Permit GraphShortlistSan Francisco building permits since 2000

Block 0325, lot 031

333 Ofarrell St

City’s use
Commercial Hotel
Built
1964
Stories
43
Units
1919
Building
1,424,230 sq ft
Lot
113,438 sq ft
Zoning
C3G
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 10, 2026In progress
filed Nov 2026, not yet issued
333 Ofarrell Strenovation of meeting space on level 45 and the restaurant space on level 46, including restrooms, lighting, raised platforms, back of house kitchen spaces. scoope includes an open interior stair between levels 45 and 46.
Details
Permit
202611100602

renovation of meeting space on level 45 and the restaurant space on level 46, including restrooms, lighting, raised platforms, back of house kitchen spaces. scoope includes an open interior stair between levels 45 and 46.

Open the permit page

$3,240,000
Nov 3, 2026In progress
filed Nov 2026, not yet issued
333 Ofarrell Stconversion of (e) bar inside an (e) hotel into a starbucks, scope includes (n) floor and wall finishes, food service equipment, millwork, lighting and ff&e.
Details
Permit
202611030267

conversion of (e) bar inside an (e) hotel into a starbucks, scope includes (n) floor and wall finishes, food service equipment, millwork, lighting and ff&e.

Open the permit page

$5,000,000
Oct 9, 2026In progress
issued Oct 2026
333 Ofarrell StSingular Builders(e) lobby to receive (n) carpet, light fixtures, millwork finishes & digital screens. (e) lobby market to be expanded & receive (n) finishes, (e) lounge to receive (n) finishes, mechanical diffucers & light fixtures, barrier removal in (e) public restrooms.
Details
Permit
202610099257
Permit issued
Oct 26, 2026

(e) lobby to receive (n) carpet, light fixtures, millwork finishes & digital screens. (e) lobby market to be expanded & receive (n) finishes, (e) lounge to receive (n) finishes, mechanical diffucers & light fixtures, barrier removal in (e) public restrooms.

Open the permit page

$2,970,000
Jun 26, 2026In progress
issued Jul 2026
333 Ofarrell StSingular Buildersremodel of 2 existing hotel guestrooms(rooms 2681 & 2682. remodel of 2 existing guestroom bathrooms only(rooms 2380 & 2683)
Details
Permit
202606263973
Permit issued
Jul 30, 2026

remodel of 2 existing hotel guestrooms(rooms 2681 & 2682. remodel of 2 existing guestroom bathrooms only(rooms 2380 & 2683)

Open the permit page

$75,000
Jun 4, 2024Completed
final sign-off Aug 2024
333 Ofarrell Stref pa # 2023-1218-2709 ti improvement to existing fire alarm system relocate 16 hsv fire sprinklers
Details
Permit
202406043607
Permit issued
Jun 4, 2024
Final sign-off
Aug 13, 2024

ref pa # 2023-1218-2709 ti improvement to existing fire alarm system relocate 16 hsv fire sprinklers

Open the permit page

$5,000
Dec 18, 2023Completed
final sign-off Aug 2024
333 Ofarrell StHathaway Dinwiddie Co.removal of extg skylight and associated equipment. new roof infill at extg skylight opening. new junction boxes for two new decorative light fixtures on 46th floor. life safety deferred.
Details
Permit
202312182709
Permit issued
May 16, 2024
Final sign-off
Aug 20, 2024

removal of extg skylight and associated equipment. new roof infill at extg skylight opening. new junction boxes for two new decorative light fixtures on 46th floor. life safety deferred.

Open the permit page

$791,944
Nov 28, 2023Completed
final sign-off Jul 2024
333 Ofarrell StKgpco Services Llct-mobile: removal of all (e) sprint equipment from the rooftop not to be replaced. a crane will be necessary to remove equipment from the building rooftop which will sit on duncan st. a traffic control plan is included in the plans.
Details
Permit
202311281467
Permit issued
Apr 25, 2024
Final sign-off
Jul 22, 2024

t-mobile: removal of all (e) sprint equipment from the rooftop not to be replaced. a crane will be necessary to remove equipment from the building rooftop which will sit on duncan st. a traffic control plan is included in the plans.

