Tomislav Gajic
- Listed as
- architect, engineer
- Firm
- Acies Engineering
- Based in
- Santa Clara
- On San Francisco permits
- Dec 2004 to Sep 2026
125 permits since 2000 (engineer on 115 permits, architect on 10 permits): 69 completed, 16 in progress, 26 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 125.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 731 Columbus Av | 1/f t.i. w/ added drink service and ext mods. int:(n) mercantile and espresso bar layout, new pvt loung space; ada upgrades. add ada restroom; new moment frames. ext: new finishes & tile, add canopy at entry, new exterior signage (sep); shift entry doors/config.Details
1/f t.i. w/ added drink service and ext mods. int:(n) mercantile and espresso bar layout, new pvt loung space; ada upgrades. add ada restroom; new moment frames. ext: new finishes & tile, add canopy at entry, new exterior signage (sep); shift entry doors/config. | $1,942,026 | |
| May 14, 2026 | In progress issued Aug 2026 | 1569 Sloat Bl | Oak Park Construction | proposed warm dark shell renovations to demise existing retail space of approximately 8,731 sf into two (2) new retail spaces suite a300 (1694 sf) and suite a302 (7,037 sf) and provide landlord improvements in suite a300. future tenant in suite a300 to be a pilates studio (under separete permit).Details
proposed warm dark shell renovations to demise existing retail space of approximately 8,731 sf into two (2) new retail spaces suite a300 (1694 sf) and suite a302 (7,037 sf) and provide landlord improvements in suite a300. future tenant in suite a300 to be a pilates studio (under separete permit). | $100,000 |
| Apr 14, 2026 | In progress issued May 2026 | 211 Jefferson St | Embree Construction Group Inc | revision to 202412176961, outline s the design revisions to door and storefront modificiations, existing door was removed and replaced, delta a changesDetails
revision to 202412176961, outline s the design revisions to door and storefront modificiations, existing door was removed and replaced, delta a changes | $7,000 |
| Mar 10, 2026 | In progress issued Apr 2026 | 255 Winston Dr | Foresite Construction Inc | revision to bpa 2025.0428.5369 - revision includes demolition, dining interior, exterior facade, kitchen, and site changesDetails
revision to bpa 2025.0428.5369 - revision includes demolition, dining interior, exterior facade, kitchen, and site changes | $10,000 |
| Jan 12, 2026 | In progress filed Jan 2026, not yet issued | 3900 Geary Bl | remodel of (e) restaurant & offices to incorporate mixed-use conversion. (e) restaurant formula retail (burger king) shall remain while (e) office space will be converted into 9 residential units. 1.5 story vertical addition with a total of 4 stories will be constructed to accomodate new residentialDetails
remodel of (e) restaurant & offices to incorporate mixed-use conversion. (e) restaurant formula retail (burger king) shall remain while (e) office space will be converted into 9 residential units. 1.5 story vertical addition with a total of 4 stories will be constructed to accomodate new residential | $5,619,200 | |
| Jan 5, 2026 | In progress issued Mar 2026 | 211 Jefferson St | Embree Construction Group Inc | reference to pa#202412176961, owner reflected exterior and interior changes.Details
reference to pa#202412176961, owner reflected exterior and interior changes. | $50,000 |
| Dec 11, 2025 | Completed final sign-off Aug 2026 | 2727 Mariposa St | 2/fl- ti continuation for previous use . upgrade restrooms to meet accessibility code for (n) partitions, lighting, mepDetails
2/fl- ti continuation for previous use . upgrade restrooms to meet accessibility code for (n) partitions, lighting, mep | $300,000 | |
| Oct 21, 2025 | In progress issued Jan 2026 | 211 Jefferson St | Embree Construction Group Inc | 1/f -to include the construction of non bearing partitions that was graphically shown on permitted drawings but not detailed theirin. to perform mech and elec work in this adjacent tenant space (art gallery) necessitated by the previously permitted work.Details
1/f -to include the construction of non bearing partitions that was graphically shown on permitted drawings but not detailed theirin. to perform mech and elec work in this adjacent tenant space (art gallery) necessitated by the previously permitted work. | $100,000 |
| Oct 14, 2025 | Completed final sign-off May 2026 | 1010 16th St | Acg Construction Inc | interior build out of an (e) ground fl space at 1010 16th st for cracked & battered. subject unit 13 "retail 1". work includes: (n) restrooms, (n) kitchen equipment, (n) coffee bar & equipment, (n) interior finishes, (n) associated plumbing & electrical.Details
interior build out of an (e) ground fl space at 1010 16th st for cracked & battered. subject unit 13 "retail 1". work includes: (n) restrooms, (n) kitchen equipment, (n) coffee bar & equipment, (n) interior finishes, (n) associated plumbing & electrical. | $900,000 |
| Aug 8, 2025 | In progress issued Mar 2026 | 537 Stevenson St | Cookline Construction Inc | prop h: change of use (e) b occupany bldg to proposed a occupancy. new elevator & sprinklers proposed under separate permits. new restrooms & modify (e) restrooms. modify stair well & demising walls per plan. installation of beverage service bars & walk-in refridgerator. no food program/kitchen.Details
