Jeffery E. Eaton
- Listed as
- architect
- Firm
- Eaton Hall Architecture
- Based in
- San Jose
- On San Francisco permits
- Feb 2008 to Sep 2020
7 permits since 2000 (architect on 7 permits): 5 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2020 | Expired or cancelled withdrawn Oct 2020 | 90 Charter Oak Av | K Bali Construction | removed accessibility path of travel in walk-in /freezer. revised landings for the freezer; in freezer remove ramp and fill in with step and added level landing in front of freezer door. revision to pa#201908300340.Details
removed accessibility path of travel in walk-in /freezer. revised landings for the freezer; in freezer remove ramp and fill in with step and added level landing in front of freezer door. revision to pa#201908300340. | $500 |
| Apr 30, 2020 | Completed final sign-off Nov 2020 | 90 Charter Oak Av | K Bali Construction | revision to pa#201908300340. split kitchens 101 into (2) kitchens; 101a &101b. corresponding door & finishes revised. enlarge kitchen 140. restrms 143, 154, 153: revised sinks to wall hung sinks. replace all wall tole for frp. storefront at driver check-in room 145 revised. roll up door on exteriorDetails
revision to pa#201908300340. split kitchens 101 into (2) kitchens; 101a &101b. corresponding door & finishes revised. enlarge kitchen 140. restrms 143, 154, 153: revised sinks to wall hung sinks. replace all wall tole for frp. storefront at driver check-in room 145 revised. roll up door on exterior | $8,500 |
| Aug 30, 2019 | Completed final sign-off Jul 2021 | 90 Charter Oak Av | K Bali Construction | (n) interior non-bearing partitions, ceilings & finishes. (n) doors & windows @(e) bldg facade. (n) hvac system & kitchen exhaust system. provide necessary control for all systems. (n) elec throught. (n) plumbing. (n) walk-in cooler & freezer. upgrade fire alarm & sprinkler system.**maher n/a**Details
(n) interior non-bearing partitions, ceilings & finishes. (n) doors & windows @(e) bldg facade. (n) hvac system & kitchen exhaust system. provide necessary control for all systems. (n) elec throught. (n) plumbing. (n) walk-in cooler & freezer. upgrade fire alarm & sprinkler system.**maher n/a** | $3,750,000 |
| Jul 17, 2019 | Completed final sign-off Jul 2020 | 90 Charter Oak Av | demo of (e) int construction demo - walls, doors, removing equip, plm & ele, non structural ab-017.Details
demo of (e) int construction demo - walls, doors, removing equip, plm & ele, non structural ab-017. | $30,000 | |
| Jan 21, 2011 | Completed final sign-off Apr 2011 | 505 Montgomery St | Parker Door & Glass, Inc | addition of interior double doors at 1st floorDetails
addition of interior double doors at 1st floor | $7,000 |
| Apr 7, 2008 | Completed final sign-off Jun 2008 | 3595 California St | Wells Construction Inc | remodel (e) starbucks-remove door into hallway and replace it in new location (hallway). new finishes, light fixtures, no change to equipmentDetails
remodel (e) starbucks-remove door into hallway and replace it in new location (hallway). new finishes, light fixtures, no change to equipment | $10,000 |
| Feb 21, 2008 | Never finaled issued Mar 2008, no final | 343 Sansome St | renovation of existing starbucks coffee, replace finishes, cabinets, equipment and lighting, no exterior modifications, new plumbing will include floor sink, new lighting 7 track fixtures 4 undercounter task lights.Details
renovation of existing starbucks coffee, replace finishes, cabinets, equipment and lighting, no exterior modifications, new plumbing will include floor sink, new lighting 7 track fixtures 4 undercounter task lights. | $25,000 |