Open the permit page

$18,000
Dec 22, 2022Never finaled
issued Jan 2023, no final
333 Ofarrell StSiemens Industry, Inc.towers 1/2/3: fire alarm work for the scl upgrade. work includes 1 for 1 relacement of initiating devices, data loop cards within existing panels and input/output card replacements for (e) annunicators and fan/damper panels. ref pa 202207158625.
Details
Permit
202212229046
Permit issued
Jan 12, 2023

towers 1/2/3: fire alarm work for the scl upgrade. work includes 1 for 1 relacement of initiating devices, data loop cards within existing panels and input/output card replacements for (e) annunicators and fan/damper panels. ref pa 202207158625.

Open the permit page

$440,000
Dec 20, 2022Expired or cancelled
cancelled Jan 2026
333 Ofarrell Stdemo and construction of new entry doors at ofarrell.
Details
Permit
202212208793

demo and construction of new entry doors at ofarrell.

Open the permit page

$200,000
Dec 20, 2022Expired or cancelled
cancelled Jan 2026
333 Ofarrell Stdemo extg awning at ofarrell and mason street and curved storefront at ofarrell st facade. construct new awnings at ofarrell and mason street a new storefront at mason, and install decorative fins at ofarrell and mason street.
Details
Permit
202212208787

demo extg awning at ofarrell and mason street and curved storefront at ofarrell st facade. construct new awnings at ofarrell and mason street a new storefront at mason, and install decorative fins at ofarrell and mason street.

Open the permit page

$200,000
Nov 23, 2022Never finaled
issued Dec 2022, no final
333 Ofarrell StSiemens Industry, Inc.tower 1: floors 7 through 46: fire alarm work only to add 153 smoke detectors in corridors. ref pa202207158625.
Details
Permit
202211237090
Permit issued
Dec 8, 2022

tower 1: floors 7 through 46: fire alarm work only to add 153 smoke detectors in corridors. ref pa202207158625.

Open the permit page

$97,000
Nov 23, 2022Never finaled
issued Dec 2022, no final
333 Ofarrell StSiemens Industry, Inc.tower 3: floors 7 through 19: fire alarm work only to add 302 smoke detectors in corridors. ref pa202207158625.
Details
Permit
202211237091
Permit issued
Dec 23, 2022

tower 3: floors 7 through 19: fire alarm work only to add 302 smoke detectors in corridors. ref pa202207158625.

Open the permit page

$191,400
Jul 15, 2022Never finaled
issued Aug 2022, no final
333 Ofarrell StSiemens Industry, Inc.fire only work to upgrade main fire alarm control panel & 39 remote panels, add new cellular dialer, replace of int modules at 3 annunciators, fan/damper panel, and damper status panel. no ref pa.
Details
Permit
202207158625
Permit issued
Aug 1, 2022

fire only work to upgrade main fire alarm control panel & 39 remote panels, add new cellular dialer, replace of int modules at 3 annunciators, fan/damper panel, and damper status panel. no ref pa.

Open the permit page

$230,000
Sep 17, 2021Never finaled
issued Sep 2021, no final
333 Ofarrell StHathaway Dinwiddie Co.new evacuation signs (17 total) in grand ballroom on 3/f and mezz level. interior renovation permit under pa201910306012. maher n/a.
Details
Permit
202109178697
Permit issued
Sep 28, 2021

new evacuation signs (17 total) in grand ballroom on 3/f and mezz level. interior renovation permit under pa201910306012. maher n/a.

Open the permit page

$7,500
Aug 16, 2021Completed
final sign-off Jun 2025
333 Ofarrell Stfire sprinkler permit. replace 426, relocate 38, add 15 and delete 9 sprinklers for the grand ballroom renovation. ref. ti pa 201910306012
Details
Permit
202108166456
Permit issued
Aug 16, 2021
Final sign-off
Jun 24, 2025

fire sprinkler permit. replace 426, relocate 38, add 15 and delete 9 sprinklers for the grand ballroom renovation. ref. ti pa 201910306012

Open the permit page

$100,000
Dec 3, 2020Expired or cancelled
cancelled Jan 2026
333 Ofarrell Stelectrical deferred submittal of approved project # 201910306012. interior remodel of grand ballroom at the 3rd flr and adjacent atrium, escalator space extending from the ground flr lobby to the 4th flr.
Details
Permit
202012030180

electrical deferred submittal of approved project # 201910306012. interior remodel of grand ballroom at the 3rd flr and adjacent atrium, escalator space extending from the ground flr lobby to the 4th flr.

