Block 2719, lot 028
125 Villa Ter
- City’s use
- Single Family Residential
- Built
- 1938
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 3,090 sq ft
- Lot
- 2,635 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 13, 2023 | Completed final sign-off Oct 2024 | 125 Villa Tr | C H Burnham Inc | remodel primary bathroom @ level 3; replace 5 doors facing rear yard. no structural workDetails
remodel primary bathroom @ level 3; replace 5 doors facing rear yard. no structural work | $20,000 |
| Mar 28, 2019 | Completed final sign-off May 2019 | 125 Villa Tr | Thompson Suskind L P | correct record on pa's to reflect "2 story over 1 basement." correction to pa's 201312315323, 201305318385, 201309066119 and 201901311719.Details
correct record on pa's to reflect "2 story over 1 basement." correction to pa's 201312315323, 201305318385, 201309066119 and 201901311719. | |
| Jan 31, 2019 | Completed final sign-off May 2019 | 125 Villa Tr | Thompson Suskind L P | to obtain final inspection for work approved under pa#201312315323, 201309066119, 201305318385. all work is complete.Details
to obtain final inspection for work approved under pa#201312315323, 201309066119, 201305318385. all work is complete. | |
| Dec 4, 2018 | Never finaled issued Dec 2018, no final | 125 Villa Tr | rev to pa# 201807104066; lamnated glass guardailDetails
rev to pa# 201807104066; lamnated glass guardail | ||
| Jul 10, 2018 | Never finaled issued Jul 2018, no final | 125 Villa Tr | revision to pa 2017-0925-9497, steel post to wood at deck. steel beam to wood.Details
revision to pa 2017-0925-9497, steel post to wood at deck. steel beam to wood. | ||
| Sep 25, 2017 | Completed final sign-off Dec 2018 | 125 Villa Tr | renovate the rear yard of an existing 3-story building into a landscape yard. remove spiral staircase and build new concrete stairs in different location.Details
renovate the rear yard of an existing 3-story building into a landscape yard. remove spiral staircase and build new concrete stairs in different location. | $20,000 | |
| Dec 31, 2013 | Never finaled issued Dec 2013, no final | 125 Villa Tr | Thompson Suskind L P | alter extg fence and awning over entrance door.Details
alter extg fence and awning over entrance door. | $2,000 |
| Sep 6, 2013 | Never finaled issued Sep 2013, no final | 125 Villa Tr | Thompson Suskind L P | revision to app#201305318385. removal 2 bathrooms, change in ceiling heights at storage room. remove and replace entry door and windows. add bath, revise retaining wall.Details
revision to app#201305318385. removal 2 bathrooms, change in ceiling heights at storage room. remove and replace entry door and windows. add bath, revise retaining wall. | $30,000 |
| Sep 3, 2013 | Never finaled issued Sep 2013, no final | 125 Villa Tr | street space permitDetails
street space permit | ||
| May 31, 2013 | Never finaled issued Jun 2013, no final | 125 Villa Tr | excavation within footprint of bldg to create new storage room at basement and remodel luandry, mechanical room and study. convert extg office, bath and laundry at 1st floor into new family room with powder room. remodel exerior stair on grade and gate. add (n) sturctural beam on 1st fl. add doorDetails
excavation within footprint of bldg to create new storage room at basement and remodel luandry, mechanical room and study. convert extg office, bath and laundry at 1st floor into new family room with powder room. remodel exerior stair on grade and gate. add (n) sturctural beam on 1st fl. add door | $150,000 | |
| Oct 29, 2007 | Completed final sign-off Jun 2008 | 125 Villa Tr | lower level- non load bearing parition wall to create a bedroom in old family room- made of steel studs, 16 ' on center 3'0" x 6'8" inswing door into new room - fully insulated .Details
lower level- non load bearing parition wall to create a bedroom in old family room- made of steel studs, 16 ' on center 3'0" x 6'8" inswing door into new room - fully insulated . | $1,000 | |
| Dec 14, 2005 | Completed final sign-off Dec 2005 | 125 Villa Tr | Design Line Construction | renew app #200409275244 for final inspectionDetails
renew app #200409275244 for final inspection | |
| Sep 27, 2004 | Completed final sign-off Dec 2005 | 125 Villa Tr | Design Line Construction | revise approved drawings to rflect existing conditions moved new foundation line 2'9" to the northDetails
revise approved drawings to rflect existing conditions moved new foundation line 2'9" to the north | |
| Apr 3, 2003 | Completed final sign-off Jan 2006 | 125 Villa Tr | addition to garage addition to kitchen (1 story) addition to east/rear of bldg (3 story) to includeDetails
addition to garage addition to kitchen (1 story) addition to east/rear of bldg (3 story) to include | $350,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.