Deborah Lee Sylva
- Listed as
- architect, engineer
- On San Francisco permits
- Sep 2021 to Feb 2026
8 permits since 2000 (architect on 7 permits, engineer on 1 permit): 4 completed, 3 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 18, 2026 | In progress issued Sep 2026 | 1692 Haight St | change of use from retail to tea coffee shop (limited restaurant). add sinks and bar area to current retail space. install 3 compartment sinks, hand sink, mop sink, prep sink. upgrade hot water heater. add electrical outlet to bar area.Details
change of use from retail to tea coffee shop (limited restaurant). add sinks and bar area to current retail space. install 3 compartment sinks, hand sink, mop sink, prep sink. upgrade hot water heater. add electrical outlet to bar area. | $48,000 | |
| Oct 1, 2025 | Completed final sign-off Dec 2025 | 475 06th St | John A Lehman Dba Lehman Construction | ste k17, k18 & k19 interior ti of portion of the 1st fl of (e) food processing establishment/commercial kitchen. non-structural work & mepDetails
ste k17, k18 & k19 interior ti of portion of the 1st fl of (e) food processing establishment/commercial kitchen. non-structural work & mep | $75,000 |
| Jan 30, 2025 | In progress issued Feb 2025 | 201 Bay Shore Bl | Colbear Contracting Group Llc | revision to pa 202310138659 (n) mechanical room w/equipment. no structural workDetails
revision to pa 202310138659 (n) mechanical room w/equipment. no structural work | $50,000 |
| Oct 13, 2023 | In progress issued Jan 2025 | 201 Bay Shore Bl | Colbear Contracting Group Llc | ti new rooftop mechanical equipment, new insulation, new security gates, new equipment padDetails
ti new rooftop mechanical equipment, new insulation, new security gates, new equipment pad | $280,000 |
| Apr 20, 2023 | Never finaled issued Jun 2023, no final | 90 Charter Oak Av | John A Lehman Dba Lehman Construction | renovation of (e) commercial kitchen suite, removal of walls to create larger suite, removal of (1) hood & new equipment, doors, fixtures & furnishingsDetails
renovation of (e) commercial kitchen suite, removal of walls to create larger suite, removal of (1) hood & new equipment, doors, fixtures & furnishings | $50,000 |
| Nov 23, 2021 | Completed final sign-off Jan 2022 | 1200 Market St | T C B Demolition | interior non-structural demolition only (n0 occupancy) per ab017 interior demo space to remain vacant until all accesible feature are restored under future ti permitsDetails
interior non-structural demolition only (n0 occupancy) per ab017 interior demo space to remain vacant until all accesible feature are restored under future ti permits | $18,210 |
| Sep 15, 2021 | Completed final sign-off Mar 2024 | 1200 Market St | K Bali Construction | basement - change of occupancy from restaurant to food preparation factory. t.i renovation of basement. (e) 2 story bldg made of masonary and wood. (n) work includes (n) interior walls, ceiling, lighting, flooring, finishes and furnishings.Details
basement - change of occupancy from restaurant to food preparation factory. t.i renovation of basement. (e) 2 story bldg made of masonary and wood. (n) work includes (n) interior walls, ceiling, lighting, flooring, finishes and furnishings. | $496,000 |
| Sep 14, 2021 | Completed final sign-off Mar 2024 | 1200 Market St | K Bali Construction | ti renovation of the ground fl of e 2 story building made of masonry and wood construction. new work in cludes new interior walls, ceilings, lighting, flooring, finishes, furnishings. full nfpa fire sprinkler system throughout entire bldg.Details
ti renovation of the ground fl of e 2 story building made of masonry and wood construction. new work in cludes new interior walls, ceilings, lighting, flooring, finishes, furnishings. full nfpa fire sprinkler system throughout entire bldg. | $350,000 |