting and controls. electrical only | $237,000 |
| Jun 10, 2019 | Completed final sign-off Oct 2019 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | 11th fl spec suite 1100: interior ti to include partial demo of partitions & floor coverings, new partitions & finishes throughout, new unisex ada restroom.Details
11th fl spec suite 1100: interior ti to include partial demo of partitions & floor coverings, new partitions & finishes throughout, new unisex ada restroom. | $1,000,000 |
| Apr 11, 2019 | Completed final sign-off Oct 2019 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | 7th flr. suite 700: interior tenant improvement. new partitions, finsishes, paint, floor coverings, new single user ada restroom, install door operator & activation at ground flr entry to comply w/ acessible business entrance program. maher n/a.Details
7th flr. suite 700: interior tenant improvement. new partitions, finsishes, paint, floor coverings, new single user ada restroom, install door operator & activation at ground flr entry to comply w/ acessible business entrance program. maher n/a. | $200,000 |
| Nov 14, 2018 | Completed final sign-off Dec 2018 | 49 Stevenson St | Sabah International Incorporated | as built for pa 2018-0808-6729Details
as built for pa 2018-0808-6729 | |
| Sep 27, 2018 | Completed final sign-off Oct 2018 | 49 Stevenson St | Cobe Construction Inc | 14th fl - revision to pa 2018-0504-8181, ti only architectural omitting (1) card reader from scopeDetails
14th fl - revision to pa 2018-0504-8181, ti only architectural omitting (1) card reader from scope | |
| Sep 26, 2018 | Completed final sign-off Oct 2018 | 49 Stevenson St | Cobe Construction Inc | electrical t.i. work for architectural t.i., appl # 2018/05/04/8181Details
electrical t.i. work for architectural t.i., appl # 2018/05/04/8181 | |
| Aug 16, 2018 | Completed final sign-off Oct 2018 | 49 Stevenson St | Cobe Construction Inc | revisionto 201805048181 pre bld inspectors request - to file this upgrade keep (e) water closets in place and use the new proposed all gender restroom as equalivent facilitation solutionDetails
revisionto 201805048181 pre bld inspectors request - to file this upgrade keep (e) water closets in place and use the new proposed all gender restroom as equalivent facilitation solution | |
| Aug 8, 2018 | Completed final sign-off Dec 2018 | 49 Stevenson St | Sabah International Incorporated | fire alarms 14th floor-ref t.i. 201805048181; add (1) pwe supple,(4) control relays high powered, (37) speaker/strobes, (1) control relay, (1) sync module, (3) duct smoke detectorsDetails
fire alarms 14th floor-ref t.i. 201805048181; add (1) pwe supple,(4) control relays high powered, (37) speaker/strobes, (1) control relay, (1) sync module, (3) duct smoke detectors | $17,548 |
| Jul 6, 2018 | Completed final sign-off Sep 2018 | 49 Stevenson St | Pioneer Fire Inc. | relocate 19 uprights, relocate 36 pendents. remove 1 upright ti 201805048181Details
relocate 19 uprights, relocate 36 pendents. remove 1 upright ti 201805048181 | $19,785 |
| Jul 5, 2018 | Completed final sign-off Oct 2018 | 49 Stevenson St | Cobe Construction Inc | deferred mechanical plans being submitted for ti office build out. ref pa 2018-0504-8181. installing new low side ductworkand hvac equipment from exsisting vavs. intall new exhaust fan serving the it rack. install new vav box and ductwork. not oshpod 3.Details
deferred mechanical plans being submitted for ti office build out. ref pa 2018-0504-8181. installing new low side ductworkand hvac equipment from exsisting vavs. intall new exhaust fan serving the it rack. install new vav box and ductwork. not oshpod 3. | $80,000 |
| May 4, 2018 | Completed final sign-off Oct 2018 | 49 Stevenson St | Cobe Construction Inc | tenant improvement only architectural, full floor. partitions, restrooms, new ceilings, finishes. new casework, mep and fire under deferred permit(s). new rated elevator lobby doors, card readersDetails
tenant improvement only architectural, full floor. partitions, restrooms, new ceilings, finishes. new casework, mep and fire under deferred permit(s). new rated elevator lobby doors, card readers | $550,000 |
| Apr 10, 2018 | Completed final sign-off May 2018 | 49 Stevenson St | Pioneer Fire Inc. | f/s on 14th fl: remove all pendent drops and bring systems to original warm shell condition. ref #201803083216.Details
f/s on 14th fl: remove all pendent drops and bring systems to original warm shell condition. ref #201803083216. | $9,800 |
| Mar 21, 2018 | Completed final sign-off May 2018 | 49 Stevenson St | Bcci Construction Company | rev to app#201712065619 per inspector request, add auto door opener in men's restroom & reconfigure women's restroom layoutDetails
rev to app#201712065619 per inspector request, add auto door opener in men's restroom & reconfigure women's restroom layout | $7,000 |
| Mar 8, 2018 | Completed final sign-off Oct 2018 | 49 Stevenson St | Cobe Construction Inc | 14/f: interior only, non-structural/building core. demolition work. interior wall partitions. iinterior n-rated door. . interior restrooms & fixtures.. all non-structural elements & core. per-ab-017 !!!!! ceiling demo not permitted!!!!!!Details
14/f: interior only, non-structural/building core. demolition work. interior wall partitions. iinterior n-rated door. . interior restrooms & fixtures.. all non-structural elements & core. per-ab-017 !!!!! ceiling demo not permitted!!!!!! | $10,000 |
| Mar 5, 2018 | Completed final sign-off May 2018 | 49 Stevenson St | 4th fl evacuation maps (3)Details
4th fl evacuation maps (3) | $1,500 | |
| Jan 30, 2018 | Completed final sign-off Oct 2018 | 49 Stevenson St | Sabah International Incorporated | modify and replace (e) partial 4th fl notification appliances to accommodate new wall configurations. ti #201712065619.Details
modify and replace (e) partial 4th fl notification appliances to accommodate new wall configurations. ti #201712065619. | $12,865 |
| Dec 13, 2017 | Completed final sign-off May 2018 | 49 Stevenson St | Bcci Construction Company | 4th flr: mech including demo of ductwork, add 1 new reheat vav boxes, 1 new water source heat pump, air distribution & balance and 1 condenser water booster pump. electrical lighting, power & signal control ref 201712065619Details
4th flr: mech including demo of ductwork, add 1 new reheat vav boxes, 1 new water source heat pump, air distribution & balance and 1 condenser water booster pump. electrical lighting, power & signal control ref 201712065619 | $95,000 |
| Dec 8, 2017 | Completed final sign-off Feb 2018 | 49 Stevenson St | Golden Gate Fire Protection Inc | 4/f- fire sprinkler only, relocate 37 pendents, add 6 pendents, relocate 32 upright, add 1 upright, delete 14 pendents. t.i. pa#201712065619.Details
