Daniel Bittiker
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Bittiker Architecture
- Based in
- San Francisco
- On San Francisco permits
- Aug 2018 to Aug 2026
78 permits since 2000 (architect on 74 permits, authorized agent-others on 4 permits, engineer on 1 permit): 40 completed, 19 in progress, 10 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2026 | In progress filed Aug 2026, not yet issued | 1526 Broderick St | Deep Elm Construction Llc | excavate ground floor to create new adu.Details
excavate ground floor to create new adu. | $75,000 |
| Jul 21, 2026 | In progress filed Jul 2026, not yet issued | 62 Baker St | horizontal and vert addition, garage addition, and interior remodel to (e) two unit building. scope includes removal of (udu) at basement level per planning code sec 317(c)(7)(b).reference planning approval letter for planning record 2025-005568prj. comply with nov 202316786, 202316812, 202312987.Details
horizontal and vert addition, garage addition, and interior remodel to (e) two unit building. scope includes removal of (udu) at basement level per planning code sec 317(c)(7)(b).reference planning approval letter for planning record 2025-005568prj. comply with nov 202316786, 202316812, 202312987. | $275,000 | |
| Jun 1, 2026 | In progress filed Jun 2026, not yet issued | 506 Divisadero St | new adu at level 1.Details
new adu at level 1. | $75,000 | |
| May 28, 2026 | In progress filed May 2026, not yet issued | 7 Kronquist Ct | replace (e) rear deck at levels 2 & 3 with new. rear siding replacement and windows and doors at rear yard.Details
replace (e) rear deck at levels 2 & 3 with new. rear siding replacement and windows and doors at rear yard. | $35,000 | |
| May 28, 2026 | In progress filed May 2026, not yet issued | 1257 Montgomery St | prop h: ti to create new bakery & coffee shopDetails
prop h: ti to create new bakery & coffee shop | ||
| May 27, 2026 | In progress filed May 2026, not yet issued | 301 Union St | prop h: blade sign for bakery & coffee shopDetails
prop h: blade sign for bakery & coffee shop | $1,500 | |
| May 27, 2026 | In progress filed May 2026, not yet issued | 301 Union St | prop h: ti to create new bakery & coffee shopDetails
prop h: ti to create new bakery & coffee shop | $70,000 | |
| May 12, 2026 | In progress issued May 2026 | 1470 De Haro St | T T General Construction | revise pa 202510097132 change structural framing at stair openingDetails
revise pa 202510097132 change structural framing at stair opening | |
| Nov 21, 2025 | In progress issued Jan 2026 | 3460 Geary Bl | Betancourt Home Builders Inc | t.i. of existing space to create pilates studio.Details
t.i. of existing space to create pilates studio. | $40,000 |
| Oct 10, 2025 | In progress issued Mar 2026 | 227 Congo St | A2z Remodeling Inc. | construct new sunroom addition in rear yardDetails
construct new sunroom addition in rear yard | $125,000 |
| Sep 18, 2025 | In progress issued Dec 2025 | 1180 Guerrero St | Atlas General Construction | convert ground floor storage to habitable space, add 173 sf stair in rear yardDetails
convert ground floor storage to habitable space, add 173 sf stair in rear yard | $45,000 |
| Sep 11, 2025 | Expired or cancelled withdrawn Apr 2026 | 7 Kronquist Ct | replace rear deck at 3 levels. replace siding, windows and doors at rear yard. replace two windows in kind at front facade.Details
replace rear deck at 3 levels. replace siding, windows and doors at rear yard. replace two windows in kind at front facade. | $38,000 | |
| Jun 25, 2025 | Completed final sign-off Nov 2025 | 566 Vermont St | 7 Hills Construction | revision to pa# 202411255678: maintain (e) front windows - no replacement needed per change in legislation.Details
revision to pa# 202411255678: maintain (e) front windows - no replacement needed per change in legislation. | |
| Apr 9, 2025 | Completed final sign-off Nov 2025 | 1180 Guerrero St | add half bath at level 2.Details
add half bath at level 2. | $5,000 | |
| Feb 14, 2025 | Completed final sign-off Nov 2025 | 566 Vermont St | 7 Hills Construction | revise sheets a201, a401, a601 of pa# 202411255678. remove 1/2 bath. no change to exterior.Details
