Block 3708, lot 040

49 Stevenson St

City’s use
Commercial Office
Built
1989
Stories
15
Building
137,747 sq ft
Lot
8,960 sq ft
Zoning
C3O
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

197 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 11, 2024Completed
final sign-off Jul 2024
49 Stevenson StTri-Signal Integration Inc.change communication path of the (e) fire alarm systems to sole path cellular radio communicator.
Details
Permit
202406114121
Status
complete
Filed
Jun 11, 2024
Permit issued
Jun 11, 2024
Final sign-off
Jul 8, 2024
Declared cost
$4,750
Address
49 Stevenson St

change communication path of the (e) fire alarm systems to sole path cellular radio communicator.

Open the permit page

$4,750
Sep 28, 2023Completed
final sign-off Feb 2024
49 Stevenson Stabate planning code violation# 2023-001179: to accurately document square footage & location of publicly accessible 2,660 sq ft open space (arcade) per motion #10162. provide seating w/in arcade, affix signage per section 138. restaurant encroach no more than 25% (up to 665 s.f.) in arcade.
Details
Permit
202309287649
Status
complete
Filed
Sep 28, 2023
Permit issued
Oct 5, 2023
Final sign-off
Feb 9, 2024
Address
49 Stevenson St

abate planning code violation# 2023-001179: to accurately document square footage & location of publicly accessible 2,660 sq ft open space (arcade) per motion #10162. provide seating w/in arcade, affix signage per section 138. restaurant encroach no more than 25% (up to 665 s.f.) in arcade.

Open the permit page

Apr 17, 2023Completed
final sign-off May 2023
49 Stevenson StSabah International Incorporated11/f: as-builts ref pa# 202206085848, changing the name of huddle room 1106 to office 1106 and removing 1-ceiling mount speaker/strobe in office 1106.
Details
Permit
202304175822
Status
complete
Filed
Apr 17, 2023
Permit issued
Apr 17, 2023
Final sign-off
May 8, 2023
Address
49 Stevenson St

11/f: as-builts ref pa# 202206085848, changing the name of huddle room 1106 to office 1106 and removing 1-ceiling mount speaker/strobe in office 1106.

Open the permit page

Jan 3, 2023Expired or cancelled
withdrawn Oct 2023
49 Stevenson Stste 1500: ti of a flr office space to include- partial demo of partitions, suspended ceilings and flr covering, installation of new partitions, new finishes throughout, paint & flr covering, ada upgrade to restrooms.
Details
Permit
202301039621
Status
withdrawn
Filed
Jan 3, 2023
Address
49 Stevenson St

ste 1500: ti of a flr office space to include- partial demo of partitions, suspended ceilings and flr covering, installation of new partitions, new finishes throughout, paint & flr covering, ada upgrade to restrooms.

Open the permit page

Nov 10, 2022Completed
final sign-off May 2023
49 Stevenson StSabah International Incorporated11th fl tenent improvement modification of the existing fire alarm suystem. add (3) ceiling mount speaker/strobe. ref pa# 202206085848
Details
Permit
202211106239
Status
complete
Filed
Nov 10, 2022
Permit issued
Nov 10, 2022
Final sign-off
May 3, 2023
Declared cost
$9,700
Address
49 Stevenson St

11th fl tenent improvement modification of the existing fire alarm suystem. add (3) ceiling mount speaker/strobe. ref pa# 202206085848

Open the permit page

$9,700
Sep 14, 2022Never finaled
issued Sep 2022, no final
49 Stevenson StSabah International Incorporatedvoluntary modifiy (e) fire alarm system add (2) smoke detectors (1) heat detector (3) control relays, (1) high power control relays, 1 monitor module
Details
Permit
202209142406
Status
issued
Filed
Sep 14, 2022
Permit issued
Sep 14, 2022
Declared cost
$24,921
Address
49 Stevenson St

voluntary modifiy (e) fire alarm system add (2) smoke detectors (1) heat detector (3) control relays, (1) high power control relays, 1 monitor module

Open the permit page

$24,921
Jun 8, 2022Never finaled
issued Oct 2022, no final
49 Stevenson StGci, Incinstallation of life safety & seismic req for 2 (e) phone booths in (e) office. work not included any demo, mech & elec, plumbing. occupany and existing, egress are not affect by the work.
Details
Permit
202206085848
Status
issued
Filed
Jun 8, 2022
Permit issued
Oct 11, 2022
Declared cost
$10,000
Address
49 Stevenson St

installation of life safety & seismic req for 2 (e) phone booths in (e) office. work not included any demo, mech & elec, plumbing. occupany and existing, egress are not affect by the work.

Open the permit page

$10,000
Feb 1, 2022Never finaled
issued Oct 2022, no final
49 Stevenson StPioneer Fire Inc.add 2 concealed pendents in phone booths. ref permit 202206085848. ref electrical permit # ew202109138338.
Details
Permit
202202017090
Status
issued
Filed
Feb 1, 2022
Permit issued
Oct 25, 2022
Declared cost
$1,000
Address
49 Stevenson St

add 2 concealed pendents in phone booths. ref permit 202206085848. ref electrical permit # ew202109138338.

Open the permit page

$1,000
Jun 8, 2021Completed
final sign-off Jul 2021
49 Stevenson StSabah International Incorporatedti #2019-1007-3701 modify existing fire alarm system. demo (4) heat detectors, (2) existing ceiling speaker/strobes. add (2) ceiling speaker/strobes.
Details
Permit
202106081902
Status
complete
Filed
Jun 8, 2021
Permit issued
Jun 9, 2021
Final sign-off
Jul 20, 2021
Declared cost
$13,800
Address
49 Stevenson St

ti #2019-1007-3701 modify existing fire alarm system. demo (4) heat detectors, (2) existing ceiling speaker/strobes. add (2) ceiling speaker/strobes.

Open the permit page

$13,800
May 25, 2021Completed
final sign-off Dec 2021
49 Stevenson StTerra Nova Industriesbasement: revision to pa 201910073701. reduced scope from original approved plans. install (n) walk-in coolers, (2) 3-compartment sinks, ventless dishwasher and hand sink. all mep work under separate deferred trade permits
Details
Permit
202105251022
Status
complete
Filed
May 25, 2021
Permit issued
Jun 14, 2021
Final sign-off
Dec 15, 2021
Address
49 Stevenson St

basement: revision to pa 201910073701. reduced scope from original approved plans. install (n) walk-in coolers, (2) 3-compartment sinks, ventless dishwasher and hand sink. all mep work under separate deferred trade permits

Open the permit page

Apr 20, 2021Completed
final sign-off Jul 2021
49 Stevenson StAaa Restaurant Fire Control/Dba Aaa Fireadd (13) new pendent 4dry pendents for new wall layout. sprinkler ti
Details
Permit
202104208964
Status
complete
Filed
Apr 20, 2021
Permit issued
May 20, 2021
Final sign-off
Jul 20, 2021
Declared cost
$12,000
Address
49 Stevenson St

add (13) new pendent 4dry pendents for new wall layout. sprinkler ti

Open the permit page

$12,000
Oct 16, 2020Completed
final sign-off Feb 2021
49 Stevenson StSabah International Incorporated3rd flr - ref ti 202002134417/202006269242: modify (e) fire alarm sys: reloc (1)contrl relay. add (1)dual input mod, (2)contrl relays, (24)ceiling spkr/strbs and provide (n) 2-way comm sys: (1)main contrl, (1)master console, (1)tele interface, (1)relay iso mod, (1)call stn, (2)cic to cat5 adpters.
Details
Permit
202010166667
Status
complete
Filed
Oct 16, 2020
Permit issued
Dec 4, 2020
Final sign-off
Feb 1, 2021
Declared cost
$18,845
Address
49 Stevenson St

3rd flr - ref ti 202002134417/202006269242: modify (e) fire alarm sys: reloc (1)contrl relay. add (1)dual input mod, (2)contrl relays, (24)ceiling spkr/strbs and provide (n) 2-way comm sys: (1)main contrl, (1)master console, (1)tele interface, (1)relay iso mod, (1)call stn, (2)cic to cat5 adpters.

Open the permit page

$18,845
Aug 4, 2020Never finaled
issued Aug 2020, no final
49 Stevenson StC B F Incsuite 300: t-24 - new electrical lighting / power for t.i. pa202002134417. maher n/a.
Details
Permit
202008041060
Status
issued
Filed
Aug 4, 2020
Permit issued
Aug 15, 2020
Declared cost
$135,000
Address
49 Stevenson St

suite 300: t-24 - new electrical lighting / power for t.i. pa202002134417. maher n/a.

Open the permit page

$135,000
Jun 26, 2020Never finaled
issued Jul 2020, no final
49 Stevenson StR M I Mechanical Contractorsreplace/add 12 vavs, add one exhaust fan, add one wshp, add one water pump, new ductwork, new water piping, temperature controls, and air balance. ref pa#202002134417
Details
Permit
202006269242
Status
issued
Filed
Jun 26, 2020
Permit issued
Jul 2, 2020
Declared cost
$150,000
Address
49 Stevenson St

replace/add 12 vavs, add one exhaust fan, add one wshp, add one water pump, new ductwork, new water piping, temperature controls, and air balance. ref pa#202002134417

Open the permit page

$150,000
Jun 2, 2020Completed
final sign-off Aug 2020
49 Stevenson StR L H Fire Protection Incsuite 300/3rd fl: fire sprinkler tenant improvement relocate 69, add 16, and delete 19 sprinklers on the 3rd floor reference building permit 2020-0213-4417
Details
Permit
202006028054
Status
complete
Filed
Jun 2, 2020
Permit issued
Jun 29, 2020
Final sign-off
Aug 11, 2020
Declared cost
$22,000
Address
49 Stevenson St

suite 300/3rd fl: fire sprinkler tenant improvement relocate 69, add 16, and delete 19 sprinklers on the 3rd floor reference building permit 2020-0213-4417

Open the permit page

$22,000
Feb 13, 2020Completed
final sign-off Mar 2021
49 Stevenson StRudolph Commercial Interiors Inc, Rcisuite 300: tenant improvement, demo partitions, ceiling, floor coverings and install new. add new single user ada restroom.
Details
Permit
202002134417
Status
complete
Filed
Feb 13, 2020
Permit issued
Mar 6, 2020
Final sign-off
Mar 17, 2021
Declared cost
$850,000
Address
49 Stevenson St

suite 300: tenant improvement, demo partitions, ceiling, floor coverings and install new. add new single user ada restroom.

Open the permit page

$850,000
Oct 7, 2019Expired or cancelled
cancelled Jan 2026
49 Stevenson Sttenant improvement of (e) basement restrooms, corridor, stairway & ground floor dining & take-out areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, lighting, mechanical, electrical, & plumbing.
Details
Permit
201910073706
Status
cancelled
Filed
Oct 7, 2019
Declared cost
$285,000
Address
49 Stevenson St

tenant improvement of (e) basement restrooms, corridor, stairway & ground floor dining & take-out areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, lighting, mechanical, electrical, & plumbing.

Open the permit page

$285,000
Oct 7, 2019Completed
final sign-off Dec 2021
49 Stevenson StTerra Nova Industriestenant improvement of (e) basement kitchen space. no work to ground floor dining or ground floor kitchen areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, and lighting, mep associated w/all kitchen equipment. addition of employee use restroom.
Details
Permit
201910073701
Status
complete
Filed
Oct 7, 2019
Permit issued
Mar 2, 2021
Final sign-off
Dec 15, 2021
Declared cost
$230,000
Address
49 Stevenson St

tenant improvement of (e) basement kitchen space. no work to ground floor dining or ground floor kitchen areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, and lighting, mep associated w/all kitchen equipment. addition of employee use restroom.