Open the permit page

$1,980,000
Feb 5, 2020Never finaled
issued Feb 2020, no final
333 Ofarrell Ststreet space
Details
Permit
M1190647
Permit issued
Feb 5, 2020

street space

Open the permit page

Jan 15, 2020Never finaled
issued Jan 2020, no final
333 Ofarrell Ststreet space
Details
Permit
M1184588
Permit issued
Jan 15, 2020

street space

Open the permit page

Dec 20, 2019Never finaled
issued Dec 2019, no final
333 Ofarrell Ststreet space
Details
Permit
M1177387
Permit issued
Dec 20, 2019

street space

Open the permit page

Nov 25, 2019Never finaled
issued Nov 2019, no final
333 Ofarrell Ststreet space
Details
Permit
M1170067
Permit issued
Nov 25, 2019

street space

Open the permit page

Nov 22, 2019Never finaled
issued Nov 2019, no final
333 Ofarrell Ststreet space
Details
Permit
M1169687
Permit issued
Nov 22, 2019

street space

Open the permit page

Oct 30, 2019Completed
final sign-off Nov 2021
333 Ofarrell StHathaway Dinwiddie Co.interior remodel of grand ballroom at 3rd fl and adjacent atrium/escalator space extending from gr fl lobby to 4th fl. public toilets at 1/2 level above ballroom to be upgraded to comply with current accessibility codes. 2 unisex bath within meeting room suites will be upgraded. scope includes new
Details
Permit
201910306012
Permit issued
Aug 5, 2021
Final sign-off
Nov 15, 2021

interior remodel of grand ballroom at 3rd fl and adjacent atrium/escalator space extending from gr fl lobby to 4th fl. public toilets at 1/2 level above ballroom to be upgraded to comply with current accessibility codes. 2 unisex bath within meeting room suites will be upgraded. scope includes new

Open the permit page

$3,920,000
Oct 25, 2019Never finaled
issued Oct 2019, no final
333 Ofarrell Ststreet space
Details
Permit
M1158267
Permit issued
Oct 25, 2019

street space

Open the permit page

Oct 21, 2019Never finaled
issued Oct 2019, no final
333 Ofarrell Ststreet space
Details
Permit
M1155227
Permit issued
Oct 21, 2019

street space

Open the permit page

Sep 9, 2019Never finaled
issued Sep 2019, no final
333 Ofarrell Ststreet space
Details
Permit
M1135208
Permit issued
Sep 9, 2019

street space

Open the permit page

Aug 20, 2019Never finaled
issued Aug 2019, no final
333 Ofarrell Ststreet space
Details
Permit
M1126307
Permit issued
Aug 20, 2019

street space

Open the permit page

Aug 7, 2019Never finaled
issued Sep 2019, no final
333 Ofarrell StCarrier Corporationreplace carrier chiller, existing chiller room ref exhaust system to remain. like for like
Details
Permit
201908078211
Permit issued
Sep 18, 2019

replace carrier chiller, existing chiller room ref exhaust system to remain. like for like

Open the permit page

$300,000
Jul 8, 2019Never finaled
issued Jul 2019, no final
333 Ofarrell Ststreet space
Details
Permit
M1105447
Permit issued
Jul 8, 2019

street space

Open the permit page

Feb 6, 2019Completed
final sign-off Feb 2019
333 Ofarrell StWalschon Fire Protection Incaddition of 1 sprinkler head in sprint it room.
Details
Permit
201902062216
Permit issued
Feb 6, 2019
Final sign-off
Feb 12, 2019

addition of 1 sprinkler head in sprint it room.

Open the permit page

$4,567
Nov 28, 2018Completed
final sign-off Jan 2019
333 Ofarrell StPribuss Engineering Incfire sprinker ti on 2nd flr - relocate 81 heads add 1. total 82 heads. n/a for maher.
Details
Permit
201811286821
Permit issued
Nov 28, 2018
Final sign-off
Jan 25, 2019

fire sprinker ti on 2nd flr - relocate 81 heads add 1. total 82 heads. n/a for maher.

Open the permit page

$42,148
Nov 14, 2018Expired or cancelled
cancelled Jan 2026
333 Ofarrell StAcco Engineered Systems Inc. Dba Acco Enreplace (e) air handler w/ new air handler on 4th flr.
Details
Permit
201811145827

replace (e) air handler w/ new air handler on 4th flr.

