Block 0310, lot 018
185 Post St
- City’s use
- Commercial Retail
- Built
- 1907
- Stories
- 6
- Units
- 2
- Rooms
- 7 bathrooms
- Building
- 28,600 sq ft
- Lot
- 3,600 sq ft
- Zoning
- C3R
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
124 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 14, 2025 | Completed final sign-off Dec 2025 | 185 Post St | Bilcor Inc | replacement of existing pots lne to accomodate dact. install 1 monitor module and teleguardDetails
replacement of existing pots lne to accomodate dact. install 1 monitor module and teleguard | $1,200 |
| Aug 4, 2025 | Completed final sign-off Aug 2025 | 185 Post St | Golden Gate Fire Protection Inc | 6/f: relocate 4 concealed pendent sprinklers. ref t.i permit 202503101871Details
6/f: relocate 4 concealed pendent sprinklers. ref t.i permit 202503101871 | $1,000 |
| May 20, 2025 | Completed final sign-off Dec 2025 | 185 Post St | Mcclure Electric Inc | 6/fl-deferred electrical for 6th floor office ti. reference permit 202503101871.Details
6/fl-deferred electrical for 6th floor office ti. reference permit 202503101871. | $54,740 |
| Mar 10, 2025 | Completed final sign-off Dec 2025 | 185 Post St | Rudolph Commercial Interiors Inc, Rci | 6th fl - ti, demo of non-structural partitions and building new non-structural partitions; all new or revised mep, life safety, fire alarm & sprinklers if needed will be design build & submitted separatelyDetails
6th fl - ti, demo of non-structural partitions and building new non-structural partitions; all new or revised mep, life safety, fire alarm & sprinklers if needed will be design build & submitted separately | $225,000 |
| May 8, 2024 | Completed final sign-off Oct 2024 | 185 Post St | Bilcor Inc | ref 202401184174- 5th/flr- install (2) ceiling mount strobesDetails
ref 202401184174- 5th/flr- install (2) ceiling mount strobes | $1,332 |
| Apr 15, 2024 | Completed final sign-off Jul 2024 | 185 Post St | C B F Inc | ref pa# 2024-0118-4174 office ti new lighting & lighting controls. minimal receptacle adds. (58) recessed fixtures. (6) added receptacles. luton wire lighting controlsDetails
ref pa# 2024-0118-4174 office ti new lighting & lighting controls. minimal receptacle adds. (58) recessed fixtures. (6) added receptacles. luton wire lighting controls | $63,000 |
| Jan 18, 2024 | Completed final sign-off Jul 2024 | 185 Post St | Rudolph Commercial Interiors Inc, Rci | 5th fl ti includes demo of non structural partitions and building new non structural partitions. all new or revvised meps, life safety work will be design build and submitted for permit separately. bldg fully sprinkleredDetails
5th fl ti includes demo of non structural partitions and building new non structural partitions. all new or revvised meps, life safety work will be design build and submitted for permit separately. bldg fully sprinklered | $215,000 |
| Aug 16, 2022 | Expired or cancelled cancelled Jan 2026 | 185 Post St | renew for final inspection only. 2014-1224-4501 2015-0107-5153 2015-0828-5589 all work completeDetails
renew for final inspection only. 2014-1224-4501 2015-0107-5153 2015-0828-5589 all work complete | ||
| Aug 16, 2022 | Completed final sign-off Oct 2022 | 185 Post St | Alain Hirsch Construction Corp | to obtain final inspection for work under 201604013779: 201603111831: 201603101734. all work is complete.Details
to obtain final inspection for work under 201604013779: 201603111831: 201603101734. all work is complete. | |
| Aug 16, 2022 | Completed final sign-off Sep 2022 | 185 Post St | Alain Hirsch Construction Corp | renew for final inspection only 2014 1224 4501, 2015 0107 5153, 2015 0828 5589. all work completeDetails
renew for final inspection only 2014 1224 4501, 2015 0107 5153, 2015 0828 5589. all work complete | |
| Aug 16, 2022 | Completed final sign-off Sep 2022 | 185 Post St | Alain Hirsch Construction Corp | renew for final inspection only 2014-0512-5489 2014-1224-4499 2015-0526-7094 (all work complete)Details
renew for final inspection only 2014-0512-5489 2014-1224-4499 2015-0526-7094 (all work complete) | |
| Aug 16, 2022 | Completed final sign-off Sep 2022 | 185 Post St | Alain Hirsch Construction Corp | to obtain final inspection for work approved under pa# 201602129485, 201512114908, 201511233333 all work is completeDetails
to obtain final inspection for work approved under pa# 201602129485, 201512114908, 201511233333 all work is complete | |
| Aug 16, 2022 | Completed final sign-off Oct 2022 | 185 Post St | Alain Hirsch Construction Corp | to obtain final inspection for work under 201505085787: 201505065553: 201505065552. all work is complete.Details
to obtain final inspection for work under 201505085787: 201505065553: 201505065552. all work is complete. | |