revise sheets a201, a401, a601 of pa# 202411255678. remove 1/2 bath. no change to exterior. | |
| Feb 13, 2025 | In progress issued Feb 2025 | 4729 18th St | 7 Hills Construction | revision 202212299333- remove overhead pergola at exterior deck. change layout at ground level and kitchen . eliminate exterior at bbq area at deck . add (n) window at the rear yard.Details
revision 202212299333- remove overhead pergola at exterior deck. change layout at ground level and kitchen . eliminate exterior at bbq area at deck . add (n) window at the rear yard. | |
| Nov 25, 2024 | In progress filed Nov 2024, not yet issued | 3948 Mission St | T T General Construction | new garage door and curb cut on mission street. remove street tree.Details
new garage door and curb cut on mission street. remove street tree. | $20,000 |
| Nov 25, 2024 | Completed final sign-off Nov 2025 | 566 Vermont St | 7 Hills Construction | add powder room at level 1, legalize bathrooms and kitchen on level 1 and 2. legalize rear deck. replace nine front windows (report number cc8672)Details
add powder room at level 1, legalize bathrooms and kitchen on level 1 and 2. legalize rear deck. replace nine front windows (report number cc8672) | $75,000 |
| Nov 25, 2024 | Completed final sign-off Jun 2025 | 3948 Mission St | T T General Construction | rev 202410092657- add utlitiy sink and remove structural scope of work at facade. reduce size of bathroom window. remove shearwall and holdown special inspections from pa#2024-1009-2657Details
rev 202410092657- add utlitiy sink and remove structural scope of work at facade. reduce size of bathroom window. remove shearwall and holdown special inspections from pa#2024-1009-2657 | |
| Oct 9, 2024 | Completed final sign-off Jun 2025 | 3948 Mission St | T T General Construction | remodel lower unit. replace and expand existing deck under 30" in height facing rear yard.Details
remodel lower unit. replace and expand existing deck under 30" in height facing rear yard. | $75,000 |
| Oct 9, 2024 | Expired or cancelled withdrawn May 2025 | 227 Congo St | legalize ground fl bedroom & bathroomDetails
legalize ground fl bedroom & bathroom | ||
| Jun 25, 2024 | In progress issued Aug 2024 | 2154 15th Av | Innovation Plumbing And Rooter | remodel kitchen and laundry room.Details
remodel kitchen and laundry room. | $10,000 |
| May 8, 2024 | In progress issued Apr 2026 | 1045 Divisadero St | 7 Hills Construction | new adu in response to planning enforcement action 2022-008315enf: reestablish previously removed 3rd unit which did not have the benefit of planning review and create a new adu at the ground floor level as 3rd unit.Details
new adu in response to planning enforcement action 2022-008315enf: reestablish previously removed 3rd unit which did not have the benefit of planning review and create a new adu at the ground floor level as 3rd unit. | $15,000 |
| May 8, 2024 | In progress issued Apr 2026 | 1045 Divisadero St | 7 Hills Construction | change of occupancy from r2 to r3 to memorialize the (e) 2 unit configuration of building, which had been approved under prior building permit without the benefit of change of use or planning approval. 3rd unit will be restored under separate adu permit to address the planning enforcement action.Details
change of occupancy from r2 to r3 to memorialize the (e) 2 unit configuration of building, which had been approved under prior building permit without the benefit of change of use or planning approval. 3rd unit will be restored under separate adu permit to address the planning enforcement action. | |
| Feb 21, 2024 | Completed final sign-off Feb 2024 | 42 Walter St | Modern Craft Construction | revision to pa# 202006239023. remove 36" fence along sidewalk.Details
revision to pa# 202006239023. remove 36" fence along sidewalk. | |
| Oct 13, 2023 | Completed final sign-off Oct 2024 | 125 Villa Tr | C H Burnham Inc | remodel primary bathroom @ level 3; replace 5 doors facing rear yard. no structural workDetails
remodel primary bathroom @ level 3; replace 5 doors facing rear yard. no structural work | $20,000 |