Open the permit page

$50,000
Aug 23, 2018Completed
final sign-off Mar 2019
333 Ofarrell StPlant Construction Co, Lpinerior remodel of 2nd fl. meeting spaces, public toilet rooms and adjacent atruim/escalator space extending from ground fl. lobby to 4th fl. w/new finishes and decorative lighting, public toilets upgradded for current code compliance w/no change in fixture count.
Details
Permit
201808238117
Permit issued
Nov 13, 2018
Final sign-off
Mar 1, 2019

inerior remodel of 2nd fl. meeting spaces, public toilet rooms and adjacent atruim/escalator space extending from ground fl. lobby to 4th fl. w/new finishes and decorative lighting, public toilets upgradded for current code compliance w/no change in fixture count.

Open the permit page

$1,167,000
Mar 8, 2018Completed
final sign-off May 2018
333 Ofarrell StPacific Automatic Sprinklerrelocate two sprinkler heads in room - tower 2 add 1 sprinkler head in cooler - basement level "a"
Details
Permit
201803083188
Permit issued
Mar 8, 2018
Final sign-off
May 11, 2018

relocate two sprinkler heads in room - tower 2 add 1 sprinkler head in cooler - basement level "a"

Open the permit page

$2,000
Mar 8, 2018Never finaled
issued Mar 2018, no final
333 Ofarrell Ststreet space
Details
Permit
M897528
Permit issued
Mar 8, 2018

street space

Open the permit page

Mar 5, 2018Completed
final sign-off Mar 2018
333 Ofarrell StUnion Rolling Door Companyto comply with nov 201841731; replace & repair the curtain of the door at the loading dock. no changes in size and the (e) opening or electrical. n/a maher
Details
Permit
201803052906
Permit issued
Mar 5, 2018
Final sign-off
Mar 9, 2018

to comply with nov 201841731; replace & repair the curtain of the door at the loading dock. no changes in size and the (e) opening or electrical. n/a maher

Open the permit page

$16,000
Feb 13, 2018Completed
final sign-off Apr 2018
333 Ofarrell StPlant Construction Co, Lpground fl. revision to pa #201707283173, delete owner finished transaction counter and relocate wall, provide new furniture layout and updated occupant loads. n/a for maher.
Details
Permit
201802131096
Permit issued
Feb 16, 2018
Final sign-off
Apr 27, 2018

ground fl. revision to pa #201707283173, delete owner finished transaction counter and relocate wall, provide new furniture layout and updated occupant loads. n/a for maher.

Open the permit page

Feb 7, 2018Completed
final sign-off Mar 2018
333 Ofarrell StSiemens Industry, Inc.fire alarm work for permit #2 on the "tower tour" remodel on floor 1; addition is 1 speaker/strobe that is being installed due to a new wall. fire alarm permit #1 for this remodel was done under pa 2017-1115-4001 and 2017-0728-3173. maher na
Details
Permit
201802070596
Permit issued
Feb 7, 2018
Final sign-off
Mar 6, 2018

fire alarm work for permit #2 on the "tower tour" remodel on floor 1; addition is 1 speaker/strobe that is being installed due to a new wall. fire alarm permit #1 for this remodel was done under pa 2017-1115-4001 and 2017-0728-3173. maher na

Open the permit page

$635
Feb 1, 2018Completed
final sign-off Apr 2018
333 Ofarrell StPlant Construction Co, Lpmodifying existing duct distribution for retail space and extend toilet exhaust fan to existing bldg exhaust system ti work under pa 2017-0728-3173. maher na
Details
Permit
201802010091
Permit issued
Feb 1, 2018
Final sign-off
Apr 27, 2018

modifying existing duct distribution for retail space and extend toilet exhaust fan to existing bldg exhaust system ti work under pa 2017-0728-3173. maher na

Open the permit page

$15,000
Jan 9, 2018Completed
final sign-off Apr 2018
333 Ofarrell StPlant Construction Co, Lptitle 24 energy inspection for approved per pa 2017-0728-3173. maher na
Details
Permit
201801098149
Permit issued
Jan 10, 2018
Final sign-off
Apr 27, 2018

title 24 energy inspection for approved per pa 2017-0728-3173. maher na

Open the permit page

$1,500
Jan 8, 2018Completed
final sign-off Jan 2018
333 Ofarrell St8th - fire sprinkler,as builts to pa 201712146480, 2 more added sprinklers and 2 more relocate sprinklers ref ti pa 201708094390maher na
Details
Permit
201801088004
Permit issued
Jan 8, 2018
Final sign-off
Jan 29, 2018