4/f- fire sprinkler only, relocate 37 pendents, add 6 pendents, relocate 32 upright, add 1 upright, delete 14 pendents. t.i. pa#201712065619. | $19,000 |
| Dec 6, 2017 | Completed final sign-off May 2018 | 49 Stevenson St | Bcci Construction Company | 4th - full floor installation of (n) partitions and gyp bd ceiling installation of (n) millwork, countertops and fixtures, new finishes throughout. paint and floor covereings. installation of card reader at elevator lobby and other locations. fire and mep will be design build under separate permitsDetails
4th - full floor installation of (n) partitions and gyp bd ceiling installation of (n) millwork, countertops and fixtures, new finishes throughout. paint and floor covereings. installation of card reader at elevator lobby and other locations. fire and mep will be design build under separate permits | $836,745 |
| Jun 28, 2017 | Completed final sign-off Sep 2017 | 49 Stevenson St | Swinerton Builders | revision to 201704244714, restroom reconfiguration due to ada requirementDetails
revision to 201704244714, restroom reconfiguration due to ada requirement | $10,000 |
| Jun 15, 2017 | Completed final sign-off Aug 2017 | 49 Stevenson St | Bilcor Inc | 15th floor: fire alarm ref 2017-0424-4714: install 10 wall mount speaker strobes. install 1 control relay moduleDetails
15th floor: fire alarm ref 2017-0424-4714: install 10 wall mount speaker strobes. install 1 control relay module | $5,500 |
| May 19, 2017 | Completed final sign-off Jun 2017 | 49 Stevenson St | R L H Fire Protection Inc | fire sprinkler relocate 17 add 5, delete 36 pendent sprinklers, install 31 new upright sprinklers on the 15th fl ref 201704244714Details
fire sprinkler relocate 17 add 5, delete 36 pendent sprinklers, install 31 new upright sprinklers on the 15th fl ref 201704244714 | $22,000 |
| Apr 24, 2017 | Completed final sign-off Sep 2017 | 49 Stevenson St | Swinerton Builders | suite 1500: office t.i. partial demolition of partitions and ceilings, new plumbing fixtures, upgrade ada restroom. new partitions and finishes. new ceiling and lighting.Details
suite 1500: office t.i. partial demolition of partitions and ceilings, new plumbing fixtures, upgrade ada restroom. new partitions and finishes. new ceiling and lighting. | $791,698 |
| Jun 13, 2016 | Completed final sign-off Aug 2016 | 49 Stevenson St | Bcci Construction Company | 11/f- revision to pa#201603222782 to show card reader location.Details
11/f- revision to pa#201603222782 to show card reader location. | |
| Jun 9, 2016 | Completed final sign-off Jun 2016 | 49 Stevenson St | Red Hawk Fire & Security Ca Llc | 11th floor: as built for change use area smoke extg to activate fsd closure in i.t. room. add control relay for secondary means of card reader release and security interface. ref app #201606069191Details
11th floor: as built for change use area smoke extg to activate fsd closure in i.t. room. add control relay for secondary means of card reader release and security interface. ref app #201606069191 | |
| Jun 6, 2016 | Completed final sign-off Jun 2016 | 49 Stevenson St | Red Hawk Fire & Security Ca Llc | add 4 duct detectors, add 2 control relay modules. 11th floor.Details
add 4 duct detectors, add 2 control relay modules. 11th floor. | $7,500 |
| May 31, 2016 | Completed final sign-off Jun 2016 | 49 Stevenson St | Bcci Construction Company | 11th flr: mechanical work associated with approved pa 2016 0322 2782Details
11th flr: mechanical work associated with approved pa 2016 0322 2782 | $15,500 |
| May 31, 2016 | Completed final sign-off Jun 2016 | 49 Stevenson St | Bcci Construction Company | 11th flr: revision to ref pa 2016 0322 2782 to revise the rating of the ceiling inthe server roomDetails
11th flr: revision to ref pa 2016 0322 2782 to revise the rating of the ceiling inthe server room | $2,500 |
| May 25, 2016 | Completed final sign-off Jun 2016 | 49 Stevenson St | Pribuss Engineering Inc | fire sprinkler ti in sute 2800, ref pa 2016-0329-3394 - relocate 3 heads, add 1 headDetails
fire sprinkler ti in sute 2800, ref pa 2016-0329-3394 - relocate 3 heads, add 1 head | $2,058 |
| Apr 26, 2016 | Completed final sign-off Aug 2016 | 49 Stevenson St | Sprig Electric (Archkey Solutions), Bcci Construction Company | 11th flr: electrical and card readers title 24 for ups unit, bldg permit 201603222782Details
11th flr: electrical and card readers title 24 for ups unit, bldg permit 201603222782 | $35,000 |
| Mar 22, 2016 | Completed final sign-off Aug 2016 | 49 Stevenson St | Bcci Construction Company | tenant improvement to include partial demo of partitions, suspended ceiling & floor covering, install new partitions, new paint & floor covering, ada upgrade to restroom. mech. elec. plumbing, fire protection & life safety under seperate permit. ti room per ab-060Details
tenant improvement to include partial demo of partitions, suspended ceiling & floor covering, install new partitions, new paint & floor covering, ada upgrade to restroom. mech. elec. plumbing, fire protection & life safety under seperate permit. ti room per ab-060 | $60,000 |
| Sep 14, 2015 | Never finaled issued Sep 2015, no final | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | #660- electrical plans in addition to pa# 2015-0716-1680Details
#660- electrical plans in addition to pa# 2015-0716-1680 | |
| Sep 14, 2015 | Expired or cancelled cancelled Jan 2026 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | #660- mechanical plans in addition to pa# 201507161680Details
#660- mechanical plans in addition to pa# 201507161680 | $36,259 |
| Aug 26, 2015 | Completed final sign-off Nov 2015 | 49 Stevenson St | H C I Systems Inc | 6th floor: install 9 nac devices on an extg power sypply. all devices are added to an extg fire alarm system. ref app#201309257683.Details
6th floor: install 9 nac devices on an extg power sypply. all devices are added to an extg fire alarm system. ref app#201309257683. | $4,500 |
| Aug 21, 2015 | Completed final sign-off May 2025 | 49 Stevenson St | Ayoob & Peery Plumbing Co Inc | 6th fl: add & relocate fire sprinklers per ti (1 add) (12 relocate). ref ti 2015-0716-1680.Details
6th fl: add & relocate fire sprinklers per ti (1 add) (12 relocate). ref ti 2015-0716-1680. | $3,000 |
| Jul 16, 2015 | Never finaled issued Aug 2015, no final | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | suite 660 - partial demo of paritiions, ceilings, floor covering. new partitions, new finishes, paint and floor coverings, ada upgrade to restroom; separate permits for mep, fire safety.Details
suite 660 - partial demo of paritiions, ceilings, floor covering. new partitions, new finishes, paint and floor coverings, ada upgrade to restroom; separate permits for mep, fire safety. | $119,850 |
| Apr 10, 2015 | Completed final sign-off Jun 2015 | 49 Stevenson St | Novo Construction Inc | suite 1300 - install heat pump and associate duct work and diffuser/grille. install condenser water pump. ref app#201503050049.Details