| Aug 16, 2022 | Never finaled issued Sep 2022, no final | 185 Post St | Alain Hirsch Construction Corp | to obtain final inspection for work under 201505287440. all work is complete.Details
to obtain final inspection for work under 201505287440. all work is complete. | |
| Aug 16, 2022 | Completed final sign-off Oct 2022 | 185 Post St | Alain Hirsch Construction Corp | to obtain final inspection for work approved under pa# 201501236541, 201501236543 all work is completeDetails
to obtain final inspection for work approved under pa# 201501236541, 201501236543 all work is complete | |
| Aug 16, 2022 | Completed final sign-off Sep 2022 | 185 Post St | Alain Hirsch Construction Corp | renew for final inspection only, 2015-1116-2693,2015-1015-9871,2015-1015-9869 all work completeDetails
renew for final inspection only, 2015-1116-2693,2015-1015-9871,2015-1015-9869 all work complete | |
| Aug 16, 2022 | Completed final sign-off Oct 2022 | 185 Post St | Alain Hirsch Construction Corp | to obtain final inspection for work approved under pa# 201501236538, 201501206145, 201407020375 all work is completeDetails
to obtain final inspection for work approved under pa# 201501236538, 201501206145, 201407020375 all work is complete | |
| Aug 16, 2022 | Completed final sign-off Sep 2022 | 185 Post St | Alain Hirsch Construction Corp | to obtain final inspection for work under 201608044215. all work is complete.Details
to obtain final inspection for work under 201608044215. all work is complete. | |
| Feb 26, 2019 | Never finaled issued Feb 2019, no final | 185 Post St | Alain Hirsch Construction Corp | to obtain final inspection for work approved under pa#201608044215. all work is complete.Details
to obtain final inspection for work approved under pa#201608044215. all work is complete. | |
| Feb 5, 2019 | Never finaled issued Feb 2019, no final | 185 Post St | Alain Hirsch Construction Corp | renew for final inspection only. 2015-0528-7440, 2016-0304-1203, 2016-0926-8836. all work in complete.Details
renew for final inspection only. 2015-0528-7440, 2016-0304-1203, 2016-0926-8836. all work in complete. | |
| Feb 5, 2019 | Completed final sign-off Oct 2022 | 185 Post St | Alain Hirsch Construction Corp | renew for final inspection only. 2014-0512-5489, 2014-1224-4499, 2015-0526-7094, all work in complete.Details
renew for final inspection only. 2014-0512-5489, 2014-1224-4499, 2015-0526-7094, all work in complete. | |
| Feb 5, 2019 | Completed final sign-off Jun 2020 | 185 Post St | Alain Hirsch Construction Corp | renew for final inspection only. 2015-0107-5153, 2014-1224-4501, 2015-0828-5589. all work in complete.Details
renew for final inspection only. 2015-0107-5153, 2014-1224-4501, 2015-0828-5589. all work in complete. | |
| Jul 5, 2017 | Never finaled issued Jul 2017, no final | 185 Post St | street spaceDetails
street space | ||
| Jul 5, 2017 | Never finaled issued Jul 2017, no final | 185 Post St | street spaceDetails
street space | ||
| Jun 8, 2017 | Never finaled issued Jun 2017, no final | 185 Post St | street spaceDetails
street space | ||
| Apr 19, 2017 | Never finaled issued Apr 2017, no final | 185 Post St | Alain Hirsch Construction Corp | renew for final inspection only: 201505055434, 201501236543, 201501236541Details
renew for final inspection only: 201505055434, 201501236543, 201501236541 | |
| Apr 19, 2017 | Never finaled issued Apr 2017, no final | 185 Post St | Alain Hirsch Construction Corp | renew for final inspection only: 201604013779, 201603111831, 201603101734Details
renew for final inspection only: 201604013779, 201603111831, 201603101734 | |
| Apr 19, 2017 | Completed final sign-off Oct 2022 | 185 Post St | Alain Hirsch Construction Corp | renew for final inspection only: 201511162693, 201510159871, 201510159869Details
renew for final inspection only: 201511162693, 201510159871, 201510159869 | |
| Apr 19, 2017 | Never finaled issued Apr 2017, no final | 185 Post St | Alain Hirsch Construction Corp | renew for final inspection only: 2015-01-23-6538, 2015-01-20-6145 , & 201407020375.Details
renew for final inspection only: 2015-01-23-6538, 2015-01-20-6145 , & 201407020375. | |
| Apr 19, 2017 | Never finaled issued Apr 2017, no final | 185 Post St | Alain Hirsch Construction Corp | renew for final inspection only: 201505085787, 201505065553, 201505065552Details
renew for final inspection only: 201505085787, 201505065553, 201505065552 | |
| Apr 19, 2017 | Never finaled issued Apr 2017, no final | 185 Post St | Alain Hirsch Construction Corp | renew for final inspection only: 201602129485, 201512114908, 201511233333Details
renew for final inspection only: 201602129485, 201512114908, 201511233333 | |
| Feb 24, 2017 | Never finaled filed Feb 2017, never issued | 185 Post St | street space | ||
| Sep 26, 2016 | Completed final sign-off Nov 2016 | 185 Post St | Bilcor Inc | ground floor: fire safety tenant improvement, install one smoke detector with base and install one control relay. ref pa# 2016-0804-4215.Details