8th - fire sprinkler,as builts to pa 201712146480, 2 more added sprinklers and 2 more relocate sprinklers ref ti pa 201708094390maher na

Open the permit page

$1,000
Dec 19, 2017Completed
final sign-off Jan 2018
333 Ofarrell StPribuss Engineering Incground fl fire sprinkler ti: relocate sprinklers 28 heads, add sprinklers 6 heads, total 34 heads. ref. building pa #201707283173. maher na
Details
Permit
201712196911
Permit issued
Dec 28, 2017
Final sign-off
Jan 16, 2018

ground fl fire sprinkler ti: relocate sprinklers 28 heads, add sprinklers 6 heads, total 34 heads. ref. building pa #201707283173. maher na

Open the permit page

$16,962
Dec 14, 2017Completed
final sign-off Jan 2018
333 Ofarrell St8th floor fire srpinkler permit - relcoate 3 pendents, 3 sidewalls & delete 4, sidewalls in rooms 831 & 832. ref t.i. #201708094390. n/a maher ordinance
Details
Permit
201712146480
Permit issued
Dec 14, 2017
Final sign-off
Jan 29, 2018

8th floor fire srpinkler permit - relcoate 3 pendents, 3 sidewalls & delete 4, sidewalls in rooms 831 & 832. ref t.i. #201708094390. n/a maher ordinance

Open the permit page

$1,500
Nov 15, 2017Completed
final sign-off Feb 2019
333 Ofarrell StSiemens Industry, Inc.fire alarm work for the "tower tour" remodel on floor 1; additions are 5 speaker/strobes and 1 strobe. ref pa 2017-0728-3173. maher na
Details
Permit
201711154001
Permit issued
Nov 16, 2017
Final sign-off
Feb 28, 2019

fire alarm work for the "tower tour" remodel on floor 1; additions are 5 speaker/strobes and 1 strobe. ref pa 2017-0728-3173. maher na

Open the permit page

$3,810
Oct 26, 2017Never finaled
issued Oct 2017, no final
333 Ofarrell Ststreet space permit m (pa #201708084203 & 201708094390)
Details
Permit
M848367
Permit issued
Oct 26, 2017

street space permit m (pa #201708084203 & 201708094390)

Open the permit page

Aug 18, 2017Never finaled
issued Aug 2017, no final
333 Ofarrell Ststreet space
Details
Permit
M820887
Permit issued
Aug 18, 2017

street space

Open the permit page

Aug 9, 2017Completed
final sign-off Apr 2018
333 Ofarrell StCw Horton General Contractor8th floor - conversion of office space, which was originally guest rooms back to guest rooms. no additional quantity of rooms being added. mep & life safety separate permit. n/a maher ordinance. work in rooms 831, 832, 8/f, tower 3
Details
Permit
201708094390
Permit issued
Oct 18, 2017
Final sign-off
Apr 2, 2018

8th floor - conversion of office space, which was originally guest rooms back to guest rooms. no additional quantity of rooms being added. mep & life safety separate permit. n/a maher ordinance. work in rooms 831, 832, 8/f, tower 3

Open the permit page

$157,007
Aug 8, 2017Completed
final sign-off Feb 2018
333 Ofarrell StCw Horton General Contractorfloors 5,8,9,10,11,12,14 - replacement of (e) guest room & back of house doors. n/a maher ordinance
Details
Permit
201708084203
Permit issued
Oct 12, 2017
Final sign-off
Feb 2, 2018

floors 5,8,9,10,11,12,14 - replacement of (e) guest room & back of house doors. n/a maher ordinance

Open the permit page

$991,007
Jul 28, 2017Completed
final sign-off Apr 2018
333 Ofarrell StPlant Construction Co, Lpground fl: interior retail ti including one (n) restroom. new non-bearing partitions, lighting, electrical distribution. mechanical, electrical, life safety and fire sprinkler to be design/built under seperate permits. maher na
Details
Permit
201707283173
Permit issued
Aug 2, 2017
Final sign-off
Apr 27, 2018

ground fl: interior retail ti including one (n) restroom. new non-bearing partitions, lighting, electrical distribution. mechanical, electrical, life safety and fire sprinkler to be design/built under seperate permits. maher na