prop h: change of use (e) b occupany bldg to proposed a occupancy. new elevator & sprinklers proposed under separate permits. new restrooms & modify (e) restrooms. modify stair well & demising walls per plan. installation of beverage service bars & walk-in refridgerator. no food program/kitchen. | $700,000 |
| Jul 16, 2025 | In progress issued Dec 2025 | 255 Winston Dr | Foresite Construction Inc | removal of existing non operable freight elevator & associate equipment. also installation of a new lula elevator within the existing shaft & all associated equipment. this work to be performed concurrently with tenant improvement work for pa 202504285369Details
removal of existing non operable freight elevator & associate equipment. also installation of a new lula elevator within the existing shaft & all associated equipment. this work to be performed concurrently with tenant improvement work for pa 202504285369 | $150,000 |
| Jun 26, 2025 | Completed final sign-off Feb 2026 | 2343 Fillmore St | Vertex Builders Dba Signal Hill Builders | revision to pa #202407257315 to the lobby space only. changes pertain to finishes, arrangement of lobby millwork furniture and limited ceiling and lighting changes.Details
revision to pa #202407257315 to the lobby space only. changes pertain to finishes, arrangement of lobby millwork furniture and limited ceiling and lighting changes. | $100 |
| May 12, 2025 | In progress issued Nov 2025 | 211 Jefferson St | Embree Construction Group Inc | change of use a3 to a2 occupancy-partial demo, renovation and conversion of 1st floor of (e) 3 story building from gallery to restaurant. (n) work includes remodel of 1st floor, mep work, minor structural scope, minor exterior storefront and utility improvementsDetails
change of use a3 to a2 occupancy-partial demo, renovation and conversion of 1st floor of (e) 3 story building from gallery to restaurant. (n) work includes remodel of 1st floor, mep work, minor structural scope, minor exterior storefront and utility improvements | $6,000,000 |
| Apr 28, 2025 | In progress issued Dec 2025 | 255 Winston Dr | Foresite Construction Inc | the proposed project is tenant improvement & facade work for 4019 square ft restaurant this includes work in existing basement (additional) 2599 sq ft & exterior facade work. certificate of final completeion not to be issued prior to issuance and final of pa# 2025-0716-0988.Details
the proposed project is tenant improvement & facade work for 4019 square ft restaurant this includes work in existing basement (additional) 2599 sq ft & exterior facade work. certificate of final completeion not to be issued prior to issuance and final of pa# 2025-0716-0988. | $800,000 |
| Apr 3, 2025 | In progress issued Apr 2025 | 1264 Folsom St | Tadashi Wood Construction Company | deferred submission for electrical from pa# 2024-0430-1096. provide indoor lighting for normal & emergency use, provide power recepticles to hvac plumbing etc. conform to energy efficency standardsDetails
deferred submission for electrical from pa# 2024-0430-1096. provide indoor lighting for normal & emergency use, provide power recepticles to hvac plumbing etc. conform to energy efficency standards | |
| Feb 26, 2025 | Completed final sign-off Dec 2025 | 90 Charter Oak Av | John A Lehman Dba Lehman Construction | k14/k15 1/f: interior ti of a portion of the first floor of (e) facility. combining (2) kitchens for single operator w/ fse install, plumbing, and electrical. no structural.Details
k14/k15 1/f: interior ti of a portion of the first floor of (e) facility. combining (2) kitchens for single operator w/ fse install, plumbing, and electrical. no structural. | $55,000 |
| Jan 30, 2025 | In progress issued Feb 2025 | 201 Bay Shore Bl | Colbear Contracting Group Llc | revision to pa 202310138659 (n) mechanical room w/equipment. no structural workDetails
revision to pa 202310138659 (n) mechanical room w/equipment. no structural work | $50,000 |
| Sep 20, 2024 | Completed final sign-off Feb 2026 | 3820 24th St | Adam Lewis Construction Company | 1275 sf basement tenant improvements expansion of existing 2576 sf ground flr veterinary clinic.completed veterinary clinc will be total of 3851sf (ref 2023-007870cua). ti work includes new partitions, new mech, elect, and plumb. new accessible restroom, new finishes, and new hvac eqip locaetd in(e)Details
1275 sf basement tenant improvements expansion of existing 2576 sf ground flr veterinary clinic.completed veterinary clinc will be total of 3851sf (ref 2023-007870cua). ti work includes new partitions, new mech, elect, and plumb. new accessible restroom, new finishes, and new hvac eqip locaetd in(e) | $400,000 |
| Aug 15, 2024 | Completed final sign-off Feb 2026 | 2343 Fillmore St | Vertex Builders Dba Signal Hill Builders | non structural interior improvement of (e) animal hospital. non-structural reconfiguration of lvl 1 & 2. ada compliance maintained throughout bldg. upgrade of (e) storefront windows to improve thermal performance & enhance storefront transparency in visibility zone. fire life safety deferred.Details
non structural interior improvement of (e) animal hospital. non-structural reconfiguration of lvl 1 & 2. ada compliance maintained throughout bldg. upgrade of (e) storefront windows to improve thermal performance & enhance storefront transparency in visibility zone. fire life safety deferred. | $2,650,000 |
| Feb 6, 2024 | Completed final sign-off Feb 2025 | 2343 Fillmore St | Blueline Associates Inc | renovation of existing interior garage for use in medical imaging.Details
renovation of existing interior garage for use in medical imaging. | $200,399 |
