John Lee
- License
- C6896
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C6896 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Based in
- Burlingame
- On San Francisco permits
- Mar 2020 to Jul 2026
17 permits since 2000 (architect on 16 permits, engineer on 1 permit): 10 completed, 4 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- L H Gao Construction Inc. (4), Builderduty Inc (2), Method Construction Inc. (2), Alex Builder Inc, J 1 Construction, West-Tec General Engineering Inc, Zeng Lie Construction
- Engineers
- Rodrigo Santos (2), Thomas Podesta (2), Srdjan Rebraca, Steve Kang, Tomislav Gajic
- Authorized agents
- Rodrigo Santos (2)
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 8
- Commercial 5
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2026 | Completed final sign-off Aug 2026 | 5 Santa Rosa Av | L H Gao Construction Inc. | construction revision @ permit# 201701177299. revised 3 rd floor plan layout per inspector requested. revised roof deck railing to wood.Details
construction revision @ permit# 201701177299. revised 3 rd floor plan layout per inspector requested. revised roof deck railing to wood. | |
| May 7, 2026 | Completed final sign-off Aug 2026 | 4500 Mission St | L H Gao Construction Inc. | revision to 201701177299. occupancy plan and egress path. fire hatch location, provide gate and signage.Details
revision to 201701177299. occupancy plan and egress path. fire hatch location, provide gate and signage. | $10,000 |
| Nov 7, 2025 | Completed final sign-off Nov 2025 | 561 Duncan St | Alex Builder Inc | revision to 202002285791. 1/f added new laundry room, 2/f change powder room layout. 3/f laundry room and bathrom layout change.Details
revision to 202002285791. 1/f added new laundry room, 2/f change powder room layout. 3/f laundry room and bathrom layout change. | $20,000 |
| Aug 1, 2025 | Completed final sign-off Aug 2026 | 4500 Mission St | L H Gao Construction Inc. | 2/f: revision to permit 201701177299. revise 2/f windows to awning windows. window style finish material from wood to vinly.Details
2/f: revision to permit 201701177299. revise 2/f windows to awning windows. window style finish material from wood to vinly. | $10,000 |
| May 27, 2025 | Completed final sign-off Aug 2026 | 5 Santa Rosa Av | L H Gao Construction Inc. | revision to 201701177299: revise floor plan per current condition. infill 133 sf at 2nd fl ref to 201701177299 (inside e) building envolope in mezzanine area open to below)Details
revision to 201701177299: revise floor plan per current condition. infill 133 sf at 2nd fl ref to 201701177299 (inside e) building envolope in mezzanine area open to below) | $60,000 |
| Feb 5, 2025 | In progress issued Mar 2025 | 1944 Ocean Av | Zeng Lie Construction | 2nd/f: revision to permit 2024-0610-4085. new 133 sf expansion and 225 sf infill at 2nd floor. structural work.Details
2nd/f: revision to permit 2024-0610-4085. new 133 sf expansion and 225 sf infill at 2nd floor. structural work. | |
| Dec 6, 2024 | Expired or cancelled cancelled Aug 2025 | 1373 San Bruno Av | remove an (e) balcony deck. convert balcony-deck into enclosed floor area.Details
remove an (e) balcony deck. convert balcony-deck into enclosed floor area. | $15,000 | |
| Jul 11, 2024 | Completed final sign-off Jun 2025 | 1349 Taraval St | J 1 Construction | at the ground floor -change of use from office to child care center (6m-4 years old). new child restroom. new crib room. mep submittal deferredDetails
at the ground floor -change of use from office to child care center (6m-4 years old). new child restroom. new crib room. mep submittal deferred | $40,000 |
| Feb 8, 2024 | Completed final sign-off May 2024 | 2575 Ocean Av | Method Construction Inc. | revision to pa #202308043783 revise 48" corridor to 44" on permit drawingsDetails
revision to pa #202308043783 revise 48" corridor to 44" on permit drawings | |
| Dec 14, 2023 | In progress filed Dec 2023, not yet issued | 2000 Mckinnon Av | Builderduty Inc | bldg 427: add 1 office, 3 unisex toilets and 2 dry goods room. renovate (e) toilet rooms and (e) room partitions for offices, filing room, emplooyee breakrooms, utility room. update electrical, mechanical and plumbing. update (e) entry stairs, add 1 entry stair and 1 entry door. area of improvementDetails
bldg 427: add 1 office, 3 unisex toilets and 2 dry goods room. renovate (e) toilet rooms and (e) room partitions for offices, filing room, emplooyee breakrooms, utility room. update electrical, mechanical and plumbing. update (e) entry stairs, add 1 entry stair and 1 entry door. area of improvement | $180,000 |
| Aug 4, 2023 | Completed final sign-off May 2024 | 2575 Ocean Av | Method Construction Inc. | change of use from health studio/meditation into office use. interior partition. update mechanical, electrical, and plumbing.Details
change of use from health studio/meditation into office use. interior partition. update mechanical, electrical, and plumbing. | $100,000 |
| Sep 9, 2022 | In progress issued Dec 2025 | 2443 24th St | response to planning enforcement #2019-017865enf, #2020012068enf, #2022003345enf: conversion of (e) basement(current use for storage) to habitable space(1 bedroom and storage) connected to recently issued permti#201810193667.Details
response to planning enforcement #2019-017865enf, #2020012068enf, #2022003345enf: conversion of (e) basement(current use for storage) to habitable space(1 bedroom and storage) connected to recently issued permti#201810193667. | $50,000 | |
| Aug 17, 2022 | Completed final sign-off Feb 2023 | 5821 Geary Bl | West-Tec General Engineering Inc | interior t.i. for new outlet and equipment. to comply with nov202291862.replace plumbing fixtures to new. no walls or layout changes.Details
interior t.i. for new outlet and equipment. to comply with nov202291862.replace plumbing fixtures to new. no walls or layout changes. | $50,000 |
| Jun 29, 2022 | Expired or cancelled withdrawn Jan 2023 | 2053 Divisadero St | automatic door abe 201911208431 | $800 | |
| May 6, 2022 | Completed final sign-off Jul 2024 | 1612 16th Av | Builderduty Inc | 2/f: kitchen remodelDetails
2/f: kitchen remodel | $40,000 |
| Feb 25, 2022 | In progress issued Mar 2026 | 1373 San Bruno Av | add 1 office/den and 1 bathroom on ground; add 1 bathroom on second floor. stair penthouse access new roof deck.Details
add 1 office/den and 1 bathroom on ground; add 1 bathroom on second floor. stair penthouse access new roof deck. | $100,000 | |
| Mar 12, 2020 | Never finaled filed Mar 2020, never issued | 5838 Mission St | legalize existing in law unit under ordiance no 43-14. | $300 |