Block 3736, lot 029
299 02nd St
- City’s use
- Commercial Hotel
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 1,800 sq ft
- Lot
- 12,000 sq ft
- Zoning
- C3OSD
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
58 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 6, 2024 | Completed final sign-off Apr 2025 | 299 02nd St | Skanska Usa Building Inc | revision to pa 2023-1130-1690 for change to exterior wall detail 11/a8.01Details
revision to pa 2023-1130-1690 for change to exterior wall detail 11/a8.01 | |
| Jul 19, 2024 | Completed final sign-off Aug 2024 | 299 02nd St | Convergint Technologies Llc | as-built fire alarm plans. ref to 202211045911Details
as-built fire alarm plans. ref to 202211045911 | |
| Nov 30, 2023 | Completed final sign-off Apr 2025 | 299 02nd St | Skanska Usa Building Inc | selective replacement of eterior tile facade installed under permit 201812148389.Details
selective replacement of eterior tile facade installed under permit 201812148389. | |
| Nov 4, 2022 | Completed final sign-off Aug 2024 | 299 02nd St | Convergint Technologies Llc | new t.i. on 2nd floor pool/fitness area. new notification to conform to new floor plan. relocate notification as noted on plans. provide smoke detection and fan shut down/fsd control.Details
new t.i. on 2nd floor pool/fitness area. new notification to conform to new floor plan. relocate notification as noted on plans. provide smoke detection and fan shut down/fsd control. | $10,000 |
| Apr 8, 2022 | Completed final sign-off Nov 2024 | 299 02nd St | Precision Hotel Interiors Inc | expansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck.Details
expansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck. | $900,000 |
| Oct 8, 2021 | Never finaled issued Oct 2021, no final | 299 02nd St | Fdr Construction Inc | rev pa202104098212: (e) 4 pipe fan coil unit to be reused & supply air to 2 (n) offices using same cfu for (n) air distrib, replace (e) fan coil unit merv13 3rd party indy air balance shall balance (n) supply & exh sys min outside air for fc149 to be set 300cfm.Details
rev pa202104098212: (e) 4 pipe fan coil unit to be reused & supply air to 2 (n) offices using same cfu for (n) air distrib, replace (e) fan coil unit merv13 3rd party indy air balance shall balance (n) supply & exh sys min outside air for fc149 to be set 300cfm. | $8,500 |
| Aug 30, 2021 | Completed final sign-off Dec 2021 | 299 02nd St | Convergint Technologies Llc | fire alarm only: 1st floor t.i. add (4) new smoke detectors,(3) speakers & (2) speaker/strobes.Details
fire alarm only: 1st floor t.i. add (4) new smoke detectors,(3) speakers & (2) speaker/strobes. | $10,000 |
| Aug 19, 2021 | Never finaled issued Aug 2021, no final | 299 02nd St | Walschon Fire Protection Inc | fire sprinkler only. ref 2021 0409 8212. add 2 pendents in break rm entry. relocate 2 pendents in new offices in laundry rm. for hotel 1st fl.Details
fire sprinkler only. ref 2021 0409 8212. add 2 pendents in break rm entry. relocate 2 pendents in new offices in laundry rm. for hotel 1st fl. | $2,000 |
| Apr 9, 2021 | Never finaled issued Jun 2021, no final | 299 02nd St | Fdr Construction Inc | removal of (e) specific pieces of laundry euipment. reconfiguration of storage and employee area addition of office spaces (2) exterior wall louvers to be demolished and replaced with (n) wall to match existing.Details
removal of (e) specific pieces of laundry euipment. reconfiguration of storage and employee area addition of office spaces (2) exterior wall louvers to be demolished and replaced with (n) wall to match existing. | $58,000 |