| Oct 13, 2023 | In progress issued Jan 2025 | 201 Bay Shore Bl | Colbear Contracting Group Llc | ti new rooftop mechanical equipment, new insulation, new security gates, new equipment padDetails
ti new rooftop mechanical equipment, new insulation, new security gates, new equipment pad | $280,000 |
| Aug 4, 2023 | Completed final sign-off May 2024 | 2575 Ocean Av | Method Construction Inc. | change of use from health studio/meditation into office use. interior partition. update mechanical, electrical, and plumbing.Details
change of use from health studio/meditation into office use. interior partition. update mechanical, electrical, and plumbing. | $100,000 |
| Jun 7, 2023 | Completed final sign-off Jul 2024 | 18 Fernwood Dr | Bayside New Homes Inc | rev to pa202103226957: pour concrete staged construction to section of each corner, total (4x).Details
rev to pa202103226957: pour concrete staged construction to section of each corner, total (4x). | $1,000 |
| May 31, 2023 | Completed final sign-off Feb 2025 | 275 South Van Ness Av | C C I Commercial Construction & Improv | change of occupancy: ti to existing building to establish distillery with accessory tasting room and cafe. associated bp#s:2022-1222-9044, 2022-1222-9047, 2023-0414-5798 and 2023-0414-5800. certificate of occupancy for this permit only after associated permits receive certificate of occupancy.Details
change of occupancy: ti to existing building to establish distillery with accessory tasting room and cafe. associated bp#s:2022-1222-9044, 2022-1222-9047, 2023-0414-5798 and 2023-0414-5800. certificate of occupancy for this permit only after associated permits receive certificate of occupancy. | $324,000 |
| May 23, 2023 | Completed final sign-off Feb 2025 | 275 South Van Ness Av | C C I Commercial Construction & Improv | change of occupancy: ti to existing building to establish distillery with accessory tasting room and cafe. associated bp#s:2022-1222-9044, 2022-1222-9047, 2023-0414-5798 and 2023-0414-5800. certificate of occupancy for this permit only after certificate of occupancy for associated permits.Details
change of occupancy: ti to existing building to establish distillery with accessory tasting room and cafe. associated bp#s:2022-1222-9044, 2022-1222-9047, 2023-0414-5798 and 2023-0414-5800. certificate of occupancy for this permit only after certificate of occupancy for associated permits. | $324,000 |
| Apr 25, 2023 | Completed final sign-off Mar 2024 | 701 03rd St | Cookline Construction Inc | revision to pa#201910235416. t.i. of a grd flr bar & restaurant. (n) non structural partitions & finishes, lightings. millwork & kitchen equipment. includes (n) mep work associated w/ project. fire sprinklers is design/built under a separate permit.Details
revision to pa#201910235416. t.i. of a grd flr bar & restaurant. (n) non structural partitions & finishes, lightings. millwork & kitchen equipment. includes (n) mep work associated w/ project. fire sprinklers is design/built under a separate permit. | $244,228 |
| Apr 20, 2023 | Completed final sign-off Feb 2025 | 275 South Van Ness Av | C C I Commercial Construction & Improv | deferred mep associated w/ approved t.i pa# 202212229047, 202212229044 & revision pa# 202304145800 & 202304145798.Details
deferred mep associated w/ approved t.i pa# 202212229047, 202212229044 & revision pa# 202304145800 & 202304145798. | |
| Apr 20, 2023 | Completed final sign-off Feb 2025 | 275 South Van Ness Av | C C I Commercial Construction & Improv | deferred mep associated w/ approved t.i pa# 202212229047, 202212229044 & revision pa# 202304145800 & 202304145798.Details
deferred mep associated w/ approved t.i pa# 202212229047, 202212229044 & revision pa# 202304145800 & 202304145798. | |
| Feb 7, 2023 | Completed final sign-off Nov 2023 | 450 Powell St | Independent Power Inc | 3rd fl - fitness center. new finishes @ floor, walls and ceiling. new decorative fixtures connected to (e) power and electrical boxes. restroom floor, wall finish, new non-structural fixed shelving and millwork. to comply with nov 202298994 and 202289771Details
3rd fl - fitness center. new finishes @ floor, walls and ceiling. new decorative fixtures connected to (e) power and electrical boxes. restroom floor, wall finish, new non-structural fixed shelving and millwork. to comply with nov 202298994 and 202289771 | $50,000 |
| Jan 19, 2023 | Expired or cancelled expired Mar 2024 | 1200 Market St | K Bali Construction | revision to 202109158511 and 202206307517. relocation of electrical gear and corresponding layout change to kitchen b104.Details
revision to 202109158511 and 202206307517. relocation of electrical gear and corresponding layout change to kitchen b104. | |
| Dec 28, 2022 | Completed final sign-off Apr 2026 | 340 Fell St | Gci, Inc | renovate two story portion into an electrical automobile service center and one story portion will be an automobile showroom. building does not have an elevator per cbc 11b-206.2.3 exception 1.1 the project includes core and shell modifications the ti willl be submitted under separate permit.Details
renovate two story portion into an electrical automobile service center and one story portion will be an automobile showroom. building does not have an elevator per cbc 11b-206.2.3 exception 1.1 the project includes core and shell modifications the ti willl be submitted under separate permit. | $5,000,000 |