Open the permit page

$230,000
Aug 8, 2019Completed
final sign-off Oct 2019
49 Stevenson StRudolph Commercial Interiors Inc, Rcinew power data for conf rms & ofc. new break room., new lighting & controls ref 201906102948
Details
Permit
201908088251
Status
complete
Filed
Aug 8, 2019
Permit issued
Aug 21, 2019
Final sign-off
Oct 24, 2019
Declared cost
$284,696
Address
49 Stevenson St

new power data for conf rms & ofc. new break room., new lighting & controls ref 201906102948

Open the permit page

$284,696
Aug 8, 2019Completed
final sign-off Oct 2019
49 Stevenson StRudolph Commercial Interiors Inc, Rcimodification of (e) hvac system to match new arch layout. the replacemnt of 10 vav terminal units the addition of 1 exhaust fan, air balance ref 201906102948
Details
Permit
201908088253
Status
complete
Filed
Aug 8, 2019
Permit issued
Aug 21, 2019
Final sign-off
Oct 24, 2019
Declared cost
$149,348
Address
49 Stevenson St

modification of (e) hvac system to match new arch layout. the replacemnt of 10 vav terminal units the addition of 1 exhaust fan, air balance ref 201906102948

Open the permit page

$149,348
Jul 25, 2019Completed
final sign-off Dec 2019
49 Stevenson StRudolph Commercial Interiors Inc, Rciti- partial demo of paritions & floor coverins, new finishes throughout and ada upgrade to restroom
Details
Permit
201907256974
Status
complete
Filed
Jul 25, 2019
Permit issued
Sep 26, 2019
Final sign-off
Dec 23, 2019
Declared cost
$153,081
Address
49 Stevenson St

ti- partial demo of paritions & floor coverins, new finishes throughout and ada upgrade to restroom

Open the permit page

$153,081
Jul 9, 2019Completed
final sign-off Oct 2022
49 Stevenson StAyoob & Peery Plumbing Co Incfire ti on 11th fl: add 2, relocate 39, and change out 27 sprinklers to conform wit hthe new wall/ceiling layout of the ti. ref pa #201906102948
Details
Permit
201907095443
Status
complete
Filed
Jul 9, 2019
Permit issued
Jul 10, 2019
Final sign-off
Oct 24, 2022
Declared cost
$15,900
Address
49 Stevenson St

fire ti on 11th fl: add 2, relocate 39, and change out 27 sprinklers to conform wit hthe new wall/ceiling layout of the ti. ref pa #201906102948

Open the permit page

$15,900
Jul 3, 2019Completed
final sign-off Sep 2019
49 Stevenson StSabah International Incorporated11th fl: ref p# 201906102948; 1 smoke detector, 28 speaker /strobes,1 sync module, 4 speaker /strobes weather proof, 1 power supply
Details
Permit
201907035053
Status
complete
Filed
Jul 3, 2019
Permit issued
Jul 3, 2019
Final sign-off
Sep 25, 2019
Declared cost
$18,219
Address
49 Stevenson St

11th fl: ref p# 201906102948; 1 smoke detector, 28 speaker /strobes,1 sync module, 4 speaker /strobes weather proof, 1 power supply

Open the permit page

$18,219
Jun 20, 2019Completed
final sign-off Jul 2019
49 Stevenson StSabah International Incorporated7th floor: add 1 smoke detector, synchronization modules, booster power supply, 22 speaker/strobes. ref app#201904117705
Details
Permit
201906203956
Status
complete
Filed
Jun 20, 2019
Permit issued
Jun 20, 2019
Final sign-off
Jul 31, 2019
Declared cost
$16,969
Address
49 Stevenson St

7th floor: add 1 smoke detector, synchronization modules, booster power supply, 22 speaker/strobes. ref app#201904117705

Open the permit page

$16,969
Jun 20, 2019Never finaled
issued Jun 2019, no final
49 Stevenson StR L H Fire Protection Inc7th fl - fire sprinkler permit. relocate 61, add 6 and delete 17 sprinklers. ref pa 2019-0411-7705
Details
Permit
201906204001
Status
issued
Filed
Jun 20, 2019
Permit issued
Jun 20, 2019
Declared cost
$16,000
Address
49 Stevenson St

7th fl - fire sprinkler permit. relocate 61, add 6 and delete 17 sprinklers. ref pa 2019-0411-7705

Open the permit page

$16,000
Jun 17, 2019Completed
final sign-off Oct 2019
49 Stevenson StRudolph Commercial Interiors Inc, Rci7th flr. mechanical work for pa 201904117705. demo lowside duct work, piping and equipment. install (n) vav boxes and ductwork. add one fsd and dsd to rated penetration in the lobby.
Details
Permit
201906173563
Status
complete
Filed
Jun 17, 2019
Permit issued
Jun 21, 2019
Final sign-off
Oct 24, 2019
Declared cost
$193,000
Address
49 Stevenson St

7th flr. mechanical work for pa 201904117705. demo lowside duct work, piping and equipment. install (n) vav boxes and ductwork. add one fsd and dsd to rated penetration in the lobby.

Open the permit page

$193,000
Jun 17, 2019Completed
final sign-off Oct 2019
49 Stevenson StRudolph Commercial Interiors Inc, Rci7th flr. electrical for pa 201904117705. (n) break room, (n) power and data at offices and conference room. (n) lighting and controls. electrical only
Details
Permit
201906173564
Status
complete
Filed
Jun 17, 2019
Permit issued
Jun 17, 2019
Final sign-off
Oct 24, 2019
Declared cost
$237,000
Address
49 Stevenson St

7th flr. electrical for pa 201904117705. (n) break room, (n) power and data at offices and conference room. (n) lighting and controls. electrical only

Open the permit page

$237,000
Jun 10, 2019Completed
final sign-off Oct 2019
49 Stevenson StRudolph Commercial Interiors Inc, Rci11th fl spec suite 1100: interior ti to include partial demo of partitions & floor coverings, new partitions & finishes throughout, new unisex ada restroom.
Details
Permit
201906102948
Status
complete
Filed
Jun 10, 2019
Permit issued
Jun 21, 2019
Final sign-off
Oct 24, 2019
Declared cost
$1,000,000
Address
49 Stevenson St

11th fl spec suite 1100: interior ti to include partial demo of partitions & floor coverings, new partitions & finishes throughout, new unisex ada restroom.

Open the permit page

$1,000,000
Apr 11, 2019Completed
final sign-off Oct 2019
49 Stevenson StRudolph Commercial Interiors Inc, Rci7th flr. suite 700: interior tenant improvement. new partitions, finsishes, paint, floor coverings, new single user ada restroom, install door operator & activation at ground flr entry to comply w/ acessible business entrance program. maher n/a.
Details
Permit
201904117705
Status
complete
Filed
Apr 11, 2019
Permit issued
May 8, 2019
Final sign-off
Oct 24, 2019
Declared cost
$200,000
Address
49 Stevenson St

7th flr. suite 700: interior tenant improvement. new partitions, finsishes, paint, floor coverings, new single user ada restroom, install door operator & activation at ground flr entry to comply w/ acessible business entrance program. maher n/a.

Open the permit page

$200,000
Nov 14, 2018Completed
final sign-off Dec 2018
49 Stevenson StSabah International Incorporatedas built for pa 2018-0808-6729
Details
Permit
201811145778
Status
complete
Filed
Nov 14, 2018
Permit issued
Nov 21, 2018
Final sign-off
Dec 19, 2018
Address
49 Stevenson St

as built for pa 2018-0808-6729

Open the permit page

Sep 27, 2018Completed
final sign-off Oct 2018
49 Stevenson StCobe Construction Inc14th fl - revision to pa 2018-0504-8181, ti only architectural omitting (1) card reader from scope
Details
Permit
201809271539
Status
complete
Filed
Sep 27, 2018
Permit issued
Sep 27, 2018
Final sign-off
Oct 11, 2018
Address
49 Stevenson St

14th fl - revision to pa 2018-0504-8181, ti only architectural omitting (1) card reader from scope

Open the permit page

Sep 26, 2018Completed
final sign-off Oct 2018
49 Stevenson StCobe Construction Incelectrical t.i. work for architectural t.i., appl # 2018/05/04/8181
Details
Permit
201809261415
Status
complete
Filed
Sep 26, 2018
Permit issued
Sep 28, 2018
Final sign-off
Oct 29, 2018
Address
49 Stevenson St

electrical t.i. work for architectural t.i., appl # 2018/05/04/8181

Open the permit page

Aug 16, 2018Completed
final sign-off Oct 2018
49 Stevenson StCobe Construction Increvisionto 201805048181 pre bld inspectors request - to file this upgrade keep (e) water closets in place and use the new proposed all gender restroom as equalivent facilitation solution
Details
Permit
201808167522
Status
complete
Filed
Aug 16, 2018
Permit issued
Aug 23, 2018
Final sign-off
Oct 11, 2018
Address
49 Stevenson St

revisionto 201805048181 pre bld inspectors request - to file this upgrade keep (e) water closets in place and use the new proposed all gender restroom as equalivent facilitation solution

Open the permit page

Aug 8, 2018Completed
final sign-off Dec 2018
49 Stevenson StSabah International Incorporatedfire alarms 14th floor-ref t.i. 201805048181; add (1) pwe supple,(4) control relays high powered, (37) speaker/strobes, (1) control relay, (1) sync module, (3) duct smoke detectors
Details
Permit
201808086729
Status
complete
Filed
Aug 8, 2018
Permit issued
Sep 5, 2018
Final sign-off
Dec 19, 2018
Declared cost
$17,548
Address
49 Stevenson St

fire alarms 14th floor-ref t.i. 201805048181; add (1) pwe supple,(4) control relays high powered, (37) speaker/strobes, (1) control relay, (1) sync module, (3) duct smoke detectors

Open the permit page

$17,548
Jul 6, 2018Completed
final sign-off Sep 2018
49 Stevenson StPioneer Fire Inc.relocate 19 uprights, relocate 36 pendents. remove 1 upright ti 201805048181
Details
Permit
201807063919
Status
complete
Filed
Jul 6, 2018
Permit issued
Jul 6, 2018
Final sign-off
Sep 12, 2018
Declared cost
$19,785
Address
49 Stevenson St

relocate 19 uprights, relocate 36 pendents. remove 1 upright ti 201805048181

Open the permit page

$19,785
Jul 5, 2018Completed
final sign-off Oct 2018
49 Stevenson StCobe Construction Incdeferred mechanical plans being submitted for ti office build out. ref pa 2018-0504-8181. installing new low side ductworkand hvac equipment from exsisting vavs. intall new exhaust fan serving the it rack. install new vav box and ductwork. not oshpod 3.
Details
Permit
201807053755
Status
complete
Filed
Jul 5, 2018
Permit issued
Jul 5, 2018
Final sign-off
Oct 29, 2018
Declared cost
$80,000
Address
49 Stevenson St

deferred mechanical plans being submitted for ti office build out. ref pa 2018-0504-8181. installing new low side ductworkand hvac equipment from exsisting vavs. intall new exhaust fan serving the it rack. install new vav box and ductwork. not oshpod 3.

Open the permit page

$80,000
May 4, 2018Completed
final sign-off Oct 2018
49 Stevenson StCobe Construction Inctenant improvement only architectural, full floor. partitions, restrooms, new ceilings, finishes. new casework, mep and fire under deferred permit(s). new rated elevator lobby doors, card readers
Details
Permit
201805048181
Status
complete
Filed
May 4, 2018
Permit issued
May 4, 2018
Final sign-off
Oct 29, 2018
Declared cost
$550,000
Address
49 Stevenson St

tenant improvement only architectural, full floor. partitions, restrooms, new ceilings, finishes. new casework, mep and fire under deferred permit(s). new rated elevator lobby doors, card readers

Open the permit page

$550,000
Apr 10, 2018Completed
final sign-off May 2018
49 Stevenson StPioneer Fire Inc.f/s on 14th fl: remove all pendent drops and bring systems to original warm shell condition. ref #201803083216.
Details
Permit
201804105950
Status
complete
Filed
Apr 10, 2018
Permit issued
Apr 10, 2018
Final sign-off
May 9, 2018
Declared cost
$9,800
Address
49 Stevenson St

f/s on 14th fl: remove all pendent drops and bring systems to original warm shell condition. ref #201803083216.

Open the permit page

$9,800
Mar 21, 2018Completed
final sign-off May 2018
49 Stevenson StBcci Construction Companyrev to app#201712065619 per inspector request, add auto door opener in men's restroom & reconfigure women's restroom layout
Details
Permit
201803214231
Status
complete
Filed
Mar 21, 2018
Permit issued
Mar 21, 2018
Final sign-off
May 2, 2018
Declared cost
$7,000
Address
49 Stevenson St

rev to app#201712065619 per inspector request, add auto door opener in men's restroom & reconfigure women's restroom layout

Open the permit page

$7,000
Mar 8, 2018Completed
final sign-off Oct 2018
49 Stevenson StCobe Construction Inc14/f: interior only, non-structural/building core. demolition work. interior wall partitions. iinterior n-rated door. . interior restrooms & fixtures.. all non-structural elements & core. per-ab-017 !!!!! ceiling demo not permitted!!!!!!
Details
Permit
201803083216
Status
complete
Filed
Mar 8, 2018
Permit issued
Mar 15, 2018
Final sign-off
Oct 12, 2018
Declared cost
$10,000
Address
49 Stevenson St

14/f: interior only, non-structural/building core. demolition work. interior wall partitions. iinterior n-rated door. . interior restrooms & fixtures.. all non-structural elements & core. per-ab-017 !!!!! ceiling demo not permitted!!!!!!

Open the permit page

$10,000
Mar 5, 2018Completed
final sign-off May 2018
49 Stevenson St4th fl evacuation maps (3)
Details
Permit
201803052804
Status
complete
Filed
Mar 5, 2018
Permit issued
Mar 5, 2018
Final sign-off
May 2, 2018
Declared cost
$1,500
Address
49 Stevenson St

4th fl evacuation maps (3)

Open the permit page

$1,500
Jan 30, 2018Completed
final sign-off Oct 2018
49 Stevenson StSabah International Incorporatedmodify and replace (e) partial 4th fl notification appliances to accommodate new wall configurations. ti #201712065619.
Details
Permit
201801309894
Status
complete
Filed
Jan 30, 2018
Permit issued
Feb 14, 2018
Final sign-off
Oct 1, 2018
Declared cost
$12,865
Address
49 Stevenson St

modify and replace (e) partial 4th fl notification appliances to accommodate new wall configurations. ti #201712065619.

Open the permit page

$12,865
Dec 13, 2017Completed
final sign-off May 2018
49 Stevenson StBcci Construction Company4th flr: mech including demo of ductwork, add 1 new reheat vav boxes, 1 new water source heat pump, air distribution & balance and 1 condenser water booster pump. electrical lighting, power & signal control ref 201712065619
Details
Permit
201712136377
Status
complete
Filed
Dec 13, 2017
Permit issued
Jan 22, 2018
Final sign-off
May 2, 2018
Declared cost
$95,000
Address
49 Stevenson St

4th flr: mech including demo of ductwork, add 1 new reheat vav boxes, 1 new water source heat pump, air distribution & balance and 1 condenser water booster pump. electrical lighting, power & signal control ref 201712065619

Open the permit page

$95,000
Dec 8, 2017Completed
final sign-off Feb 2018
49 Stevenson StGolden Gate Fire Protection Inc4/f- fire sprinkler only, relocate 37 pendents, add 6 pendents, relocate 32 upright, add 1 upright, delete 14 pendents. t.i. pa#201712065619.
Details
Permit
201712085892
Status
complete
Filed
Dec 8, 2017
Permit issued
Dec 8, 2017
Final sign-off
Feb 2, 2018
Declared cost
$19,000
Address
49 Stevenson St

4/f- fire sprinkler only, relocate 37 pendents, add 6 pendents, relocate 32 upright, add 1 upright, delete 14 pendents. t.i. pa#201712065619.