| Oct 2, 2023 | In progress issued Aug 2024 | 45 Eagle St | David M Goray | legalize lower unit to comply with nov 20230134 per ord 43-14.Details
legalize lower unit to comply with nov 20230134 per ord 43-14. | $10,000 |
| Sep 25, 2023 | Completed final sign-off Dec 2023 | 1290 28th Av | Lindquist Custom Construction Inc | document as-built conditions to comply with nov 202310100. add 2 storage rooms at g/f. add 2 openings in level 2 bearing wall.Details
document as-built conditions to comply with nov 202310100. add 2 storage rooms at g/f. add 2 openings in level 2 bearing wall. | $15,000 |
| Aug 22, 2023 | Completed final sign-off Nov 2023 | 1763 Hayes St | 7 Hills Construction | condo conversion to comply with physical inspection report 8586 to show as-built conditions at basement storage area and electrical work.Details
condo conversion to comply with physical inspection report 8586 to show as-built conditions at basement storage area and electrical work. | $10,000 |
| Jun 23, 2023 | Completed final sign-off Jun 2023 | 145 Buena Vista Ave East Av | Lindquist Custom Construction Inc | revision to pa 2021-0419-8796 updated annotation on plans to comply with inspector comments. show egress & occupancy load from roof dec; label units & show locked gate @ ground floorDetails
revision to pa 2021-0419-8796 updated annotation on plans to comply with inspector comments. show egress & occupancy load from roof dec; label units & show locked gate @ ground floor | |
| May 11, 2023 | Completed final sign-off Jul 2024 | 45 Eagle St | Home Run Inc | replace front entry stair and handrails to comply with nov 202200722Details
replace front entry stair and handrails to comply with nov 202200722 | $5,000 |
| Mar 2, 2023 | Expired or cancelled expired Oct 2025 | 566 Anderson St | bathroom remodel including fixtures & finishes. replace window in bathroom, no change in size or location. not visible from st.Details
bathroom remodel including fixtures & finishes. replace window in bathroom, no change in size or location. not visible from st. | $3,000 | |
| Mar 2, 2023 | In progress issued Oct 2023 | 784 48th Av | revision to pa# 202002134456, redesign 2 bathrooms upstairs.Details
revision to pa# 202002134456, redesign 2 bathrooms upstairs. | ||
| Dec 29, 2022 | In progress issued Feb 2025 | 4729 18th St | 7 Hills Construction | horizontal addition in rear yard.Details
horizontal addition in rear yard. | $42,000 |
| Dec 8, 2022 | Completed final sign-off Jan 2024 | 1720 Lake St | David M Goray | gr fl single family dwelling, enclose tunnel entry, add mudroom. new window in e openings at entry/stairs, remove door to stairs 2nd flDetails
gr fl single family dwelling, enclose tunnel entry, add mudroom. new window in e openings at entry/stairs, remove door to stairs 2nd fl | $5,000 |
| Dec 7, 2022 | Expired or cancelled cancelled Jan 2026 | 633 Hampshire St | new shadesail canopy at (e) level 4 roof deckDetails
new shadesail canopy at (e) level 4 roof deck | $2,500 | |
| Dec 7, 2022 | Completed final sign-off Aug 2023 | 1856 Alemany Bl | 7 Hills Construction | updates to kitchen and bathrooms and addition of a powder room, no change to building foot print replacement of rear yard facing windowsDetails
updates to kitchen and bathrooms and addition of a powder room, no change to building foot print replacement of rear yard facing windows | $50,000 |
| Sep 15, 2022 | Completed final sign-off Jun 2023 | 145 Buena Vista Ave East Av | Lindquist Custom Construction Inc | revision to pa 202104198796. relocate sink at rooftop deck. add gas fire pit.Details
revision to pa 202104198796. relocate sink at rooftop deck. add gas fire pit. | $5,000 |
| Sep 14, 2022 | Completed final sign-off Mar 2023 | 894 De Haro St | Spryscapes Const Inc. | install new sliding doors and windows to rear yard. no interior work, no work to front facadeDetails
install new sliding doors and windows to rear yard. no interior work, no work to front facade | $5,000 |
| Aug 18, 2022 | Expired or cancelled withdrawn Sep 2022 | 894 De Haro St | Spryscapes Const Inc. | replace (e) rear deck in-kind. install new sliding doors & windows to rear yard. no interior work no work to front facade.Details