ground floor: fire safety tenant improvement, install one smoke detector with base and install one control relay. ref pa# 2016-0804-4215. | $800 |
| Sep 22, 2016 | Never finaled issued May 2017, no final | 185 Post St | street spaceDetails
street space | ||
| Sep 21, 2016 | Never finaled issued May 2017, no final | 185 Post St | street spaceDetails
street space | ||
| Sep 2, 2016 | Never finaled issued May 2017, no final | 185 Post St | street spaceDetails
street space | ||
| Aug 4, 2016 | Expired or cancelled expired Jul 2020 | 185 Post St | Alain Hirsch Construction Corp | install magnetic lock exit button & detector at ground floor entry door, no other work. at interior only. no exterior work.Details
install magnetic lock exit button & detector at ground floor entry door, no other work. at interior only. no exterior work. | $2,000 |
| May 10, 2016 | Never finaled issued May 2016, no final | 185 Post St | street spaceDetails
street space | ||
| Apr 1, 2016 | Never finaled issued Apr 2016, no final | 185 Post St | Alain Hirsch Construction Corp | revision to ref pa 2015 1116 2693: scope revision title 24 to show correct # of light fixtures installed on storefrontDetails
revision to ref pa 2015 1116 2693: scope revision title 24 to show correct # of light fixtures installed on storefront | |
| Mar 11, 2016 | Never finaled issued Mar 2016, no final | 185 Post St | Alain Hirsch Construction Corp | revision to app#201501075153. electrical and mech changes to 3rd floor.Details
revision to app#201501075153. electrical and mech changes to 3rd floor. | |
| Mar 10, 2016 | Never finaled issued Mar 2016, no final | 185 Post St | Alain Hirsch Construction Corp | revision to app#201412244499. scope is for minor bldg & lighting changes on 3rd floor.Details
revision to app#201412244499. scope is for minor bldg & lighting changes on 3rd floor. | $1,000 |
| Mar 4, 2016 | Completed final sign-off Jun 2016 | 185 Post St | Bilcor Inc | basement-3rd floor: fire alarm t.i., install 8 ceiling mount strobes, install 15 ceiling mount speakers-strobes, install 9 smoke detector with base, install 9 duct detector, install 18 control relay, connect new horn strobes to extg booster panels. ref app# 201412244499.Details
basement-3rd floor: fire alarm t.i., install 8 ceiling mount strobes, install 15 ceiling mount speakers-strobes, install 9 smoke detector with base, install 9 duct detector, install 18 control relay, connect new horn strobes to extg booster panels. ref app# 201412244499. | $25,000 |
| Feb 12, 2016 | Never finaled issued Feb 2016, no final | 185 Post St | Alain Hirsch Construction Corp | revision to app#201405125489 & 201511233333. additional structural drawings for interior structural stell connection to extg structure. no exterior work under this permit.Details
revision to app#201405125489 & 201511233333. additional structural drawings for interior structural stell connection to extg structure. no exterior work under this permit. | |
| Dec 11, 2015 | Never finaled issued Dec 2015, no final | 185 Post St | Alain Hirsch Construction Corp | revision to app#201412244501. mobile storage shelving installation.Details
revision to app#201412244501. mobile storage shelving installation. | |
| Nov 23, 2015 | Never finaled issued Mar 2016, no final | 185 Post St | Alain Hirsch Construction Corp | revision to approved appln #201405125489. changes to facade work in field.Details
revision to approved appln #201405125489. changes to facade work in field. | |
| Nov 20, 2015 | Never finaled issued Nov 2015, no final | 185 Post St | street space permit - renewal of permit # 201505055434Details
street space permit - renewal of permit # 201505055434 | ||
| Nov 16, 2015 | Never finaled issued Nov 2015, no final | 185 Post St | Alain Hirsch Construction Corp | revision to pa 2015-1015-9869 & 201505267094. electrical revisions onlyDetails
revision to pa 2015-1015-9869 & 201505267094. electrical revisions only | |
| Oct 19, 2015 | Completed final sign-off Dec 2015 | 170 Grant Av | Rudolph Commercial Interiors Inc, Rci | limited demolition of non structural wall, carpet, act tile, door per ab-17Details
limited demolition of non structural wall, carpet, act tile, door per ab-17 | $5,000 |
| Oct 15, 2015 | Never finaled issued Feb 2016, no final | 185 Post St | Alain Hirsch Construction Corp | revision to pa 2015 0120 6145 metal guardrail replaces w/glass, structural revision for stringer along east wall to acomodate video wallDetails
revision to pa 2015 0120 6145 metal guardrail replaces w/glass, structural revision for stringer along east wall to acomodate video wall | |
| Oct 15, 2015 | Never finaled issued Nov 2015, no final | 185 Post St | Alain Hirsch Construction Corp | revision to pa 2015 0526 7094: electrical revision added lights under the stair.Details
