Glenn Alan Friedman
- License
- M22870
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M22870 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Taylor Engineers
- Based in
- Alameda
- On San Francisco permits
- Jun 2024 to Nov 2026
9 permits since 2000 (engineer on 9 permits): 5 completed, 4 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Matrix Hg Inc (7), Bcci Construction Company, Source Planning And Construction Inc
- Architects
- Breck Polley (5), Lawrence Smith, Marc Pfenninger
- Engineers
- Edward Rivera (2), Edward Rivera (2), Joshua Mcmahan, Shawn Vessels
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 9, 2026 | In progress filed Nov 2026, not yet issued | 300 Clay St | Matrix Hg Inc | alteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb toDetails
alteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb to | $875,345 |
| Oct 29, 2026 | In progress issued Nov 2026 | 1 Maritime Pz | Bcci Construction Company | interior non structural demolition of partitions, ceilings, light fixtures, millwork, finishes, mep. new fit out of core restroooms, new finishes, ceiling and lighting in elevator lobby. the tenant suites will remain unoccupied at the completion of this project.Details
interior non structural demolition of partitions, ceilings, light fixtures, millwork, finishes, mep. new fit out of core restroooms, new finishes, ceiling and lighting in elevator lobby. the tenant suites will remain unoccupied at the completion of this project. | $572,440 |
| Oct 21, 2026 | In progress filed Oct 2026, not yet issued | 345 Spear St | Source Planning And Construction Inc | 1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldgDetails
1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldg | $292,338 |
| Jun 24, 2026 | In progress issued Jun 2026 | 150 California St | Matrix Hg Inc | replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse.Details
replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse. | $198,000 |
| Apr 8, 2026 | Completed final sign-off Oct 2026 | 300 Clay St | Matrix Hg Inc | 26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused.Details
26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused. | $90,000 |
| Jun 16, 2025 | Completed final sign-off Jan 2026 | 300 Clay St | Matrix Hg Inc | add (3) overhead electric heaters in an existing outdoor dining area for an existing restaurant.Details
add (3) overhead electric heaters in an existing outdoor dining area for an existing restaurant. | $36,789 |
| Sep 24, 2024 | Completed final sign-off Jul 2025 | 300 Clay St | Matrix Hg Inc | ground fl - replace (e) mechanical system serving the plaza level tenant space, bar sprezzatura. relocate heat pumps to permanent locations on ground fl; connect plaza level return to the heat pump units. unit not in the restaurantDetails
ground fl - replace (e) mechanical system serving the plaza level tenant space, bar sprezzatura. relocate heat pumps to permanent locations on ground fl; connect plaza level return to the heat pump units. unit not in the restaurant | $352,749 |
| Jul 24, 2024 | Completed final sign-off Aug 2025 | 300 Clay St | Matrix Hg Inc | replace (2) air handling units, vavs and coils.Details
replace (2) air handling units, vavs and coils. | $800,000 |
| Jun 21, 2024 | Completed final sign-off Aug 2024 | 300 Clay St | Matrix Hg Inc | suite 15 1st fl: demo mopsink faucet and fixture trim. install airgap fitting to (e) handsink. install grease intercepter and modify (e) sanitary drain and vent piping for connection. install kitchen sink and connect to (e) cw and hw piping.Details
suite 15 1st fl: demo mopsink faucet and fixture trim. install airgap fitting to (e) handsink. install grease intercepter and modify (e) sanitary drain and vent piping for connection. install kitchen sink and connect to (e) cw and hw piping. | $20,000 |