Open the permit page

$110,000
Apr 28, 2017Completed
final sign-off May 2017
333 Ofarrell St15th floor: fire sprinkler alteration to relocate 1 upright sprinkler, add 3 uprights, delete 1 upright. ti #201612286045. n/a for maher
Details
Permit
201704285146
Permit issued
Apr 28, 2017
Final sign-off
May 23, 2017

15th floor: fire sprinkler alteration to relocate 1 upright sprinkler, add 3 uprights, delete 1 upright. ti #201612286045. n/a for maher

Open the permit page

$1,500
Apr 17, 2017Completed
final sign-off Sep 2017
333 Ofarrell StHathaway Dinwiddie Co.mechanical work in association with 201612286045. relocate ductwork for new wall layout
Details
Permit
201704174170
Permit issued
Apr 26, 2017
Final sign-off
Sep 15, 2017

mechanical work in association with 201612286045. relocate ductwork for new wall layout

Open the permit page

$2,000
Apr 13, 2017Completed
final sign-off Jan 2021
333 Ofarrell StSiemens Industry, Inc.tower 2 level s & floors 18 & 21- fire alarm work for the "elevator modifications". additions are 3 heat detectors and 5 relay modules. maher na
Details
Permit
201704133874
Permit issued
Apr 13, 2017
Final sign-off
Jan 8, 2021

tower 2 level s & floors 18 & 21- fire alarm work for the "elevator modifications". additions are 3 heat detectors and 5 relay modules. maher na

Open the permit page

$4,380
Mar 31, 2017Never finaled
issued Mar 2017, no final
333 Ofarrell Ststreet space
Details
Permit
M773088
Permit issued
Mar 31, 2017

street space

Open the permit page

Feb 17, 2017Completed
final sign-off May 2017
333 Ofarrell StSiemens Industry, Inc.fire alarm work the new co detectors at kitchen areas in the lower levels of guest towers 1, 2, and 3; 24 detectors are added. maher na
Details
Permit
201702179622
Permit issued
Feb 17, 2017
Final sign-off
May 1, 2017

fire alarm work the new co detectors at kitchen areas in the lower levels of guest towers 1, 2, and 3; 24 detectors are added. maher na

Open the permit page

$14,640
Jan 23, 2017Never finaled
issued May 2017, no final
333 Ofarrell StCw Horton General Contractorbarrier removal. general renovation of existing parking level and accessibility upgrade along the path of travel. work inclues accessible parking spot restriping to bring up to cook. work tower 111 on floor 1, 6, 7,8, 9, 10, 11
Details
Permit
201701237694
Permit issued
May 5, 2017

barrier removal. general renovation of existing parking level and accessibility upgrade along the path of travel. work inclues accessible parking spot restriping to bring up to cook. work tower 111 on floor 1, 6, 7,8, 9, 10, 11

Open the permit page

$62,000
Dec 29, 2016Completed
final sign-off Mar 2017
333 Ofarrell Stfloors 7 - 9 & 14 - 19 fire sprinkler permit - relcoate 13 sidewall sprinklers. ref t.i. #201604185028. n/a maher ordinance
Details
Permit
201612296182
Permit issued
Dec 29, 2016
Final sign-off
Mar 31, 2017

floors 7 - 9 & 14 - 19 fire sprinkler permit - relcoate 13 sidewall sprinklers. ref t.i. #201604185028. n/a maher ordinance

Open the permit page

$2,600
Dec 28, 2016Completed
final sign-off Sep 2017
333 Ofarrell StHathaway Dinwiddie Co.15th flr: barrier removal to provide ada accessible toilets and lockers for employee locker rooms. scope includes replacementt of plumbing fixtures, finishes, toilet compartments and lighting maher na
Details
Permit
201612286045
Permit issued
Mar 31, 2017
Final sign-off
Sep 15, 2017

15th flr: barrier removal to provide ada accessible toilets and lockers for employee locker rooms. scope includes replacementt of plumbing fixtures, finishes, toilet compartments and lighting maher na

Open the permit page

$225,000
Dec 20, 2016Completed
final sign-off Apr 2017
333 Ofarrell StSiemens Industry, Inc.7,8,9,14,15,16,17,18,19 flr: fire alarm add 22 smoke detectors and 48 speakers ref 201604185028 maher na
Details
Permit
201612205377
Permit issued
Dec 20, 2016
Final sign-off
Apr 13, 2017

