Block 5370, lot 057
90 Charter Oak Ave
- City’s use
- Industrial
- Built
- 1956
- Stories
- 1
- Units
- 1
- Rooms
- 4 bathrooms
- Building
- 20,000 sq ft
- Lot
- 20,000 sq ft
- Zoning
- M1
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 9, 2025 | In progress issued Dec 2025 | 90 Charter Oak Av | Ha Fire Protection | k14-k15: modify 2 ul-300 hood and duct fire suppression systemDetails
k14-k15: modify 2 ul-300 hood and duct fire suppression system | $2,000 |
| Feb 26, 2025 | Completed final sign-off Dec 2025 | 90 Charter Oak Av | John A Lehman Dba Lehman Construction | k14/k15 1/f: interior ti of a portion of the first floor of (e) facility. combining (2) kitchens for single operator w/ fse install, plumbing, and electrical. no structural.Details
k14/k15 1/f: interior ti of a portion of the first floor of (e) facility. combining (2) kitchens for single operator w/ fse install, plumbing, and electrical. no structural. | $55,000 |
| Sep 12, 2023 | In progress issued Oct 2023 | 90 Charter Oak Av | interior ti for new commercial kitchen suite. work includes non structural partitions, equipment, fixtures, furnings to create new larger kitchen from 2 existing kitchens. k23-k24Details
interior ti for new commercial kitchen suite. work includes non structural partitions, equipment, fixtures, furnings to create new larger kitchen from 2 existing kitchens. k23-k24 | $110,000 | |
| May 17, 2023 | Completed final sign-off Aug 2023 | 90 Charter Oak Av | The Signworks Of America Inc | install a blade sign " food pickup"Details
install a blade sign " food pickup" | $2,000 |
| May 17, 2023 | Never finaled issued May 2023, no final | 90 Charter Oak Av | The Signworks Of America Inc | install a cabinet box light sign " food pickup, uber eats" 2 x 6'. (qty 2)Details
install a cabinet box light sign " food pickup, uber eats" 2 x 6'. (qty 2) | $2,000 |
| Apr 20, 2023 | Never finaled issued Jun 2023, no final | 90 Charter Oak Av | John A Lehman Dba Lehman Construction | renovation of (e) commercial kitchen suite, removal of walls to create larger suite, removal of (1) hood & new equipment, doors, fixtures & furnishingsDetails
renovation of (e) commercial kitchen suite, removal of walls to create larger suite, removal of (1) hood & new equipment, doors, fixtures & furnishings | $50,000 |
| Dec 7, 2020 | Completed final sign-off Dec 2020 | 90 Charter Oak Av | revised 201908306340 revised accessiblity sheet a0.8 to make clear conditions for pot between walk in cooler and freezer room 163 and 162 per cbc 11b2.06.2.8 exeception 2 freezer employee use onlyDetails
revised 201908306340 revised accessiblity sheet a0.8 to make clear conditions for pot between walk in cooler and freezer room 163 and 162 per cbc 11b2.06.2.8 exeception 2 freezer employee use only | ||
| Sep 29, 2020 | Expired or cancelled withdrawn Oct 2020 | 90 Charter Oak Av | K Bali Construction | removed accessibility path of travel in walk-in /freezer. revised landings for the freezer; in freezer remove ramp and fill in with step and added level landing in front of freezer door. revision to pa#201908300340.Details
removed accessibility path of travel in walk-in /freezer. revised landings for the freezer; in freezer remove ramp and fill in with step and added level landing in front of freezer door. revision to pa#201908300340. | $500 |
| Aug 20, 2020 | Completed final sign-off Oct 2020 | 90 Charter Oak Av | Hue & Cry Security System | installation of fire alarm system with pull and smoke at facp. system to monitor water flow, tamper switch, all ansuls and duct smokes. system monitored by cell communicator. notification installed within all common areas.Details
installation of fire alarm system with pull and smoke at facp. system to monitor water flow, tamper switch, all ansuls and duct smokes. system monitored by cell communicator. notification installed within all common areas. | $30,000 |
| Jul 22, 2020 | Completed final sign-off Oct 2020 | 90 Charter Oak Av | Chris' Plumbing Inc, K Bali Construction | tenant improvements to the (e) fire sprinkler system 135 sprinklersDetails
tenant improvements to the (e) fire sprinkler system 135 sprinklers | $67,500 |
