Permit GraphShortlistSan Francisco building permits since 2000

Block 5230, lot 018

450 Toland St

City’s use
Industrial
Built
1969
Units
2
Building
43,240 sq ft
Lot
55,328 sq ft
Zoning
M1
Construction type
C

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

10 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 11, 2018Completed
final sign-off Aug 2018
450 Toland StCharles Pankow Builders Ltdrev to pa# 201606281072: revised parking area per dpw accessibility, parking stall designations and tally affecting accesible parking requirements. the content of this revision does not add to the scope of the project. (parking lot striping) n/a maher
Details
Permit
201805118905
Status
complete
Filed
May 11, 2018
Permit issued
May 17, 2018
Final sign-off
Aug 24, 2018
Address
450 Toland St

rev to pa# 201606281072: revised parking area per dpw accessibility, parking stall designations and tally affecting accesible parking requirements. the content of this revision does not add to the scope of the project. (parking lot striping) n/a maher

Open the permit page

Apr 27, 2018Never finaled
issued Apr 2018, no final
450 Toland Ststreet space permit - renewal of permit # m841107
Details
Permit
M919347
Status
issued
Filed
Apr 27, 2018
Permit issued
Apr 27, 2018
Address
450 Toland St

street space permit - renewal of permit # m841107

Open the permit page

Mar 5, 2018Completed
final sign-off Jun 2018
450 Toland StPriority Architectural Graphics Dba Prio11 evacuation plan maps floor 1
Details
Permit
201803052776
Status
complete
Filed
Mar 5, 2018
Permit issued
Mar 5, 2018
Final sign-off
Jun 14, 2018
Declared cost
$4,400
Address
450 Toland St

11 evacuation plan maps floor 1

Open the permit page

$4,400
Oct 10, 2017Never finaled
issued Oct 2017, no final
450 Toland Ststreet space
Details
Permit
M841107
Status
issued
Filed
Oct 10, 2017
Permit issued
Oct 10, 2017
Address
450 Toland St

street space

Open the permit page

Sep 26, 2017Completed
final sign-off Aug 2018
450 Toland StCharles Pankow Builders Ltdrevision to pa#201606281072-s2, remove existing plywood sheathing (3/8") and replace with new 1/2" plywood as required for roofing warranty. clarification & proposed bldg us as 41 (auto repair). n/a ordinance #155-13
Details
Permit
201709269581
Status
complete
Filed
Sep 26, 2017
Permit issued
Oct 18, 2017
Final sign-off
Aug 14, 2018
Declared cost
$150,000
Address
450 Toland St

revision to pa#201606281072-s2, remove existing plywood sheathing (3/8") and replace with new 1/2" plywood as required for roofing warranty. clarification & proposed bldg us as 41 (auto repair). n/a ordinance #155-13

Open the permit page

$150,000
Aug 17, 2017Expired or cancelled
cancelled Sep 2018
450 Toland StPyro-Comm Systems, Inc.provision of a sprinkler monitoring system. provide 91) facp; (1) dact; (1) smoke detector; (1) pull station (3) modules; (1) horn/strobe. ref pa #201606281072. maher na
Details
Permit
201708175071
Status
cancelled
Filed
Aug 17, 2017
Permit issued
Aug 17, 2017
Declared cost
$5,000
Address
450 Toland St

provision of a sprinkler monitoring system. provide 91) facp; (1) dact; (1) smoke detector; (1) pull station (3) modules; (1) horn/strobe. ref pa #201606281072. maher na

Open the permit page

$5,000
Apr 24, 2017Never finaled
issued Apr 2017, no final
450 Toland Ststreet space.
Details
Permit
M780356
Status
issued
Filed
Apr 24, 2017
Permit issued
Apr 24, 2017
Address
450 Toland St

street space.

Open the permit page

Jun 28, 2016Completed
final sign-off Aug 2018
450 Toland StPyro-Comm Systems, Inc., H & M Fire Protection, Inc.change of use from factory/story to motor vehicle repair garage. site permit for alteration to (e) bldg primarily interiors including site work & alterations to principal bldg facade facilty for light duty auto repair, paint shop w/ accessory spaces. life safety deferred.
Details
Permit
201606281072
Status
complete
Filed
Jun 28, 2016
Permit issued
Dec 13, 2016
Final sign-off
Aug 24, 2018
Declared cost
$9,200,000
Address
450 Toland St

change of use from factory/story to motor vehicle repair garage. site permit for alteration to (e) bldg primarily interiors including site work & alterations to principal bldg facade facilty for light duty auto repair, paint shop w/ accessory spaces. life safety deferred.

Open the permit page

$9,200,000
Mar 30, 2016Never finaled
issued Apr 2016, no final
450 Toland StKimberlite Corporationinstalltion of sprinkler monitoring system maher not req
Details
Permit
201603303484
Status
issued
Filed
Mar 30, 2016
Permit issued
Apr 6, 2016
Declared cost
$10,000
Address
450 Toland St

installtion of sprinkler monitoring system maher not req

Open the permit page

$10,000
May 18, 2006Completed
final sign-off Jun 2006
450 Toland StDinyari Construction Inc.reroofing
Details
Permit
200605181944
Status
complete
Filed
May 18, 2006
Permit issued
May 18, 2006
Final sign-off
Jun 15, 2006
Declared cost
$70,000
Address
450 Toland St

reroofing

Open the permit page

$70,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Charles Pankow Builders Ltd (2), Pyro-Comm Systems, Inc. (2), Dinyari Construction Inc., H & M Fire Protection, Inc., Kimberlite Corporation, Priority Architectural Graphics Dba Prio
Engineers
Edward Rivera
Designers
David Plotkin

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.