| Aug 4, 2020 | Never finaled issued Aug 2020, no final | 299 02nd St | street spaceDetails
street space | ||
| Jul 7, 2020 | Completed final sign-off Nov 2020 | 299 02nd St | Thomas Swan Sign Co Inc | install (1) illuminated single-faced wall sign.Details
install (1) illuminated single-faced wall sign. | $4,000 |
| May 18, 2020 | Never finaled issued May 2020, no final | 299 02nd St | street spaceDetails
street space | ||
| Mar 4, 2020 | Completed final sign-off Dec 2020 | 299 02nd St | Walschon Fire Protection Inc | rev to pa201905100296: as-builts for restaurant area. fire sprinklerDetails
rev to pa201905100296: as-builts for restaurant area. fire sprinkler | |
| Feb 20, 2020 | Never finaled issued Feb 2020, no final | 299 02nd St | street spaceDetails
street space | ||
| Dec 9, 2019 | Never finaled issued Dec 2019, no final | 299 02nd St | street spaceDetails
street space | ||
| Dec 9, 2019 | Never finaled issued Jan 2020, no final | 299 02nd St | street spaceDetails
street space | ||
| Nov 7, 2019 | Never finaled issued Nov 2019, no final | 299 02nd St | street spaceDetails
street space | ||
| Nov 7, 2019 | Completed final sign-off Nov 2020 | 299 02nd St | Thomas Swan Sign Co Inc | install 1 electric single faced sign "the clancy" atop existing canopy.Details
install 1 electric single faced sign "the clancy" atop existing canopy. | $5,000 |
| Oct 7, 2019 | Completed final sign-off Jul 2020 | 299 02nd St | Thomas Swan Sign Co Inc | install 2 projecting signs illuminatedDetails
install 2 projecting signs illuminated | $10,000 |
| Sep 20, 2019 | Completed final sign-off Dec 2020 | 299 02nd St | Skanska Usa Building Inc | evac mapsDetails
evac maps | $3,000 |
| Jul 23, 2019 | Completed final sign-off Mar 2021 | 299 02nd St | Skanska Usa Building Inc | revision to 201812148389 and 201901251235: (e) roof trellis to remain, changes to elevations revised structural design to art box, marquee, rest, canopy, ext light fixture remove from scopeDetails
revision to 201812148389 and 201901251235: (e) roof trellis to remain, changes to elevations revised structural design to art box, marquee, rest, canopy, ext light fixture remove from scope | |
| Jul 15, 2019 | Never finaled issued Nov 2019, no final | 299 02nd St | revision to pa 2016-1031-1498 as built per fire inspector - provide 120 vac smoke detector with 177 cd built in strobe next to the fire system speaker strobe and smoke detectorDetails
revision to pa 2016-1031-1498 as built per fire inspector - provide 120 vac smoke detector with 177 cd built in strobe next to the fire system speaker strobe and smoke detector | ||
| Jun 4, 2019 | Completed final sign-off Sep 2020 | 299 02nd St | Convergint Technologies Llc | 1st and 2nd floor: modification to fire alarm and add 5 control relays, 4 smoke detectors and 1 duct detector. change 39 sprinkler/strobes.for maher. ref app#201812148389Details
1st and 2nd floor: modification to fire alarm and add 5 control relays, 4 smoke detectors and 1 duct detector. change 39 sprinkler/strobes.for maher. ref app#201812148389 | $50,000 |
| May 30, 2019 | Completed final sign-off Mar 2021 | 299 02nd St | Skanska Usa Building Inc | ref pa 201812148389. cold metal framing; exterior metal stud framing. install all exterior metal stud framing system as required.Details
ref pa 201812148389. cold metal framing; exterior metal stud framing. install all exterior metal stud framing system as required. | $6,300,000 |
