Soundproofing Remodelers
- Based in
- San Francisco
- On San Francisco permits
- Dec 2008 to Jun 2026
- Last 24 months
- 4 permits filed
16 permits since 2000: 13 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2026 | Completed final sign-off Aug 2026 | 41 Douglass St | front building: install new sound proofing at the ceiling floor between ground floor and 2nd floor (except at entry stairway. no structural work req) related structural framing completed per bpa 201604255607Details
front building: install new sound proofing at the ceiling floor between ground floor and 2nd floor (except at entry stairway. no structural work req) related structural framing completed per bpa 201604255607 | $25,000 |
| Feb 27, 2026 | Completed final sign-off Jul 2026 | 2001 Van Ness Av | ref 202512292884 to include mep work. to include replace water fountain and fixtures and finishes.Details
ref 202512292884 to include mep work. to include replace water fountain and fixtures and finishes. | $30,000 |
| Dec 29, 2025 | Completed final sign-off Jul 2026 | 2001 Van Ness Av | suite 100: interior non structural, wall, floor and exposed ceiling finishes. mep & fire deferredDetails
suite 100: interior non structural, wall, floor and exposed ceiling finishes. mep & fire deferred | $75,000 |
| Nov 18, 2025 | Completed final sign-off May 2026 | 2655 Steiner St | same size and same location: broken single glass upgrading in kind. 8 existing street facing aluminum thermally broken tile turn windows on the 1st floor of a non-historic residence with new stc 49 sound proofing tile turn windows within existing wood casing & upgrade existing.Details
same size and same location: broken single glass upgrading in kind. 8 existing street facing aluminum thermally broken tile turn windows on the 1st floor of a non-historic residence with new stc 49 sound proofing tile turn windows within existing wood casing & upgrade existing. | $4,000 |
| Dec 28, 2022 | Completed final sign-off Mar 2023 | 80 Ora Wy | bldg g unit #102 only. add sound insulation.Details
bldg g unit #102 only. add sound insulation. | $60,000 |
| May 23, 2022 | Completed final sign-off Jul 2022 | 327 Cornwall St | add sound insulation at ceiling. unit of 327 cornwall st only.Details
add sound insulation at ceiling. unit of 327 cornwall st only. | $100,000 |
| Aug 8, 2020 | Completed final sign-off Mar 2021 | 996 Burnett Av | replace all (e) alum frame windows w/ special airport noise reduction vinyl windows w/ sound proof rating of stc 47. 1 at grnd flr, 4 at 2nd flr units due to noise from busy traffic intersection on portola st. all new vinyl same size, color. no street visible windows.Details
replace all (e) alum frame windows w/ special airport noise reduction vinyl windows w/ sound proof rating of stc 47. 1 at grnd flr, 4 at 2nd flr units due to noise from busy traffic intersection on portola st. all new vinyl same size, color. no street visible windows. | $10,000 |
| Sep 4, 2019 | Completed final sign-off Nov 2019 | 2733 Folsom St | add sound insulation at ceiling of 2nd fl at master bedroom only.Details
add sound insulation at ceiling of 2nd fl at master bedroom only. | $10,000 |
| Mar 29, 2017 | Completed final sign-off May 2017 | 339 Filbert St | add sound proofing insulation at ceiling of 339 filbert street at foyer, kitchen, dining ,and master bedroomDetails
add sound proofing insulation at ceiling of 339 filbert street at foyer, kitchen, dining ,and master bedroom | $40,000 |
| Aug 25, 2014 | Never finaled issued Aug 2014, no final | 776 Tehama St | unit #17, 4th floor - add sound insulation @ bedroom #2 along southern property line & portion of wall adjacent to bathroom.Details
unit #17, 4th floor - add sound insulation @ bedroom #2 along southern property line & portion of wall adjacent to bathroom. | $7,000 |
| Jul 28, 2014 | Completed final sign-off Nov 2014 | 1040 Pine St | replace 4 windows in unit b, like for like sizes with 4 noise control windows. windows are at the back of the house. comply with egress windows.Details
replace 4 windows in unit b, like for like sizes with 4 noise control windows. windows are at the back of the house. comply with egress windows. | $6,000 |
| Nov 29, 2012 | Completed final sign-off Feb 2013 | 54 Palm Av | add sound proof insulation at ceiling of 2nd float living, foyer, dining, kitchen, hallway, laundry and master bedroom.Details
add sound proof insulation at ceiling of 2nd float living, foyer, dining, kitchen, hallway, laundry and master bedroom. | $37,000 |
| Nov 29, 2012 | Completed final sign-off Feb 2013 | 66 05th Av | add sound proofing insulation at ceiling of 2nd floor at living, entry hall, hallway, kitchen and master bedroom.Details
add sound proofing insulation at ceiling of 2nd floor at living, entry hall, hallway, kitchen and master bedroom. | $30,000 |
| Mar 22, 2010 | Expired or cancelled expired Nov 2011 | 770 Bay St | replace extg vinyl windowsat uit 770 bay street. total 6 windows at bay window(visible from street. replace in kind. u factor 0.40 max.Details
replace extg vinyl windowsat uit 770 bay street. total 6 windows at bay window(visible from street. replace in kind. u factor 0.40 max. | $2,000 |
| Dec 16, 2008 | Never finaled issued Dec 2008, no final | 16 Ord Ct | reinforce existing ceiling beam with new psl.Details
reinforce existing ceiling beam with new psl. | $3,000 |
| Dec 16, 2008 | Completed final sign-off Jan 2009 | 16 Ord Ct | add sound insulation @ ceiling of bedroom c unit #1.Details
add sound insulation @ ceiling of bedroom c unit #1. | $10,000 |