suite 1300 - install heat pump and associate duct work and diffuser/grille. install condenser water pump. ref app#201503050049. | $10,000 |
| Apr 8, 2015 | Completed final sign-off Apr 2015 | 49 Stevenson St | Ayoob & Peery Plumbing Co Inc | relocate (2) fire sprinklers at 13/f t.i. pa# 201503050049Details
relocate (2) fire sprinklers at 13/f t.i. pa# 201503050049 | $1,028 |
| Mar 5, 2015 | Completed final sign-off Jun 2015 | 49 Stevenson St | Novo Construction Inc | suite 1300: expansion of (e) it closet and minor accessibility upgradesDetails
suite 1300: expansion of (e) it closet and minor accessibility upgrades | $10,742 |
| Aug 18, 2014 | Completed final sign-off Sep 2014 | 49 Stevenson St | H C I Systems Inc | add 6 new horn strobes on an existing fire alarm system in the 10/f. t.i. pa#201406027245.Details
add 6 new horn strobes on an existing fire alarm system in the 10/f. t.i. pa#201406027245. | $7,400 |
| Aug 11, 2014 | Completed final sign-off Sep 2014 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | install penn model z8-ra exhaust fan (hvac)Details
install penn model z8-ra exhaust fan (hvac) | $327,600 |
| Jul 14, 2014 | Completed final sign-off May 2025 | 49 Stevenson St | Ayoob & Peery Plumbing Co Inc | #1000- add & relocate fire sprinklers per t.i. (1) add, (15) relocate. t.i. pa#201406027245Details
#1000- add & relocate fire sprinklers per t.i. (1) add, (15) relocate. t.i. pa#201406027245 | $8,224 |
| Jun 2, 2014 | Completed final sign-off Sep 2014 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | tenant improvement: install new partitions, doors and finishes. mechanical & electrical under seperate permit.Details
tenant improvement: install new partitions, doors and finishes. mechanical & electrical under seperate permit. | $327,600 |
| May 28, 2014 | Never finaled issued May 2014, no final | 49 Stevenson St | H C I Systems Inc | add 3 strobes & 6 speaker strobes to an existing fire alarm system in the new 2/f t.i. space. t.i. pa#201312265082Details
add 3 strobes & 6 speaker strobes to an existing fire alarm system in the new 2/f t.i. space. t.i. pa#201312265082 | $6,480 |
| Apr 23, 2014 | Completed final sign-off Jun 2014 | 49 Stevenson St | Allied Heating & Air Conditioning | 2nd floor: t.i. (interior) new ductwork and diffusers, controls and air balancing.Details
2nd floor: t.i. (interior) new ductwork and diffusers, controls and air balancing. | $32,500 |
| Mar 31, 2014 | Completed final sign-off May 2014 | 49 Stevenson St | Golden Gate Fire Protection Inc | relocate 3 pendent sprinklers on the 2nd fl. relocate 27 upright sprinklers. t.i. 2013.1226.5082Details
relocate 3 pendent sprinklers on the 2nd fl. relocate 27 upright sprinklers. t.i. 2013.1226.5082 | $15,450 |
| Jan 16, 2014 | Completed final sign-off Feb 2014 | 49 Stevenson St | Ayoob & Peery Plumbing Co Inc | 7th floor suite 700 - add fire sprinkler heads per tenant improvements, add 6 heads. ref pa #2013.12.09.3682Details
7th floor suite 700 - add fire sprinkler heads per tenant improvements, add 6 heads. ref pa #2013.12.09.3682 | $3,084 |
| Dec 26, 2013 | Completed final sign-off Jun 2014 | 49 Stevenson St | Swinerton Builders | 2nd floor: t.i. interior installation of new 1 hour partitions, doors, finishes, and ceilings. bathroom remodel to make comply. mechanical and electrical under separate permit.Details
2nd floor: t.i. interior installation of new 1 hour partitions, doors, finishes, and ceilings. bathroom remodel to make comply. mechanical and electrical under separate permit. | $173,300 |
| Dec 9, 2013 | Completed final sign-off Feb 2014 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | 7th floor suite 700- revision to pa#201310280402 adding full height glass wall (partition)Details
7th floor suite 700- revision to pa#201310280402 adding full height glass wall (partition) | $40,000 |
| Oct 28, 2013 | Completed final sign-off Feb 2014 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | minor interior remodel on 7th floor include installation of new partition, doors & finishes, minor demolition. electrical & mechanical under seperate permit.Details
minor interior remodel on 7th floor include installation of new partition, doors & finishes, minor demolition. electrical & mechanical under seperate permit. | $261,234 |
| Oct 11, 2013 | Completed final sign-off Oct 2013 | 49 Stevenson St | Ayoob & Peery Plumbing Co Inc | 6th floor - add & relocate sprinkler heads per t.i.- add 1, relcoate 6. ref pa #2013.0925.7683.Details
6th floor - add & relocate sprinkler heads per t.i.- add 1, relcoate 6. ref pa #2013.0925.7683. | $3,598 |
| Sep 27, 2013 | Completed final sign-off Oct 2013 | 49 Stevenson St | R L H Fire Protection Inc | 13th floor:add, relocate and change out fire sprinkler heads per t.i. 8 add, 18 relocate, 39 change out. remove extg drops and install new uprights.Details
13th floor:add, relocate and change out fire sprinkler heads per t.i. 8 add, 18 relocate, 39 change out. remove extg drops and install new uprights. | $32,825 |
| Sep 25, 2013 | Never finaled issued Oct 2013, no final | 49 Stevenson St | H C I Systems Inc | 13th floor: add 3 strobes and 9 speaker strobes to an existing fire alarm system in a new ti space (ti#201308063657)Details
13th floor: add 3 strobes and 9 speaker strobes to an existing fire alarm system in a new ti space (ti#201308063657) | $6,100 |
| Sep 25, 2013 | Completed final sign-off Dec 2013 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | 6th floor:minor interior remodel of suite 600. including new partitions, doors and finishes. fire sprinklers, fire alarm, electrical and mechinical under separate permit.Details
6th floor:minor interior remodel of suite 600. including new partitions, doors and finishes. fire sprinklers, fire alarm, electrical and mechinical under separate permit. | $140,000 |
| Aug 6, 2013 | Completed final sign-off Feb 2014 | 49 Stevenson St | Swinerton Builders | 13/f- interior remodel: installation of partitions, doors, ceiling and wall finishes. sprinkleers, fire alarm, mechanical & electrical under seperate permit.Details
13/f- interior remodel: installation of partitions, doors, ceiling and wall finishes. sprinkleers, fire alarm, mechanical & electrical under seperate permit. | $270,020 |
| Jul 16, 2013 | Completed final sign-off Jul 2013 | 49 Stevenson St | Golden Gate Fire Protection Inc | 8th floor-relocate 5 pendent sprinklers & relocate 3 upright sprinkler headsDetails
8th floor-relocate 5 pendent sprinklers & relocate 3 upright sprinkler heads | $4,120 |
| Jun 4, 2013 | Completed final sign-off Jun 2014 | 49 Stevenson St | Tom Rectenwald Const. Inc. | interior remodel. partial ceiling and walls demolition. installation of new walls, finishes, doors and furniture. mech and elect under seperate permit.Details