replace (e) rear deck in-kind. install new sliding doors & windows to rear yard. no interior work no work to front facade. | $10,000 |
| Aug 16, 2022 | Completed final sign-off Sep 2023 | 2163 Funston Av | H & Bo Construction Inc. | revision to pa 202204293133. remove wet bar in basement. add shower in basement. remove angled parapet wall at front facade. replace metal railing with wood railing at front deck.Details
revision to pa 202204293133. remove wet bar in basement. add shower in basement. remove angled parapet wall at front facade. replace metal railing with wood railing at front deck. | $5,000 |
| Jul 5, 2022 | Completed final sign-off Jun 2023 | 273 Vienna St | 7 Hills Construction | interior conversion of single family dwelling from 2 bedroom 1 bath to 3 bedroom 2 bath. remove structural wall between kitchen and living room.Details
interior conversion of single family dwelling from 2 bedroom 1 bath to 3 bedroom 2 bath. remove structural wall between kitchen and living room. | $19,000 |
| Jun 7, 2022 | Never finaled issued Jun 2022, no final | 2900 Pierce St | Heirloom Builders Inc, Northbay Home Construction Solutions Inc | unit #6: convert bathroom to new bedroom and construct new smaller bathroom.Details
unit #6: convert bathroom to new bedroom and construct new smaller bathroom. | $25,000 |
| May 3, 2022 | Completed final sign-off Feb 2023 | 1315 Minna St | Continuum Construction | remove structural wall in kitchen at top level. new fixtures and finishes in kitchen.Details
remove structural wall in kitchen at top level. new fixtures and finishes in kitchen. | $40,000 |
| Apr 29, 2022 | Completed final sign-off Sep 2023 | 2163 Funston Av | H & Bo Construction Inc. | revision to pa# 202112144422. add wet bar in basement. add sauna at lvl 1. extend front door at lvl 2. remove stone at front facade. rear yard landscape. revise retaining wall layout at basement.Details
revision to pa# 202112144422. add wet bar in basement. add sauna at lvl 1. extend front door at lvl 2. remove stone at front facade. rear yard landscape. revise retaining wall layout at basement. | $5,000 |
| Mar 23, 2022 | Completed final sign-off Feb 2024 | 42 Walter St | Arbor Homes Inc | add wet bar to basement. revise plumbing locationcs with bathroom at level 3. rev to pa202006239023. rectify story count in pts existing three story change to three story with a basement.Details
add wet bar to basement. revise plumbing locationcs with bathroom at level 3. rev to pa202006239023. rectify story count in pts existing three story change to three story with a basement. | $3,500 |
| Jan 12, 2022 | Completed final sign-off Dec 2022 | 122 Rivoli St | revision to pa# 202102044014. add bathroom at basement level.Details
revision to pa# 202102044014. add bathroom at basement level. | $10,000 | |
| Dec 14, 2021 | Completed final sign-off Sep 2023 | 2163 Funston Av | H & Bo Construction Inc. | remodel basement to create rec room, add bath at level 1, update fixtures and finishes throughoutDetails
remodel basement to create rec room, add bath at level 1, update fixtures and finishes throughout | $150,000 |
| Dec 7, 2021 | Completed final sign-off Nov 2023 | 784 48th Av | remodel bathroom at level 1. add deck at rear yard.Details
remodel bathroom at level 1. add deck at rear yard. | $10,000 | |
| Jul 29, 2021 | Completed final sign-off Sep 2022 | 2779 Diamond St | Seismic Retrofitters Inc., Lindquist Custom Construction Inc | new bath and laundry room at gr level. new ev charger. voluntary structural strengtheningDetails
new bath and laundry room at gr level. new ev charger. voluntary structural strengthening | $10,000 |
| May 28, 2021 | Never finaled issued Jun 2021, no final | 2797 16th St | Ecotechnikos | revision to pa 202102235191. change to mechanical specifications and layout. ansul fire suppression permit already issued.Details
revision to pa 202102235191. change to mechanical specifications and layout. ansul fire suppression permit already issued. | |
