Robert Stickles
- License
- C18396
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Ideation
- Based in
- Phoenix
- On San Francisco permits
- Sep 2021 to Jan 2023
8 permits since 2000 (architect on 8 permits): 2 completed, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- K Bali Construction (7), Apg Plumbing
- Engineers
- Srdjan Rebraca (3), Tomislav Gajic (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 8
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 19, 2023 | Expired or cancelled expired Mar 2024 | 1200 Market St | K Bali Construction | revision to 202109158511 and 202206307517. relocation of electrical gear and corresponding layout change to kitchen b104.Details
revision to 202109158511 and 202206307517. relocation of electrical gear and corresponding layout change to kitchen b104. | |
| Jun 30, 2022 | Expired or cancelled expired Mar 2024 | 1200 Market St | K Bali Construction | basement: revision to 202109158511 to incorporate the modification of size to kitchen b101. the addition of cold storage walk in box b106. removal of kitchen 107 and utility control room is now (e) to remain in (e) location. addition of b105 kitchenDetails
basement: revision to 202109158511 to incorporate the modification of size to kitchen b101. the addition of cold storage walk in box b106. removal of kitchen 107 and utility control room is now (e) to remain in (e) location. addition of b105 kitchen | |
| Jun 30, 2022 | Expired or cancelled expired Mar 2024 | 1200 Market St | K Bali Construction | ground fl: revision to 202109148433 to incorporate the addition of mechanical chase separation wall updated finishes.Details
ground fl: revision to 202109148433 to incorporate the addition of mechanical chase separation wall updated finishes. | |
| Jun 30, 2022 | Expired or cancelled expired Mar 2024 | 1200 Market St | K Bali Construction | 2/f: revision to 202109158499 to incorporate the addition of mechanical chase separation wall and updated finishes.Details
2/f: revision to 202109158499 to incorporate the addition of mechanical chase separation wall and updated finishes. | |
| Feb 28, 2022 | Expired or cancelled expired Mar 2024 | 1200 Market St | K Bali Construction | exterior scope includes addition of louvers to existing storefront window.Details
exterior scope includes addition of louvers to existing storefront window. | $1,000 |
| Feb 3, 2022 | Completed final sign-off Mar 2024 | 1200 Market St | K Bali Construction | t.i. mechanical & electrical work associated with food hall and kitchens.Details
t.i. mechanical & electrical work associated with food hall and kitchens. | $175,000 |
| Feb 3, 2022 | Expired or cancelled expired Mar 2024 | 1200 Market St | Apg Plumbing | plumbing review only for work associated with food hall and kitchens under pa 202109158511, 202109158499 & 202109148433Details
plumbing review only for work associated with food hall and kitchens under pa 202109158511, 202109158499 & 202109148433 | |
| Sep 15, 2021 | Completed final sign-off Mar 2024 | 1200 Market St | K Bali Construction | t.i renovation of 2nd floor. (e) 2 story bldg made of masonary and wood. (n) work includes (n) interior walls, ceilings, lighting, flooring, finises and furnishings.Details
t.i renovation of 2nd floor. (e) 2 story bldg made of masonary and wood. (n) work includes (n) interior walls, ceilings, lighting, flooring, finises and furnishings. | $330,000 |