interior remodel. partial ceiling and walls demolition. installation of new walls, finishes, doors and furniture. mech and elect under seperate permit. | $125,000 |
| Apr 25, 2013 | Completed final sign-off Jun 2013 | 49 Stevenson St | Principal Builders Inc. | 3rd floor:mechanical and electrical for 3rd floor t.i. to relocate and install new equipment include ducts exhaust fans and grills, light fixture and outlets. ref app#201303222788 for t.i. ref.Details
3rd floor:mechanical and electrical for 3rd floor t.i. to relocate and install new equipment include ducts exhaust fans and grills, light fixture and outlets. ref app#201303222788 for t.i. ref. | $150,000 |
| Apr 22, 2013 | Completed final sign-off Jun 2013 | 49 Stevenson St | Johnson Controls Security Solutions Llc | 3rd floor - isntall new fire alarm devices in the newly remodeled tenant improvement space, all devices shall be added to an existing fire alarm system. installation of 4 new ceiling speaker/storbes & 9 ceiling strobes. t.i. #2013.03.22.2788.Details
3rd floor - isntall new fire alarm devices in the newly remodeled tenant improvement space, all devices shall be added to an existing fire alarm system. installation of 4 new ceiling speaker/storbes & 9 ceiling strobes. t.i. #2013.03.22.2788. | $10,000 |
| Apr 18, 2013 | Completed final sign-off Apr 2013 | 49 Stevenson St | Pribuss Engineering Inc | ti. pa# 201303222788. fire sprinkler for t.i relocate 22 fire sprinklers. remove 5 fire sprinklers.Details
ti. pa# 201303222788. fire sprinkler for t.i relocate 22 fire sprinklers. remove 5 fire sprinklers. | $11,322 |
| Mar 22, 2013 | Completed final sign-off Jun 2013 | 49 Stevenson St | Principal Builders Inc. | 3rd floor-office improvements including selective demo of interior partitions, construction of new partitions, installation of new millwork & upgrades to (e) ceilings. new finishes & furniture. f/a & sprinklers under seperate permit, mechanical, electrical & plumbing under seperate permit.Details
3rd floor-office improvements including selective demo of interior partitions, construction of new partitions, installation of new millwork & upgrades to (e) ceilings. new finishes & furniture. f/a & sprinklers under seperate permit, mechanical, electrical & plumbing under seperate permit. | $380,000 |
| Feb 8, 2013 | Completed final sign-off Mar 2013 | 49 Stevenson St | Johnson Controls Security Solutions Llc | 8th floor - relocate 8 existing speaker/strobes and 1 strobe for newly remodeled. all devices on existing fire alarm system. ref arch #201210293011Details
8th floor - relocate 8 existing speaker/strobes and 1 strobe for newly remodeled. all devices on existing fire alarm system. ref arch #201210293011 | $2,500 |
| Jan 29, 2013 | Never finaled issued Jan 2013, no final | 49 Stevenson St | Pioneer Fire Inc. | relocatre 14, add 6, delete 2 fire sprinklers.Details
relocatre 14, add 6, delete 2 fire sprinklers. | $11,000 |
| Oct 29, 2012 | Completed final sign-off Mar 2013 | 49 Stevenson St | Swinerton Builders | 8th floor suite 800 - installation of partitions, doors, finishes, ceiling remodel. elec, mech work under separate permitDetails
8th floor suite 800 - installation of partitions, doors, finishes, ceiling remodel. elec, mech work under separate permit | $270,020 |
| Jun 14, 2012 | Never finaled issued Dec 2012, no final | 49 Stevenson St | Swinerton Builders | 8th floor:barrier remodel:minor demo door relocation, new accessories and new toilet partitions, patching finishes. no electrical and mechanical work. replace existing drinking fountain to hi/lo drinking fountain.Details
8th floor:barrier remodel:minor demo door relocation, new accessories and new toilet partitions, patching finishes. no electrical and mechanical work. replace existing drinking fountain to hi/lo drinking fountain. | $10,000 |
| Jun 14, 2012 | Completed final sign-off Mar 2013 | 49 Stevenson St | Swinerton Builders | 7th floor:barrier remodel:minor demo door relocation, new accessories and new toilet partitions,new fixtures, patching finishes. no electrical and mechanical work. new lavatories & urinal, new high-low drinking fountain to replace (e) drinking fountain.Details
7th floor:barrier remodel:minor demo door relocation, new accessories and new toilet partitions,new fixtures, patching finishes. no electrical and mechanical work. new lavatories & urinal, new high-low drinking fountain to replace (e) drinking fountain. | $25,000 |
| Mar 2, 2012 | Completed final sign-off Apr 2012 | 49 Stevenson St | Carter Brothers Fire & Life Safety | 5th floor-add 8 speaker strobes & 2 strobes. t.i. pa# 2011-1222-1169Details
5th floor-add 8 speaker strobes & 2 strobes. t.i. pa# 2011-1222-1169 | $5,920 |
| Feb 13, 2012 | Never finaled issued Feb 2012, no final | 49 Stevenson St | Ayoob & Peery Plumbing Co Inc | relocate 7, add 2 and demo 1, sprinkler in suite 575. total = 9.Details
relocate 7, add 2 and demo 1, sprinkler in suite 575. total = 9. | $4,626 |
| Dec 22, 2011 | Completed final sign-off Mar 2013 | 49 Stevenson St | barrier removal - ada restrooms upgrade include: minor demo, new partitions, door relocation, new accessories, plumbing fixtures, pataching of e finishes. no elecDetails
barrier removal - ada restrooms upgrade include: minor demo, new partitions, door relocation, new accessories, plumbing fixtures, pataching of e finishes. no elec | $19,008 | |
| Dec 22, 2011 | Expired or cancelled cancelled Jan 2026 | 49 Stevenson St | barrier removal - ada restrooms upgrade include: minor demo, door relocation, new partitions, new accessories and plumbing fixtures, patching of e finishes. no electricDetails
barrier removal - ada restrooms upgrade include: minor demo, door relocation, new partitions, new accessories and plumbing fixtures, patching of e finishes. no electric | $19,868 | |
| Dec 22, 2011 | Completed final sign-off Mar 2013 | 49 Stevenson St | Swinerton Builders | barrier removal - ada upgrade (restrooms) includes: door relocation, new wall, new accessories and finishes, patching. minor demolition. no electricalDetails
barrier removal - ada upgrade (restrooms) includes: door relocation, new wall, new accessories and finishes, patching. minor demolition. no electrical | $11,848 |
| Dec 22, 2011 | Completed final sign-off Apr 2012 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | ada restroom upgrade including: 1 new partition, doors, relocations, new accessories and patching of finishes minor demoltion. no electricalDetails
ada restroom upgrade including: 1 new partition, doors, relocations, new accessories and patching of finishes minor demoltion. no electrical | $18,000 |
