James Maxwell
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Architects Ii
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Apr 2026
26 permits since 2000 (architect on 22 permits, authorized agent-others on 3 permits, engineer on 1 permit): 17 completed, 3 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 13, 2026 | Completed final sign-off Jun 2026 | 2155 Buchanan St | Christos Alexandridis | unit #4: demolish (e) bathroom, walls and floor to beams. remove part of (e) wall between bathroom and closet. move toilet and sink, build new wall for shower. lower ceiling by 5 inches including shower install heater floor, drywall walls and ceiling. install tiles on shower floor. install washer..Details
unit #4: demolish (e) bathroom, walls and floor to beams. remove part of (e) wall between bathroom and closet. move toilet and sink, build new wall for shower. lower ceiling by 5 inches including shower install heater floor, drywall walls and ceiling. install tiles on shower floor. install washer.. | $35,000 |
| Apr 14, 2023 | Expired or cancelled cancelled Jan 2026 | 3352 Steiner St | designate e restaurant as formula retail under planning motion cua 20220049869 no new work this permit. remodel under 202212239078Details
designate e restaurant as formula retail under planning motion cua 20220049869 no new work this permit. remodel under 202212239078 | ||
| Dec 23, 2022 | Never finaled issued Jul 2023, no final | 3352 Steiner St | R 3 Builders Inc. | interior remodel of existing restaurant. upgrade (e) accessible restroom. no exterior alterations. no structural work.Details
interior remodel of existing restaurant. upgrade (e) accessible restroom. no exterior alterations. no structural work. | $180,000 |
| Sep 15, 2022 | Completed final sign-off Jul 2023 | 2016 Fillmore St | Alsterlind Construction Inc. | prop h: (e) restaurant - light remodel of (e) kitchen and install (n) wine bar. new finishes and lighting throughout. structural work limited to dry rot mitigation.Details
prop h: (e) restaurant - light remodel of (e) kitchen and install (n) wine bar. new finishes and lighting throughout. structural work limited to dry rot mitigation. | $140,000 |
| Mar 2, 2022 | Completed final sign-off May 2023 | 1501 Baker St | 1,085 sf interior tenant improvements to full service restaurant - non-load-bearing walls, ada compliant stairs and unisex restroom, mechanical (new type 1 hood to existing grease duct), plumbing and electrical.Details
1,085 sf interior tenant improvements to full service restaurant - non-load-bearing walls, ada compliant stairs and unisex restroom, mechanical (new type 1 hood to existing grease duct), plumbing and electrical. | $168,000 | |
| Jun 2, 2021 | Completed final sign-off Sep 2022 | 1097 Irving St | Maven Maintenance Inc | converting salon to limited restaurant cafe serving coffee,pastries & retail component.Details
converting salon to limited restaurant cafe serving coffee,pastries & retail component. | $18,000 |
| Oct 31, 2020 | Completed final sign-off Mar 2021 | 2215 Market St | Global Arch Construction Inc | barrier removal only. adding new ada restroom. railings and striping at (e) stairs.Details
barrier removal only. adding new ada restroom. railings and striping at (e) stairs. | $25,000 |
| Jun 5, 2019 | Expired or cancelled cancelled Feb 2024 | 2215 Market St | ground floor renovation, new ada restroom, new partitions and catering kitchenDetails
ground floor renovation, new ada restroom, new partitions and catering kitchen | $147,000 | |
| Mar 23, 2017 | Completed final sign-off Aug 2017 | 2317 Chestnut St | Diego Brothers Inc. | add sushi bar to (e) full service restaurant space and relocate servers station (reduces dining area) add ada counter to (e) bar, new lighting & controls for title 24. no work at (e) mzzanine-storage only. maher naDetails
add sushi bar to (e) full service restaurant space and relocate servers station (reduces dining area) add ada counter to (e) bar, new lighting & controls for title 24. no work at (e) mzzanine-storage only. maher na | $42,800 |
| Apr 28, 2014 | Never finaled issued Apr 2014, no final | 280 Valencia St | Occidental Express | t.i. for (e) restaurant.Details
t.i. for (e) restaurant. | $4,500 |
| Nov 30, 2011 | Completed final sign-off Jun 2012 | 550 Gough St | R 3 Builders Inc. | t.i. for self service specialty food service planning code sec. 790.93 in (e) vacant space. 1st time tenant improvement.Details
t.i. for self service specialty food service planning code sec. 790.93 in (e) vacant space. 1st time tenant improvement. | $179,000 |
| Jun 28, 2011 | Completed final sign-off Dec 2011 | 1963 Sutter St | R 3 Builders Inc. | remove interior partition walls, finishes, fixtures. rear exterior windows, patio, trees & fence. new interior finishes, fixtures (plumbing, lighting, kitchen equipment), new interior partitions, new windows & door at rear, new exterior doors, new patio concrete slab, fence & planters.mep sep permitDetails
remove interior partition walls, finishes, fixtures. rear exterior windows, patio, trees & fence. new interior finishes, fixtures (plumbing, lighting, kitchen equipment), new interior partitions, new windows & door at rear, new exterior doors, new patio concrete slab, fence & planters.mep sep permit | $195,750 |
