Kirk Lindorfer
- Listed as
- architect, engineer
- Firm
- Paradigm Structural
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to May 2018
16 permits since 2000 (engineer on 10 permits, architect on 6 permits): 14 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 23, 2018 | Completed final sign-off Apr 2020 | 2224 Clement St | L P Construction | revision to original permit drawings for propety line shoring wall along west property line. oringal permit #201611213210.Details
revision to original permit drawings for propety line shoring wall along west property line. oringal permit #201611213210. | $8,000 |
| Feb 15, 2018 | Completed final sign-off Apr 2020 | 2224 Clement St | L P Construction | revision to pa #201611213210. gas meter relocation - minor changes to first floor adding insulation on roof.Details
revision to pa #201611213210. gas meter relocation - minor changes to first floor adding insulation on roof. | |
| Nov 21, 2017 | Completed final sign-off May 2019 | 2424 Buchanan St | Richard Avelar &Assoc Reconstr/Dba Recon | full residential interior remodel on all floors, partial roof repair. new 2' retaining wall at rear, remove 1 window, relocate 1 window. maher not reqDetails
full residential interior remodel on all floors, partial roof repair. new 2' retaining wall at rear, remove 1 window, relocate 1 window. maher not req | $1,200,000 |
| Nov 21, 2016 | Completed final sign-off Apr 2020 | 2224 Clement St | L P Construction | to erect 4 stories, no basement, type 1 & 5a, 12 units residential unit with retail & parking.Details
to erect 4 stories, no basement, type 1 & 5a, 12 units residential unit with retail & parking. | $3,600,000 |
| Apr 26, 2016 | Completed final sign-off Mar 2017 | 135 Townsend St | Cannon Constructors North Inc | all floors: mechanical equipment and installation per application #2015-1016-9929. n/a for maher. 16 fsds. fire alarm deferred.Details
all floors: mechanical equipment and installation per application #2015-1016-9929. n/a for maher. 16 fsds. fire alarm deferred. | $323,000 |
| Dec 8, 2015 | Completed final sign-off Nov 2017 | 856 Market St | South Bay Construction | interior remodel, structural improvements, new mechanical, elecatrical, plumbing. all facade work & sprinkler under separate permit. ** maher: n/a **Details
interior remodel, structural improvements, new mechanical, elecatrical, plumbing. all facade work & sprinkler under separate permit. ** maher: n/a ** | $2,500,000 |
| Sep 9, 2014 | Completed final sign-off Aug 2016 | 3450 Washington St | Matarozzi/Pelsinger Builders Inc. | add 241 sq. ft. addition to the rear of the (e) single family residence to expand family room & open it to the backyard. ** maher: compliance with ordinance no# 155-13 not required **Details
add 241 sq. ft. addition to the rear of the (e) single family residence to expand family room & open it to the backyard. ** maher: compliance with ordinance no# 155-13 not required ** | $300,000 |
| Jul 18, 2014 | Completed final sign-off Jul 2016 | 3450 Washington St | Matarozzi/Pelsinger Builders Inc. | voluntary seismic upgrade on residential sfh building lateral force resisting system will be upgraded with plywood shear walls & a 2 story simpson moment frame. ** maher: compliance with ordinance no# 155-13 not required **Details
voluntary seismic upgrade on residential sfh building lateral force resisting system will be upgraded with plywood shear walls & a 2 story simpson moment frame. ** maher: compliance with ordinance no# 155-13 not required ** | $400,000 |
| Mar 12, 2014 | Completed final sign-off Jan 2015 | 460 Bryant St | revision to appl #2012.0815.7486-r1: remove gas vault from basement. add storage closets & electrical& teledata closets to floors 1,2,3. revise exit doors to stair 2. infill one existing skylight only. maher ordiance not required.Details
revision to appl #2012.0815.7486-r1: remove gas vault from basement. add storage closets & electrical& teledata closets to floors 1,2,3. revise exit doors to stair 2. infill one existing skylight only. maher ordiance not required. | $20,000 | |
| Jul 29, 2013 | Completed final sign-off Jan 2015 | 690 Folsom St | Plant Construction Company Lp | change of use.renov incl seismic strengtheing.install new core elements,remov grd fl walls&replace columns.install new exterior cladding over approx 40%of(e)exterior walls.new mech,elec,plumb&fire protection system & t.i. under separate permit.Details
change of use.renov incl seismic strengtheing.install new core elements,remov grd fl walls&replace columns.install new exterior cladding over approx 40%of(e)exterior walls.new mech,elec,plumb&fire protection system & t.i. under separate permit. | $4,000,000 |
| Mar 4, 2013 | Completed final sign-off Oct 2014 | 560 Valencia St | Devlin/Mcnally Construction | demolition of existing tenant improvements & installation fo new tenant improvements (furniture) including a new store front facade on valencia st.Details
demolition of existing tenant improvements & installation fo new tenant improvements (furniture) including a new store front facade on valencia st. | $300,000 |
| Oct 6, 2009 | Never finaled issued Nov 2009, no final | 710 Market St | Gci, Inc | interior construction of gr floor annex, 2nd floor annex, floors 3-10. restoration of masonry interior walls, new acousitic tile ceilings. hvac and lighting separate permit. ref app 200607136416.Details
interior construction of gr floor annex, 2nd floor annex, floors 3-10. restoration of masonry interior walls, new acousitic tile ceilings. hvac and lighting separate permit. ref app 200607136416. | $980,000 |
| Apr 28, 2008 | Completed final sign-off May 2009 | 200 Paul Av | Carlson Design Construct | addition of 1-2000 kw generator and belly tank. concrete pad for generator, add breaker (e) switch gear for generator. conduit and bus duct from generator to gearDetails
addition of 1-2000 kw generator and belly tank. concrete pad for generator, add breaker (e) switch gear for generator. conduit and bus duct from generator to gear | $680,000 |
| Oct 18, 2005 | Completed final sign-off Feb 2006 | 1018 Pennsylvania Av | rear 1 story horizontal addition 5'x17'x10' h value $4,000. wood framing, concrete foundation work, drywall & roofing & siding & electrical. to comply w/nov#200562512.Details
rear 1 story horizontal addition 5'x17'x10' h value $4,000. wood framing, concrete foundation work, drywall & roofing & siding & electrical. to comply w/nov#200562512. | $4,000 | |
| Jul 28, 2005 | Expired or cancelled expired Jun 2007 | 2574 Green St | interior remodel to include kitche, bathroom and laundry appliances & finishes. new internal stair to 4th floor.Details
interior remodel to include kitche, bathroom and laundry appliances & finishes. new internal stair to 4th floor. | $50,000 | |
| Oct 5, 2004 | Completed final sign-off Jun 2007 | 329 Bay St | demolish 1 story retail buildingDetails
demolish 1 story retail building |