| Dec 22, 2011 | Completed final sign-off Apr 2012 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | 5th floor-tenant improvement: installation of partitions, doors, floor and wall finishes, minor ceiling remodel. electrical under separate permitDetails
5th floor-tenant improvement: installation of partitions, doors, floor and wall finishes, minor ceiling remodel. electrical under separate permit | $52,000 |
| Dec 3, 2010 | Completed final sign-off Sep 2011 | 49 Stevenson St | Carter Brothers Fire & Life Safety | suite 1100: add 11-speaker/strobes & 4-strobes to and (e) fire alarm system in a (n) t.i. space. (t.i. application #201011154894).Details
suite 1100: add 11-speaker/strobes & 4-strobes to and (e) fire alarm system in a (n) t.i. space. (t.i. application #201011154894). | $5,600 |
| Dec 3, 2010 | Completed final sign-off Apr 2011 | 49 Stevenson St | Carter Brothers Fire & Life Safety | suite 660: add 5-(n) speaker strobes to an (e) fire alarm system in a (n) t.i. space (t.i.#201011154894)Details
suite 660: add 5-(n) speaker strobes to an (e) fire alarm system in a (n) t.i. space (t.i.#201011154894) | $4,500 |
| Dec 3, 2010 | Completed final sign-off Mar 2011 | 49 Stevenson St | Carter Brothers Fire & Life Safety | suite 600: add 7-(n) speaker strobes to an (e) fire alarm system in a (n) t.i. space (t.i.#201011154894).Details
suite 600: add 7-(n) speaker strobes to an (e) fire alarm system in a (n) t.i. space (t.i.#201011154894). | $4,750 |
| Nov 15, 2010 | Never finaled issued Nov 2010, no final | 49 Stevenson St | Pioneer Fire Inc. | suite 600, 660, 1100 - relocate 14 and add 7 fire sprinklersDetails
suite 600, 660, 1100 - relocate 14 and add 7 fire sprinklers | $3,500 |
| Oct 22, 2010 | Completed final sign-off Sep 2011 | 49 Stevenson St | revision to app#201010213517. changing the door swing, revised ceiling plan. . mechanical, electrical under seperate permit.Details
revision to app#201010213517. changing the door swing, revised ceiling plan. . mechanical, electrical under seperate permit. | ||
| Oct 21, 2010 | Expired or cancelled expired Nov 2014 | 49 Stevenson St | installations of interior partition, doors, new finishes; electrical and mechanical under separate permit applicationDetails
installations of interior partition, doors, new finishes; electrical and mechanical under separate permit application | $128,410 | |
| Oct 21, 2010 | Completed final sign-off Jul 2011 | 49 Stevenson St | 11th floor-installation of interior partitions, doors, new finishes, millwork, mechanical & electrical- mep, life safety and sprinklers separate permitDetails
11th floor-installation of interior partitions, doors, new finishes, millwork, mechanical & electrical- mep, life safety and sprinklers separate permit | $187,371 | |
| Apr 20, 2010 | Completed final sign-off Jul 2010 | 49 Stevenson St | minor interior remodel including (n) partitions and doors, 20% ada upgrade in women toilet room only. electrical under separate permit.Details
minor interior remodel including (n) partitions and doors, 20% ada upgrade in women toilet room only. electrical under separate permit. | $32,000 | |
| Jan 21, 2010 | Completed final sign-off Apr 2010 | 49 Stevenson St | Novo Construction Inc | all work has been completed; to obtain final inspection for work approved under 200711278986Details
all work has been completed; to obtain final inspection for work approved under 200711278986 | |
| Jan 21, 2010 | Completed final sign-off Apr 2010 | 49 Stevenson St | Novo Construction Inc | all work has been completed; to obtain final inspection for work approved under pa 200712140495Details
all work has been completed; to obtain final inspection for work approved under pa 200712140495 | |
| Jan 21, 2010 | Completed final sign-off Apr 2010 | 49 Stevenson St | Novo Construction Inc | all work has been completed; to obtain final inspection for work approved under 200712110205Details
all work has been completed; to obtain final inspection for work approved under 200712110205 | |
| Jan 21, 2010 | Completed final sign-off Apr 2010 | 49 Stevenson St | Novo Construction Inc | all work has been completed; to obtain final inspection for work approved under pa 200707025752Details
all work has been completed; to obtain final inspection for work approved under pa 200707025752 | |
| Jan 21, 2010 | Completed final sign-off Apr 2010 | 49 Stevenson St | Novo Construction Inc | all work has been completed; to obtain final inspection for work approved under 200711198518Details
all work has been completed; to obtain final inspection for work approved under 200711198518 | |
| Jan 21, 2010 | Completed final sign-off Apr 2010 | 49 Stevenson St | Novo Construction Inc | all work has been completed; to obtain final inspection for work approved under 200712120311Details
all work has been completed; to obtain final inspection for work approved under 200712120311 | |
| Jan 21, 2010 | Completed final sign-off Apr 2010 | 49 Stevenson St | Novo Construction Inc | all work has been completed; to obtain final inspection for work approved under 200706063191Details
all work has been completed; to obtain final inspection for work approved under 200706063191 | |
| Jan 21, 2010 | Completed final sign-off Apr 2010 | 49 Stevenson St | Novo Construction Inc | all work has been completed; to obtain final inspection for work approved under pa 200704138740Details
all work has been completed; to obtain final inspection for work approved under pa 200704138740 | |
| Sep 25, 2009 | Completed final sign-off Nov 2009 | 49 Stevenson St | Pioneer Fire Inc. | 1oth fl, suite 1075: relocate 3 and add 1 fire sprinklerDetails
1oth fl, suite 1075: relocate 3 and add 1 fire sprinkler | $2,500 |
| Sep 17, 2009 | Completed final sign-off Nov 2009 | 49 Stevenson St | Ward Alan Emery Construction Inc. | tenant improvement for 10th floor - 1075. new breakroom, millwork to comply with ada, office expansion to include 2 new private offices, refinish reception floor.Details
tenant improvement for 10th floor - 1075. new breakroom, millwork to comply with ada, office expansion to include 2 new private offices, refinish reception floor. | $108,951 |
| Jul 17, 2008 | Never finaled issued Jul 2008, no final | 49 Stevenson St | Ward Alan Emery Construction Inc. | at 2nd fl: rvision to pa #200806063854, replace existing woment's rm sink for accessibility.Details
at 2nd fl: rvision to pa #200806063854, replace existing woment's rm sink for accessibility. | $2,960 |
| Jul 1, 2008 | Completed final sign-off Aug 2008 | 49 Stevenson St | Richlen Construction | relocation of supply air grilles, including addiiton of (n) ductwork as required to match new architectural layout. ref. appl. 200804240504.Details
relocation of supply air grilles, including addiiton of (n) ductwork as required to match new architectural layout. ref. appl. 200804240504. | $10,000 |