Open the permit page

$19,000
Dec 6, 2017Completed
final sign-off May 2018
49 Stevenson StBcci Construction Company4th - full floor installation of (n) partitions and gyp bd ceiling installation of (n) millwork, countertops and fixtures, new finishes throughout. paint and floor covereings. installation of card reader at elevator lobby and other locations. fire and mep will be design build under separate permits
Details
Permit
201712065619
Status
complete
Filed
Dec 6, 2017
Permit issued
Dec 8, 2017
Final sign-off
May 2, 2018
Declared cost
$836,745
Address
49 Stevenson St

4th - full floor installation of (n) partitions and gyp bd ceiling installation of (n) millwork, countertops and fixtures, new finishes throughout. paint and floor covereings. installation of card reader at elevator lobby and other locations. fire and mep will be design build under separate permits

Open the permit page

$836,745
Jun 28, 2017Completed
final sign-off Sep 2017
49 Stevenson StSwinerton Buildersrevision to 201704244714, restroom reconfiguration due to ada requirement
Details
Permit
201706280558
Status
complete
Filed
Jun 28, 2017
Permit issued
Jul 5, 2017
Final sign-off
Sep 28, 2017
Declared cost
$10,000
Address
49 Stevenson St

revision to 201704244714, restroom reconfiguration due to ada requirement

Open the permit page

$10,000
Jun 15, 2017Completed
final sign-off Aug 2017
49 Stevenson StBilcor Inc15th floor: fire alarm ref 2017-0424-4714: install 10 wall mount speaker strobes. install 1 control relay module
Details
Permit
201706159506
Status
complete
Filed
Jun 15, 2017
Permit issued
Jun 15, 2017
Final sign-off
Aug 7, 2017
Declared cost
$5,500
Address
49 Stevenson St

15th floor: fire alarm ref 2017-0424-4714: install 10 wall mount speaker strobes. install 1 control relay module

Open the permit page

$5,500
May 19, 2017Completed
final sign-off Jun 2017
49 Stevenson StR L H Fire Protection Incfire sprinkler relocate 17 add 5, delete 36 pendent sprinklers, install 31 new upright sprinklers on the 15th fl ref 201704244714
Details
Permit
201705197173
Status
complete
Filed
May 19, 2017
Permit issued
May 19, 2017
Final sign-off
Jun 16, 2017
Declared cost
$22,000
Address
49 Stevenson St

fire sprinkler relocate 17 add 5, delete 36 pendent sprinklers, install 31 new upright sprinklers on the 15th fl ref 201704244714

Open the permit page

$22,000
Apr 24, 2017Completed
final sign-off Sep 2017
49 Stevenson StSwinerton Builderssuite 1500: office t.i. partial demolition of partitions and ceilings, new plumbing fixtures, upgrade ada restroom. new partitions and finishes. new ceiling and lighting.
Details
Permit
201704244714
Status
complete
Filed
Apr 24, 2017
Permit issued
May 12, 2017
Final sign-off
Sep 28, 2017
Declared cost
$791,698
Address
49 Stevenson St

suite 1500: office t.i. partial demolition of partitions and ceilings, new plumbing fixtures, upgrade ada restroom. new partitions and finishes. new ceiling and lighting.

Open the permit page

$791,698
Jun 13, 2016Completed
final sign-off Aug 2016
49 Stevenson StBcci Construction Company11/f- revision to pa#201603222782 to show card reader location.
Details
Permit
201606139840
Status
complete
Filed
Jun 13, 2016
Permit issued
Jun 17, 2016
Final sign-off
Aug 19, 2016
Address
49 Stevenson St

11/f- revision to pa#201603222782 to show card reader location.

Open the permit page

Jun 9, 2016Completed
final sign-off Jun 2016
49 Stevenson StRed Hawk Fire & Security Ca Llc11th floor: as built for change use area smoke extg to activate fsd closure in i.t. room. add control relay for secondary means of card reader release and security interface. ref app #201606069191
Details
Permit
201606099473
Status
complete
Filed
Jun 9, 2016
Permit issued
Jun 9, 2016
Final sign-off
Jun 13, 2016
Address
49 Stevenson St

11th floor: as built for change use area smoke extg to activate fsd closure in i.t. room. add control relay for secondary means of card reader release and security interface. ref app #201606069191

Open the permit page

Jun 6, 2016Completed
final sign-off Jun 2016
49 Stevenson StRed Hawk Fire & Security Ca Llcadd 4 duct detectors, add 2 control relay modules. 11th floor.
Details
Permit
201606069191
Status
complete
Filed
Jun 6, 2016
Permit issued
Jun 6, 2016
Final sign-off
Jun 13, 2016
Declared cost
$7,500
Address
49 Stevenson St

add 4 duct detectors, add 2 control relay modules. 11th floor.

Open the permit page

$7,500
May 31, 2016Completed
final sign-off Jun 2016
49 Stevenson StBcci Construction Company11th flr: mechanical work associated with approved pa 2016 0322 2782
Details
Permit
201605318780
Status
complete
Filed
May 31, 2016
Permit issued
May 31, 2016
Final sign-off
Jun 10, 2016
Declared cost
$15,500
Address
49 Stevenson St

11th flr: mechanical work associated with approved pa 2016 0322 2782

Open the permit page

$15,500
May 31, 2016Completed
final sign-off Jun 2016
49 Stevenson StBcci Construction Company11th flr: revision to ref pa 2016 0322 2782 to revise the rating of the ceiling inthe server room
Details
Permit
201605318779
Status
complete
Filed
May 31, 2016
Permit issued
May 31, 2016
Final sign-off
Jun 10, 2016
Declared cost
$2,500
Address
49 Stevenson St

11th flr: revision to ref pa 2016 0322 2782 to revise the rating of the ceiling inthe server room

Open the permit page

$2,500
May 25, 2016Completed
final sign-off Jun 2016
49 Stevenson StPribuss Engineering Incfire sprinkler ti in sute 2800, ref pa 2016-0329-3394 - relocate 3 heads, add 1 head
Details
Permit
201605258309
Status
complete
Filed
May 25, 2016
Permit issued
May 25, 2016
Final sign-off
Jun 13, 2016
Declared cost
$2,058
Address
49 Stevenson St

fire sprinkler ti in sute 2800, ref pa 2016-0329-3394 - relocate 3 heads, add 1 head

Open the permit page

$2,058
Apr 26, 2016Completed
final sign-off Aug 2016
49 Stevenson StSprig Electric (Archkey Solutions), Bcci Construction Company11th flr: electrical and card readers title 24 for ups unit, bldg permit 201603222782
Details
Permit
201604265714
Status
complete
Filed
Apr 26, 2016
Permit issued
Apr 27, 2016
Final sign-off
Aug 19, 2016
Declared cost
$35,000
Address
49 Stevenson St

11th flr: electrical and card readers title 24 for ups unit, bldg permit 201603222782

Open the permit page

$35,000
Mar 22, 2016Completed
final sign-off Aug 2016
49 Stevenson StBcci Construction Companytenant improvement to include partial demo of partitions, suspended ceiling & floor covering, install new partitions, new paint & floor covering, ada upgrade to restroom. mech. elec. plumbing, fire protection & life safety under seperate permit. ti room per ab-060
Details
Permit
201603222782
Status
complete
Filed
Mar 22, 2016
Permit issued
Apr 8, 2016
Final sign-off
Aug 19, 2016
Declared cost
$60,000
Address
49 Stevenson St

tenant improvement to include partial demo of partitions, suspended ceiling & floor covering, install new partitions, new paint & floor covering, ada upgrade to restroom. mech. elec. plumbing, fire protection & life safety under seperate permit. ti room per ab-060

Open the permit page

$60,000
Sep 14, 2015Never finaled
issued Sep 2015, no final
49 Stevenson StRudolph Commercial Interiors Inc, Rci#660- electrical plans in addition to pa# 2015-0716-1680
Details
Permit
201509146852
Status
issued
Filed
Sep 14, 2015
Permit issued
Sep 14, 2015
Address
49 Stevenson St

#660- electrical plans in addition to pa# 2015-0716-1680

Open the permit page

Sep 14, 2015Expired or cancelled
cancelled Jan 2026
49 Stevenson StRudolph Commercial Interiors Inc, Rci#660- mechanical plans in addition to pa# 201507161680
Details
Permit
201509146855
Status
cancelled
Filed
Sep 14, 2015
Declared cost
$36,259
Address
49 Stevenson St

#660- mechanical plans in addition to pa# 201507161680

Open the permit page

$36,259
Aug 26, 2015Completed
final sign-off Nov 2015
49 Stevenson StH C I Systems Inc6th floor: install 9 nac devices on an extg power sypply. all devices are added to an extg fire alarm system. ref app#201309257683.
Details
Permit
201508265334
Status
complete
Filed
Aug 26, 2015
Permit issued
Aug 26, 2015
Final sign-off
Nov 20, 2015
Declared cost
$4,500
Address
49 Stevenson St

6th floor: install 9 nac devices on an extg power sypply. all devices are added to an extg fire alarm system. ref app#201309257683.

Open the permit page

$4,500
Aug 21, 2015Completed
final sign-off May 2025
49 Stevenson StAyoob & Peery Plumbing Co Inc6th fl: add & relocate fire sprinklers per ti (1 add) (12 relocate). ref ti 2015-0716-1680.
Details
Permit
201508214909
Status
complete
Filed
Aug 21, 2015
Permit issued
Aug 21, 2015
Final sign-off
May 15, 2025
Declared cost
$3,000
Address
49 Stevenson St

6th fl: add & relocate fire sprinklers per ti (1 add) (12 relocate). ref ti 2015-0716-1680.

Open the permit page

$3,000
Jul 16, 2015Never finaled
issued Aug 2015, no final
49 Stevenson StRudolph Commercial Interiors Inc, Rcisuite 660 - partial demo of paritiions, ceilings, floor covering. new partitions, new finishes, paint and floor coverings, ada upgrade to restroom; separate permits for mep, fire safety.
Details
Permit
201507161680
Status
issued
Filed
Jul 16, 2015
Permit issued
Aug 11, 2015
Declared cost
$119,850
Address
49 Stevenson St

suite 660 - partial demo of paritiions, ceilings, floor covering. new partitions, new finishes, paint and floor coverings, ada upgrade to restroom; separate permits for mep, fire safety.

Open the permit page

$119,850
Apr 10, 2015Completed
final sign-off Jun 2015
49 Stevenson StNovo Construction Incsuite 1300 - install heat pump and associate duct work and diffuser/grille. install condenser water pump. ref app#201503050049.
Details
Permit
201504103312
Status
complete
Filed
Apr 10, 2015
Permit issued
Apr 13, 2015
Final sign-off
Jun 24, 2015
Declared cost
$10,000
Address
49 Stevenson St

suite 1300 - install heat pump and associate duct work and diffuser/grille. install condenser water pump. ref app#201503050049.

Open the permit page

$10,000
Apr 8, 2015Completed
final sign-off Apr 2015
49 Stevenson StAyoob & Peery Plumbing Co Increlocate (2) fire sprinklers at 13/f t.i. pa# 201503050049
Details
Permit
201504083108
Status
complete
Filed
Apr 8, 2015
Permit issued
Apr 8, 2015
Final sign-off
Apr 14, 2015
Declared cost
$1,028
Address
49 Stevenson St

relocate (2) fire sprinklers at 13/f t.i. pa# 201503050049

Open the permit page

$1,028
Mar 5, 2015Completed
final sign-off Jun 2015
49 Stevenson StNovo Construction Incsuite 1300: expansion of (e) it closet and minor accessibility upgrades
Details
Permit
201503050049
Status
complete
Filed
Mar 5, 2015
Permit issued
Mar 5, 2015
Final sign-off
Jun 24, 2015
Declared cost
$10,742
Address
49 Stevenson St

suite 1300: expansion of (e) it closet and minor accessibility upgrades

Open the permit page

$10,742
Aug 18, 2014Completed
final sign-off Sep 2014
49 Stevenson StH C I Systems Incadd 6 new horn strobes on an existing fire alarm system in the 10/f. t.i. pa#201406027245.
Details
Permit
201408184042
Status
complete
Filed
Aug 18, 2014
Permit issued
Aug 18, 2014
Final sign-off
Sep 30, 2014
Declared cost
$7,400
Address
49 Stevenson St

add 6 new horn strobes on an existing fire alarm system in the 10/f. t.i. pa#201406027245.

Open the permit page

$7,400
Aug 11, 2014Completed
final sign-off Sep 2014
49 Stevenson StRudolph Commercial Interiors Inc, Rciinstall penn model z8-ra exhaust fan (hvac)
Details
Permit
201408113503
Status
complete
Filed
Aug 11, 2014
Permit issued
Aug 12, 2014
Final sign-off
Sep 26, 2014
Declared cost
$327,600
Address
49 Stevenson St

install penn model z8-ra exhaust fan (hvac)

Open the permit page

$327,600
Jul 14, 2014Completed
final sign-off May 2025
49 Stevenson StAyoob & Peery Plumbing Co Inc#1000- add & relocate fire sprinklers per t.i. (1) add, (15) relocate. t.i. pa#201406027245
Details
Permit
201407141195
Status
complete
Filed
Jul 14, 2014
Permit issued
Jul 14, 2014
Final sign-off
May 20, 2025
Declared cost
$8,224
Address
49 Stevenson St

#1000- add & relocate fire sprinklers per t.i. (1) add, (15) relocate. t.i. pa#201406027245

Open the permit page

$8,224
Jun 2, 2014Completed
final sign-off Sep 2014
49 Stevenson StRudolph Commercial Interiors Inc, Rcitenant improvement: install new partitions, doors and finishes. mechanical & electrical under seperate permit.
Details
Permit
201406027245
Status
complete
Filed
Jun 2, 2014
Permit issued
Jun 26, 2014
Final sign-off
Sep 19, 2014
Declared cost
$327,600
Address
49 Stevenson St

tenant improvement: install new partitions, doors and finishes. mechanical & electrical under seperate permit.