| May 16, 2019 | Never finaled issued May 2019, no final | 299 02nd St | street space onlyDetails
street space only | ||
| May 15, 2019 | Never finaled issued May 2019, no final | 299 02nd St | street spaceDetails
street space | ||
| May 10, 2019 | Completed final sign-off Sep 2020 | 299 02nd St | Walschon Fire Protection Inc | modify (e) sprinkler system due to new walls and ceiling ti. grnd flr - demo 10, add 24 and relocate 99. 2nd flr add 10, relocate 44Details
modify (e) sprinkler system due to new walls and ceiling ti. grnd flr - demo 10, add 24 and relocate 99. 2nd flr add 10, relocate 44 | $138,000 |
| Mar 22, 2019 | Never finaled issued Mar 2019, no final | 299 02nd St | street spaceDetails
street space | ||
| Mar 11, 2019 | Never finaled issued Mar 2019, no final | 299 02nd St | street spaceDetails
street space | ||
| Jan 25, 2019 | Completed final sign-off Mar 2021 | 299 02nd St | Skanska Usa Building Inc | selective demo of 1st & 2nd fl, interior and exterior selective demo of (e) porte cochere, public open space at folsom and courtyard public open space. demolition of roof trellis. associated with bpa #201812148389.Details
selective demo of 1st & 2nd fl, interior and exterior selective demo of (e) porte cochere, public open space at folsom and courtyard public open space. demolition of roof trellis. associated with bpa #201812148389. | $1,000,000 |
| Dec 14, 2018 | Completed final sign-off Aug 2021 | 299 02nd St | Skanska Usa Building Inc | ground & 2nd floor - selective remodel of exterior, new interior finishes. expand lobby at ground floor, partial infill of (e) port-cochere, new exterior covered outdoor space, interior renovation of ground floor public spaces, basement parking restriping. ** maher: n/a **Details
ground & 2nd floor - selective remodel of exterior, new interior finishes. expand lobby at ground floor, partial infill of (e) port-cochere, new exterior covered outdoor space, interior renovation of ground floor public spaces, basement parking restriping. ** maher: n/a ** | $6,300,000 |
| Jun 19, 2018 | Expired or cancelled withdrawn Feb 2019 | 299 02nd St | selective remodel of exterior, new exterior finishes on ground and second fl, new exterior paint throught, expanding lobby at ground fl, interior renovation renovation at ground fl public spaces and 2nd fl fitness roomDetails
selective remodel of exterior, new exterior finishes on ground and second fl, new exterior paint throught, expanding lobby at ground fl, interior renovation renovation at ground fl public spaces and 2nd fl fitness room | $6,300,000 | |
| Jan 23, 2018 | Completed final sign-off Mar 2018 | 299 02nd St | Red Hawk Fire & Security Ca Llc | 17th flr - relocate 48 sprinkler heads in all guest bathrooms ref pa 2016-1031-1498. maher naDetails
17th flr - relocate 48 sprinkler heads in all guest bathrooms ref pa 2016-1031-1498. maher na | $5,000 |
| Jan 23, 2018 | Completed final sign-off Apr 2018 | 299 02nd St | Red Hawk Fire & Security Ca Llc | 18th flr - relocate 48 sprinkler heads in all the guest bathrooms ref pa 201610311498 maher naDetails
18th flr - relocate 48 sprinkler heads in all the guest bathrooms ref pa 201610311498 maher na | $5,000 |
| Jan 18, 2018 | Completed final sign-off Mar 2018 | 299 02nd St | Red Hawk Fire & Security Ca Llc | 16th floor - relocate 48 heads in bathrooms. ref pa #201610311498. n/a maher ordinanceDetails
16th floor - relocate 48 heads in bathrooms. ref pa #201610311498. n/a maher ordinance | $5,000 |
| Jan 16, 2018 | Never finaled filed Jan 2018, never issued | 299 02nd St | street spaceDetails