| Jun 26, 2008 | Completed final sign-off Aug 2008 | 49 Stevenson St | Carter Brothers Fire & Life Safety | add fire alarm safety notification to 4th floor t.i. all devices to be added to existing fire alarm. add 1 ceiling strobe, 2 ceiling speakers/strobe and 4 wall mounted strobes.Details
add fire alarm safety notification to 4th floor t.i. all devices to be added to existing fire alarm. add 1 ceiling strobe, 2 ceiling speakers/strobe and 4 wall mounted strobes. | $9,000 |
| Jun 19, 2008 | Completed final sign-off Aug 2008 | 49 Stevenson St | Richlen Construction | reuse and relocated existing 2x4 and 2x2 fixtures. add new downlights. ref arch: 200804240504Details
reuse and relocated existing 2x4 and 2x2 fixtures. add new downlights. ref arch: 200804240504 | $60,000 |
| Jun 12, 2008 | Completed final sign-off Jan 2009 | 49 Stevenson St | Pioneer Fire Protection | relocate 28 sprinklers pendants and add 1.Details
relocate 28 sprinklers pendants and add 1. | $6,000 |
| Jun 6, 2008 | Completed final sign-off Jan 2009 | 49 Stevenson St | Ward Alan Emery Construction Inc. | ti - new drywall partitions. new acoustic ceiling. 20% restroom upgrades. ref#2008-0521-2594 for app'vd demo. mep, & fire under separate permitDetails
ti - new drywall partitions. new acoustic ceiling. 20% restroom upgrades. ref#2008-0521-2594 for app'vd demo. mep, & fire under separate permit | $72,000 |
| Jun 3, 2008 | Never finaled issued Jun 2008, no final | 49 Stevenson St | R L H Fire Protection Inc | ti upgrade of existing sprinkler system. relocate 12 sprinkler heads, add 3 pendent heads and delete 1 headDetails
ti upgrade of existing sprinkler system. relocate 12 sprinkler heads, add 3 pendent heads and delete 1 head | $6,500 |
| May 21, 2008 | Completed final sign-off Jan 2009 | 49 Stevenson St | Ward Alan Emery Construction Inc. | 2nd floor - minor non-structural interior demolition at 2nd fl.Details
2nd floor - minor non-structural interior demolition at 2nd fl. | $13,000 |
| Apr 24, 2008 | Completed final sign-off Aug 2008 | 49 Stevenson St | Richlen Construction | 4th floor tenant improvement: office expansion from multi-tenant floor to single tenant flr; new ceiling height partitions with doors & sidelites/ upgrade restrooms on this floor. minor lighting layout and hvac modifications per new floor plan will be under separate permit.Details
4th floor tenant improvement: office expansion from multi-tenant floor to single tenant flr; new ceiling height partitions with doors & sidelites/ upgrade restrooms on this floor. minor lighting layout and hvac modifications per new floor plan will be under separate permit. | $100,000 |
| Dec 14, 2007 | Expired or cancelled expired Apr 2010 | 49 Stevenson St | Carter Brothers Fire & Life Safety | 14th floor: adding fire alarm system coverage to tenant improvement space. all devices will be added to an existing fire alarm system. adding 9 strobes, 1 ceiling speaker.Details
14th floor: adding fire alarm system coverage to tenant improvement space. all devices will be added to an existing fire alarm system. adding 9 strobes, 1 ceiling speaker. | $7,000 |
| Dec 12, 2007 | Expired or cancelled expired Apr 2010 | 49 Stevenson St | Novo Construction Inc | electrical & lighting work on the 14th floor referance pa 2007-1127-8986 14th floor.Details
electrical & lighting work on the 14th floor referance pa 2007-1127-8986 14th floor. | $48,000 |
| Dec 11, 2007 | Expired or cancelled expired Apr 2010 | 49 Stevenson St | Ayoob & Peery Plumbing Co Inc | 14th floor: relocate 10 sprinkler heads per tenant improvement.Details
14th floor: relocate 10 sprinkler heads per tenant improvement. | $3,000 |
| Nov 27, 2007 | Expired or cancelled expired Apr 2010 | 49 Stevenson St | Novo Construction Inc | 14th floor - building partition for office, conference room, library, server room. relocating lights as required, adding new power-data as required. new finishes. demo under separate p/a 2007.11.19.8518. mep, life safety & sprinkler under separate permit.Details
14th floor - building partition for office, conference room, library, server room. relocating lights as required, adding new power-data as required. new finishes. demo under separate p/a 2007.11.19.8518. mep, life safety & sprinkler under separate permit. | $300,000 |
| Nov 19, 2007 | Expired or cancelled expired Apr 2010 | 49 Stevenson St | Novo Construction Inc | suite #1400- interior non-structrural demo.Details
suite #1400- interior non-structrural demo. | $6,000 |
| Jul 2, 2007 | Expired or cancelled expired Apr 2010 | 49 Stevenson St | Carter Brothers Fire & Life Safety | 8th floor tenant improvement, adding 9 speaker strobe and 1 strobe, 1 speaker to existing fire alarm system.Details
8th floor tenant improvement, adding 9 speaker strobe and 1 strobe, 1 speaker to existing fire alarm system. | $7,000 |
| Jun 6, 2007 | Expired or cancelled expired Apr 2010 | 49 Stevenson St | Novo Construction Inc | oti-2 8th fl el,meDetails
oti-2 8th fl el,me | $21,000 |
| Apr 13, 2007 | Expired or cancelled expired Apr 2010 | 49 Stevenson St | oti-1, cbre, 8th fl, el, me ,ls, sp.Details
oti-1, cbre, 8th fl, el, me ,ls, sp. | $150,000 | |
| Jan 26, 2007 | Never finaled issued Jan 2007, no final | 49 Stevenson St | Geo M Robinson & Co | modify existing fire sprinkler system to protect new partition and ceiling layout on 5/f, relocate 2 & add 1 sprinkler.Details
modify existing fire sprinkler system to protect new partition and ceiling layout on 5/f, relocate 2 & add 1 sprinkler. | $575 |
| Jan 24, 2007 | Expired or cancelled expired Jun 2008 | 49 Stevenson St | add 2 new strobes and 2 new spkr/strobes to an extg fire alarm system in a new 5th floor t i spaceDetails
add 2 new strobes and 2 new spkr/strobes to an extg fire alarm system in a new 5th floor t i space | $3,800 | |
| Jan 24, 2007 | Expired or cancelled expired Jun 2008 | 49 Stevenson St | add 3 smoke detectors to an extg fire alarm system 1 smoke det will be in a new server room on 5th, 6th, and 11th floorDetails
add 3 smoke detectors to an extg fire alarm system 1 smoke det will be in a new server room on 5th, 6th, and 11th floor | $2,000 | |
| Dec 7, 2006 | Completed final sign-off Jan 2007 | 49 Stevenson St | minor interior tenant improvements and accessibility improvements in restroomsDetails
minor interior tenant improvements and accessibility improvements in restrooms | $74,000 | |
| Aug 16, 2006 | Completed final sign-off Apr 2007 | 49 Stevenson St | Edwards Service Dba G E Security | fire alarm 3rd floor. adding of 12 strobe g1r-vm and 2 speakers 965-1a-4rw to existing speaker and strobe circuitDetails
fire alarm 3rd floor. adding of 12 strobe g1r-vm and 2 speakers 965-1a-4rw to existing speaker and strobe circuit | $10,000 |
| Aug 2, 2006 | Completed final sign-off Apr 2007 | 49 Stevenson St | Richlen Construction | oti-3 lsDetails
oti-3 ls | $5,000 |