7,8,9,14,15,16,17,18,19 flr: fire alarm add 22 smoke detectors and 48 speakers ref 201604185028 maher na

Open the permit page

$37,900
Dec 14, 2016Never finaled
issued Dec 2016, no final
333 Ofarrell Ststreet space
Details
Permit
M746487
Permit issued
Dec 14, 2016

street space

Open the permit page

Oct 21, 2016Never finaled
issued Oct 2016, no final
333 Ofarrell Ststreet space
Details
Permit
M732448
Permit issued
Oct 21, 2016

street space

Open the permit page

Aug 11, 2016Completed
final sign-off Dec 2016
333 Ofarrell StSiemens Industry, Inc.fire alarm work for the "main lobby" remodel on floor 1; additions are 2 speaker/strobes, as well as the relocation of 2 smoke detectors, 1 speaker, 5 speaker/strobes and 4 strobes. ref pa 201603031149. n/a for maher.
Details
Permit
201608114740
Permit issued
Aug 11, 2016
Final sign-off
Dec 20, 2016

fire alarm work for the "main lobby" remodel on floor 1; additions are 2 speaker/strobes, as well as the relocation of 2 smoke detectors, 1 speaker, 5 speaker/strobes and 4 strobes. ref pa 201603031149. n/a for maher.

Open the permit page

$4,200
Aug 2, 2016Completed
final sign-off Sep 2017
333 Ofarrell StHathaway Dinwiddie Co.renovation to (e) women's & men's locker rooms to include demo of lockers, lavatories, urinals, toilet stalls & showers. all items to be renovated to comply with current code & provide (n) finishes. n/a ordinance #155-13
Details
Permit
201608024017
Permit issued
Sep 9, 2016
Final sign-off
Sep 15, 2017

renovation to (e) women's & men's locker rooms to include demo of lockers, lavatories, urinals, toilet stalls & showers. all items to be renovated to comply with current code & provide (n) finishes. n/a ordinance #155-13

Open the permit page

$190,000
Jul 21, 2016Never finaled
issued Jul 2016, no final
333 Ofarrell Stfire sprinkler permit - relocate 29 pendents, replace 62 pendents and 20 sidewall sprinklers on the 1st. ref ti 2016-0303-1149
Details
Permit
201607212983
Permit issued
Jul 21, 2016

fire sprinkler permit - relocate 29 pendents, replace 62 pendents and 20 sidewall sprinklers on the 1st. ref ti 2016-0303-1149

Open the permit page

$22,500
Apr 18, 2016Never finaled
issued Nov 2016, no final
333 Ofarrell StCw Horton General Contractornew plumbing and finishes for 389 guestroms in tower 2 on floor 7-23. n/a for maher ordinance no.155-13.
Details
Permit
201604185028
Permit issued
Nov 18, 2016

new plumbing and finishes for 389 guestroms in tower 2 on floor 7-23. n/a for maher ordinance no.155-13.

Open the permit page

$4,862,415
Mar 16, 2016Completed
final sign-off Nov 2016
333 Ofarrell StSiemens Industry, Inc.g level: fire alarm work for att verizon switch room remodel on g level, additions are 3 smoke detectors and 1 speaker strobe; ref 201510089201; maher n/a
Details
Permit
201603162132
Permit issued
Mar 16, 2016
Final sign-off
Nov 22, 2016

g level: fire alarm work for att verizon switch room remodel on g level, additions are 3 smoke detectors and 1 speaker strobe; ref 201510089201; maher n/a

Open the permit page

$2,300
Mar 9, 2016Completed
final sign-off May 2016
333 Ofarrell StPribuss Engineering Inc12th floor fire sprinkler - change of existing pipe under #201507060724. n/a maher ordinance
Details
Permit
201603091556
Permit issued
Mar 15, 2016
Final sign-off
May 12, 2016

12th floor fire sprinkler - change of existing pipe under #201507060724. n/a maher ordinance

Open the permit page

$25,000
Mar 3, 2016Completed
final sign-off Dec 2016
333 Ofarrell StCw Horton General Contractorinterior renovation ground floor promenade, tower 1 elevator lobby, and executive conference center. ti includes new finishes, lighting, furniture, and millwork. no mech and elec maher not req
Details
Permit
201603031149
Permit issued
May 9, 2016
Final sign-off
Dec 22, 2016

interior renovation ground floor promenade, tower 1 elevator lobby, and executive conference center. ti includes new finishes, lighting, furniture, and millwork. no mech and elec maher not req