| Jun 12, 2020 | Completed final sign-off Oct 2020 | 90 Charter Oak Av | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish & install 23 ansul r-102 fire systems in the kitchen areas on the g/f. ref t.i. 201908300340Details
furnish & install 23 ansul r-102 fire systems in the kitchen areas on the g/f. ref t.i. 201908300340 | $65,000 |
| Apr 30, 2020 | Completed final sign-off Nov 2020 | 90 Charter Oak Av | K Bali Construction | revision to pa#201908300340. split kitchens 101 into (2) kitchens; 101a &101b. corresponding door & finishes revised. enlarge kitchen 140. restrms 143, 154, 153: revised sinks to wall hung sinks. replace all wall tole for frp. storefront at driver check-in room 145 revised. roll up door on exteriorDetails
revision to pa#201908300340. split kitchens 101 into (2) kitchens; 101a &101b. corresponding door & finishes revised. enlarge kitchen 140. restrms 143, 154, 153: revised sinks to wall hung sinks. replace all wall tole for frp. storefront at driver check-in room 145 revised. roll up door on exterior | $8,500 |
| Aug 30, 2019 | Completed final sign-off Jul 2021 | 90 Charter Oak Av | K Bali Construction | (n) interior non-bearing partitions, ceilings & finishes. (n) doors & windows @(e) bldg facade. (n) hvac system & kitchen exhaust system. provide necessary control for all systems. (n) elec throught. (n) plumbing. (n) walk-in cooler & freezer. upgrade fire alarm & sprinkler system.**maher n/a**Details
(n) interior non-bearing partitions, ceilings & finishes. (n) doors & windows @(e) bldg facade. (n) hvac system & kitchen exhaust system. provide necessary control for all systems. (n) elec throught. (n) plumbing. (n) walk-in cooler & freezer. upgrade fire alarm & sprinkler system.**maher n/a** | $3,750,000 |
| Jul 23, 2019 | Completed final sign-off Nov 2020 | 90 Charter Oak Av | Anderson, Rowe & Buckley, Inc. | change out fire sprinklers 180 spkrs add longitudal sway bracing demo 25 sprinklersDetails
change out fire sprinklers 180 spkrs add longitudal sway bracing demo 25 sprinklers | $38,000 |
| Jul 17, 2019 | Completed final sign-off Jul 2020 | 90 Charter Oak Av | demo of (e) int construction demo - walls, doors, removing equip, plm & ele, non structural ab-017.Details
demo of (e) int construction demo - walls, doors, removing equip, plm & ele, non structural ab-017. | $30,000 | |
| May 16, 2012 | Completed final sign-off Jun 2012 | 90 Charter Oak Av | Monolith Construction Inc. | revision to appl #2011.01.03.7743 - revised disabled access checklist, revised form c: disable access 20% & unreasonable hardship form - revise layout to unisex bathroom.Details
revision to appl #2011.01.03.7743 - revised disabled access checklist, revised form c: disable access 20% & unreasonable hardship form - revise layout to unisex bathroom. | |
| Apr 15, 2011 | Completed final sign-off Jun 2011 | 92 Charter Oak Av | new uni-sex, ada compliant bathroom added to extg pdr-2 zoned bldg,new lateral sewer at right of way to be tied into extg address #90 soft t.i. for speculative,future tenant.Details
new uni-sex, ada compliant bathroom added to extg pdr-2 zoned bldg,new lateral sewer at right of way to be tied into extg address #90 soft t.i. for speculative,future tenant. | $8,000 | |
| Apr 1, 2011 | Expired or cancelled withdrawn Apr 2011 | 92 Charter Oak Av | change of use from warehouse to auto repair @#92 charter oak - new uni-sex, ada compliant bathroom added to existing pdr-2 zoned bldg, new lateral sewer at r.o.w. to be tied into (e) & 90.Details
change of use from warehouse to auto repair @#92 charter oak - new uni-sex, ada compliant bathroom added to existing pdr-2 zoned bldg, new lateral sewer at r.o.w. to be tied into (e) & 90. | ||
| Apr 1, 2011 | Never finaled issued Apr 2011, no final | 92 Charter Oak Av | add new address for commercial space.Details
add new address for commercial space. | ||
| Jan 3, 2011 | Completed final sign-off Jun 2012 | 90 Charter Oak Av | Monolith Construction Inc. | restore existing office space by replacing all fire damaged, walls, ceiling gyp bd and finishes. modify e toilet room for ada access, patch exterior wall damaged by fireDetails
restore existing office space by replacing all fire damaged, walls, ceiling gyp bd and finishes. modify e toilet room for ada access, patch exterior wall damaged by fire | $4,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.