Xiang Liu
- Listed as
- engineer
- Firm
- Comfort Dynamics
- On San Francisco permits
- Feb 2018 to Sep 2026
6 permits since 2000 (engineer on 6 permits): 4 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 201 Mission St | Richlen Construction | mech: replace duct work, transfer fan relocation, supply air diffusers, rework flexible inlet duct connectors, install new balancing dampers where required. check all hvac equip. elec: new lighting fixtures and associated circuiting /controls, new power and signal devices and associated wiring. refDetails
mech: replace duct work, transfer fan relocation, supply air diffusers, rework flexible inlet duct connectors, install new balancing dampers where required. check all hvac equip. elec: new lighting fixtures and associated circuiting /controls, new power and signal devices and associated wiring. ref | $337,875 |
| Jun 25, 2026 | In progress issued Jul 2026 | 221 Main St | Richlen Construction | suite 400: reconfigure existing ductwork, ceiling diffusers, and grilles. provided vav boxes and suspended transfer air fan.Details
suite 400: reconfigure existing ductwork, ceiling diffusers, and grilles. provided vav boxes and suspended transfer air fan. | $75,000 |
| Jun 4, 2026 | Completed final sign-off Sep 2026 | 201 Mission St | Richlen Construction | 21 fl - ste: 2150 - hvac relocate (e) difusers, air grills, modify heat pump add thermostats. mech deferred for 202605201639Details
21 fl - ste: 2150 - hvac relocate (e) difusers, air grills, modify heat pump add thermostats. mech deferred for 202605201639 | $60,000 |
| Jan 22, 2026 | Completed final sign-off Jul 2026 | 201 Mission St | Richlen Construction | 23rd flr. mep permit for approved architectual scope. new fsd and supply diffusers. new lighting and power. ref pa#: 202510308608.Details
23rd flr. mep permit for approved architectual scope. new fsd and supply diffusers. new lighting and power. ref pa#: 202510308608. | $249,348 |
| Apr 14, 2021 | Completed final sign-off Jun 2022 | 632 Commercial St | ref to pa# 201912200174 & pa# 20191220175; mechanical & commercial lighting permit only, basement level 1 ,level 2 commercial lighting and mechanical only, level 5 mechanical onlyDetails
ref to pa# 201912200174 & pa# 20191220175; mechanical & commercial lighting permit only, basement level 1 ,level 2 commercial lighting and mechanical only, level 5 mechanical only | $50,000 | |
| Feb 15, 2018 | Completed final sign-off Mar 2019 | 201 Mission St | Novo Construction Inc | 2/f: mechanical and electrical work for ti. ref pa 2018-0117-8781Details
2/f: mechanical and electrical work for ti. ref pa 2018-0117-8781 | $150,000 |