street space | ||
| Jan 16, 2018 | Never finaled issued Jan 2018, no final | 299 02nd St | street spaceDetails
street space | ||
| Jan 4, 2018 | Completed final sign-off Mar 2018 | 299 02nd St | Johnson Controls Fire | f/as: add one each fire sprinkler in existing security room on the 1st fl in stair #2. maher naDetails
f/as: add one each fire sprinkler in existing security room on the 1st fl in stair #2. maher na | $1,200 |
| Dec 18, 2017 | Completed final sign-off Feb 2018 | 299 02nd St | Red Hawk Fire & Security Ca Llc | 15th fr: relocate 48 sprinkler heads in newly remodel bathrooms. ref 201610311498 maher naDetails
15th fr: relocate 48 sprinkler heads in newly remodel bathrooms. ref 201610311498 maher na | $5,000 |
| Nov 22, 2017 | Completed final sign-off Jan 2018 | 299 02nd St | Red Hawk Fire & Security Ca Llc | 14th flr: 48 relocate sprinkler heads in the bathrooms maher naDetails
14th flr: 48 relocate sprinkler heads in the bathrooms maher na | $5,000 |
| Oct 26, 2017 | Completed final sign-off Dec 2017 | 299 02nd St | Red Hawk Fire & Security Ca Llc | 12th floor fire sprinkler - relocate 52 sprinkler heads to accommodate the remodel bathrooms per floor. ref #201610311498. maher n/aDetails
12th floor fire sprinkler - relocate 52 sprinkler heads to accommodate the remodel bathrooms per floor. ref #201610311498. maher n/a | $5,000 |
| Oct 5, 2017 | Completed final sign-off Nov 2017 | 299 02nd St | Red Hawk Fire & Security Ca Llc | f/s 11th fl: relocate (2) sprinkler heads per unit. out of the way of new doors in bathrooms. (48 total). maher na ref pa# 201610311498Details
f/s 11th fl: relocate (2) sprinkler heads per unit. out of the way of new doors in bathrooms. (48 total). maher na ref pa# 201610311498 | $5,000 |
| Jul 31, 2017 | Never finaled issued Jul 2017, no final | 299 02nd St | street spaceDetails
street space | ||
| May 30, 2017 | Never finaled issued May 2017, no final | 299 02nd St | Western States Fire Protection Co. | relocate fire sprinklers on 6th to 14th floor (bathroom entry). ref pa 2016-1031-1498. maher na (50 sprinklers per floor total 400)Details
relocate fire sprinklers on 6th to 14th floor (bathroom entry). ref pa 2016-1031-1498. maher na (50 sprinklers per floor total 400) | $25,000 |
| Apr 26, 2017 | Completed final sign-off Jun 2017 | 299 02nd St | Western States Fire Protection Co. | 5th fl: t.i. relocate 50 fire sprinklers for bathroom update/remodel. ref #2016-1031-1498.Details
5th fl: t.i. relocate 50 fire sprinklers for bathroom update/remodel. ref #2016-1031-1498. | $25,000 |
| Mar 22, 2017 | Completed final sign-off Apr 2017 | 299 02nd St | Western States Fire Protection Co. | 4th flr: sprinkler relocates due to hotel room/bathroom updates. maher naDetails
4th flr: sprinkler relocates due to hotel room/bathroom updates. maher na | $25,000 |
| Mar 9, 2017 | Completed final sign-off Apr 2017 | 299 02nd St | Western States Fire Protection Co. | 3rd flr: relocate fire sprinklers for room remodel ref 201610311498Details
3rd flr: relocate fire sprinklers for room remodel ref 201610311498 | $25,000 |
| Jan 30, 2017 | Never finaled issued Jan 2017, no final | 299 02nd St | street spaceDetails
street space | ||
| Oct 31, 2016 | Never finaled issued Feb 2017, no final | 299 02nd St | Martin-Harris Construction Llc. | renovatation of 15 ada rooms on floors 3-18. converting 3 ada guestrooms to standard guestrooms & 1 guest suite to an ada guest suite. commercial ti. ** maher: n/a **Details