| Dec 23, 2022 | Never finaled issued Jul 2023, no final | 3352 Steiner St | R 3 Builders Inc. | interior remodel of existing restaurant. upgrade (e) accessible restroom. no exterior alterations. no structural work.Details
interior remodel of existing restaurant. upgrade (e) accessible restroom. no exterior alterations. no structural work. | $180,000 |
| Dec 23, 2022 | Never finaled filed Dec 2022, never issued | 1030 Fillmore St | general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office. accessible units in this bldg unit 802,803, 804Details
general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office. accessible units in this bldg unit 802,803, 804 | $262,500 | |
| Dec 23, 2022 | Never finaled filed Dec 2022, never issued | 1020 Fillmore St | general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office.Details
general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office. | $262,500 | |
| Dec 23, 2022 | Never finaled filed Dec 2022, never issued | 911 Webster St | general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office.Details
general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office. | $262,500 | |
| Dec 23, 2022 | Never finaled filed Dec 2022, never issued | 1040 Fillmore St | general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office.Details
general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office. | $262,500 | |
| Dec 23, 2022 | Never finaled filed Dec 2022, never issued | 1261 Golden Gate Av | general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduciton of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office.Details
general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduciton of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office. | $262,500 | |
| Dec 23, 2022 | Never finaled filed Dec 2022, never issued | 1291 Golden Gate Av | general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office.Details
general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office. | $262,500 | |
| Dec 23, 2022 | Never finaled filed Dec 2022, never issued | 1140 Mcallister St | general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office.Details
general rehabilitation of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office. | $262,500 | |
| Dec 23, 2022 | Never finaled filed Dec 2022, never issued | 1170 Mcallister St | general rehab of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office. accessible units in this bldg unit #403 & #404Details
general rehab of (e) affordable housing complex. accessible units to be provided per cbc 11b. accessible path of travel upgrades. reduction of concrete site work. common area & unit interior upgrades. update unit 501. relocate security office. accessible units in this bldg unit #403 & #404 | $262,500 | |
| Dec 19, 2022 | In progress issued Feb 2025 | 228 Jersey St | 415 Remodeling Inc, Aaron Gordon Construction Inc | renovation of an (e) 2-story single family home, including: (1) demo (e) rear yard porch, (2) new single story addition at rear, (3) new interior wall layout, (4) replacing existing foundation w/ associated excavation work, (5) repair/replace exterior finishes, (6) replacing exterior windows & doorsDetails
renovation of an (e) 2-story single family home, including: (1) demo (e) rear yard porch, (2) new single story addition at rear, (3) new interior wall layout, (4) replacing existing foundation w/ associated excavation work, (5) repair/replace exterior finishes, (6) replacing exterior windows & doors | $400,000 |
| Dec 6, 2022 | Completed final sign-off Jan 2024 | 120 Folsom St | Barrett Karber Built Llc | we are building a coffee shop inside a newly constructed commercial condo at 120 folsom st. includes coffee bar & service counter w/seating for the sale + consumption of coffee and pastry. first time t.i.Details
we are building a coffee shop inside a newly constructed commercial condo at 120 folsom st. includes coffee bar & service counter w/seating for the sale + consumption of coffee and pastry. first time t.i. | $250,000 |
| Nov 30, 2022 | Never finaled issued Feb 2023, no final | 701 08th St | E.A.Davidovits &Co.,Inc. | mercantile tenant improvement for ground floor space in a newly constructed existing shell building includes open showeroom space, smaller display spaces, employee offices, office support areas, and restrooms.Details
mercantile tenant improvement for ground floor space in a newly constructed existing shell building includes open showeroom space, smaller display spaces, employee offices, office support areas, and restrooms. | $1,200,000 |
| Apr 26, 2022 | Completed final sign-off Apr 2023 | 201 Powell St | Wells Construction Inc | t.i. for a take out only coffee shop in (e) shell. new non-structural partitions, storefront, equipment, fixtures, finishes, and mep upgrades.Details
t.i. for a take out only coffee shop in (e) shell. new non-structural partitions, storefront, equipment, fixtures, finishes, and mep upgrades. | $192,800 |
| Apr 8, 2022 | Completed final sign-off Nov 2024 | 299 02nd St | Precision Hotel Interiors Inc | expansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck.Details
expansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck. | $900,000 |
| Mar 17, 2022 | Completed final sign-off Jun 2022 | 225 30th St | Essa's Remodeling | revision to pa# 202009053608, title 24 exempt form.Details
revision to pa# 202009053608, title 24 exempt form. | |
| Feb 3, 2022 | Completed final sign-off Mar 2024 | 1200 Market St | K Bali Construction | t.i. mechanical & electrical work associated with food hall and kitchens.Details