revision to pa 2015 0526 7094: electrical revision added lights under the stair. | |
| Aug 28, 2015 | Never finaled issued Aug 2015, no final | 185 Post St | Alain Hirsch Construction Corp | revision to app#201501075153. provide fire smoke damper in fire wall extending to deck.Details
revision to app#201501075153. provide fire smoke damper in fire wall extending to deck. | $1,000 |
| May 28, 2015 | Expired or cancelled expired Jul 2020 | 185 Post St | Red Hawk Fire & Security Ca Llc | relocate main and add 6 heads to basement, add 32 and plug 5, relocate branch line on 2/f. add 11 new, relocate 2 and relocate 1 branch line on 3/fDetails
relocate main and add 6 heads to basement, add 32 and plug 5, relocate branch line on 2/f. add 11 new, relocate 2 and relocate 1 branch line on 3/f | $28,000 |
| May 26, 2015 | Expired or cancelled expired Jul 2020 | 185 Post St | Alain Hirsch Construction Corp | 2nd flr: revision to pa 2014 1224 4499: corridor to 1 hour fire rated ceiling. no change of use or occupancyDetails
2nd flr: revision to pa 2014 1224 4499: corridor to 1 hour fire rated ceiling. no change of use or occupancy | $10,000 |
| May 8, 2015 | Never finaled filed May 2015, never issued | 185 Post St | street space permit and mta permitDetails
street space permit and mta permit | ||
| May 8, 2015 | Never finaled issued Jun 2015, no final | 185 Post St | Alain Hirsch Construction Corp | revision to app# 201412244499. change is in basement: ceiling to be open to structure in lieu of accoustical tile.Details
revision to app# 201412244499. change is in basement: ceiling to be open to structure in lieu of accoustical tile. | $1,000 |
| May 6, 2015 | Never finaled issued Jun 2015, no final | 185 Post St | Alain Hirsch Construction Corp | revision to pa 2015 0120 6145 - structural change to elevator connecting basement thru 3rd flr. no change of use or occupancy.Details
revision to pa 2015 0120 6145 - structural change to elevator connecting basement thru 3rd flr. no change of use or occupancy. | |
| May 6, 2015 | Never finaled issued Jun 2015, no final | 185 Post St | Alain Hirsch Construction Corp | revision to pa 2015 0107 5153 - mep for basement thru 3rd flr. no change of group/occp.Details
revision to pa 2015 0107 5153 - mep for basement thru 3rd flr. no change of group/occp. | $10,000 |
| May 5, 2015 | Completed final sign-off Aug 2019 | 185 Post St | Alain Hirsch Construction Corp | install of 20' barricade along ground floor perimeter during storefront construction, temporary use. facade approved under pa 2014 0512 5489Details
install of 20' barricade along ground floor perimeter during storefront construction, temporary use. facade approved under pa 2014 0512 5489 | $5,000 |
| Feb 24, 2015 | Never finaled issued Feb 2015, no final | 185 Post St | street space and mtaDetails
street space and mta | ||
| Jan 23, 2015 | Never finaled issued May 2015, no final | 185 Post St | Alain Hirsch Construction Corp | to erect double faced non electric signDetails
to erect double faced non electric sign | $20,000 |
| Jan 23, 2015 | Never finaled issued May 2015, no final | 185 Post St | Alain Hirsch Construction Corp | to erect single faced electric signDetails
to erect single faced electric sign | $3,000 |
| Jan 23, 2015 | Never finaled issued May 2015, no final | 185 Post St | Alain Hirsch Construction Corp | to erect single faced non electric signDetails
to erect single faced non electric sign | $5,000 |
| Jan 20, 2015 | Never finaled issued Feb 2015, no final | 185 Post St | Alain Hirsch Construction Corp | new elevator connecting basement through 3/f; provide new stair connecting ground to second floorDetails
new elevator connecting basement through 3/f; provide new stair connecting ground to second floor | $75,000 |
| Jan 7, 2015 | Expired or cancelled expired Jul 2020 | 185 Post St | Alain Hirsch Construction Corp | (work for basemt-3rd floors).mep work only for approved t-1 p/a#201412244499. work is in basement & floors 1-3 for retail dior store. no exterior work. fire protection under separate permit.Details
(work for basemt-3rd floors).mep work only for approved t-1 p/a#201412244499. work is in basement & floors 1-3 for retail dior store. no exterior work. fire protection under separate permit. | $100,000 |
| Dec 24, 2014 | Expired or cancelled expired Jul 2020 | 185 Post St | Alain Hirsch Construction Corp | flrs: 1-3/t.i. for retail store on ground floor & 2nd & 3rd floors, work includes (n) partitions, fixtures, finishes millwork, mep & fire protection under separate permits.Details
flrs: 1-3/t.i. for retail store on ground floor & 2nd & 3rd floors, work includes (n) partitions, fixtures, finishes millwork, mep & fire protection under separate permits. | $900,000 |