Open the permit page

$327,600
May 28, 2014Never finaled
issued May 2014, no final
49 Stevenson StH C I Systems Incadd 3 strobes & 6 speaker strobes to an existing fire alarm system in the new 2/f t.i. space. t.i. pa#201312265082
Details
Permit
201405286826
Status
issued
Filed
May 28, 2014
Permit issued
May 28, 2014
Declared cost
$6,480
Address
49 Stevenson St

add 3 strobes & 6 speaker strobes to an existing fire alarm system in the new 2/f t.i. space. t.i. pa#201312265082

Open the permit page

$6,480
Apr 23, 2014Completed
final sign-off Jun 2014
49 Stevenson StAllied Heating & Air Conditioning2nd floor: t.i. (interior) new ductwork and diffusers, controls and air balancing.
Details
Permit
201404233982
Status
complete
Filed
Apr 23, 2014
Permit issued
Apr 23, 2014
Final sign-off
Jun 11, 2014
Declared cost
$32,500
Address
49 Stevenson St

2nd floor: t.i. (interior) new ductwork and diffusers, controls and air balancing.

Open the permit page

$32,500
Mar 31, 2014Completed
final sign-off May 2014
49 Stevenson StGolden Gate Fire Protection Increlocate 3 pendent sprinklers on the 2nd fl. relocate 27 upright sprinklers. t.i. 2013.1226.5082
Details
Permit
201403312001
Status
complete
Filed
Mar 31, 2014
Permit issued
Mar 31, 2014
Final sign-off
May 21, 2014
Declared cost
$15,450
Address
49 Stevenson St

relocate 3 pendent sprinklers on the 2nd fl. relocate 27 upright sprinklers. t.i. 2013.1226.5082

Open the permit page

$15,450
Jan 16, 2014Completed
final sign-off Feb 2014
49 Stevenson StAyoob & Peery Plumbing Co Inc7th floor suite 700 - add fire sprinkler heads per tenant improvements, add 6 heads. ref pa #2013.12.09.3682
Details
Permit
201401166442
Status
complete
Filed
Jan 16, 2014
Permit issued
Jan 16, 2014
Final sign-off
Feb 20, 2014
Declared cost
$3,084
Address
49 Stevenson St

7th floor suite 700 - add fire sprinkler heads per tenant improvements, add 6 heads. ref pa #2013.12.09.3682

Open the permit page

$3,084
Dec 26, 2013Completed
final sign-off Jun 2014
49 Stevenson StSwinerton Builders2nd floor: t.i. interior installation of new 1 hour partitions, doors, finishes, and ceilings. bathroom remodel to make comply. mechanical and electrical under separate permit.
Details
Permit
201312265082
Status
complete
Filed
Dec 26, 2013
Permit issued
Mar 25, 2014
Final sign-off
Jun 11, 2014
Declared cost
$173,300
Address
49 Stevenson St

2nd floor: t.i. interior installation of new 1 hour partitions, doors, finishes, and ceilings. bathroom remodel to make comply. mechanical and electrical under separate permit.

Open the permit page

$173,300
Dec 9, 2013Completed
final sign-off Feb 2014
49 Stevenson StRudolph Commercial Interiors Inc, Rci7th floor suite 700- revision to pa#201310280402 adding full height glass wall (partition)
Details
Permit
201312093682
Status
complete
Filed
Dec 9, 2013
Permit issued
Dec 30, 2013
Final sign-off
Feb 21, 2014
Declared cost
$40,000
Address
49 Stevenson St

7th floor suite 700- revision to pa#201310280402 adding full height glass wall (partition)

Open the permit page

$40,000
Oct 28, 2013Completed
final sign-off Feb 2014
49 Stevenson StRudolph Commercial Interiors Inc, Rciminor interior remodel on 7th floor include installation of new partition, doors & finishes, minor demolition. electrical & mechanical under seperate permit.
Details
Permit
201310280402
Status
complete
Filed
Oct 28, 2013
Permit issued
Oct 29, 2013
Final sign-off
Feb 21, 2014
Declared cost
$261,234
Address
49 Stevenson St

minor interior remodel on 7th floor include installation of new partition, doors & finishes, minor demolition. electrical & mechanical under seperate permit.

Open the permit page

$261,234
Oct 11, 2013Completed
final sign-off Oct 2013
49 Stevenson StAyoob & Peery Plumbing Co Inc6th floor - add & relocate sprinkler heads per t.i.- add 1, relcoate 6. ref pa #2013.0925.7683.
Details
Permit
201310119085
Status
complete
Filed
Oct 11, 2013
Permit issued
Oct 11, 2013
Final sign-off
Oct 31, 2013
Declared cost
$3,598
Address
49 Stevenson St

6th floor - add & relocate sprinkler heads per t.i.- add 1, relcoate 6. ref pa #2013.0925.7683.

Open the permit page

$3,598
Sep 27, 2013Completed
final sign-off Oct 2013
49 Stevenson StR L H Fire Protection Inc13th floor:add, relocate and change out fire sprinkler heads per t.i. 8 add, 18 relocate, 39 change out. remove extg drops and install new uprights.
Details
Permit
201309277940
Status
complete
Filed
Sep 27, 2013
Permit issued
Oct 1, 2013
Final sign-off
Oct 31, 2013
Declared cost
$32,825
Address
49 Stevenson St

13th floor:add, relocate and change out fire sprinkler heads per t.i. 8 add, 18 relocate, 39 change out. remove extg drops and install new uprights.

Open the permit page

$32,825
Sep 25, 2013Never finaled
issued Oct 2013, no final
49 Stevenson StH C I Systems Inc13th floor: add 3 strobes and 9 speaker strobes to an existing fire alarm system in a new ti space (ti#201308063657)
Details
Permit
201309257734
Status
issued
Filed
Sep 25, 2013
Permit issued
Oct 18, 2013
Declared cost
$6,100
Address
49 Stevenson St

13th floor: add 3 strobes and 9 speaker strobes to an existing fire alarm system in a new ti space (ti#201308063657)

Open the permit page

$6,100
Sep 25, 2013Completed
final sign-off Dec 2013
49 Stevenson StRudolph Commercial Interiors Inc, Rci6th floor:minor interior remodel of suite 600. including new partitions, doors and finishes. fire sprinklers, fire alarm, electrical and mechinical under separate permit.
Details
Permit
201309257683
Status
complete
Filed
Sep 25, 2013
Permit issued
Sep 26, 2013
Final sign-off
Dec 6, 2013
Declared cost
$140,000
Address
49 Stevenson St

6th floor:minor interior remodel of suite 600. including new partitions, doors and finishes. fire sprinklers, fire alarm, electrical and mechinical under separate permit.

Open the permit page

$140,000
Aug 6, 2013Completed
final sign-off Feb 2014
49 Stevenson StSwinerton Builders13/f- interior remodel: installation of partitions, doors, ceiling and wall finishes. sprinkleers, fire alarm, mechanical & electrical under seperate permit.
Details
Permit
201308063657
Status
complete
Filed
Aug 6, 2013
Permit issued
Aug 22, 2013
Final sign-off
Feb 3, 2014
Declared cost
$270,020
Address
49 Stevenson St

13/f- interior remodel: installation of partitions, doors, ceiling and wall finishes. sprinkleers, fire alarm, mechanical & electrical under seperate permit.

Open the permit page

$270,020
Jul 16, 2013Completed
final sign-off Jul 2013
49 Stevenson StGolden Gate Fire Protection Inc8th floor-relocate 5 pendent sprinklers & relocate 3 upright sprinkler heads
Details
Permit
201307161933
Status
complete
Filed
Jul 16, 2013
Permit issued
Jul 16, 2013
Final sign-off
Jul 22, 2013
Declared cost
$4,120
Address
49 Stevenson St

8th floor-relocate 5 pendent sprinklers & relocate 3 upright sprinkler heads

Open the permit page

$4,120
Jun 4, 2013Completed
final sign-off Jun 2014
49 Stevenson StTom Rectenwald Const. Inc.interior remodel. partial ceiling and walls demolition. installation of new walls, finishes, doors and furniture. mech and elect under seperate permit.
Details
Permit
201306048679
Status
complete
Filed
Jun 4, 2013
Permit issued
Jun 12, 2013
Final sign-off
Jun 30, 2014
Declared cost
$125,000
Address
49 Stevenson St

interior remodel. partial ceiling and walls demolition. installation of new walls, finishes, doors and furniture. mech and elect under seperate permit.

Open the permit page

$125,000
Apr 25, 2013Completed
final sign-off Jun 2013
49 Stevenson StPrincipal Builders Inc.3rd floor:mechanical and electrical for 3rd floor t.i. to relocate and install new equipment include ducts exhaust fans and grills, light fixture and outlets. ref app#201303222788 for t.i. ref.
Details
Permit
201304255470
Status
complete
Filed
Apr 25, 2013
Permit issued
Apr 25, 2013
Final sign-off
Jun 7, 2013
Declared cost
$150,000
Address
49 Stevenson St

3rd floor:mechanical and electrical for 3rd floor t.i. to relocate and install new equipment include ducts exhaust fans and grills, light fixture and outlets. ref app#201303222788 for t.i. ref.

Open the permit page

$150,000
Apr 22, 2013Completed
final sign-off Jun 2013
49 Stevenson StJohnson Controls Security Solutions Llc3rd floor - isntall new fire alarm devices in the newly remodeled tenant improvement space, all devices shall be added to an existing fire alarm system. installation of 4 new ceiling speaker/storbes & 9 ceiling strobes. t.i. #2013.03.22.2788.
Details
Permit
201304225123
Status
complete
Filed
Apr 22, 2013
Permit issued
Apr 22, 2013
Final sign-off
Jun 7, 2013
Declared cost
$10,000
Address
49 Stevenson St

3rd floor - isntall new fire alarm devices in the newly remodeled tenant improvement space, all devices shall be added to an existing fire alarm system. installation of 4 new ceiling speaker/storbes & 9 ceiling strobes. t.i. #2013.03.22.2788.

Open the permit page

$10,000
Apr 18, 2013Completed
final sign-off Apr 2013
49 Stevenson StPribuss Engineering Incti. pa# 201303222788. fire sprinkler for t.i relocate 22 fire sprinklers. remove 5 fire sprinklers.
Details
Permit
201304184828
Status
complete
Filed
Apr 18, 2013
Permit issued
Apr 18, 2013
Final sign-off
Apr 30, 2013
Declared cost
$11,322
Address
49 Stevenson St

ti. pa# 201303222788. fire sprinkler for t.i relocate 22 fire sprinklers. remove 5 fire sprinklers.

Open the permit page

$11,322
Mar 22, 2013Completed
final sign-off Jun 2013
49 Stevenson StPrincipal Builders Inc.3rd floor-office improvements including selective demo of interior partitions, construction of new partitions, installation of new millwork & upgrades to (e) ceilings. new finishes & furniture. f/a & sprinklers under seperate permit, mechanical, electrical & plumbing under seperate permit.
Details
Permit
201303222788
Status
complete
Filed
Mar 22, 2013
Permit issued
Mar 27, 2013
Final sign-off
Jun 18, 2013
Declared cost
$380,000
Address
49 Stevenson St

3rd floor-office improvements including selective demo of interior partitions, construction of new partitions, installation of new millwork & upgrades to (e) ceilings. new finishes & furniture. f/a & sprinklers under seperate permit, mechanical, electrical & plumbing under seperate permit.

Open the permit page

$380,000
Feb 8, 2013Completed
final sign-off Mar 2013
49 Stevenson StJohnson Controls Security Solutions Llc8th floor - relocate 8 existing speaker/strobes and 1 strobe for newly remodeled. all devices on existing fire alarm system. ref arch #201210293011
Details
Permit
201302089760
Status
complete
Filed
Feb 8, 2013
Permit issued
Feb 8, 2013
Final sign-off
Mar 21, 2013
Declared cost
$2,500
Address
49 Stevenson St

8th floor - relocate 8 existing speaker/strobes and 1 strobe for newly remodeled. all devices on existing fire alarm system. ref arch #201210293011

Open the permit page

$2,500
Jan 29, 2013Never finaled
issued Jan 2013, no final
49 Stevenson StPioneer Fire Inc.relocatre 14, add 6, delete 2 fire sprinklers.
Details
Permit
201301298950
Status
issued
Filed
Jan 29, 2013
Permit issued
Jan 29, 2013
Declared cost
$11,000
Address
49 Stevenson St

relocatre 14, add 6, delete 2 fire sprinklers.