t.i. mechanical & electrical work associated with food hall and kitchens. | $175,000 |
| Jan 18, 2022 | Completed final sign-off Sep 2022 | 2100 Chestnut St | Paradigm General Contractors | tenant improvement interior ti in (e) shell space, including including interior walk-up atms, for (n) wells fargo bank; the proposal is to establish a formula retail use to dba wells fargo @ 2100 chestnut st (currently occupied by pottery barn). the proposed project will allow (e) wells fargoDetails
tenant improvement interior ti in (e) shell space, including including interior walk-up atms, for (n) wells fargo bank; the proposal is to establish a formula retail use to dba wells fargo @ 2100 chestnut st (currently occupied by pottery barn). the proposed project will allow (e) wells fargo | $561,470 |
| Dec 22, 2021 | Completed final sign-off Nov 2022 | 3820 24th St | Sphinx Inc Dba Pharaoh Construction | tenant improvement for veterinary clinic. new partition, new ceilings, new lighting, new m&p, new accessible restroom, and new finishes. the possible future expansion of the clinic by constructing a shaft for a future elevator b/t the street and basement levels.Details
tenant improvement for veterinary clinic. new partition, new ceilings, new lighting, new m&p, new accessible restroom, and new finishes. the possible future expansion of the clinic by constructing a shaft for a future elevator b/t the street and basement levels. | $400,000 |
| Nov 29, 2021 | Completed final sign-off Feb 2022 | 1110 04th St | Bay Area Builders Inc. | revision to permit 202009265080. work includes layout revision to pet washing and isolation suite. added handwash sink station in the corridor. multiple doors to be switced from hinged to sliding doorsDetails
revision to permit 202009265080. work includes layout revision to pet washing and isolation suite. added handwash sink station in the corridor. multiple doors to be switced from hinged to sliding doors | |
| Sep 23, 2021 | Completed final sign-off Apr 2022 | 343 08th St | Guzman Construction Group Inc. | dbi review of t 24 tco exception associated with 201707121715Details
dbi review of t 24 tco exception associated with 201707121715 | |
| Jul 12, 2021 | Completed final sign-off Sep 2023 | 4033 Judah St | Concore Development Group | unit a: 15ft rear yard addition, single story, and commercial ti. no work to 2nd flr residential, no work to front facade,project includes plumbing, new lighting,new doors and roof w/ skylight.Details
unit a: 15ft rear yard addition, single story, and commercial ti. no work to 2nd flr residential, no work to front facade,project includes plumbing, new lighting,new doors and roof w/ skylight. | $85,000 |
| Jun 25, 2021 | Completed final sign-off Aug 2021 | 8 Boardman Pl | Martin Building Co | mep/ t24 for addition of non structural interior office spaces and restroom. ref pa 202106021457Details
mep/ t24 for addition of non structural interior office spaces and restroom. ref pa 202106021457 | $10,000 |
| Jun 16, 2021 | Completed final sign-off Oct 2021 | 7 Drumm St | Wells Construction Inc | revision to app#202012221572 store front and interior changes. (minimum)Details
revision to app#202012221572 store front and interior changes. (minimum) | $2,000 |
| May 10, 2021 | In progress issued Jan 2026 | 2440 Van Ness Av | De Brus Construction Inc | the addition of an accessory dwelling unit (adu) within the (e) building envelope at the ground floor in a space currently occupied by resident laundry, facility toilet room, and facility storage. other maintanence upgrades to be done.Details
the addition of an accessory dwelling unit (adu) within the (e) building envelope at the ground floor in a space currently occupied by resident laundry, facility toilet room, and facility storage. other maintanence upgrades to be done. | $100,000 |
| May 4, 2021 | Completed final sign-off Jul 2022 | 1100 Van Ness Av | T C B Builders Inc | g/f: interior t.i. for coffee shop in (e) shell.new non-structural partitions, new electrical plans and remote transformer at back of house. new equipment, lighting fixtures, furniture and finishes. maher n/a.Details
g/f: interior t.i. for coffee shop in (e) shell.new non-structural partitions, new electrical plans and remote transformer at back of house. new equipment, lighting fixtures, furniture and finishes. maher n/a. | $182,700 |
| May 4, 2021 | Completed final sign-off Jun 2022 | 3595 California St | Wells Construction Inc | g/f: interior t.i. into (e) starbucks. new non-structural partitions, update restrooms, new equipment, new cabinets and new finishes, upate (e) lighting and electrical. no exterior work. no increase in square footage. maher n/a.Details
g/f: interior t.i. into (e) starbucks. new non-structural partitions, update restrooms, new equipment, new cabinets and new finishes, upate (e) lighting and electrical. no exterior work. no increase in square footage. maher n/a. | $117,500 |
| Apr 6, 2021 | Completed final sign-off Nov 2021 | 495 Beach St | Excel Hotel Services | revision to pa 201909181934. new finishes per dph request, remodeled area into beverage station, new walk in cooler at existing location, identified accessible seating in dining area. accessible counter at fitness room. 1st flr guest room work.Details
revision to pa 201909181934. new finishes per dph request, remodeled area into beverage station, new walk in cooler at existing location, identified accessible seating in dining area. accessible counter at fitness room. 1st flr guest room work. | $465,000 |