| Dec 24, 2014 | Expired or cancelled expired Jul 2020 | 185 Post St | Alain Hirsch Construction Corp | basement - t.i. for retail store storage area, add sink, elevator under separate permit. no exterior work. mep & fire protection under separate permit. (ref pa #201412244499 under review)Details
basement - t.i. for retail store storage area, add sink, elevator under separate permit. no exterior work. mep & fire protection under separate permit. (ref pa #201412244499 under review) | $50,000 |
| Jul 2, 2014 | Never finaled issued Jan 2015, no final | 185 Post St | Alain Hirsch Construction Corp | complete interior non structural demo of ground to 3rd flrs, per ab 017, tenant space to remain unoccupied until all accessible features are returned to full complianceDetails
complete interior non structural demo of ground to 3rd flrs, per ab 017, tenant space to remain unoccupied until all accessible features are returned to full compliance | $12,000 |
| May 12, 2014 | Expired or cancelled expired Jul 2020 | 185 Post St | Alain Hirsch Construction Corp | exterior ground floor facade renovation for retail store interior t.i. under separate permitDetails
exterior ground floor facade renovation for retail store interior t.i. under separate permit | $500,000 |
| Aug 11, 2010 | Expired or cancelled cancelled Jan 2026 | 170 Grant Av | interior remodel on 2nd and 3rd floors. new flooring, paint. demo 20' partition wall on 3rd fl. mech,ductwork, elec, disconnect and reconnect existing light fixturesDetails
interior remodel on 2nd and 3rd floors. new flooring, paint. demo 20' partition wall on 3rd fl. mech,ductwork, elec, disconnect and reconnect existing light fixtures | $25,000 | |
| Oct 2, 2009 | Never finaled issued Oct 2009, no final | 185 Post St | Intrepid Electronic Systems Inc | to obtain final inspection for work approved under pa # 200801071981. allwork has been completed. (2nd, 3rd, 4th, & 5th floor)Details
to obtain final inspection for work approved under pa # 200801071981. allwork has been completed. (2nd, 3rd, 4th, & 5th floor) | |
| Apr 29, 2009 | Completed final sign-off May 2009 | 185 Post St | Shawmut Woodworking & Supply Inc | renew pa# 2007/08/10/9462 to obtain final inspection. all work has been completed.Details
renew pa# 2007/08/10/9462 to obtain final inspection. all work has been completed. | |
| Apr 29, 2009 | Completed final sign-off May 2009 | 185 Post St | Shawmut Woodworking & Supply Inc | renew pa# 2008/04/25/0664 to obtain final inspection. all work has been completed.Details
renew pa# 2008/04/25/0664 to obtain final inspection. all work has been completed. | |
| Feb 18, 2009 | Completed final sign-off Mar 2009 | 170 Grant Av | Intrepid Electronic Systems Inc | 5th fl - fire alarm system modifications for 5th floor t.i. including 3 strobes, 3 addressable relays for heat pump shut dowm.Details
5th fl - fire alarm system modifications for 5th floor t.i. including 3 strobes, 3 addressable relays for heat pump shut dowm. | $2,500 |
| Jan 30, 2009 | Expired or cancelled cancelled Jan 2026 | 185 Post St | to paint non structural signDetails
to paint non structural sign | $1,000 | |
| Jan 23, 2009 | Completed final sign-off Mar 2009 | 170 Grant Av | mechanical work only for 5th floor.Details
mechanical work only for 5th floor. | $42,000 | |
| Jan 14, 2009 | Completed final sign-off Mar 2009 | 170 Grant Av | lighting & title 24 & power.Details
lighting & title 24 & power. | $20,000 | |
| Jan 14, 2009 | Completed final sign-off Mar 2009 | 170 Grant Av | Anderson, Rowe & Buckley, Inc. | 5th/fl. tenant improvement to the extg fire sprinkler system. 30 new pendents.Details
5th/fl. tenant improvement to the extg fire sprinkler system. 30 new pendents. | $6,000 |
| Jan 12, 2009 | Completed final sign-off Mar 2009 | 170 Grant Av | t.i. at 5th fl, non-structural partion walls, for offices, conference rm and pantry, cabinets, counters, shelves. mechanical, electrical, plumb are under separate permit, building is fully sprinklered.Details
t.i. at 5th fl, non-structural partion walls, for offices, conference rm and pantry, cabinets, counters, shelves. mechanical, electrical, plumb are under separate permit, building is fully sprinklered. | $325,096 | |
| Jan 9, 2009 | Expired or cancelled cancelled Jan 2026 | 170 Grant Av | Anderson, Rowe & Buckley, Inc. | 4th floor-adding new heat pumps, apn# 2008-0709-6329Details
4th floor-adding new heat pumps, apn# 2008-0709-6329 | $75,000 |
| Dec 30, 2008 | Never finaled issued Jan 2009, no final | 185 Post St | C/S Electors Inc | new sign projecting, double sided, 25'x3' on post st. & grant ave.Details
new sign projecting, double sided, 25'x3' on post st. & grant ave. | $10,000 |
| Dec 12, 2008 | Never finaled issued Dec 2008, no final | 170 Grant Av | Northwest Security Inc. | install fire alarm power supply and 19 horn/strobes. connect to (e) fire alarm panel. (notify panel located in basement.Details