| Apr 19, 2021 | Completed final sign-off Jun 2023 | 145 Buena Vista Ave East Av | Lindquist Custom Construction Inc | replace windows and doors at (e) stair penthouse. install new decking at roof deck and provide new railing. no change to building footprint. new roof deck.Details
replace windows and doors at (e) stair penthouse. install new decking at roof deck and provide new railing. no change to building footprint. new roof deck. | $25,000 |
| Feb 23, 2021 | Never finaled issued May 2021, no final | 2797 16th St | Ecotechnikos, Lindquist Custom Construction Inc | revision to app#201908078156. changes to mechanical specifications and layout.Details
revision to app#201908078156. changes to mechanical specifications and layout. | $5,000 |
| Feb 22, 2021 | Completed final sign-off Nov 2021 | 550 Davis St | Lindquist Custom Construction Inc | unit #19: remodel kitchen, 2 bathrooms, and powder room.Details
unit #19: remodel kitchen, 2 bathrooms, and powder room. | $15,000 |
| Feb 4, 2021 | Completed final sign-off Dec 2022 | 122 Rivoli St | foundation replacement and excavation to create new lower level. addition of 2 bedrooms, laundry and bathroom. covert (e) attic space to storage and utility access area.Details
foundation replacement and excavation to create new lower level. addition of 2 bedrooms, laundry and bathroom. covert (e) attic space to storage and utility access area. | $110,000 | |
| Feb 2, 2021 | Never finaled issued Feb 2023, no final | 1224 02nd Av | unit legalization per ordinance 43-14. fire sprinklers on entire ground floor under seperate permit. change occupancy from r-3 to r-2, provide lateral force resisting elements in the lowest story and all lateral force resisting elements below.Details
unit legalization per ordinance 43-14. fire sprinklers on entire ground floor under seperate permit. change occupancy from r-3 to r-2, provide lateral force resisting elements in the lowest story and all lateral force resisting elements below. | $60,000 | |
| Dec 8, 2020 | Completed final sign-off Jun 2026 | 3997 Washington St | Lindquist Custom Construction Inc | remodel of laundry rmDetails
remodel of laundry rm | $5,000 |
| Dec 8, 2020 | Expired or cancelled expired Jun 2026 | 424 Haight St | Lindquist Custom Construction Inc | install window at haight street facade.Details
install window at haight street facade. | $9,000 |
| Nov 18, 2020 | Never finaled issued Feb 2021, no final | 1185 Dolores St | Lindquist Custom Construction Inc | unit 2. englarge rear facing windows & install (n) sliding glass door to (e) balcony. replace railing.Details
unit 2. englarge rear facing windows & install (n) sliding glass door to (e) balcony. replace railing. | $10,000 |
| Nov 17, 2020 | Expired or cancelled cancelled Nov 2024 | 3191 Washington St | unit 5: remodel bathroom, add 1/2 bathroom and remodel (e) kitchen.Details
unit 5: remodel bathroom, add 1/2 bathroom and remodel (e) kitchen. | $40,000 | |
| Oct 29, 2020 | Completed final sign-off Mar 2025 | 767 18th Av | David M Goray | adu ordinance# 95-17, add adu at garage level withing (e) building enclosure.Details
adu ordinance# 95-17, add adu at garage level withing (e) building enclosure. | $60,000 |
| Aug 25, 2020 | Completed final sign-off Feb 2024 | 1562 20th Av | H & Bo Construction Inc. | rear addition, new media room, full bath, laundry area, interior stair at ground fl. new bedroom and bath at 2nd fl.Details
rear addition, new media room, full bath, laundry area, interior stair at ground fl. new bedroom and bath at 2nd fl. | $125,000 |
| Jul 2, 2020 | Completed final sign-off Jan 2021 | 385 10th St | J Z Construction | add bathroom at mezzanine. live work to remain live workDetails
add bathroom at mezzanine. live work to remain live work | $5,000 |
| Jul 1, 2020 | Completed final sign-off Sep 2020 | 633 Hampshire St | S F O Brien Construction | apt #5.remodel two bathrooms and install new lightingDetails
apt #5.remodel two bathrooms and install new lighting | $15,000 |
| Jun 23, 2020 | Completed final sign-off Feb 2024 | 42 Walter St | Arbor Homes Inc, Modern Craft Construction | 4 vertical and horizontal addition at rear, full renovation of interior.Details