| Mar 17, 2021 | Never finaled issued Apr 2022, no final | 430 Folsom St | R 3 Builders Inc. | tenant improvement for proposed restaurant & bar located at current vacant retail space 2 & 5. including full commercial kitchen, 2 ada restrooms, and sushi bar at retail 2, and full bar & seating at retail 5. upgrade existing path of travel from folsom st with new 1:20 ramp.Details
tenant improvement for proposed restaurant & bar located at current vacant retail space 2 & 5. including full commercial kitchen, 2 ada restrooms, and sushi bar at retail 2, and full bar & seating at retail 5. upgrade existing path of travel from folsom st with new 1:20 ramp. | $467,000 |
| Dec 22, 2020 | Completed final sign-off Mar 2022 | 7 Drumm St | Wells Construction Inc | tenant improvement for a take out only coffee shop in (e) shell. new non-structural partitions, storefront, equipment, fixtures, finishes, and mep upgrades.Details
tenant improvement for a take out only coffee shop in (e) shell. new non-structural partitions, storefront, equipment, fixtures, finishes, and mep upgrades. | $96,500 |
| Sep 23, 2020 | Completed final sign-off Oct 2021 | 495 Beach St | Acco Engineered Systems Inc. Dba Acco En | new toilet exhaust fans & ductwork in rooms. ref t.i. pa201909303101. maher n/a.Details
new toilet exhaust fans & ductwork in rooms. ref t.i. pa201909303101. maher n/a. | $12,000 |
| Jul 21, 2020 | Completed final sign-off Sep 2021 | 229 Ellis St | Corish Electric Corporation | title 25 electrical/lighting compliance plan check only. ref pa 201804277608 & e/p ew201909193634. maher n/a.Details
title 25 electrical/lighting compliance plan check only. ref pa 201804277608 & e/p ew201909193634. maher n/a. | |
| Jun 23, 2020 | Completed final sign-off Feb 2024 | 42 Walter St | Arbor Homes Inc, Modern Craft Construction | 4 vertical and horizontal addition at rear, full renovation of interior.Details
4 vertical and horizontal addition at rear, full renovation of interior. | $450,000 |
| Dec 18, 2019 | Completed final sign-off Nov 2020 | 2190 Market St | Allsite Corp Goods/Services Construction | rev to pa201902253723: change to mechanical ducts configuration, minor electrical changes.Details
rev to pa201902253723: change to mechanical ducts configuration, minor electrical changes. | |
| Oct 30, 2019 | Completed final sign-off May 2020 | 75 Boardman Pl | Skyline Construction | replace lighting in e space, add outlets and elec connections. add elec fixtures, camaras reconfigure e restrooms, add 3 small meeting roomsDetails
replace lighting in e space, add outlets and elec connections. add elec fixtures, camaras reconfigure e restrooms, add 3 small meeting rooms | $75,000 |
| Oct 24, 2019 | Completed final sign-off Feb 2020 | 498 Haight St | Bannside Construction Inc. | revision to 201906193888 for elayout modifications change to 1 window, mep drawings added as a deferred submittal to 201906193888Details
revision to 201906193888 for elayout modifications change to 1 window, mep drawings added as a deferred submittal to 201906193888 | |
| Oct 7, 2019 | Expired or cancelled cancelled Jan 2026 | 49 Stevenson St | tenant improvement of (e) basement restrooms, corridor, stairway & ground floor dining & take-out areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, lighting, mechanical, electrical, & plumbing.Details
tenant improvement of (e) basement restrooms, corridor, stairway & ground floor dining & take-out areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, lighting, mechanical, electrical, & plumbing. | $285,000 | |
| Oct 7, 2019 | Completed final sign-off Dec 2021 | 49 Stevenson St | Terra Nova Industries | tenant improvement of (e) basement kitchen space. no work to ground floor dining or ground floor kitchen areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, and lighting, mep associated w/all kitchen equipment. addition of employee use restroom.Details
tenant improvement of (e) basement kitchen space. no work to ground floor dining or ground floor kitchen areas. no work to (e) egress components. new interior non-structural partitions & associated finishes, and lighting, mep associated w/all kitchen equipment. addition of employee use restroom. | $230,000 |
| Sep 18, 2019 | Completed final sign-off Sep 2021 | 495 Beach St | Excel Hotel Services | partial interior remodel of (e) ground floor public area and kitchen spaces. memp and kitchen includedDetails
partial interior remodel of (e) ground floor public area and kitchen spaces. memp and kitchen included | $1,500,000 |
| Aug 7, 2019 | Never finaled issued Nov 2019, no final | 2797 16th St | Ecotechnikos, Lindquist Custom Construction Inc | tenant improvement of existing restaurant, new tenant (bakery) storefront, new kitchen, restrooms, mep included.Details
tenant improvement of existing restaurant, new tenant (bakery) storefront, new kitchen, restrooms, mep included. | $7,000 |
| Apr 5, 2019 | Never finaled issued Apr 2019, no final | 999 Brannan St | Lindquist Custom Construction Inc | revision to existing approved pa# 2016-0718-2636. electrical revision of lighting schedule and title 24 calcs. pages with update info are e0.3, e0.4,e0.5, and e2.1.Details
revision to existing approved pa# 2016-0718-2636. electrical revision of lighting schedule and title 24 calcs. pages with update info are e0.3, e0.4,e0.5, and e2.1. | $400 |