install fire alarm power supply and 19 horn/strobes. connect to (e) fire alarm panel. (notify panel located in basement. | $2,977 |
| Nov 10, 2008 | Never finaled issued Nov 2008, no final | 170 Grant Av | Allied Fire Protection | add 44 sprinkler heads on level 2, add 42 sprinkler heads on level 3Details
add 44 sprinkler heads on level 2, add 42 sprinkler heads on level 3 | $27,280 |
| Oct 28, 2008 | Never finaled issued Nov 2008, no final | 185 Post St | erect a electric single faced (e) canopy/new signDetails
erect a electric single faced (e) canopy/new sign | $4,000 | |
| Oct 24, 2008 | Completed final sign-off Nov 2008 | 170 Grant Av | Intrepid Electronic Systems Inc | 4th floor fire alarm system modification tenant improvement include addition of 3 horn/strobes, 4 smoke detectors & 4 relays to shut down heat pumps.Details
4th floor fire alarm system modification tenant improvement include addition of 3 horn/strobes, 4 smoke detectors & 4 relays to shut down heat pumps. | $2,500 |
| Oct 9, 2008 | Completed final sign-off Nov 2008 | 170 Grant Av | 4th floor - mep- title 24. reference applciation 200807096329.Details
4th floor - mep- title 24. reference applciation 200807096329. | $70,000 | |
| Oct 2, 2008 | Completed final sign-off Nov 2008 | 170 Grant Av | Pribuss Engineering Inc | t.i. at 4th fl: firesprinkler, 25 sprinkler heads.Details
t.i. at 4th fl: firesprinkler, 25 sprinkler heads. | $6,250 |
| Sep 17, 2008 | Never finaled issued Sep 2008, no final | 185 Post St | street space permit only.Details
street space permit only. | ||
| Aug 6, 2008 | Completed final sign-off Apr 2009 | 170 Grant Av | J M J Building Company Inc. | interior remodel to include partition walls, ceiling, flooring. mech, elect, plumbing on 2nd & 3rd floor. fire spinkler and fire alarm under seperate permit.Details
interior remodel to include partition walls, ceiling, flooring. mech, elect, plumbing on 2nd & 3rd floor. fire spinkler and fire alarm under seperate permit. | $248,000 |
| Jul 16, 2008 | Completed final sign-off Sep 2008 | 170 Grant Av | Decker Electric Co Inc Electrical Contra | as built, remove strobe shown on fire alarm drawn approved by sffd per pa #200805142100.Details
as built, remove strobe shown on fire alarm drawn approved by sffd per pa #200805142100. | $2,500 |
| Jul 9, 2008 | Completed final sign-off Nov 2008 | 170 Grant Av | 4th floor-install partition walls, suspended ceilings and flooring. sprinklers, mechanical & electrical under seperate permit.Details
4th floor-install partition walls, suspended ceilings and flooring. sprinklers, mechanical & electrical under seperate permit. | $250,000 | |
| Jun 16, 2008 | Never finaled issued Jun 2008, no final | 170 Grant Av | Novo Construction Inc | mechanical & plumbing work on 5th floor to include new heat pumps. ref. to application 200805202448.Details
mechanical & plumbing work on 5th floor to include new heat pumps. ref. to application 200805202448. | $45,000 |
| May 20, 2008 | Never finaled issued Jun 2008, no final | 170 Grant Av | 5th floor: tenant improvement -new prtitions and doors, new temp glass walls. millwork, new ceiling,,electrical. mechanical under a separate permit. valuation reduced because mechanical was removed fromscope of work.Details
5th floor: tenant improvement -new prtitions and doors, new temp glass walls. millwork, new ceiling,,electrical. mechanical under a separate permit. valuation reduced because mechanical was removed fromscope of work. | $325,096 | |
| May 14, 2008 | Completed final sign-off Sep 2008 | 170 Grant Av | Intrepid Electronic Systems Inc | 6th floor - fire alarm modification at 6th fl tenant improvement, adding 3 horn/strobes and 4 strobes.Details
6th floor - fire alarm modification at 6th fl tenant improvement, adding 3 horn/strobes and 4 strobes. | $2,500 |
| Apr 25, 2008 | Expired or cancelled expired May 2009 | 185 Post St | Intrepid Electronic Systems Inc | fire alarm ti for 1st floor. add 1 smoke detectors, 2 relays, 5 horn/strobes and 4 strobesDetails
fire alarm ti for 1st floor. add 1 smoke detectors, 2 relays, 5 horn/strobes and 4 strobes | $2,500 |
| Apr 18, 2008 | Completed final sign-off Sep 2008 | 170 Grant Av | revision to pa 200804038701 for mechanical only.Details
revision to pa 200804038701 for mechanical only. | $50,000 | |
| Apr 17, 2008 | Completed final sign-off Sep 2008 | 170 Grant Av | Pribuss Engineering Inc | 6th floor-fire sprinkler t.i.-change ssu to ssp-33 totalDetails
6th floor-fire sprinkler t.i.-change ssu to ssp-33 total | $6,600 |
| Apr 7, 2008 | Completed final sign-off Apr 2009 | 185 Post St | Thomas Swan Sign Co Inc | erect a electric wall direct new signDetails
erect a electric wall direct new sign | |