| Mar 23, 2011 | Completed final sign-off Sep 2012 | 871 Sutter St | D Kelly Construction Inc. | revision to application #2010-01-27-5406: revised rear stair direction/landing, additional structural per elevator contractor, beam removal at lower level, revise steal collector at lower level.Details
revision to application #2010-01-27-5406: revised rear stair direction/landing, additional structural per elevator contractor, beam removal at lower level, revise steal collector at lower level. | $18,950 |
| Aug 20, 2010 | Completed final sign-off Jun 2011 | 3839 17th St | Finian Norris Construction | replace (e) 3 story rear deck w/(n) 3 story rear deck in kind. same height, length, depth.Details
replace (e) 3 story rear deck w/(n) 3 story rear deck in kind. same height, length, depth. | $17,000 |
| Jul 20, 2010 | Completed final sign-off Sep 2010 | 4079 Mission St | Hive Builds Inc. | replace dryrotted wood decking, guarrail, and joists as required in kind. provide add'l structural supportDetails
replace dryrotted wood decking, guarrail, and joists as required in kind. provide add'l structural support | $17,000 |
| Dec 10, 2009 | Expired or cancelled cancelled Jan 2026 | 2400 Lombard St | no new construction, occupancy calculation only, adjust from 164 to 207. reference pa#2009082275682.Details
no new construction, occupancy calculation only, adjust from 164 to 207. reference pa#2009082275682. | ||
| Dec 10, 2009 | Completed final sign-off Feb 2010 | 155 Columbus Av | voluntary barrier removal, ada upgrade, add (n) accessible restroom, add operator @ entry door for accessible entrance.Details
voluntary barrier removal, ada upgrade, add (n) accessible restroom, add operator @ entry door for accessible entrance. | $20,000 | |
| Nov 19, 2009 | Never finaled issued Nov 2009, no final | 2801 Leavenworth St | no new work - occupancy upgrade only per fire inspector from 299-399. reference pa #200907243409.(occupant load was approved 299)Details
no new work - occupancy upgrade only per fire inspector from 299-399. reference pa #200907243409.(occupant load was approved 299) | ||
| Jul 24, 2009 | Completed final sign-off Nov 2009 | 2801 Leavenworth St | R 3 Builders Inc. | interior remodel of existing bar/nightclub. remove ramps, install accessible lift, raise floor. add accessible bathroom, relocate bar and add 550 sq ft of office and support staff.m,e pd sprinkler under separate permit.Details
interior remodel of existing bar/nightclub. remove ramps, install accessible lift, raise floor. add accessible bathroom, relocate bar and add 550 sq ft of office and support staff.m,e pd sprinkler under separate permit. | $215,000 |
| May 14, 2008 | Completed final sign-off Dec 2008 | 1700 Fillmore St | tenant improvement in (e) shell-full service restaurant. new handicap entry (per ada requirements), bar with counters, shelves and sink. 2 handicap bathrooms, new kitchen with type 1 hoodDetails
tenant improvement in (e) shell-full service restaurant. new handicap entry (per ada requirements), bar with counters, shelves and sink. 2 handicap bathrooms, new kitchen with type 1 hood | $580,000 | |
| Apr 28, 2008 | Completed final sign-off Apr 2009 | 1815 Market St | da upgrade per da checklist at new bar and lounge. additoin of new bar and lounge to (e) restaraunt. mep under seperate permit.Details
da upgrade per da checklist at new bar and lounge. additoin of new bar and lounge to (e) restaraunt. mep under seperate permit. | $58,000 | |
| Dec 24, 2007 | Expired or cancelled expired Jul 2009 | 1525 Mission St | interior remodeling for barrier removal. construct level landing for accessable entrance, 3 new accessable restrooms, create 2nd means of egress at rear of buildng and repair mezzzanin floor joistDetails
interior remodeling for barrier removal. construct level landing for accessable entrance, 3 new accessable restrooms, create 2nd means of egress at rear of buildng and repair mezzzanin floor joist | $50,000 | |
| Oct 17, 2007 | Expired or cancelled expired May 2015 | 3232 Scott St | mechanical work only for maked-up air only to match (e) exhaust systemDetails
mechanical work only for maked-up air only to match (e) exhaust system | $2,000 | |
| Aug 28, 2007 | Completed final sign-off Nov 2008 | 855 Divisadero St | Kendu Construction | this is a newly remodeled space that will have no structural changes. will turn into full service restaurant by adding fixtures, appliances, equipment, cabinets, tables, chairs. separate permits for mech,elec, and plumbing work under separate permit.Details
this is a newly remodeled space that will have no structural changes. will turn into full service restaurant by adding fixtures, appliances, equipment, cabinets, tables, chairs. separate permits for mech,elec, and plumbing work under separate permit. | $140,000 |
| Jun 12, 2007 | Expired or cancelled withdrawn Sep 2008 | 725 Folsom St | Millennium Construction Group | safe off electrical and plumbing, soft demolition of non bearing interior partitions & acoustic ceilings, finishes and fixtures.Details
safe off electrical and plumbing, soft demolition of non bearing interior partitions & acoustic ceilings, finishes and fixtures. | $7,000 |
| May 7, 2007 | Completed final sign-off Feb 2008 | 757 Bryant St | Terra Nova Industries | install storage rack for wine, replace damaged roll up door. seperate electrical & plumbing permitDetails
install storage rack for wine, replace damaged roll up door. seperate electrical & plumbing permit | $118,000 |