| Jan 17, 2019 | Expired or cancelled cancelled Sep 2020 | 101 01st St | Dome Construction Corp | project is new cafe and bar gr fl in existing vacant retail restaurant space. includes takeaway retail food service, comm kitchen and bakery, restrooms, mezzanine for storage and mech. scope e building lobby is a bar and lounge.Details
project is new cafe and bar gr fl in existing vacant retail restaurant space. includes takeaway retail food service, comm kitchen and bakery, restrooms, mezzanine for storage and mech. scope e building lobby is a bar and lounge. | $600,000 |
| Oct 5, 2018 | Completed final sign-off Sep 2020 | 241 10th St | Js Sullivan Construction Inc | g/f: #101: tenant improvement to formerly unoccupied space for professional services office. space is fully compliant per cbc chapter 11b ada. ada compliant bath is existing.Details
g/f: #101: tenant improvement to formerly unoccupied space for professional services office. space is fully compliant per cbc chapter 11b ada. ada compliant bath is existing. | $80,000 |
| Sep 25, 2018 | Never finaled issued Oct 2018, no final | 528 Washington St | Northern Sun Associates | title 24 revisions & calculation for base building permit ref 2017-1205-5512Details
title 24 revisions & calculation for base building permit ref 2017-1205-5512 | $2,500 |
| May 31, 2018 | Never finaled issued Jun 2018, no final | 2358 Fillmore St | Northern Sun Associates | engineered title 24 lighting and power requirements ref pa 2017-0718-2143Details
engineered title 24 lighting and power requirements ref pa 2017-0718-2143 | $500 |
| May 25, 2018 | Completed final sign-off Jun 2019 | 1226 09th Av | Cookline Construction Inc | revision to 201706290709. misc interior plan changesDetails
revision to 201706290709. misc interior plan changes | |
| Feb 15, 2018 | Completed final sign-off Apr 2020 | 2224 Clement St | L P Construction | revision to pa #201611213210. gas meter relocation - minor changes to first floor adding insulation on roof.Details
revision to pa #201611213210. gas meter relocation - minor changes to first floor adding insulation on roof. | |
| Dec 20, 2017 | Never finaled issued Feb 2018, no final | 1439 Egbert Av | D B Group Construction Inc | unit c, addition of food service & addition & relocation of production equipment. less than 1452 sf maher n/a.Details
unit c, addition of food service & addition & relocation of production equipment. less than 1452 sf maher n/a. | $30,000 |
| Dec 19, 2017 | Completed final sign-off Sep 2019 | 2301 Mission St | L C Builders Inc. | interior remodel of (e) commercial space; including construction of new limited resturaunt vendors (2), with common dining space. reference #201712196847 for commercial space remodel.Details
interior remodel of (e) commercial space; including construction of new limited resturaunt vendors (2), with common dining space. reference #201712196847 for commercial space remodel. | $125,000 |
| Dec 19, 2017 | Completed final sign-off Sep 2019 | 2301 Mission St | L C Builders Inc. | interior remodel of (e) commercial space; including, reconfiguration of prfessional services, reconfiguration of retail space & construction of new accessible bathrooms. retail space to be divided into 5 different tenant spaces.Details
interior remodel of (e) commercial space; including, reconfiguration of prfessional services, reconfiguration of retail space & construction of new accessible bathrooms. retail space to be divided into 5 different tenant spaces. | $200,000 |
| Dec 14, 2017 | Completed final sign-off Feb 2025 | 377 06th St | Js Sullivan Construction Inc | to erect 8 stories, no basement, type i-a, 90 units residential with commercial mixed use building and parking. (r-2, a-2, s)Details
to erect 8 stories, no basement, type i-a, 90 units residential with commercial mixed use building and parking. (r-2, a-2, s) | $26,068,060 |
| Nov 9, 2017 | Completed final sign-off Jan 2018 | 4343 03rd St | Infinium Air Inc | installation of two inline fans with duct work. n/a ordinance #155-13Details
installation of two inline fans with duct work. n/a ordinance #155-13 | $6,000 |
| Nov 1, 2017 | Completed final sign-off May 2019 | 455 Market St | T C B Builders Inc | suite #100 - renovation of existing unit "starbucks coffee" - remove existing & install new walls, doors, casework, furniture, finishes, ceilings & lighting. new restrooms fixtures & accessories for compliance. permit 201605036413 is to be cancelled. maher naDetails
suite #100 - renovation of existing unit "starbucks coffee" - remove existing & install new walls, doors, casework, furniture, finishes, ceilings & lighting. new restrooms fixtures & accessories for compliance. permit 201605036413 is to be cancelled. maher na | $129,245 |
| Aug 31, 2017 | Expired or cancelled cancelled Jan 2026 | 326 01st St | mep. submittal to pa#201610079763Details
mep. submittal to pa#201610079763 | $150,000 | |
| Apr 12, 2017 | Never finaled issued May 2017, no final | 138 King St | O'keeffe Construction Inc | erect single faced electric sign "bar via". n/a ordinance #155-13Details
erect single faced electric sign "bar via". n/a ordinance #155-13 | $1,500 |
| Apr 12, 2017 | Never finaled issued May 2017, no final | 138 King St | O'keeffe Construction Inc | erect single faced electric sign "hotel via". n/a ordinance #155-13Details
erect single faced electric sign "hotel via". n/a ordinance #155-13 | $1,500 |
| Apr 12, 2017 | Never finaled issued May 2017, no final | 138 King St | O'keeffe Construction Inc | erect electric double faced projecting sign "via". n/a ordinance #155-13Details