| Jul 31, 2006 | Completed final sign-off Apr 2007 | 49 Stevenson St | Richlen Construction | oti-2, 3rd floor, el, me.Details
oti-2, 3rd floor, el, me. | $26,000 |
| Jul 27, 2006 | Completed final sign-off Apr 2007 | 49 Stevenson St | oti-1 3/f el, me, ls, sp. demolition of 3 rooms. construction of 6 offices and a training room.Details
oti-1 3/f el, me, ls, sp. demolition of 3 rooms. construction of 6 offices and a training room. | $102,000 | |
| Jan 3, 2006 | Completed final sign-off Jan 2006 | 49 Stevenson St | Richlen Construction | oti-2, 9th fl. el.Details
oti-2, 9th fl. el. | $22,000 |
| Dec 29, 2005 | Completed final sign-off Jan 2006 | 49 Stevenson St | add 17 new fire alarm devices to an (e) fire alarm system in a t.i. space on the 9th floor. this includes 4 speakers, 9 strobes, 2 smokes, & 2 door holders.Details
add 17 new fire alarm devices to an (e) fire alarm system in a t.i. space on the 9th floor. this includes 4 speakers, 9 strobes, 2 smokes, & 2 door holders. | $4,500 | |
| Dec 8, 2005 | Completed final sign-off Jan 2006 | 49 Stevenson St | oti-1 9/f el, me, ls, sp office t.i. some demolition, minor new construction.Details
oti-1 9/f el, me, ls, sp office t.i. some demolition, minor new construction. | $66,000 | |
| Nov 30, 2005 | Completed final sign-off Mar 2006 | 49 Stevenson St | Ward Alan Emery Construction Inc. | rev. to permit #2005/08/2/9/1517 - revise laayout and door from original permit setDetails
rev. to permit #2005/08/2/9/1517 - revise laayout and door from original permit set | |
| Oct 6, 2005 | Expired or cancelled expired Apr 2007 | 49 Stevenson St | Geo M Robinson & Co | alteration to (e) fire sprinkler system. ad (2) pendent (ceiling) sprinklers. relocate (2) pendent (ceiling) sprinklers.Details
alteration to (e) fire sprinkler system. ad (2) pendent (ceiling) sprinklers. relocate (2) pendent (ceiling) sprinklers. | $650 |
| Aug 29, 2005 | Never finaled issued Aug 2005, no final | 49 Stevenson St | Ward Alan Emery Construction Inc. | interior demolition, new drywall partation, acoustic ceiling, doors, frames & hardward finishes. eleDetails
interior demolition, new drywall partation, acoustic ceiling, doors, frames & hardward finishes. ele | $36,000 |
| Jul 21, 2005 | Completed final sign-off Dec 2005 | 49 Stevenson St | Arrow Sign Company | sign permit - electric, projecting, single faced.Details
sign permit - electric, projecting, single faced. | |
| Jul 21, 2005 | Completed final sign-off Dec 2005 | 49 Stevenson St | Arrow Sign Company | sign permit - electric, projecting, double faced.Details
sign permit - electric, projecting, double faced. | |
| Jul 18, 2005 | Completed final sign-off Jun 2006 | 49 Stevenson St | Arrow Sign Company | to erect electric double faced projecting sign.Details
to erect electric double faced projecting sign. | $7,500 |
| May 5, 2005 | Completed final sign-off Jun 2005 | 49 Stevenson St | add 1 speaker and 1 strobe to an (e) fire alarm system to a tt in suite 460Details
add 1 speaker and 1 strobe to an (e) fire alarm system to a tt in suite 460 | $4,000 | |
| Apr 21, 2005 | Completed final sign-off Jun 2005 | 49 Stevenson St | Richlen Construction | oti-2 4th floor me lsDetails
oti-2 4th floor me ls | $16,630 |
| Mar 25, 2005 | Completed final sign-off Jun 2005 | 49 Stevenson St | office remodel-revise office layout,sprinkler,mech & life safety separate permits.Details
office remodel-revise office layout,sprinkler,mech & life safety separate permits. | $40,000 | |
| Mar 14, 2005 | Completed final sign-off Jul 2005 | 49 Stevenson St | Ward Alan Emery Construction Inc. | revision to 3200410146765. revision check list#12 sht. 12a-0.0Details
revision to 3200410146765. revision check list#12 sht. 12a-0.0 | |
| Nov 5, 2004 | Never finaled issued Nov 2004, no final | 49 Stevenson St | add to a extg fire alarm system new speakers and strobes in a new ti area on the 13th flrDetails
add to a extg fire alarm system new speakers and strobes in a new ti area on the 13th flr | $9,700 | |
| Oct 28, 2004 | Completed final sign-off Nov 2004 | 49 Stevenson St | R L H Fire Protection Inc | oti-2, 13th floor, sp.Details
oti-2, 13th floor, sp. | $2,000 |
| Oct 14, 2004 | Completed final sign-off Jul 2005 | 49 Stevenson St | oti-1 12th floor el me ls spDetails
oti-1 12th floor el me ls sp | $33,000 | |
| Sep 23, 2004 | Completed final sign-off Nov 2004 | 49 Stevenson St | 15/f-add speakers/strobes to (e) fire alarm system to provide audio & visual coverage to t.i. spaceDetails
15/f-add speakers/strobes to (e) fire alarm system to provide audio & visual coverage to t.i. space | $9,800 | |
| Sep 20, 2004 | Completed final sign-off Nov 2004 | 49 Stevenson St | Skyline Construction | sprinkler work 15 relocation, 2 removed. no increase in office space, 13th floorDetails
sprinkler work 15 relocation, 2 removed. no increase in office space, 13th floor | $2,500 |
| Sep 10, 2004 | Completed final sign-off Dec 2004 | 49 Stevenson St | Skyline Construction | oti-2, 15th floor, el, meDetails
oti-2, 15th floor, el, me | $6,000 |
| Sep 2, 2004 | Completed final sign-off Nov 2004 | 49 Stevenson St | oti-1 13th floor el me ls spDetails
oti-1 13th floor el me ls sp | $72,300 | |
| Aug 20, 2004 | Completed final sign-off Nov 2004 | 49 Stevenson St | Skyline Construction | oti-1,15th/fl-el,ls, me, spDetails
oti-1,15th/fl-el,ls, me, sp | $92,000 |
| Apr 19, 2004 | Completed final sign-off Jul 2004 | 49 Stevenson St | tenant improvement on 7/f 2 smoke detector 12 speaker and 14 strobeDetails
tenant improvement on 7/f 2 smoke detector 12 speaker and 14 strobe | $10,100 | |
| Mar 29, 2004 | Expired or cancelled expired Jan 2005 | 49 Stevenson St | Ward Alan Emery Construction Inc. | oti-3 7th floor spDetails
oti-3 7th floor sp | $4,200 |
| Mar 4, 2004 | Completed final sign-off Sep 2004 | 49 Stevenson St | Ward Alan Emery Construction Inc. | oti-1,7th fl-el,me, ls, spDetails
oti-1,7th fl-el,me, ls, sp | $74,000 |
| Mar 4, 2004 | Completed final sign-off Jul 2004 | 49 Stevenson St | Ward Alan Emery Construction Inc. | oti-2,7th fl-el,meDetails
oti-2,7th fl-el,me | $26,000 |
| Mar 3, 2004 | Completed final sign-off Jul 2004 | 49 Stevenson St | Ward Alan Emery Construction Inc. | interior soft demo only at 7th floorDetails
interior soft demo only at 7th floor | $5,500 |
| Nov 6, 2003 | Completed final sign-off Jan 2004 | 49 Stevenson St | Rudolph Commercial Interiors Inc, Rci | oti-1 10th fl-el, me, ls, spDetails
oti-1 10th fl-el, me, ls, sp | $28,000 |
| Aug 11, 2003 | Completed final sign-off Oct 2003 | 49 Stevenson St | at street level, outdoor plaza, adding new movable seating, tables, & 3' -0" high plantersDetails
at street level, outdoor plaza, adding new movable seating, tables, & 3' -0" high planters | $12,000 | |
| Jun 30, 2003 | Expired or cancelled expired Mar 2004 | 49 Stevenson St | install new devices to provide fire alarm audio visual coverage to 10th floor tenant area,Details