4 vertical and horizontal addition at rear, full renovation of interior. | $450,000 |
| Mar 9, 2020 | Never finaled filed Mar 2020, never issued | 1185 Dolores St | enclose (e) balcony to enlarge sunroom @ level 3. no change to building heightDetails
enclose (e) balcony to enlarge sunroom @ level 3. no change to building height | $20,000 | |
| Feb 21, 2020 | Completed final sign-off Mar 2020 | 1070 Dolores St | remove wet bar at ground level rec room, no other workDetails
remove wet bar at ground level rec room, no other work | $500 | |
| Feb 13, 2020 | Never finaled issued Oct 2020, no final | 784 48th Av | Kendell Brook Builders | enclose (e) tunnel entry, new bedroom and bathroom at level 1 enclose existing lightwell addition of master bathroom at level 2 remodel bathroom at level 2Details
enclose (e) tunnel entry, new bedroom and bathroom at level 1 enclose existing lightwell addition of master bathroom at level 2 remodel bathroom at level 2 | $75,000 |
| Feb 13, 2020 | Completed final sign-off Oct 2020 | 582 Corbett Av | H & Bo Construction Inc. | remodel 2 existitng bathrooms in unit 582 on 2nd floorDetails
remodel 2 existitng bathrooms in unit 582 on 2nd floor | $20,000 |
| Dec 11, 2019 | Completed final sign-off Jun 2020 | 15 Divisadero St | Edenavow Construction & Design | bathroom addition at level 2, removal of structural wall between kitchen and dining room, post to extend to garage levelDetails
bathroom addition at level 2, removal of structural wall between kitchen and dining room, post to extend to garage level | $50,000 |
| Dec 11, 2019 | Expired or cancelled cancelled Jan 2026 | 2797 16th St | rev: to pa# 201908078156; updated exterior storefront design previously approved uner 201908078156Details
rev: to pa# 201908078156; updated exterior storefront design previously approved uner 201908078156 | $10,000 | |
| Sep 5, 2019 | Never finaled filed Sep 2019, never issued | 1224 02nd Av | to comply with complaint 201806612: removal of range, sink and shower at (e) basement rec room. convert rec room to storage spaceDetails
to comply with complaint 201806612: removal of range, sink and shower at (e) basement rec room. convert rec room to storage space | $2,000 | |
| Aug 7, 2019 | Never finaled issued Nov 2019, no final | 2797 16th St | Ecotechnikos, Lindquist Custom Construction Inc | tenant improvement of existing restaurant, new tenant (bakery) storefront, new kitchen, restrooms, mep included.Details
tenant improvement of existing restaurant, new tenant (bakery) storefront, new kitchen, restrooms, mep included. | $7,000 |
| Aug 5, 2019 | Completed final sign-off Jun 2020 | 2102 Baker St | Wall 2 Wall Construction Inc | relocate non-structural bedroom wall.Details
relocate non-structural bedroom wall. | $2,000 |
| May 2, 2019 | Expired or cancelled cancelled Jan 2026 | 1070 Dolores St | addition of dormer ar level 3. remodel bathroom at level 3 remove columns at garage level and replace with overhead beam and new column. plans correspond to #cc8314Details
addition of dormer ar level 3. remodel bathroom at level 3 remove columns at garage level and replace with overhead beam and new column. plans correspond to #cc8314 | $40,000 | |
| Apr 26, 2019 | Completed final sign-off Nov 2019 | 27 Ardenwood Wy | S F O Brien Construction | construct new laundry room at ground level.Details
construct new laundry room at ground level. | $20,000 |
| Feb 13, 2019 | Completed final sign-off Feb 2020 | 654 15th Av | Modern Craft Construction | remodel kitchen and bath at 2nd fl add powder rm. 2nd fl add 2nd full bath, remodel master bath. voluntary seismic upgrade.Details
remodel kitchen and bath at 2nd fl add powder rm. 2nd fl add 2nd full bath, remodel master bath. voluntary seismic upgrade. | $75,000 |
| Aug 14, 2018 | Never finaled issued Nov 2019, no final | 252 Hermann St | Quality Builders General Construction In | remove dividing wall btw kitchen and dining room. replace existing kitchen fixtures and finishes.Details
remove dividing wall btw kitchen and dining room. replace existing kitchen fixtures and finishes. | $3,500 |