Shawn P.H. Vessels
- License
- 18389
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Electric Advantage Engineering
- On San Francisco permits
- Mar 2021 to Nov 2026
5 permits since 2000 (engineer on 5 permits): 3 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Derry Casey Builders Inc, Singular Builders, Source Planning And Construction Inc, Tank - Tek Environmental Corporation
- Architects
- Rory J. Carroll (2), Brian Milford, Marc Pfenninger
- Engineers
- David Zenor Heinzerling, Glenn Friedman, Joseph Canajani
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 3, 2026 | In progress filed Nov 2026, not yet issued | 333 Ofarrell St | conversion of (e) bar inside an (e) hotel into a starbucks, scope includes (n) floor and wall finishes, food service equipment, millwork, lighting and ff&e.Details
conversion of (e) bar inside an (e) hotel into a starbucks, scope includes (n) floor and wall finishes, food service equipment, millwork, lighting and ff&e. | $5,000,000 | |
| Oct 21, 2026 | In progress filed Oct 2026, not yet issued | 345 Spear St | Source Planning And Construction Inc | 1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldgDetails
1st fl t.i. combining 2 existing suites into singular office space. new flooring, ceilings, lighting and wall partition with glass office fronts. new pantry/breakroom. set of e glass entry doors (exterior to interior) to be demo'd and infilled w fixed panel window to mas e doors on grd floor of bldg | $292,338 |
| Oct 15, 2026 | In progress issued Oct 2026 | 55 Cyril Magnin St | Singular Builders | 13-14/f: remodel of 3 (e) guestrooms (1320, 3215, 3209) including (n) finishes, plumbing fixtures, doors, and barrier removal.Details
13-14/f: remodel of 3 (e) guestrooms (1320, 3215, 3209) including (n) finishes, plumbing fixtures, doors, and barrier removal. | $150,000 |
| Oct 19, 2022 | Never finaled issued Sep 2023, no final | 300 Lake St | Tank - Tek Environmental Corporation | replacement of (e) fueling system with (n) 2000 gallon wall underground storage tank (diesel). double wall underground fuel oil supply/return piping, piping transition sump, 50 gallon double wall day tank, (2) gpm remote pumping skid & new veeder-root fuel mgmt control system (rewire old to new...Details
replacement of (e) fueling system with (n) 2000 gallon wall underground storage tank (diesel). double wall underground fuel oil supply/return piping, piping transition sump, 50 gallon double wall day tank, (2) gpm remote pumping skid & new veeder-root fuel mgmt control system (rewire old to new... | $40,000 |
| Mar 17, 2021 | Never finaled issued Jul 2021, no final | 450 Sutter St | Derry Casey Builders Inc | 6th fl: (n) non-bearing partitions, gypboard & suspended ceiling, casework, fixture & finishes. (n) accessible restroom. (n) procedure room & associated service rooms. (n) fire rated common corridor connecting teannt space to egress stair with (n) finishes & light fixtures. no exterior work.Details
6th fl: (n) non-bearing partitions, gypboard & suspended ceiling, casework, fixture & finishes. (n) accessible restroom. (n) procedure room & associated service rooms. (n) fire rated common corridor connecting teannt space to egress stair with (n) finishes & light fixtures. no exterior work. | $700,000 |