Jason Jones
- Listed as
- architect, designer, engineer
- Firm
- Arcsine
- Based in
- Oakland
- On San Francisco permits
- Feb 2023 to Aug 2026
8 permits since 2000 (architect on 6 permits, designer on 1 permit, engineer on 1 permit): 2 completed, 6 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 1581 Webster St | g/f - the entire scope consists of accessible barrier removal in accordance w/the 2025 cbc chapter 11b including: 1.accessible upgrade reno of the exterior stairs on webster st, including new treads, risers & handrails. 2.accessible upgrade reno of public restroom & drinking fountains @ 1st fl.Details
g/f - the entire scope consists of accessible barrier removal in accordance w/the 2025 cbc chapter 11b including: 1.accessible upgrade reno of the exterior stairs on webster st, including new treads, risers & handrails. 2.accessible upgrade reno of public restroom & drinking fountains @ 1st fl. | $196,500 | |
| Jun 24, 2026 | In progress filed Jun 2026, not yet issued | 555 Market St | 6th fl - ti of existing cafe servery to upgrade kitchen equipment and finishes w/new ceiling soffit, new serving counter.Details
6th fl - ti of existing cafe servery to upgrade kitchen equipment and finishes w/new ceiling soffit, new serving counter. | $160,000 | |
| Dec 18, 2025 | In progress filed Dec 2025, not yet issued | 1581 Webster St | interior - existing restroom renovation to upgrade and make accessibly compliant doors in circulation, security grille, and stair handrail modificationsDetails
interior - existing restroom renovation to upgrade and make accessibly compliant doors in circulation, security grille, and stair handrail modifications | $350,000 | |
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 1815 Market St | revision to pa#202503253024, affecting architectural and structural scopes. mep revision scope to be included under deferred submittal.Details
revision to pa#202503253024, affecting architectural and structural scopes. mep revision scope to be included under deferred submittal. | $500 | |
| Apr 10, 2025 | In progress issued Oct 2025 | 1815 Market St | Gci, Inc | building enlargement -to add level 2, remodel restaurant and change of occupancyDetails
building enlargement -to add level 2, remodel restaurant and change of occupancy | $1,400,000 |
| Nov 15, 2024 | In progress issued Dec 2024 | 1815 Market St | Gci, Inc, Gregory Davis Construction Incgregory Da | ab-17 demo interior only 2,120 sq ft.Details
ab-17 demo interior only 2,120 sq ft. | $93,875 |
| Jun 21, 2024 | Completed final sign-off Jan 2026 | 1581 Webster St | install (18) illuminated egress signs and (2) pair unrated doors, addition: of emergency lighting anmd wall scones emergency back upDetails
install (18) illuminated egress signs and (2) pair unrated doors, addition: of emergency lighting anmd wall scones emergency back up | $25,000 | |
| Feb 7, 2023 | Completed final sign-off Nov 2023 | 450 Powell St | Independent Power Inc | 3rd fl - fitness center. new finishes @ floor, walls and ceiling. new decorative fixtures connected to (e) power and electrical boxes. restroom floor, wall finish, new non-structural fixed shelving and millwork. to comply with nov 202298994 and 202289771Details
3rd fl - fitness center. new finishes @ floor, walls and ceiling. new decorative fixtures connected to (e) power and electrical boxes. restroom floor, wall finish, new non-structural fixed shelving and millwork. to comply with nov 202298994 and 202289771 | $50,000 |