install new devices to provide fire alarm audio visual coverage to 10th floor tenant area, | $8,920 | |
| Jun 13, 2003 | Completed final sign-off Sep 2003 | 49 Stevenson St | demolition of non structural partitions on 12th floor, 20% hc upgrade at restroom. replace toilet paDetails
demolition of non structural partitions on 12th floor, 20% hc upgrade at restroom. replace toilet pa | $3,500 | |
| Jun 11, 2003 | Completed final sign-off Jun 2003 | 49 Stevenson St | Allan Automatic Sprinkler | add 1 pendent sp. hd. , relocate 1 sp. hd. on 10/floorDetails
add 1 pendent sp. hd. , relocate 1 sp. hd. on 10/floor | $1,200 |
| Jun 4, 2003 | Completed final sign-off Sep 2003 | 49 Stevenson St | Richlen Construction | oti-2 4th floor spDetails
oti-2 4th floor sp | $3,200 |
| May 30, 2003 | Completed final sign-off Sep 2003 | 49 Stevenson St | add devices on 4th floor to exist fire alarm panel, 2 smoke detector, one control relay for door conDetails
add devices on 4th floor to exist fire alarm panel, 2 smoke detector, one control relay for door con | $5,300 | |
| Apr 29, 2003 | Completed final sign-off Jun 2003 | 49 Stevenson St | Rossi Builders Inc. | oti-1, 10th floor, el, me, ls, spDetails
oti-1, 10th floor, el, me, ls, sp | $30,000 |
| Apr 21, 2003 | Expired or cancelled expired Jan 2005 | 49 Stevenson St | adding 9 strobe 1 sprklr strobe to new 3rd floor/add control for security dr detctr for elevator lbyDetails
adding 9 strobe 1 sprklr strobe to new 3rd floor/add control for security dr detctr for elevator lby | $8,700 | |
| Apr 3, 2003 | Expired or cancelled expired Jan 2005 | 49 Stevenson St | Pankow Special Projects Lp | oti-2 3rd floor, el, spDetails
oti-2 3rd floor, el, sp | $16,000 |
| Mar 31, 2003 | Expired or cancelled expired Jan 2005 | 49 Stevenson St | Pankow Special Projects Lp | oti-1 3rd floorDetails
oti-1 3rd floor | $30,000 |
| Mar 27, 2003 | Completed final sign-off Sep 2003 | 49 Stevenson St | Richlen Construction | oti-1 4th fl-me,lsDetails
oti-1 4th fl-me,ls | $55,000 |
| Dec 19, 2002 | Completed final sign-off Mar 2003 | 49 Stevenson St | Dpr Construction Inc | install ceiling hieght partition in existing files work roomDetails
install ceiling hieght partition in existing files work room | $5,000 |
| Dec 27, 2001 | Expired or cancelled expired Aug 2005 | 49 Stevenson St | Rossi Builders Inc. | renew pa#2001/03/14/4194 for fifnal insp.Details
renew pa#2001/03/14/4194 for fifnal insp. | |
| Dec 27, 2001 | Expired or cancelled expired Aug 2005 | 49 Stevenson St | Rossi Builders Inc. | renew pa#2001/05/01/8079 for final insp.Details
renew pa#2001/05/01/8079 for final insp. | |
| Jul 5, 2001 | Expired or cancelled expired Aug 2005 | 49 Stevenson St | Rossi Builders Inc. | oti-3 9/f ls onlyDetails
oti-3 9/f ls only | $19,000 |
| Jun 11, 2001 | Expired or cancelled expired Oct 2003 | 49 Stevenson St | Allan Automatic Sprinkler | add 2 pendent sprinkler heads and relocate one pendent srpinkler head on the ninth fl.Details
add 2 pendent sprinkler heads and relocate one pendent srpinkler head on the ninth fl. | $1,826 |
| May 1, 2001 | Expired or cancelled expired Aug 2005 | 49 Stevenson St | Rossi Builders Inc. | oti-2 9th floor, ltg, mechDetails
oti-2 9th floor, ltg, mech | $6,300 |
| Mar 14, 2001 | Expired or cancelled expired Aug 2005 | 49 Stevenson St | Rossi Builders Inc. | oti-1 9/f ltg mech lsDetails
oti-1 9/f ltg mech ls | $19,000 |
| Feb 2, 2001 | Expired or cancelled expired Oct 2003 | 49 Stevenson St | fire alarm / life safety system upgrade to all floors and basement.Details
fire alarm / life safety system upgrade to all floors and basement. | $117,000 | |
| Jan 12, 2001 | Completed final sign-off Feb 2001 | 49 Stevenson St | Richlen Construction | oti-2 mech, l/s/ (14 floor only)Details
oti-2 mech, l/s/ (14 floor only) | $6,000 |
| Dec 13, 2000 | Completed final sign-off Aug 2001 | 49 Stevenson St | Richlen Construction | oti-3 me,fs 12th floorDetails
oti-3 me,fs 12th floor | $2,500 |
| Dec 13, 2000 | Completed final sign-off Jan 2001 | 49 Stevenson St | Richlen Construction | oti-3 8th floor me,spDetails
oti-3 8th floor me,sp | $6,000 |
| Dec 1, 2000 | Completed final sign-off Feb 2001 | 49 Stevenson St | Richlen Construction | oti-1: el me, and l/s (14th fl.)Details
oti-1: el me, and l/s (14th fl.) | $35,000 |
| Nov 27, 2000 | Completed final sign-off Aug 2001 | 49 Stevenson St | Richlen Construction | oti-2 12th floor, l/s onlyDetails
oti-2 12th floor, l/s only | $12,000 |
| Nov 27, 2000 | Completed final sign-off Jan 2001 | 49 Stevenson St | Richlen Construction | oti-2 8th floor, l/s onlyDetails
oti-2 8th floor, l/s only | $10,000 |
| Nov 3, 2000 | Expired or cancelled cancelled Jan 2002 | 49 Stevenson St | oti-1 8/f ls onlyDetails
oti-1 8/f ls only | $5,000 | |
| Nov 3, 2000 | Completed final sign-off Aug 2001 | 49 Stevenson St | Richlen Construction | oti-1 12/f el me ls spDetails
oti-1 12/f el me ls sp | $27,000 |
| Nov 3, 2000 | Completed final sign-off Jan 2001 | 49 Stevenson St | Richlen Construction | oti-1 8/f el me ls spDetails
oti-1 8/f el me ls sp | $37,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Rudolph Commercial Interiors Inc, Rci (19), Richlen Construction (17), Novo Construction Inc (14), Ward Alan Emery Construction Inc. (11), Sabah International Incorporated (10), Ayoob & Peery Plumbing Co Inc (8), Bcci Construction Company (8), Swinerton Builders (8), Carter Brothers Fire & Life Safety (7), Cobe Construction Inc (6), Pioneer Fire Inc. (6), R L H Fire Protection Inc (6), Rossi Builders Inc. (6), H C I Systems Inc (4), Arrow Sign Company (3), Golden Gate Fire Protection Inc (3), Skyline Construction (3), Allan Automatic Sprinkler (2), Geo M Robinson & Co (2), Johnson Controls Security Solutions Llc (2), Pankow Special Projects Lp (2), Pribuss Engineering Inc (2), Principal Builders Inc. (2), Red Hawk Fire & Security Ca Llc (2), Terra Nova Industries (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Allied Heating & Air Conditioning, Bilcor Inc, C B F Inc, Dpr Construction Inc, Edwards Service Dba G E Security, Gci, Inc, Pioneer Fire Protection, R M I Mechanical Contractors, Sprig Electric (Archkey Solutions), Tom Rectenwald Const. Inc., Tri-Signal Integration Inc.
- Architects
- Christopher Preovolos (12), Robin Mcdonald (5), Shawn Anderson (4), Howard Kwok (3), Phoebe Lam (2), Huntsman Arch., Joseph Tyndall, Karen Carlene Letteney, Scott E Clement, Steve Fee, Tom Gajek, Virginie Manichon, William Duff
- Engineers
- Tom Gajic (5), Greg Wagner (2), Srdjan Rebraca (2), Alexander Joseph Pacheco, Craig Laws, Jesus B Cabellon Jr, Mozart Faizi, Peter Kogan, Sherry Chaumpluke, Xuong Quach, Xuong Quach
- Authorized agent-otherss
- Adolfo Alano, Fred Maguire
- Designers
- Sabah International Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.