Open the permit page

$11,000
Oct 29, 2012Completed
final sign-off Mar 2013
49 Stevenson StSwinerton Builders8th floor suite 800 - installation of partitions, doors, finishes, ceiling remodel. elec, mech work under separate permit
Details
Permit
201210293011
Status
complete
Filed
Oct 29, 2012
Permit issued
Dec 6, 2012
Final sign-off
Mar 1, 2013
Declared cost
$270,020
Address
49 Stevenson St

8th floor suite 800 - installation of partitions, doors, finishes, ceiling remodel. elec, mech work under separate permit

Open the permit page

$270,020
Jun 14, 2012Never finaled
issued Dec 2012, no final
49 Stevenson StSwinerton Builders8th floor:barrier remodel:minor demo door relocation, new accessories and new toilet partitions, patching finishes. no electrical and mechanical work. replace existing drinking fountain to hi/lo drinking fountain.
Details
Permit
201206142596
Status
issued
Filed
Jun 14, 2012
Permit issued
Dec 6, 2012
Declared cost
$10,000
Address
49 Stevenson St

8th floor:barrier remodel:minor demo door relocation, new accessories and new toilet partitions, patching finishes. no electrical and mechanical work. replace existing drinking fountain to hi/lo drinking fountain.

Open the permit page

$10,000
Jun 14, 2012Completed
final sign-off Mar 2013
49 Stevenson StSwinerton Builders7th floor:barrier remodel:minor demo door relocation, new accessories and new toilet partitions,new fixtures, patching finishes. no electrical and mechanical work. new lavatories & urinal, new high-low drinking fountain to replace (e) drinking fountain.
Details
Permit
201206142598
Status
complete
Filed
Jun 14, 2012
Permit issued
Dec 6, 2012
Final sign-off
Mar 1, 2013
Declared cost
$25,000
Address
49 Stevenson St

7th floor:barrier remodel:minor demo door relocation, new accessories and new toilet partitions,new fixtures, patching finishes. no electrical and mechanical work. new lavatories & urinal, new high-low drinking fountain to replace (e) drinking fountain.

Open the permit page

$25,000
Mar 2, 2012Completed
final sign-off Apr 2012
49 Stevenson StCarter Brothers Fire & Life Safety5th floor-add 8 speaker strobes & 2 strobes. t.i. pa# 2011-1222-1169
Details
Permit
201203025271
Status
complete
Filed
Mar 2, 2012
Permit issued
Mar 2, 2012
Final sign-off
Apr 23, 2012
Declared cost
$5,920
Address
49 Stevenson St

5th floor-add 8 speaker strobes & 2 strobes. t.i. pa# 2011-1222-1169

Open the permit page

$5,920
Feb 13, 2012Never finaled
issued Feb 2012, no final
49 Stevenson StAyoob & Peery Plumbing Co Increlocate 7, add 2 and demo 1, sprinkler in suite 575. total = 9.
Details
Permit
201202134064
Status
issued
Filed
Feb 13, 2012
Permit issued
Feb 13, 2012
Declared cost
$4,626
Address
49 Stevenson St

relocate 7, add 2 and demo 1, sprinkler in suite 575. total = 9.

Open the permit page

$4,626
Dec 22, 2011Completed
final sign-off Mar 2013
49 Stevenson Stbarrier removal - ada restrooms upgrade include: minor demo, new partitions, door relocation, new accessories, plumbing fixtures, pataching of e finishes. no elec
Details
Permit
201112221164
Status
complete
Filed
Dec 22, 2011
Permit issued
Dec 6, 2012
Final sign-off
Mar 1, 2013
Declared cost
$19,008
Address
49 Stevenson St

barrier removal - ada restrooms upgrade include: minor demo, new partitions, door relocation, new accessories, plumbing fixtures, pataching of e finishes. no elec

Open the permit page

$19,008
Dec 22, 2011Expired or cancelled
cancelled Jan 2026
49 Stevenson Stbarrier removal - ada restrooms upgrade include: minor demo, door relocation, new partitions, new accessories and plumbing fixtures, patching of e finishes. no electric
Details
Permit
201112221163
Status
cancelled
Filed
Dec 22, 2011
Declared cost
$19,868
Address
49 Stevenson St

barrier removal - ada restrooms upgrade include: minor demo, door relocation, new partitions, new accessories and plumbing fixtures, patching of e finishes. no electric

Open the permit page

$19,868
Dec 22, 2011Completed
final sign-off Mar 2013
49 Stevenson StSwinerton Buildersbarrier removal - ada upgrade (restrooms) includes: door relocation, new wall, new accessories and finishes, patching. minor demolition. no electrical
Details
Permit
201112221159
Status
complete
Filed
Dec 22, 2011
Permit issued
Dec 6, 2012
Final sign-off
Mar 1, 2013
Declared cost
$11,848
Address
49 Stevenson St

barrier removal - ada upgrade (restrooms) includes: door relocation, new wall, new accessories and finishes, patching. minor demolition. no electrical

Open the permit page

$11,848
Dec 22, 2011Completed
final sign-off Apr 2012
49 Stevenson StRudolph Commercial Interiors Inc, Rciada restroom upgrade including: 1 new partition, doors, relocations, new accessories and patching of finishes minor demoltion. no electrical
Details
Permit
201112221166
Status
complete
Filed
Dec 22, 2011
Permit issued
Jan 26, 2012
Final sign-off
Apr 23, 2012
Declared cost
$18,000
Address
49 Stevenson St

ada restroom upgrade including: 1 new partition, doors, relocations, new accessories and patching of finishes minor demoltion. no electrical

Open the permit page

$18,000
Dec 22, 2011Completed
final sign-off Apr 2012
49 Stevenson StRudolph Commercial Interiors Inc, Rci5th floor-tenant improvement: installation of partitions, doors, floor and wall finishes, minor ceiling remodel. electrical under separate permit
Details
Permit
201112221169
Status
complete
Filed
Dec 22, 2011
Permit issued
Jan 26, 2012
Final sign-off
Apr 23, 2012
Declared cost
$52,000
Address
49 Stevenson St

5th floor-tenant improvement: installation of partitions, doors, floor and wall finishes, minor ceiling remodel. electrical under separate permit

Open the permit page

$52,000
Dec 3, 2010Completed
final sign-off Sep 2011
49 Stevenson StCarter Brothers Fire & Life Safetysuite 1100: add 11-speaker/strobes & 4-strobes to and (e) fire alarm system in a (n) t.i. space. (t.i. application #201011154894).
Details
Permit
201012036058
Status
complete
Filed
Dec 3, 2010
Permit issued
Dec 3, 2010
Final sign-off
Sep 8, 2011
Declared cost
$5,600
Address
49 Stevenson St

suite 1100: add 11-speaker/strobes & 4-strobes to and (e) fire alarm system in a (n) t.i. space. (t.i. application #201011154894).

Open the permit page

$5,600
Dec 3, 2010Completed
final sign-off Apr 2011
49 Stevenson StCarter Brothers Fire & Life Safetysuite 660: add 5-(n) speaker strobes to an (e) fire alarm system in a (n) t.i. space (t.i.#201011154894)
Details
Permit
201012036061
Status
complete
Filed
Dec 3, 2010
Permit issued
Dec 3, 2010
Final sign-off
Apr 4, 2011
Declared cost
$4,500
Address
49 Stevenson St

suite 660: add 5-(n) speaker strobes to an (e) fire alarm system in a (n) t.i. space (t.i.#201011154894)

Open the permit page

$4,500
Dec 3, 2010Completed
final sign-off Mar 2011
49 Stevenson StCarter Brothers Fire & Life Safetysuite 600: add 7-(n) speaker strobes to an (e) fire alarm system in a (n) t.i. space (t.i.#201011154894).
Details
Permit
201012036062
Status
complete
Filed
Dec 3, 2010
Permit issued
Dec 3, 2010
Final sign-off
Mar 29, 2011
Declared cost
$4,750
Address
49 Stevenson St

suite 600: add 7-(n) speaker strobes to an (e) fire alarm system in a (n) t.i. space (t.i.#201011154894).

Open the permit page

$4,750
Nov 15, 2010Never finaled
issued Nov 2010, no final
49 Stevenson StPioneer Fire Inc.suite 600, 660, 1100 - relocate 14 and add 7 fire sprinklers
Details
Permit
201011154894
Status
issued
Filed
Nov 15, 2010
Permit issued
Nov 15, 2010
Declared cost
$3,500
Address
49 Stevenson St

suite 600, 660, 1100 - relocate 14 and add 7 fire sprinklers

Open the permit page

$3,500
Oct 22, 2010Completed
final sign-off Sep 2011
49 Stevenson Strevision to app#201010213517. changing the door swing, revised ceiling plan. . mechanical, electrical under seperate permit.
Details
Permit
201010223611
Status
complete
Filed
Oct 22, 2010
Permit issued
Oct 22, 2010
Final sign-off
Sep 8, 2011
Address
49 Stevenson St

revision to app#201010213517. changing the door swing, revised ceiling plan. . mechanical, electrical under seperate permit.

Open the permit page

Oct 21, 2010Expired or cancelled
expired Nov 2014
49 Stevenson Stinstallations of interior partition, doors, new finishes; electrical and mechanical under separate permit application
Details
Permit
201010213522
Status
expired
Filed
Oct 21, 2010
Permit issued
Oct 22, 2010
Declared cost
$128,410
Address
49 Stevenson St

installations of interior partition, doors, new finishes; electrical and mechanical under separate permit application

Open the permit page

$128,410
Oct 21, 2010Completed
final sign-off Jul 2011
49 Stevenson St11th floor-installation of interior partitions, doors, new finishes, millwork, mechanical & electrical- mep, life safety and sprinklers separate permit
Details
Permit
201010213517
Status
complete
Filed
Oct 21, 2010
Permit issued
Oct 22, 2010
Final sign-off
Jul 5, 2011
Declared cost
$187,371
Address
49 Stevenson St

11th floor-installation of interior partitions, doors, new finishes, millwork, mechanical & electrical- mep, life safety and sprinklers separate permit

Open the permit page

$187,371
Apr 20, 2010Completed
final sign-off Jul 2010
49 Stevenson Stminor interior remodel including (n) partitions and doors, 20% ada upgrade in women toilet room only. electrical under separate permit.
Details
Permit
201004200668
Status
complete
Filed
Apr 20, 2010
Permit issued
Apr 21, 2010
Final sign-off
Jul 20, 2010
Declared cost
$32,000
Address
49 Stevenson St

minor interior remodel including (n) partitions and doors, 20% ada upgrade in women toilet room only. electrical under separate permit.

Open the permit page

$32,000
Jan 21, 2010Completed
final sign-off Apr 2010
49 Stevenson StNovo Construction Incall work has been completed; to obtain final inspection for work approved under 200711278986
Details
Permit
201001215099
Status
complete
Filed
Jan 21, 2010
Permit issued
Jan 21, 2010
Final sign-off
Apr 19, 2010
Address
49 Stevenson St

all work has been completed; to obtain final inspection for work approved under 200711278986

Open the permit page

Jan 21, 2010Completed
final sign-off Apr 2010
49 Stevenson StNovo Construction Incall work has been completed; to obtain final inspection for work approved under pa 200712140495
Details
Permit
201001215098
Status
complete
Filed
Jan 21, 2010
Permit issued
Jan 21, 2010
Final sign-off
Apr 19, 2010
Address
49 Stevenson St

all work has been completed; to obtain final inspection for work approved under pa 200712140495

Open the permit page

Jan 21, 2010Completed
final sign-off Apr 2010
49 Stevenson StNovo Construction Incall work has been completed; to obtain final inspection for work approved under 200712110205
Details
Permit
201001215100
Status
complete
Filed
Jan 21, 2010
Permit issued
Jan 21, 2010
Final sign-off
Apr 19, 2010
Address
49 Stevenson St

all work has been completed; to obtain final inspection for work approved under 200712110205

Open the permit page

Jan 21, 2010Completed
final sign-off Apr 2010
49 Stevenson StNovo Construction Incall work has been completed; to obtain final inspection for work approved under pa 200707025752
Details
Permit
201001215104
Status
complete
Filed
Jan 21, 2010
Permit issued
Jan 21, 2010
Final sign-off
Apr 29, 2010
Address
49 Stevenson St

all work has been completed; to obtain final inspection for work approved under pa 200707025752

Open the permit page

Jan 21, 2010Completed
final sign-off Apr 2010
49 Stevenson StNovo Construction Incall work has been completed; to obtain final inspection for work approved under 200711198518
Details
Permit
201001215101
Status
complete
Filed
Jan 21, 2010
Permit issued
Jan 21, 2010
Final sign-off
Apr 29, 2010
Address
49 Stevenson St

all work has been completed; to obtain final inspection for work approved under 200711198518

Open the permit page

Jan 21, 2010Completed
final sign-off Apr 2010
49 Stevenson StNovo Construction Incall work has been completed; to obtain final inspection for work approved under 200712120311
Details
Permit
201001215102
Status
complete
Filed
Jan 21, 2010
Permit issued
Jan 21, 2010
Final sign-off
Apr 19, 2010
Address
49 Stevenson St

all work has been completed; to obtain final inspection for work approved under 200712120311

Open the permit page

Jan 21, 2010Completed
final sign-off Apr 2010
49 Stevenson StNovo Construction Incall work has been completed; to obtain final inspection for work approved under 200706063191
Details
Permit
201001215095
Status
complete
Filed
Jan 21, 2010
Permit issued
Jan 21, 2010
Final sign-off
Apr 29, 2010
Address
49 Stevenson St

all work has been completed; to obtain final inspection for work approved under 200706063191

Open the permit page

Jan 21, 2010Completed
final sign-off Apr 2010
49 Stevenson StNovo Construction Incall work has been completed; to obtain final inspection for work approved under pa 200704138740
Details
Permit
201001215103
Status
complete
Filed
Jan 21, 2010
Permit issued
Jan 21, 2010
Final sign-off
Apr 29, 2010
Address
49 Stevenson St

all work has been completed; to obtain final inspection for work approved under pa 200704138740

Open the permit page

Sep 25, 2009Completed
final sign-off Nov 2009
49 Stevenson StPioneer Fire Inc.1oth fl, suite 1075: relocate 3 and add 1 fire sprinkler
Details
Permit
200909257656
Status
complete
Filed
Sep 25, 2009
Permit issued
Sep 25, 2009
Final sign-off
Nov 24, 2009
Declared cost
$2,500
Address
49 Stevenson St

1oth fl, suite 1075: relocate 3 and add 1 fire sprinkler

Open the permit page

$2,500
Sep 17, 2009Completed
final sign-off Nov 2009
49 Stevenson StWard Alan Emery Construction Inc.tenant improvement for 10th floor - 1075. new breakroom, millwork to comply with ada, office expansion to include 2 new private offices, refinish reception floor.
Details
Permit
200909177042
Status
complete
Filed
Sep 17, 2009
Permit issued
Sep 23, 2009
Final sign-off
Nov 24, 2009
Declared cost
$108,951
Address
49 Stevenson St

tenant improvement for 10th floor - 1075. new breakroom, millwork to comply with ada, office expansion to include 2 new private offices, refinish reception floor.

