Permit GraphShortlistSan Francisco building permits since 2000

Glenn Alan Friedman

License
M22870
Mechanical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up M22870 at the Board for Professional Engineers
Listed as
engineer
Firm
Taylor Engineers
Based in
Alameda
On San Francisco permits
Jun 2024 to Nov 2026

9 permits since 2000 (engineer on 9 permits): 5 completed, 4 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Matrix Hg Inc (7), Bcci Construction Company, Source Planning And Construction Inc
Architects
Breck Polley (5), Lawrence Smith, Marc Pfenninger
Engineers
Edward Rivera (2), Edward Rivera (2), Joshua Mcmahan, Shawn Vessels

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 9, 2026In progress
filed Nov 2026, not yet issued
300 Clay StMatrix Hg Incalteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb to
Details
Permit
202609027552

alteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb to

Open the permit page

$875,345
Oct 29, 2026In progress
issued Nov 2026
1 Maritime PzBcci Construction Companyinterior non structural demolition of partitions, ceilings, light fixtures, millwork, finishes, mep. new fit out of core restroooms, new finishes, ceiling and lighting in elevator lobby. the tenant suites will remain unoccupied at the completion of this project.
Details
Permit
202610290068
Permit issued
Nov 17, 2026

interior non structural demolition of partitions, ceilings, light fixtures, millwork, finishes, mep. new fit out of core restroooms, new finishes, ceiling and lighting in elevator lobby. the tenant suites will remain unoccupied at the completion of this project.

Open the permit page

$572,440
Oct 21, 2026In progress
filed Oct 2026, not yet issued
345 Spear StSource Planning And Construction Inc1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldg
Details
Permit
202610219700

1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldg

Open the permit page

$292,338
Jun 24, 2026In progress
issued Jun 2026
150 California StMatrix Hg Increplace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse.
Details
Permit
202606243787
Permit issued
Jun 24, 2026

replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse.

Open the permit page

$198,000
Apr 8, 2026Completed
final sign-off Oct 2026
300 Clay StMatrix Hg Inc26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused.
Details
Permit
202604089072
Permit issued
Apr 21, 2026
Final sign-off
Oct 29, 2026

26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused.

Open the permit page

$90,000
Jun 16, 2025Completed
final sign-off Jan 2026
300 Clay StMatrix Hg Incadd (3) overhead electric heaters in an existing outdoor dining area for an existing restaurant.
Details
Permit
202506168732
Permit issued
Jun 16, 2025
Final sign-off
Jan 7, 2026

add (3) overhead electric heaters in an existing outdoor dining area for an existing restaurant.

Open the permit page

$36,789
Sep 24, 2024Completed
final sign-off Jul 2025
300 Clay StMatrix Hg Incground fl - replace (e) mechanical system serving the plaza level tenant space, bar sprezzatura. relocate heat pumps to permanent locations on ground fl; connect plaza level return to the heat pump units. unit not in the restaurant
Details
Permit
202409241446
Permit issued
Oct 21, 2024
Final sign-off
Jul 18, 2025

ground fl - replace (e) mechanical system serving the plaza level tenant space, bar sprezzatura. relocate heat pumps to permanent locations on ground fl; connect plaza level return to the heat pump units. unit not in the restaurant

Open the permit page

$352,749
Jul 24, 2024Completed
final sign-off Aug 2025
300 Clay StMatrix Hg Increplace (2) air handling units, vavs and coils.
Details
Permit
202407247142
Permit issued
Aug 2, 2024
Final sign-off
Aug 14, 2025

replace (2) air handling units, vavs and coils.

Open the permit page

$800,000
Jun 21, 2024Completed
final sign-off Aug 2024
300 Clay StMatrix Hg Incsuite 15 1st fl: demo mopsink faucet and fixture trim. install airgap fitting to (e) handsink. install grease intercepter and modify (e) sanitary drain and vent piping for connection. install kitchen sink and connect to (e) cw and hw piping.
Details
Permit
202406214962
Permit issued
Jun 21, 2024
Final sign-off
Aug 23, 2024

suite 15 1st fl: demo mopsink faucet and fixture trim. install airgap fitting to (e) handsink. install grease intercepter and modify (e) sanitary drain and vent piping for connection. install kitchen sink and connect to (e) cw and hw piping.

Open the permit page

$20,000