| Apr 3, 2008 | Completed final sign-off Sep 2008 | 170 Grant Av | 6th floor-tenant improvement, new non-structural partitions and doors. mechanical, electrical, life safety shall be on seperate permitDetails
6th floor-tenant improvement, new non-structural partitions and doors. mechanical, electrical, life safety shall be on seperate permit | $300,000 | |
| Mar 13, 2008 | Completed final sign-off Apr 2009 | 185 Post St | Ayoob & Peery Plumbing Co Inc | ti for sprinkler system on the ground floor. relocate 27 sprinkler headsDetails
ti for sprinkler system on the ground floor. relocate 27 sprinkler heads | $5,500 |
| Feb 13, 2008 | Never finaled issued Feb 2008, no final | 185 Post St | street spaceDetails
street space | ||
| Jan 7, 2008 | Expired or cancelled expired Jun 2009 | 185 Post St | Intrepid Electronic Systems Inc | 2nd, 3rd, 4th & 5th floors - add strobes to new restrooms on 2nd, 3rd, 4th & 5th floors, connect to existing fire alarm system. 8 strobes & 1 strobe power supply.Details
2nd, 3rd, 4th & 5th floors - add strobes to new restrooms on 2nd, 3rd, 4th & 5th floors, connect to existing fire alarm system. 8 strobes & 1 strobe power supply. | $3,500 |
| Dec 11, 2007 | Completed final sign-off Apr 2009 | 185 Post St | int. ground floor renovation of retail space, including stock & office rooms. work includes (n) partitions, fixtures, finishes. mech., electrical, plumbing, no exterior work under this permit. fire protection under seperate permitDetails
int. ground floor renovation of retail space, including stock & office rooms. work includes (n) partitions, fixtures, finishes. mech., electrical, plumbing, no exterior work under this permit. fire protection under seperate permit | $1,000,000 | |
| Dec 10, 2007 | Completed final sign-off Apr 2009 | 185 Post St | exterior facade alteration for jewelry store at ground floor. signage under separate permit. u factor for exterior glazing to be .77 min.Details
exterior facade alteration for jewelry store at ground floor. signage under separate permit. u factor for exterior glazing to be .77 min. | $680,000 | |
| Nov 28, 2007 | Completed final sign-off Apr 2008 | 185 Post St | Novo Construction Inc | alternate 6th floor plan to exclude bathroom construction. revision to permit 2007 0904 1683.Details
alternate 6th floor plan to exclude bathroom construction. revision to permit 2007 0904 1683. | |
| Nov 13, 2007 | Expired or cancelled expired Jun 2009 | 185 Post St | Ayoob & Peery Plumbing Co Inc | 2nd thru 5th floor: relocate 1 sprinkler & add 1 head per tenant improvment. total 8 spri nklers.Details
2nd thru 5th floor: relocate 1 sprinkler & add 1 head per tenant improvment. total 8 spri nklers. | $7,628 |
| Oct 5, 2007 | Never finaled issued Oct 2007, no final | 185 Post St | street space permitDetails
street space permit | ||
| Sep 6, 2007 | Never finaled issued Sep 2007, no final | 185 Post St | street spaceDetails
street space | ||
| Sep 4, 2007 | Completed final sign-off Apr 2008 | 185 Post St | Novo Construction Inc | new accessible restrooms on floors 2,3,4,5,& 6./ mech. & lighting.Details
new accessible restrooms on floors 2,3,4,5,& 6./ mech. & lighting. | $70,000 |
| Aug 17, 2007 | Never finaled issued Aug 2007, no final | 185 Post St | street space permitDetails
street space permit | ||
| Aug 10, 2007 | Expired or cancelled expired May 2009 | 185 Post St | ground floor retail partial tenant improvement of areas approved by cp-zoc for rooms 111,112,113,114,103,104. no fire protection, signage, lighting, mech under this permit.Details
ground floor retail partial tenant improvement of areas approved by cp-zoc for rooms 111,112,113,114,103,104. no fire protection, signage, lighting, mech under this permit. | $100,000 | |
| Jun 25, 2007 | Completed final sign-off Mar 2008 | 185 Post St | revision to approved fire alarm permit #200607055704 scope of revised work includes 15 new duct smoke detectors anad main supply 2 new trobes and 1 horn/strobe in add corridors in basemtn & 3 manual pull stations at ground level.Details
revision to approved fire alarm permit #200607055704 scope of revised work includes 15 new duct smoke detectors anad main supply 2 new trobes and 1 horn/strobe in add corridors in basemtn & 3 manual pull stations at ground level. | $20,000 | |
| Jun 21, 2007 | Completed final sign-off May 2008 | 185 Post St | rev. to approved pa#2006/03/22/7278 scope of work under this applic. includes rev. to the main electrical room in basement and changes to the elevator shaft wall. this application represents the "as built" condition of shaft wall. changes shown as delta 12 on drawings.Details
rev. to approved pa#2006/03/22/7278 scope of work under this applic. includes rev. to the main electrical room in basement and changes to the elevator shaft wall. this application represents the "as built" condition of shaft wall. changes shown as delta 12 on drawings. | ||