Open the permit page

$108,951
Jul 17, 2008Never finaled
issued Jul 2008, no final
49 Stevenson StWard Alan Emery Construction Inc.at 2nd fl: rvision to pa #200806063854, replace existing woment's rm sink for accessibility.
Details
Permit
200807176974
Status
issued
Filed
Jul 17, 2008
Permit issued
Jul 22, 2008
Declared cost
$2,960
Address
49 Stevenson St

at 2nd fl: rvision to pa #200806063854, replace existing woment's rm sink for accessibility.

Open the permit page

$2,960
Jul 1, 2008Completed
final sign-off Aug 2008
49 Stevenson StRichlen Constructionrelocation of supply air grilles, including addiiton of (n) ductwork as required to match new architectural layout. ref. appl. 200804240504.
Details
Permit
200807015726
Status
complete
Filed
Jul 1, 2008
Permit issued
Jul 1, 2008
Final sign-off
Aug 28, 2008
Declared cost
$10,000
Address
49 Stevenson St

relocation of supply air grilles, including addiiton of (n) ductwork as required to match new architectural layout. ref. appl. 200804240504.

Open the permit page

$10,000
Jun 26, 2008Completed
final sign-off Aug 2008
49 Stevenson StCarter Brothers Fire & Life Safetyadd fire alarm safety notification to 4th floor t.i. all devices to be added to existing fire alarm. add 1 ceiling strobe, 2 ceiling speakers/strobe and 4 wall mounted strobes.
Details
Permit
200806265396
Status
complete
Filed
Jun 26, 2008
Permit issued
Jun 26, 2008
Final sign-off
Aug 28, 2008
Declared cost
$9,000
Address
49 Stevenson St

add fire alarm safety notification to 4th floor t.i. all devices to be added to existing fire alarm. add 1 ceiling strobe, 2 ceiling speakers/strobe and 4 wall mounted strobes.

Open the permit page

$9,000
Jun 19, 2008Completed
final sign-off Aug 2008
49 Stevenson StRichlen Constructionreuse and relocated existing 2x4 and 2x2 fixtures. add new downlights. ref arch: 200804240504
Details
Permit
200806194822
Status
complete
Filed
Jun 19, 2008
Permit issued
Jun 19, 2008
Final sign-off
Aug 28, 2008
Declared cost
$60,000
Address
49 Stevenson St

reuse and relocated existing 2x4 and 2x2 fixtures. add new downlights. ref arch: 200804240504

Open the permit page

$60,000
Jun 12, 2008Completed
final sign-off Jan 2009
49 Stevenson StPioneer Fire Protectionrelocate 28 sprinklers pendants and add 1.
Details
Permit
200806124237
Status
complete
Filed
Jun 12, 2008
Permit issued
Jun 12, 2008
Final sign-off
Jan 13, 2009
Declared cost
$6,000
Address
49 Stevenson St

relocate 28 sprinklers pendants and add 1.

Open the permit page

$6,000
Jun 6, 2008Completed
final sign-off Jan 2009
49 Stevenson StWard Alan Emery Construction Inc.ti - new drywall partitions. new acoustic ceiling. 20% restroom upgrades. ref#2008-0521-2594 for app'vd demo. mep, & fire under separate permit
Details
Permit
200806063854
Status
complete
Filed
Jun 6, 2008
Permit issued
Jun 20, 2008
Final sign-off
Jan 13, 2009
Declared cost
$72,000
Address
49 Stevenson St

ti - new drywall partitions. new acoustic ceiling. 20% restroom upgrades. ref#2008-0521-2594 for app'vd demo. mep, & fire under separate permit

Open the permit page

$72,000
Jun 3, 2008Never finaled
issued Jun 2008, no final
49 Stevenson StR L H Fire Protection Incti upgrade of existing sprinkler system. relocate 12 sprinkler heads, add 3 pendent heads and delete 1 head
Details
Permit
200806033524
Status
issued
Filed
Jun 3, 2008
Permit issued
Jun 3, 2008
Declared cost
$6,500
Address
49 Stevenson St

ti upgrade of existing sprinkler system. relocate 12 sprinkler heads, add 3 pendent heads and delete 1 head

Open the permit page

$6,500
May 21, 2008Completed
final sign-off Jan 2009
49 Stevenson StWard Alan Emery Construction Inc.2nd floor - minor non-structural interior demolition at 2nd fl.
Details
Permit
200805212594
Status
complete
Filed
May 21, 2008
Permit issued
May 29, 2008
Final sign-off
Jan 13, 2009
Declared cost
$13,000
Address
49 Stevenson St

2nd floor - minor non-structural interior demolition at 2nd fl.

Open the permit page

$13,000
Apr 24, 2008Completed
final sign-off Aug 2008
49 Stevenson StRichlen Construction4th floor tenant improvement: office expansion from multi-tenant floor to single tenant flr; new ceiling height partitions with doors & sidelites/ upgrade restrooms on this floor. minor lighting layout and hvac modifications per new floor plan will be under separate permit.
Details
Permit
200804240504
Status
complete
Filed
Apr 24, 2008
Permit issued
May 1, 2008
Final sign-off
Aug 28, 2008
Declared cost
$100,000
Address
49 Stevenson St

4th floor tenant improvement: office expansion from multi-tenant floor to single tenant flr; new ceiling height partitions with doors & sidelites/ upgrade restrooms on this floor. minor lighting layout and hvac modifications per new floor plan will be under separate permit.

Open the permit page

$100,000
Dec 14, 2007Expired or cancelled
expired Apr 2010
49 Stevenson StCarter Brothers Fire & Life Safety14th floor: adding fire alarm system coverage to tenant improvement space. all devices will be added to an existing fire alarm system. adding 9 strobes, 1 ceiling speaker.
Details
Permit
200712140495
Status
expired
Filed
Dec 14, 2007
Permit issued
Dec 14, 2007
Declared cost
$7,000
Address
49 Stevenson St

14th floor: adding fire alarm system coverage to tenant improvement space. all devices will be added to an existing fire alarm system. adding 9 strobes, 1 ceiling speaker.

Open the permit page

$7,000
Dec 12, 2007Expired or cancelled
expired Apr 2010
49 Stevenson StNovo Construction Incelectrical & lighting work on the 14th floor referance pa 2007-1127-8986 14th floor.
Details
Permit
200712120311
Status
expired
Filed
Dec 12, 2007
Permit issued
Dec 12, 2007
Declared cost
$48,000
Address
49 Stevenson St

electrical & lighting work on the 14th floor referance pa 2007-1127-8986 14th floor.

Open the permit page

$48,000
Dec 11, 2007Expired or cancelled
expired Apr 2010
49 Stevenson StAyoob & Peery Plumbing Co Inc14th floor: relocate 10 sprinkler heads per tenant improvement.
Details
Permit
200712110205
Status
expired
Filed
Dec 11, 2007
Permit issued
Dec 11, 2007
Declared cost
$3,000
Address
49 Stevenson St

14th floor: relocate 10 sprinkler heads per tenant improvement.

Open the permit page

$3,000
Nov 27, 2007Expired or cancelled
expired Apr 2010
49 Stevenson StNovo Construction Inc14th floor - building partition for office, conference room, library, server room. relocating lights as required, adding new power-data as required. new finishes. demo under separate p/a 2007.11.19.8518. mep, life safety & sprinkler under separate permit.
Details
Permit
200711278986
Status
expired
Filed
Nov 27, 2007
Permit issued
Nov 28, 2007
Declared cost
$300,000
Address
49 Stevenson St

14th floor - building partition for office, conference room, library, server room. relocating lights as required, adding new power-data as required. new finishes. demo under separate p/a 2007.11.19.8518. mep, life safety & sprinkler under separate permit.

Open the permit page

$300,000
Nov 19, 2007Expired or cancelled
expired Apr 2010
49 Stevenson StNovo Construction Incsuite #1400- interior non-structrural demo.
Details
Permit
200711198518
Status
expired
Filed
Nov 19, 2007
Permit issued
Nov 20, 2007
Declared cost
$6,000
Address
49 Stevenson St

suite #1400- interior non-structrural demo.

Open the permit page

$6,000
Jul 2, 2007Expired or cancelled
expired Apr 2010
49 Stevenson StCarter Brothers Fire & Life Safety8th floor tenant improvement, adding 9 speaker strobe and 1 strobe, 1 speaker to existing fire alarm system.
Details
Permit
200707025752
Status
expired
Filed
Jul 2, 2007
Permit issued
Jul 3, 2007
Declared cost
$7,000
Address
49 Stevenson St

8th floor tenant improvement, adding 9 speaker strobe and 1 strobe, 1 speaker to existing fire alarm system.

Open the permit page

$7,000
Jun 6, 2007Expired or cancelled
expired Apr 2010
49 Stevenson StNovo Construction Incoti-2 8th fl el,me
Details
Permit
200706063191
Status
expired
Filed
Jun 6, 2007
Permit issued
Jun 6, 2007
Declared cost
$21,000
Address
49 Stevenson St

oti-2 8th fl el,me

Open the permit page

$21,000
Apr 13, 2007Expired or cancelled
expired Apr 2010
49 Stevenson Stoti-1, cbre, 8th fl, el, me ,ls, sp.
Details
Permit
200704138740
Status
expired
Filed
Apr 13, 2007
Permit issued
Jun 1, 2007
Declared cost
$150,000
Address
49 Stevenson St

oti-1, cbre, 8th fl, el, me ,ls, sp.

Open the permit page

$150,000
Jan 26, 2007Never finaled
issued Jan 2007, no final
49 Stevenson StGeo M Robinson & Comodify existing fire sprinkler system to protect new partition and ceiling layout on 5/f, relocate 2 & add 1 sprinkler.
Details
Permit
200701262725
Status
issued
Filed
Jan 26, 2007
Permit issued
Jan 26, 2007
Declared cost
$575
Address
49 Stevenson St

modify existing fire sprinkler system to protect new partition and ceiling layout on 5/f, relocate 2 & add 1 sprinkler.

Open the permit page

$575
Jan 24, 2007Expired or cancelled
expired Jun 2008
49 Stevenson Stadd 2 new strobes and 2 new spkr/strobes to an extg fire alarm system in a new 5th floor t i space
Details
Permit
200701242404
Status
expired
Filed
Jan 24, 2007
Permit issued
Jan 24, 2007
Declared cost
$3,800
Address
49 Stevenson St

add 2 new strobes and 2 new spkr/strobes to an extg fire alarm system in a new 5th floor t i space

Open the permit page

$3,800
Jan 24, 2007Expired or cancelled
expired Jun 2008
49 Stevenson Stadd 3 smoke detectors to an extg fire alarm system 1 smoke det will be in a new server room on 5th, 6th, and 11th floor
Details
Permit
200701242400
Status
expired
Filed
Jan 24, 2007
Permit issued
Jan 24, 2007
Declared cost
$2,000
Address
49 Stevenson St

add 3 smoke detectors to an extg fire alarm system 1 smoke det will be in a new server room on 5th, 6th, and 11th floor

Open the permit page

$2,000
Dec 7, 2006Completed
final sign-off Jan 2007
49 Stevenson Stminor interior tenant improvements and accessibility improvements in restrooms
Details
Permit
200612079346
Status
complete
Filed
Dec 7, 2006
Permit issued
Dec 7, 2006
Final sign-off
Jan 29, 2007
Declared cost
$74,000
Address
49 Stevenson St

minor interior tenant improvements and accessibility improvements in restrooms

Open the permit page

$74,000
Aug 16, 2006Completed
final sign-off Apr 2007
49 Stevenson StEdwards Service Dba G E Securityfire alarm 3rd floor. adding of 12 strobe g1r-vm and 2 speakers 965-1a-4rw to existing speaker and strobe circuit
Details
Permit
200608169686
Status
complete
Filed
Aug 16, 2006
Permit issued
Aug 16, 2006
Final sign-off
Apr 25, 2007
Declared cost
$10,000
Address
49 Stevenson St

fire alarm 3rd floor. adding of 12 strobe g1r-vm and 2 speakers 965-1a-4rw to existing speaker and strobe circuit

Open the permit page

$10,000
Aug 2, 2006Completed
final sign-off Apr 2007
49 Stevenson StRichlen Constructionoti-3 ls
Details
Permit
200608028302
Status
complete
Filed
Aug 2, 2006
Permit issued
Aug 2, 2006
Final sign-off
Apr 25, 2007
Declared cost
$5,000
Address
49 Stevenson St

oti-3 ls

Open the permit page

$5,000
Jul 31, 2006Completed
final sign-off Apr 2007
49 Stevenson StRichlen Constructionoti-2, 3rd floor, el, me.
Details
Permit
200607318088
Status
complete
Filed
Jul 31, 2006
Permit issued
Jul 31, 2006
Final sign-off
Apr 25, 2007
Declared cost
$26,000
Address
49 Stevenson St

oti-2, 3rd floor, el, me.