erect electric double faced projecting sign "via". n/a ordinance #155-13 | $2,000 |
| Mar 9, 2017 | Completed final sign-off Jun 2017 | 138 King St | O'keeffe Construction Inc | t.i. for a basement kitchen and breakfast room and level 1 bar including fixtures, finishes, mechanical, electrical and plumbing in an existing hotel. ref. pa#201306280783 (new bldg) & 201612165250 (rev. addendum 2). n/a ordinance #155-13Details
t.i. for a basement kitchen and breakfast room and level 1 bar including fixtures, finishes, mechanical, electrical and plumbing in an existing hotel. ref. pa#201306280783 (new bldg) & 201612165250 (rev. addendum 2). n/a ordinance #155-13 | $100,000 |
| Feb 16, 2017 | Completed final sign-off Apr 2017 | 100 Van Ness Av | R 3 Builders Inc. | revision to pa #201508184601 - removal of two light fixtures. n/a maher ord. 155-13Details
revision to pa #201508184601 - removal of two light fixtures. n/a maher ord. 155-13 | |
| Feb 7, 2017 | Completed final sign-off Feb 2017 | 2675 Geary Bl | Kdc Construction | space e-104: revision to pa#201610180528 soffit & lighting. n/a ordinance #155-13Details
space e-104: revision to pa#201610180528 soffit & lighting. n/a ordinance #155-13 | $5,000 |
| Jan 10, 2017 | Never finaled issued Jan 2017, no final | 2675 Geary Bl | Hayden Electric | #e104- revise (e) permit 2016-1018-0528 change electrical plans to have only one meter for the electrical. n/a ordinance #155-13Details
#e104- revise (e) permit 2016-1018-0528 change electrical plans to have only one meter for the electrical. n/a ordinance #155-13 | |
| Jun 15, 2016 | Completed final sign-off Nov 2016 | 2250 Chestnut St | Northern Sun Associates | title 24 revisions to ref pa 2016-0311-1827. install title 24 compliant lighting & devices. n/a ordinance #155-13Details
title 24 revisions to ref pa 2016-0311-1827. install title 24 compliant lighting & devices. n/a ordinance #155-13 | $20,000 |
| Mar 23, 2016 | Completed final sign-off Sep 2016 | 399 Laurel St | Infinium Air Inc | replacing existing hvac system with new vrf hvac system including electrical connections to the new fan coils and roof top unit. roof top unit will not be visable from the street.Details
replacing existing hvac system with new vrf hvac system including electrical connections to the new fan coils and roof top unit. roof top unit will not be visable from the street. | $60,000 |
| Jan 22, 2016 | Never finaled issued Jan 2016, no final | 100 Van Ness Av | R 3 Builders Inc. | companion electrical plans for work under pa #201509298302. n/a meher ordinanceDetails
companion electrical plans for work under pa #201509298302. n/a meher ordinance | $55,000 |
| Dec 5, 2014 | Never finaled issued Dec 2014, no final | 3198 16th St | Northern Sun Associates | revised title 24 electrical plans per app#201402259289. n/a for the maher ordinanceDetails
revised title 24 electrical plans per app#201402259289. n/a for the maher ordinance | |
| Sep 10, 2014 | Completed final sign-off Oct 2014 | 557 Howard St | Ic Refrigeration Service Inc | upgrades to kitchen equipment and addition of type 1 exhaust hood for fish six restaurantDetails
upgrades to kitchen equipment and addition of type 1 exhaust hood for fish six restaurant | $60,000 |
| Mar 6, 2013 | Completed final sign-off Oct 2013 | 505 Beach St | Tritek Construction Inc., European Enterprises | new restaurant on basement level, raise interior floor to make level, new framing, plumbing, electrical, mechanical for interior. new outdoor dining area and excavation of existing soil at north east corner. new civil and landscape work for outdoor dining, sewer lateral tie in. new storefront,Details
new restaurant on basement level, raise interior floor to make level, new framing, plumbing, electrical, mechanical for interior. new outdoor dining area and excavation of existing soil at north east corner. new civil and landscape work for outdoor dining, sewer lateral tie in. new storefront, | $800,000 |
| Jan 9, 2013 | Completed final sign-off Jul 2013 | 140 Chestnut St | Howard S. Wright Constructors Lp | new electrical work to support commercial bldg renovation, tenant improvement under separate permit. new mech and plumbing under separate pa# 201212065649 (arch)Details
new electrical work to support commercial bldg renovation, tenant improvement under separate permit. new mech and plumbing under separate pa# 201212065649 (arch) | |
| May 15, 2009 | Expired or cancelled cancelled Jun 2010 | 550 Kearny St | Carter Brothers Fire & Life Safety | fire alarm system upgrade. replace old edwards fa panel with new est3. bring all core areas, public areas up to code. tenant spaces shall remain the sameDetails
fire alarm system upgrade. replace old edwards fa panel with new est3. bring all core areas, public areas up to code. tenant spaces shall remain the same | $74,000 |
| Apr 22, 2009 | Completed final sign-off Aug 2010 | 180 Geary St | Carter Brothers Fire & Life Safety | 1st,mezz,2 basements - add new fire alarm devices to an (e) fire alarm system includes 44 smoke detectors, 1 duct det, 3 heats, 2 pull stations, 16 wall horn strobes, 1 strobes & 4 ceiling horn storbes. t.i. under pa #200807146642, mep under #200810204620.Details
1st,mezz,2 basements - add new fire alarm devices to an (e) fire alarm system includes 44 smoke detectors, 1 duct det, 3 heats, 2 pull stations, 16 wall horn strobes, 1 strobes & 4 ceiling horn storbes. t.i. under pa #200807146642, mep under #200810204620. | $11,200 |