renovatation of 15 ada rooms on floors 3-18. converting 3 ada guestrooms to standard guestrooms & 1 guest suite to an ada guest suite. commercial ti. ** maher: n/a ** | $200,000 |
| Jan 9, 2015 | Completed final sign-off Jan 2015 | 299 02nd St | Newland Interiors | mechanical work:add 2 diffusers:connect to existing duct in fitness center rm 239. add 1 exhaust grill in unisex restroom 236 :connect to existing exhaust system. ref pa# 2014-0220-8892. compliance with maher ordinance no 155-13 not required.Details
mechanical work:add 2 diffusers:connect to existing duct in fitness center rm 239. add 1 exhaust grill in unisex restroom 236 :connect to existing exhaust system. ref pa# 2014-0220-8892. compliance with maher ordinance no 155-13 not required. | $2,000 |
| Nov 4, 2014 | Completed final sign-off Dec 2014 | 299 02nd St | Red Hawk Fire & Security Ca Llc | remove 1 existing strobe, relocate 1 existing strobe. n/a ordinance #155-13Details
remove 1 existing strobe, relocate 1 existing strobe. n/a ordinance #155-13 | $5,500 |
| Sep 26, 2014 | Never finaled issued Sep 2014, no final | 299 02nd St | Johnson Controls Fire | 2nd floor:lower and raise 4 each extg fire sprinkler heads in fitness center and add new fire sprinkler in new unisex toilet room. ref app#201402208892 and 201409226914. n/a ordinance #155-13.Details
2nd floor:lower and raise 4 each extg fire sprinkler heads in fitness center and add new fire sprinkler in new unisex toilet room. ref app#201402208892 and 201409226914. n/a ordinance #155-13. | $3,200 |
| Sep 22, 2014 | Completed final sign-off Jan 2015 | 299 02nd St | Newland Interiors | 2nd flr: revise submission for an addition of a urinal in the new toilet room, revision to permit 201402208892; maher n/aDetails
2nd flr: revise submission for an addition of a urinal in the new toilet room, revision to permit 201402208892; maher n/a | $10,000 |
| Sep 2, 2014 | Never finaled issued Sep 2014, no final | 299 02nd St | street spaceDetails
street space | ||
| Apr 18, 2014 | Never finaled issued Apr 2014, no final | 299 02nd St | street spaceDetails
street space | ||
| Feb 20, 2014 | Completed final sign-off Jan 2015 | 299 02nd St | Newland Interiors | remodel of existing fitness center on 2/f of hotel. compliance ordinance #155-13 not required.Details
remodel of existing fitness center on 2/f of hotel. compliance ordinance #155-13 not required. | $90,000 |
| Jan 6, 2012 | Never finaled issued Jan 2012, no final | 299 02nd St | street space permit for dumpster.Details
street space permit for dumpster. | ||
| Sep 23, 2011 | Completed final sign-off May 2012 | 299 02nd St | Transceive Communications Inc. | installation of 5 at&t equipment cabinets in a fenced compound in (e) basement parking garage parking garage of (e) building.Details
installation of 5 at&t equipment cabinets in a fenced compound in (e) basement parking garage parking garage of (e) building. | $100,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Red Hawk Fire & Security Ca Llc (8), Skanska Usa Building Inc (7), Convergint Technologies Llc (4), Western States Fire Protection Co. (4), Newland Interiors (3), Thomas Swan Sign Co Inc (3), Walschon Fire Protection Inc (3), Fdr Construction Inc (2), Johnson Controls Fire (2), Martin-Harris Construction Llc., Precision Hotel Interiors Inc, Transceive Communications Inc.
- Architects
- Rory James Carroll (7), Thomas Pirtle (3), Whitney Marr (2), Kenneth Camp
- Engineers
- Emily Guglielmo (2), Brett Anthony Olson, Shahla Saiidnia, Srdjan Rebraca, Tomislav Gajic
- Authorized agent-otherss
- Charles Chapman, Whitney Marr