Open the permit page

$26,000
Jul 27, 2006Completed
final sign-off Apr 2007
49 Stevenson Stoti-1 3/f el, me, ls, sp. demolition of 3 rooms. construction of 6 offices and a training room.
Details
Permit
200607277788
Status
complete
Filed
Jul 27, 2006
Permit issued
Jul 27, 2006
Final sign-off
Apr 25, 2007
Declared cost
$102,000
Address
49 Stevenson St

oti-1 3/f el, me, ls, sp. demolition of 3 rooms. construction of 6 offices and a training room.

Open the permit page

$102,000
Jan 3, 2006Completed
final sign-off Jan 2006
49 Stevenson StRichlen Constructionoti-2, 9th fl. el.
Details
Permit
200601031393
Status
complete
Filed
Jan 3, 2006
Permit issued
Jan 3, 2006
Final sign-off
Jan 25, 2006
Declared cost
$22,000
Address
49 Stevenson St

oti-2, 9th fl. el.

Open the permit page

$22,000
Dec 29, 2005Completed
final sign-off Jan 2006
49 Stevenson Stadd 17 new fire alarm devices to an (e) fire alarm system in a t.i. space on the 9th floor. this includes 4 speakers, 9 strobes, 2 smokes, & 2 door holders.
Details
Permit
200512291237
Status
complete
Filed
Dec 29, 2005
Permit issued
Dec 29, 2005
Final sign-off
Jan 25, 2006
Declared cost
$4,500
Address
49 Stevenson St

add 17 new fire alarm devices to an (e) fire alarm system in a t.i. space on the 9th floor. this includes 4 speakers, 9 strobes, 2 smokes, & 2 door holders.

Open the permit page

$4,500
Dec 8, 2005Completed
final sign-off Jan 2006
49 Stevenson Stoti-1 9/f el, me, ls, sp office t.i. some demolition, minor new construction.
Details
Permit
200512089826
Status
complete
Filed
Dec 8, 2005
Permit issued
Dec 8, 2005
Final sign-off
Jan 25, 2006
Declared cost
$66,000
Address
49 Stevenson St

oti-1 9/f el, me, ls, sp office t.i. some demolition, minor new construction.

Open the permit page

$66,000
Nov 30, 2005Completed
final sign-off Mar 2006
49 Stevenson StWard Alan Emery Construction Inc.rev. to permit #2005/08/2/9/1517 - revise laayout and door from original permit set
Details
Permit
200511309161
Status
complete
Filed
Nov 30, 2005
Permit issued
Nov 30, 2005
Final sign-off
Mar 27, 2006
Address
49 Stevenson St

rev. to permit #2005/08/2/9/1517 - revise laayout and door from original permit set

Open the permit page

Oct 6, 2005Expired or cancelled
expired Apr 2007
49 Stevenson StGeo M Robinson & Coalteration to (e) fire sprinkler system. ad (2) pendent (ceiling) sprinklers. relocate (2) pendent (ceiling) sprinklers.
Details
Permit
200510064933
Status
expired
Filed
Oct 6, 2005
Permit issued
Oct 6, 2005
Declared cost
$650
Address
49 Stevenson St

alteration to (e) fire sprinkler system. ad (2) pendent (ceiling) sprinklers. relocate (2) pendent (ceiling) sprinklers.

Open the permit page

$650
Aug 29, 2005Never finaled
issued Aug 2005, no final
49 Stevenson StWard Alan Emery Construction Inc.interior demolition, new drywall partation, acoustic ceiling, doors, frames & hardward finishes. ele
Details
Permit
200508291517
Status
issued
Filed
Aug 29, 2005
Permit issued
Aug 29, 2005
Declared cost
$36,000
Address
49 Stevenson St

interior demolition, new drywall partation, acoustic ceiling, doors, frames & hardward finishes. ele

Open the permit page

$36,000
Jul 21, 2005Completed
final sign-off Dec 2005
49 Stevenson StArrow Sign Companysign permit - electric, projecting, single faced.
Details
Permit
200507218253
Status
complete
Filed
Jul 21, 2005
Permit issued
Jul 21, 2005
Final sign-off
Dec 5, 2005
Address
49 Stevenson St

sign permit - electric, projecting, single faced.

Open the permit page

Jul 21, 2005Completed
final sign-off Dec 2005
49 Stevenson StArrow Sign Companysign permit - electric, projecting, double faced.
Details
Permit
200507218255
Status
complete
Filed
Jul 21, 2005
Permit issued
Jul 21, 2005
Final sign-off
Dec 5, 2005
Address
49 Stevenson St

sign permit - electric, projecting, double faced.

Open the permit page

Jul 18, 2005Completed
final sign-off Jun 2006
49 Stevenson StArrow Sign Companyto erect electric double faced projecting sign.
Details
Permit
200507187871
Status
complete
Filed
Jul 18, 2005
Permit issued
Aug 1, 2005
Final sign-off
Jun 16, 2006
Declared cost
$7,500
Address
49 Stevenson St

to erect electric double faced projecting sign.

Open the permit page

$7,500
May 5, 2005Completed
final sign-off Jun 2005
49 Stevenson Stadd 1 speaker and 1 strobe to an (e) fire alarm system to a tt in suite 460
Details
Permit
200505051630
Status
complete
Filed
May 5, 2005
Permit issued
May 5, 2005
Final sign-off
Jun 3, 2005
Declared cost
$4,000
Address
49 Stevenson St

add 1 speaker and 1 strobe to an (e) fire alarm system to a tt in suite 460

Open the permit page

$4,000
Apr 21, 2005Completed
final sign-off Jun 2005
49 Stevenson StRichlen Constructionoti-2 4th floor me ls
Details
Permit
200504210558
Status
complete
Filed
Apr 21, 2005
Permit issued
Apr 21, 2005
Final sign-off
Jun 3, 2005
Declared cost
$16,630
Address
49 Stevenson St

oti-2 4th floor me ls

Open the permit page

$16,630
Mar 25, 2005Completed
final sign-off Jun 2005
49 Stevenson Stoffice remodel-revise office layout,sprinkler,mech & life safety separate permits.
Details
Permit
200503258383
Status
complete
Filed
Mar 25, 2005
Permit issued
Mar 25, 2005
Final sign-off
Jun 3, 2005
Declared cost
$40,000
Address
49 Stevenson St

office remodel-revise office layout,sprinkler,mech & life safety separate permits.

Open the permit page

$40,000
Mar 14, 2005Completed
final sign-off Jul 2005
49 Stevenson StWard Alan Emery Construction Inc.revision to 3200410146765. revision check list#12 sht. 12a-0.0
Details
Permit
200503147396
Status
complete
Filed
Mar 14, 2005
Permit issued
Mar 14, 2005
Final sign-off
Jul 12, 2005
Address
49 Stevenson St

revision to 3200410146765. revision check list#12 sht. 12a-0.0

Open the permit page

Nov 5, 2004Never finaled
issued Nov 2004, no final
49 Stevenson Stadd to a extg fire alarm system new speakers and strobes in a new ti area on the 13th flr
Details
Permit
200411058659
Status
issued
Filed
Nov 5, 2004
Permit issued
Nov 5, 2004
Declared cost
$9,700
Address
49 Stevenson St

add to a extg fire alarm system new speakers and strobes in a new ti area on the 13th flr

Open the permit page

$9,700
Oct 28, 2004Completed
final sign-off Nov 2004
49 Stevenson StR L H Fire Protection Incoti-2, 13th floor, sp.
Details
Permit
200410287931
Status
complete
Filed
Oct 28, 2004
Permit issued
Oct 28, 2004
Final sign-off
Nov 30, 2004
Declared cost
$2,000
Address
49 Stevenson St

oti-2, 13th floor, sp.

Open the permit page

$2,000
Oct 14, 2004Completed
final sign-off Jul 2005
49 Stevenson Stoti-1 12th floor el me ls sp
Details
Permit
200410146765
Status
complete
Filed
Oct 14, 2004
Permit issued
Oct 14, 2004
Final sign-off
Jul 12, 2005
Declared cost
$33,000
Address
49 Stevenson St

oti-1 12th floor el me ls sp

Open the permit page

$33,000
Sep 23, 2004Completed
final sign-off Nov 2004
49 Stevenson St15/f-add speakers/strobes to (e) fire alarm system to provide audio & visual coverage to t.i. space
Details
Permit
200409234972
Status
complete
Filed
Sep 23, 2004
Permit issued
Sep 23, 2004
Final sign-off
Nov 30, 2004
Declared cost
$9,800
Address
49 Stevenson St

15/f-add speakers/strobes to (e) fire alarm system to provide audio & visual coverage to t.i. space

Open the permit page

$9,800
Sep 20, 2004Completed
final sign-off Nov 2004
49 Stevenson StSkyline Constructionsprinkler work 15 relocation, 2 removed. no increase in office space, 13th floor
Details
Permit
200409204649
Status
complete
Filed
Sep 20, 2004
Permit issued
Sep 20, 2004
Final sign-off
Nov 30, 2004
Declared cost
$2,500
Address
49 Stevenson St

sprinkler work 15 relocation, 2 removed. no increase in office space, 13th floor

Open the permit page

$2,500
Sep 10, 2004Completed
final sign-off Dec 2004
49 Stevenson StSkyline Constructionoti-2, 15th floor, el, me
Details
Permit
200409103812
Status
complete
Filed
Sep 10, 2004
Permit issued
Oct 8, 2004
Final sign-off
Dec 2, 2004
Declared cost
$6,000
Address
49 Stevenson St

oti-2, 15th floor, el, me

Open the permit page

$6,000
Sep 2, 2004Completed
final sign-off Nov 2004
49 Stevenson Stoti-1 13th floor el me ls sp
Details
Permit
200409023197
Status
complete
Filed
Sep 2, 2004
Permit issued
Sep 2, 2004
Final sign-off
Nov 29, 2004
Declared cost
$72,300
Address
49 Stevenson St

oti-1 13th floor el me ls sp

Open the permit page

$72,300
Aug 20, 2004Completed
final sign-off Nov 2004
49 Stevenson StSkyline Constructionoti-1,15th/fl-el,ls, me, sp
Details
Permit
200408202138
Status
complete
Filed
Aug 20, 2004
Permit issued
Sep 8, 2004
Final sign-off
Nov 30, 2004
Declared cost
$92,000
Address
49 Stevenson St

oti-1,15th/fl-el,ls, me, sp

Open the permit page

$92,000
Apr 19, 2004Completed
final sign-off Jul 2004
49 Stevenson Sttenant improvement on 7/f 2 smoke detector 12 speaker and 14 strobe
Details
Permit
200404191652
Status
complete
Filed
Apr 19, 2004
Permit issued
Apr 19, 2004
Final sign-off
Jul 8, 2004
Declared cost
$10,100
Address
49 Stevenson St

tenant improvement on 7/f 2 smoke detector 12 speaker and 14 strobe

Open the permit page

$10,100
Mar 29, 2004Expired or cancelled
expired Jan 2005
49 Stevenson StWard Alan Emery Construction Inc.oti-3 7th floor sp
Details
Permit
200403299835
Status
expired
Filed
Mar 29, 2004
Permit issued
Apr 13, 2004
Declared cost
$4,200
Address
49 Stevenson St

oti-3 7th floor sp

Open the permit page

$4,200
Mar 4, 2004Completed
final sign-off Sep 2004
49 Stevenson StWard Alan Emery Construction Inc.oti-1,7th fl-el,me, ls, sp
Details
Permit
200403047723
Status
complete
Filed
Mar 4, 2004
Permit issued
Mar 19, 2004
Final sign-off
Sep 22, 2004
Declared cost
$74,000
Address
49 Stevenson St

oti-1,7th fl-el,me, ls, sp

Open the permit page

$74,000
Mar 4, 2004Completed
final sign-off Jul 2004
49 Stevenson StWard Alan Emery Construction Inc.oti-2,7th fl-el,me
Details
Permit
200403047724
Status
complete
Filed
Mar 4, 2004
Permit issued
Mar 29, 2004
Final sign-off
Jul 8, 2004
Declared cost
$26,000
Address
49 Stevenson St

oti-2,7th fl-el,me

Open the permit page

$26,000
Mar 3, 2004Completed
final sign-off Jul 2004
49 Stevenson StWard Alan Emery Construction Inc.interior soft demo only at 7th floor
Details
Permit
200403037612
Status
complete
Filed
Mar 3, 2004
Permit issued
Mar 3, 2004
Final sign-off
Jul 8, 2004
Declared cost
$5,500
Address
49 Stevenson St

interior soft demo only at 7th floor

Open the permit page

$5,500
Nov 6, 2003Completed
final sign-off Jan 2004
49 Stevenson StRudolph Commercial Interiors Inc, Rcioti-1 10th fl-el, me, ls, sp
Details
Permit
200311069550
Status
complete
Filed
Nov 6, 2003
Permit issued
Dec 3, 2003
Final sign-off
Jan 29, 2004
Declared cost
$28,000
Address
49 Stevenson St

oti-1 10th fl-el, me, ls, sp

Open the permit page

$28,000
Aug 11, 2003Completed
final sign-off Oct 2003
49 Stevenson Stat street level, outdoor plaza, adding new movable seating, tables, & 3' -0" high planters
Details
Permit
200308111706
Status
complete
Filed
Aug 11, 2003
Permit issued
Sep 30, 2003
Final sign-off
Oct 3, 2003
Declared cost
$12,000
Address
49 Stevenson St

at street level, outdoor plaza, adding new movable seating, tables, & 3' -0" high planters

