Bonnie Bridges
- Listed as
- architect, engineer
- Firm
- Boor Bridges Architecture
- On San Francisco permits
- Jun 2006 to Jun 2022
14 permits since 2000 (architect on 12 permits, engineer on 2 permits): 13 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 2, 2022 | Completed final sign-off Jul 2023 | 1016 Pierce St | restore 2 dwelling units to comply with planning 2018-015061 enf to address the planning commission decision under 2018-015061 cua. designated entry to unit a & b. door infill for unit seperation. 1hr fire rated wall between units. window location at unit bDetails
restore 2 dwelling units to comply with planning 2018-015061 enf to address the planning commission decision under 2018-015061 cua. designated entry to unit a & b. door infill for unit seperation. 1hr fire rated wall between units. window location at unit b | $50,000 | |
| May 25, 2018 | Completed final sign-off Jun 2019 | 1226 09th Av | Cookline Construction Inc | revision to 201706290709. misc interior plan changesDetails
revision to 201706290709. misc interior plan changes | |
| Dec 11, 2017 | Completed final sign-off Apr 2019 | 1006 Page St | Roman Hunt | remodel kitchen, add 1/2 bath & bath, install one replacement window and one new window, add one bedroom.Details
remodel kitchen, add 1/2 bath & bath, install one replacement window and one new window, add one bedroom. | $90,000 |
| Jul 20, 2017 | Completed final sign-off Dec 2017 | 120 Kearny St | Principal Builders Inc. | 19/f- amep plans - full floor t.i. to demo and construct new partitions, finishing, millwork and mep., life safety and sprinkler under seperate permit. n/a ordinance #155-13Details
19/f- amep plans - full floor t.i. to demo and construct new partitions, finishing, millwork and mep., life safety and sprinkler under seperate permit. n/a ordinance #155-13 | $2,200,000 |
| May 18, 2016 | Completed final sign-off Oct 2016 | 185 Berry St | Principal Builders Inc. | demo of partition doors, millwork and finishes on 4th floor. sapace to remain vacant under ab-017. all ada will be addressed on seperate permit #2016-0516-7510.Details
demo of partition doors, millwork and finishes on 4th floor. sapace to remain vacant under ab-017. all ada will be addressed on seperate permit #2016-0516-7510. | $22,400 |
| Dec 22, 2014 | Completed final sign-off Nov 2015 | 361 28th St | Blair Burke General Contractors Inc | infill existing closet window in property line wall at 3rd floor. infill existing lightwell at 3rd floor bathroom on neighboring wall. remove existing skylight and add new skylight in 3rd floor bathroom at new location. add attic access to roof. revision to 201402219069Details
infill existing closet window in property line wall at 3rd floor. infill existing lightwell at 3rd floor bathroom on neighboring wall. remove existing skylight and add new skylight in 3rd floor bathroom at new location. add attic access to roof. revision to 201402219069 | $5,000 |
| Sep 3, 2014 | Completed final sign-off Oct 2014 | 455 Mission Bay Blvd South | R C Benson & Sons Inc. | suite #125: interior ti. remodel of existing spaces. electrical upgrade to comply with title 24. new ada compliance kitchette. maher n/a.Details
suite #125: interior ti. remodel of existing spaces. electrical upgrade to comply with title 24. new ada compliance kitchette. maher n/a. | $165,000 |
| May 7, 2014 | Completed final sign-off Nov 2014 | 670 Commercial St | Muddyorange Fabrication | remodel of 1 story commercial space. change use from office to cafe. restroom upgrades, new kitchen, sinks, flooring. no exterior work. deferred submittal for electrical and plumbingDetails
remodel of 1 story commercial space. change use from office to cafe. restroom upgrades, new kitchen, sinks, flooring. no exterior work. deferred submittal for electrical and plumbing | $30,000 |
| Dec 20, 2012 | Completed final sign-off Jun 2013 | 1041 Shrader St | Hughes Mcginnis Builders Inc | install cricket for drainage on north & south sides roof.Details
install cricket for drainage on north & south sides roof. | $3,000 |
| Dec 21, 2007 | Completed final sign-off Nov 2008 | 2428 Union St | Ken Hughes General Cont. | units 2 & 4 - merge two units, one above the other, add circular stair (not required means of egress), minor kitchen changes to accomodate stair, removal of kitchen, change kitchen to wet bar/study.Details
units 2 & 4 - merge two units, one above the other, add circular stair (not required means of egress), minor kitchen changes to accomodate stair, removal of kitchen, change kitchen to wet bar/study. | $45,000 |
| Dec 14, 2007 | Completed final sign-off Oct 2008 | 2166 Beach St | remodel, kitchen, dining room, 2 bathrooms, replace lighting fixtures, install new finishes, minor change to load bearing walls. no change to square footage, no change to exterior envelope. (3rd floor).Details
remodel, kitchen, dining room, 2 bathrooms, replace lighting fixtures, install new finishes, minor change to load bearing walls. no change to square footage, no change to exterior envelope. (3rd floor). | $100,000 | |
| Dec 6, 2007 | Completed final sign-off Apr 2009 | 327 Eureka St | Ken Hughes General Cont. | merge 2 units into 1 unit. add interior stair, move fireplace, lower fl. elevation @ ground fl. voluntary seismic upgrade. full interior remodel. replace fau w/radiant heat system. add 2 skylights, repair deck @ rear.Details
merge 2 units into 1 unit. add interior stair, move fireplace, lower fl. elevation @ ground fl. voluntary seismic upgrade. full interior remodel. replace fau w/radiant heat system. add 2 skylights, repair deck @ rear. | $140,000 |
| Oct 19, 2007 | Never finaled issued Oct 2007, no final | 22 Hoffman Av | Rock And Rose Landscaping & Birkmyer | replace existing fence with 8'-0" fence. repair <50% of rear deck. repair existing fence piersDetails
replace existing fence with 8'-0" fence. repair <50% of rear deck. repair existing fence piers | $15,000 |
| Jun 27, 2006 | Completed final sign-off Sep 2006 | 62 Buena Vista Tr | Hughes Mcginnis Builders Inc | remodel kitchen and conversion of closet to laundry room.Details
remodel kitchen and conversion of closet to laundry room. | $15,000 |