| May 16, 2007 | Never finaled issued May 2007, no final | 185 Post St | street space permit.Details
street space permit. | ||
| Feb 16, 2007 | Completed final sign-off May 2008 | 185 Post St | install new 2-hour walls adjacent to elevator shaft to create (n) mechanical shaft penetrating all floors. install new 1-hour walls at basement and at g/f to create (n) elevator lobby or exit corridor. no exterior work.Details
install new 2-hour walls adjacent to elevator shaft to create (n) mechanical shaft penetrating all floors. install new 1-hour walls at basement and at g/f to create (n) elevator lobby or exit corridor. no exterior work. | $45,000 | |
| Nov 14, 2006 | Completed final sign-off May 2008 | 185 Post St | work to construct new elevator lobbies at bsmnt and ground floors including new sheetrock, finishes, lighting and ducting.work also includes new cooling tower and fan. work also includes new bae bldg hvac stub outs on floors 2 thru six.seismic upgrades approved under app #200511027232/200603227278Details
work to construct new elevator lobbies at bsmnt and ground floors including new sheetrock, finishes, lighting and ducting.work also includes new cooling tower and fan. work also includes new bae bldg hvac stub outs on floors 2 thru six.seismic upgrades approved under app #200511027232/200603227278 | $905,000 | |
| Jul 5, 2006 | Completed final sign-off May 2008 | 185 Post St | new fire alarm system for 6 story bldg and basement under current ti & seismic upgrade on pa# 2006/03/22/7278 & pa# 2006/02/07/3955. fire alarm plan only under this permit.Details
new fire alarm system for 6 story bldg and basement under current ti & seismic upgrade on pa# 2006/03/22/7278 & pa# 2006/02/07/3955. fire alarm plan only under this permit. | $60,000 | |
| Jun 16, 2006 | Completed final sign-off May 2008 | 185 Post St | revision to pa# 200511027232. construct an electrical vault per pg & e specifications in the basement of 185 post street. vault to extend beneath sidewalk of post & grant streets. work w/in public r.o.u (encroachment & street improvement) to be separate permits.Details
revision to pa# 200511027232. construct an electrical vault per pg & e specifications in the basement of 185 post street. vault to extend beneath sidewalk of post & grant streets. work w/in public r.o.u (encroachment & street improvement) to be separate permits. | $40,000 | |
| Mar 22, 2006 | Completed final sign-off May 2008 | 185 Post St | original seismic upgrade permit issued under pa# 2005/11/02/7232. this application includes revisions to approved seismic drawings plus base building m.e.p. and fire protection installation. no tenant improvement under this application, only base bldg work.Details
original seismic upgrade permit issued under pa# 2005/11/02/7232. this application includes revisions to approved seismic drawings plus base building m.e.p. and fire protection installation. no tenant improvement under this application, only base bldg work. | $140,000 | |
| Feb 7, 2006 | Completed final sign-off May 2008 | 185 Post St | Plant Construction Co, Lp | remove of extg facades on post and grant re-clad facades with glass curtain walls both post and granit.Details
remove of extg facades on post and grant re-clad facades with glass curtain walls both post and granit. | $300,000 |
| Nov 2, 2005 | Completed final sign-off May 2008 | 185 Post St | Plant Construction Company Lp | seismic retrofit (umb upgrade) new restrooms. general procedures facade under separate permit per drawing. new standpipe under separate permit.Details
seismic retrofit (umb upgrade) new restrooms. general procedures facade under separate permit per drawing. new standpipe under separate permit. | $1,500,000 |
| Oct 13, 2005 | Never finaled issued Oct 2005, no final | 185 Post St | Plant Construction Company Lp | construct temporary barricade @ grant street & post st. to allow renovations (to be permitted seperately)Details
construct temporary barricade @ grant street & post st. to allow renovations (to be permitted seperately) | $15,000 |
| Aug 31, 2005 | Completed final sign-off Mar 2008 | 185 Post St | Plant Construction Company Lp | remove three facade panels @ (e) fireescape to determine repair needed from water intrusion.Details
remove three facade panels @ (e) fireescape to determine repair needed from water intrusion. | $1,500 |
| May 30, 2001 | Expired or cancelled cancelled Sep 2007 | 185 Post St | demolish a six story office/retail bldgDetails
demolish a six story office/retail bldg | ||
| May 30, 2001 | Expired or cancelled cancelled Mar 2004 | 185 Post St | erect 2 story 1 unit and retail office buildingDetails
erect 2 story 1 unit and retail office building | $14,000,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.