Open the permit page

$12,000
Jun 30, 2003Expired or cancelled
expired Mar 2004
49 Stevenson Stinstall new devices to provide fire alarm audio visual coverage to 10th floor tenant area,
Details
Permit
200306308372
Status
expired
Filed
Jun 30, 2003
Permit issued
Jun 30, 2003
Declared cost
$8,920
Address
49 Stevenson St

install new devices to provide fire alarm audio visual coverage to 10th floor tenant area,

Open the permit page

$8,920
Jun 13, 2003Completed
final sign-off Sep 2003
49 Stevenson Stdemolition of non structural partitions on 12th floor, 20% hc upgrade at restroom. replace toilet pa
Details
Permit
200306137076
Status
complete
Filed
Jun 13, 2003
Permit issued
Jun 13, 2003
Final sign-off
Sep 16, 2003
Declared cost
$3,500
Address
49 Stevenson St

demolition of non structural partitions on 12th floor, 20% hc upgrade at restroom. replace toilet pa

Open the permit page

$3,500
Jun 11, 2003Completed
final sign-off Jun 2003
49 Stevenson StAllan Automatic Sprinkleradd 1 pendent sp. hd. , relocate 1 sp. hd. on 10/floor
Details
Permit
200306116848
Status
complete
Filed
Jun 11, 2003
Permit issued
Jun 11, 2003
Final sign-off
Jun 20, 2003
Declared cost
$1,200
Address
49 Stevenson St

add 1 pendent sp. hd. , relocate 1 sp. hd. on 10/floor

Open the permit page

$1,200
Jun 4, 2003Completed
final sign-off Sep 2003
49 Stevenson StRichlen Constructionoti-2 4th floor sp
Details
Permit
200306046186
Status
complete
Filed
Jun 4, 2003
Permit issued
Jun 12, 2003
Final sign-off
Sep 18, 2003
Declared cost
$3,200
Address
49 Stevenson St

oti-2 4th floor sp

Open the permit page

$3,200
May 30, 2003Completed
final sign-off Sep 2003
49 Stevenson Stadd devices on 4th floor to exist fire alarm panel, 2 smoke detector, one control relay for door con
Details
Permit
200305305873
Status
complete
Filed
May 30, 2003
Permit issued
May 30, 2003
Final sign-off
Sep 18, 2003
Declared cost
$5,300
Address
49 Stevenson St

add devices on 4th floor to exist fire alarm panel, 2 smoke detector, one control relay for door con

Open the permit page

$5,300
Apr 29, 2003Completed
final sign-off Jun 2003
49 Stevenson StRossi Builders Inc.oti-1, 10th floor, el, me, ls, sp
Details
Permit
200304293341
Status
complete
Filed
Apr 29, 2003
Permit issued
May 13, 2003
Final sign-off
Jun 20, 2003
Declared cost
$30,000
Address
49 Stevenson St

oti-1, 10th floor, el, me, ls, sp

Open the permit page

$30,000
Apr 21, 2003Expired or cancelled
expired Jan 2005
49 Stevenson Stadding 9 strobe 1 sprklr strobe to new 3rd floor/add control for security dr detctr for elevator lby
Details
Permit
200304212743
Status
expired
Filed
Apr 21, 2003
Permit issued
Apr 21, 2003
Declared cost
$8,700
Address
49 Stevenson St

adding 9 strobe 1 sprklr strobe to new 3rd floor/add control for security dr detctr for elevator lby

Open the permit page

$8,700
Apr 3, 2003Expired or cancelled
expired Jan 2005
49 Stevenson StPankow Special Projects Lpoti-2 3rd floor, el, sp
Details
Permit
200304031341
Status
expired
Filed
Apr 3, 2003
Permit issued
Apr 18, 2003
Declared cost
$16,000
Address
49 Stevenson St

oti-2 3rd floor, el, sp

Open the permit page

$16,000
Mar 31, 2003Expired or cancelled
expired Jan 2005
49 Stevenson StPankow Special Projects Lpoti-1 3rd floor
Details
Permit
200303311040
Status
expired
Filed
Mar 31, 2003
Permit issued
Apr 3, 2003
Declared cost
$30,000
Address
49 Stevenson St

oti-1 3rd floor

Open the permit page

$30,000
Mar 27, 2003Completed
final sign-off Sep 2003
49 Stevenson StRichlen Constructionoti-1 4th fl-me,ls
Details
Permit
200303270832
Status
complete
Filed
Mar 27, 2003
Permit issued
Apr 17, 2003
Final sign-off
Sep 18, 2003
Declared cost
$55,000
Address
49 Stevenson St

oti-1 4th fl-me,ls

Open the permit page

$55,000
Dec 19, 2002Completed
final sign-off Mar 2003
49 Stevenson StDpr Construction Incinstall ceiling hieght partition in existing files work room
Details
Permit
200212193899
Status
complete
Filed
Dec 19, 2002
Permit issued
Dec 19, 2002
Final sign-off
Mar 13, 2003
Declared cost
$5,000
Address
49 Stevenson St

install ceiling hieght partition in existing files work room

Open the permit page

$5,000
Dec 27, 2001Expired or cancelled
expired Aug 2005
49 Stevenson StRossi Builders Inc.renew pa#2001/03/14/4194 for fifnal insp.
Details
Permit
200112275943
Status
expired
Filed
Dec 27, 2001
Permit issued
Dec 27, 2001
Address
49 Stevenson St

renew pa#2001/03/14/4194 for fifnal insp.

Open the permit page

Dec 27, 2001Expired or cancelled
expired Aug 2005
49 Stevenson StRossi Builders Inc.renew pa#2001/05/01/8079 for final insp.
Details
Permit
200112275942
Status
expired
Filed
Dec 27, 2001
Permit issued
Dec 27, 2001
Address
49 Stevenson St

renew pa#2001/05/01/8079 for final insp.

Open the permit page

Jul 5, 2001Expired or cancelled
expired Aug 2005
49 Stevenson StRossi Builders Inc.oti-3 9/f ls only
Details
Permit
200107052987
Status
expired
Filed
Jul 5, 2001
Permit issued
Jul 19, 2001
Declared cost
$19,000
Address
49 Stevenson St

oti-3 9/f ls only

Open the permit page

$19,000
Jun 11, 2001Expired or cancelled
expired Oct 2003
49 Stevenson StAllan Automatic Sprinkleradd 2 pendent sprinkler heads and relocate one pendent srpinkler head on the ninth fl.
Details
Permit
200106111239
Status
expired
Filed
Jun 11, 2001
Permit issued
Jun 11, 2001
Declared cost
$1,826
Address
49 Stevenson St

add 2 pendent sprinkler heads and relocate one pendent srpinkler head on the ninth fl.

Open the permit page

$1,826
May 1, 2001Expired or cancelled
expired Aug 2005
49 Stevenson StRossi Builders Inc.oti-2 9th floor, ltg, mech
Details
Permit
200105018079
Status
expired
Filed
May 1, 2001
Permit issued
May 10, 2001
Declared cost
$6,300
Address
49 Stevenson St

oti-2 9th floor, ltg, mech

Open the permit page

$6,300
Mar 14, 2001Expired or cancelled
expired Aug 2005
49 Stevenson StRossi Builders Inc.oti-1 9/f ltg mech ls
Details
Permit
200103144194
Status
expired
Filed
Mar 14, 2001
Permit issued
Apr 24, 2001
Declared cost
$19,000
Address
49 Stevenson St

oti-1 9/f ltg mech ls

Open the permit page

$19,000
Feb 2, 2001Expired or cancelled
expired Oct 2003
49 Stevenson Stfire alarm / life safety system upgrade to all floors and basement.
Details
Permit
200102021290
Status
expired
Filed
Feb 2, 2001
Permit issued
Jun 7, 2001
Declared cost
$117,000
Address
49 Stevenson St

fire alarm / life safety system upgrade to all floors and basement.

Open the permit page

$117,000
Jan 12, 2001Completed
final sign-off Feb 2001
49 Stevenson StRichlen Constructionoti-2 mech, l/s/ (14 floor only)
Details
Permit
200101129698
Status
complete
Filed
Jan 12, 2001
Permit issued
Jan 26, 2001
Final sign-off
Feb 27, 2001
Declared cost
$6,000
Address
49 Stevenson St

oti-2 mech, l/s/ (14 floor only)

Open the permit page

$6,000
Dec 13, 2000Completed
final sign-off Aug 2001
49 Stevenson StRichlen Constructionoti-3 me,fs 12th floor
Details
Permit
200012137821
Status
complete
Filed
Dec 13, 2000
Permit issued
Dec 28, 2000
Final sign-off
Aug 16, 2001
Declared cost
$2,500
Address
49 Stevenson St

oti-3 me,fs 12th floor

Open the permit page

$2,500
Dec 13, 2000Completed
final sign-off Jan 2001
49 Stevenson StRichlen Constructionoti-3 8th floor me,sp
Details
Permit
200012137823
Status
complete
Filed
Dec 13, 2000
Permit issued
Dec 28, 2000
Final sign-off
Jan 30, 2001
Declared cost
$6,000
Address
49 Stevenson St

oti-3 8th floor me,sp

Open the permit page

$6,000
Dec 1, 2000Completed
final sign-off Feb 2001
49 Stevenson StRichlen Constructionoti-1: el me, and l/s (14th fl.)
Details
Permit
200012016949
Status
complete
Filed
Dec 1, 2000
Permit issued
Jan 4, 2001
Final sign-off
Feb 27, 2001
Declared cost
$35,000
Address
49 Stevenson St

oti-1: el me, and l/s (14th fl.)

Open the permit page

$35,000
Nov 27, 2000Completed
final sign-off Aug 2001
49 Stevenson StRichlen Constructionoti-2 12th floor, l/s only
Details
Permit
200011276561
Status
complete
Filed
Nov 27, 2000
Permit issued
Dec 7, 2000
Final sign-off
Aug 16, 2001
Declared cost
$12,000
Address
49 Stevenson St

oti-2 12th floor, l/s only

Open the permit page

$12,000
Nov 27, 2000Completed
final sign-off Jan 2001
49 Stevenson StRichlen Constructionoti-2 8th floor, l/s only
Details
Permit
200011276559
Status
complete
Filed
Nov 27, 2000
Permit issued
Dec 13, 2000
Final sign-off
Jan 30, 2001
Declared cost
$10,000
Address
49 Stevenson St

oti-2 8th floor, l/s only

Open the permit page

$10,000
Nov 3, 2000Expired or cancelled
cancelled Jan 2002
49 Stevenson Stoti-1 8/f ls only
Details
Permit
200011034800
Status
cancelled
Filed
Nov 3, 2000
Declared cost
$5,000
Address
49 Stevenson St

oti-1 8/f ls only

Open the permit page

$5,000
Nov 3, 2000Completed
final sign-off Aug 2001
49 Stevenson StRichlen Constructionoti-1 12/f el me ls sp
Details
Permit
200011034797
Status
complete
Filed
Nov 3, 2000
Permit issued
Nov 22, 2000
Final sign-off
Aug 16, 2001
Declared cost
$27,000
Address
49 Stevenson St

oti-1 12/f el me ls sp

Open the permit page

$27,000
Nov 3, 2000Completed
final sign-off Jan 2001
49 Stevenson StRichlen Constructionoti-1 8/f el me ls sp
Details
Permit
200011034799
Status
complete
Filed
Nov 3, 2000
Permit issued
Nov 22, 2000
Final sign-off
Jan 30, 2001
Declared cost
$37,000
Address
49 Stevenson St

oti-1 8/f el me ls sp

Open the permit page

$37,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Rudolph Commercial Interiors Inc, Rci (19), Richlen Construction (17), Novo Construction Inc (14), Ward Alan Emery Construction Inc. (11), Sabah International Incorporated (10), Ayoob & Peery Plumbing Co Inc (8), Bcci Construction Company (8), Swinerton Builders (8), Carter Brothers Fire & Life Safety (7), Cobe Construction Inc (6), Pioneer Fire Inc. (6), R L H Fire Protection Inc (6), Rossi Builders Inc. (6), H C I Systems Inc (4), Arrow Sign Company (3), Golden Gate Fire Protection Inc (3), Skyline Construction (3), Allan Automatic Sprinkler (2), Geo M Robinson & Co (2), Johnson Controls Security Solutions Llc (2), Pankow Special Projects Lp (2), Pribuss Engineering Inc (2), Principal Builders Inc. (2), Red Hawk Fire & Security Ca Llc (2), Terra Nova Industries (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Allied Heating & Air Conditioning, Bilcor Inc, C B F Inc, Dpr Construction Inc, Edwards Service Dba G E Security, Gci, Inc, Pioneer Fire Protection, R M I Mechanical Contractors, Sprig Electric (Archkey Solutions), Tom Rectenwald Const. Inc., Tri-Signal Integration Inc.
Architects
Christopher Preovolos (12), Robin Mcdonald (5), Shawn Anderson (4), Howard Kwok (3), Phoebe Lam (2), Huntsman Arch., Joseph Tyndall, Karen Carlene Letteney, Scott E Clement, Steve Fee, Tom Gajek, Virginie Manichon, William Duff
Engineers
Tom Gajic (5), Greg Wagner (2), Srdjan Rebraca (2), Alexander Joseph Pacheco, Craig Laws, Jesus B Cabellon Jr, Mozart Faizi, Peter Kogan, Sherry Chaumpluke, Xuong Quach, Xuong Quach
Authorized agent-otherss
Adolfo Alano, Fred Maguire
Designers
Sabah International Inc

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.