William Liang
- License
- 63224
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- Firm
- Dpw -Boe
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Aug 2019
3 permits since 2000 (engineer on 2 permits, architect on 1 permit): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Skyline Construction
- Architects
- Gary Hoy
- Engineers
- Amit Wadhwa, John Laws
- Authorized agents
- Will Kwan
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 5, 2019 | Completed final sign-off Mar 2021 | 1 Bush St | Skyline Construction | phase 2- 5th floor: demo of non-bearing interior partitions, plumbing, mech, equipment/ducts and electrical work. new non-bearing interior partitions, doors, glass partitions, finishes, electrical, plumbing and mechanical work.Details
phase 2- 5th floor: demo of non-bearing interior partitions, plumbing, mech, equipment/ducts and electrical work. new non-bearing interior partitions, doors, glass partitions, finishes, electrical, plumbing and mechanical work. | $552,500 |
| Mar 12, 2008 | Never finaled issued Mar 2008, no final | 1801 24th Av | interior renovation of ground floor from retail space to beauty salon. upgrade ex. restroom to comply with ada. addition of facial room. upgrade lighting, electrical wiring, switches and outletsDetails
interior renovation of ground floor from retail space to beauty salon. upgrade ex. restroom to comply with ada. addition of facial room. upgrade lighting, electrical wiring, switches and outlets | $15,000 | |
| May 8, 2007 | Completed final sign-off Feb 2010 | 1900 Geary Bl | seismic, access upgrades & renovation. renovate the (e) pool building & gymnasium . the (e) recreation center bldg. & pool locker rooms will be removed & replaced with a new one story bldg. site improvements include a new playground, play structures and new accessible ramps and entrances.Details
seismic, access upgrades & renovation. renovate the (e) pool building & gymnasium . the (e) recreation center bldg. & pool locker rooms will be removed & replaced with a new one story bldg. site improvements include a new playground, play structures and new accessible ramps and entrances. |