Open the permit page

$353,457
Feb 9, 2016Never finaled
issued Feb 2016, no final
333 Ofarrell StSiemens Industry, Inc.g level: fire alarm - add 2 relay modules for diesel pump shutdown maher na
Details
Permit
201602099087
Permit issued
Feb 9, 2016

g level: fire alarm - add 2 relay modules for diesel pump shutdown maher na

Open the permit page

$1,000
Dec 21, 2015Completed
final sign-off Jan 2016
333 Ofarrell StSiemens Industry, Inc.1st fl: fire alarm work to revise the detector layout for the 'main lobby' remodel project. the changes result in the addition of 1 smoke detector & the removal of a retractable door closure. ref pa #2015-0924-7980. n/a maher ordinance
Details
Permit
201512215579
Permit issued
Dec 21, 2015
Final sign-off
Jan 27, 2016

1st fl: fire alarm work to revise the detector layout for the 'main lobby' remodel project. the changes result in the addition of 1 smoke detector & the removal of a retractable door closure. ref pa #2015-0924-7980. n/a maher ordinance

Open the permit page

$600
Nov 12, 2015Completed
final sign-off Jan 2016
333 Ofarrell StPribuss Engineering Inc1st flr lobby: fire sprinkler c/o under g.c. eprmit 201507060724, add 152, total 152 (x514.62)=78,222
Details
Permit
201511122442
Permit issued
Nov 13, 2015
Final sign-off
Jan 8, 2016

1st flr lobby: fire sprinkler c/o under g.c. eprmit 201507060724, add 152, total 152 (x514.62)=78,222

Open the permit page

$78,222
Oct 8, 2015Expired or cancelled
cancelled Dec 2016
333 Ofarrell StCommunication Technology Services Llcproposal to install verizon wireless: das system, including 2 new equipment racks, 1 equipment cabinet, and 6 wall -mounted radios. all within extg head end room. no antennas are proposed. no exterior work is proposed. n/a maher.
Details
Permit
201510089201
Permit issued
Nov 9, 2015

proposal to install verizon wireless: das system, including 2 new equipment racks, 1 equipment cabinet, and 6 wall -mounted radios. all within extg head end room. no antennas are proposed. no exterior work is proposed. n/a maher.

Open the permit page

$20,000
Oct 6, 2015Expired or cancelled
cancelled Jan 2026
333 Ofarrell Stground floor:wall finishes, flooring, wall fixtures, lighting and equipment. maher na
Details
Permit
201510068933

ground floor:wall finishes, flooring, wall fixtures, lighting and equipment. maher na

Open the permit page

$60,000
Sep 24, 2015Never finaled
issued Sep 2015, no final
333 Ofarrell StSiemens Industry, Inc.floor 1 fire alarm work for the "main lobby" remodel; additions are 5 smoke detectors & 12 speaker/strobes. ref pa #201504244593. n/a maher ordinance. no mechanical.
Details
Permit
201509247980
Permit issued
Sep 25, 2015

floor 1 fire alarm work for the "main lobby" remodel; additions are 5 smoke detectors & 12 speaker/strobes. ref pa #201504244593. n/a maher ordinance. no mechanical.

Open the permit page

$9,000
Aug 13, 2015Completed
final sign-off Oct 2015
333 Ofarrell StPribuss Engineering Incfire sprinkler t.i. relocates 20, add 2 total 22. t.i. pa#201507060724. n/a ordinance #155-13
Details
Permit
201508134133
Permit issued
Aug 13, 2015
Final sign-off
Oct 30, 2015

fire sprinkler t.i. relocates 20, add 2 total 22. t.i. pa#201507060724. n/a ordinance #155-13

Open the permit page

$11,322
Aug 10, 2015Never finaled
issued Aug 2015, no final
333 Ofarrell Ststreet space
Details
Permit
M612867
Permit issued
Aug 10, 2015

street space

Open the permit page

Jul 6, 2015Never finaled
issued Jul 2015, no final
333 Ofarrell StPlant Construction Co, Lpgrnd flr: interior demo of non-load bearing walls, finishes, equipment, light fixtures, to comply with ab017, no exterior or stuctural work under permit; maher n/a
Details
Permit
201507060724
Permit issued
Jul 9, 2015

grnd flr: interior demo of non-load bearing walls, finishes, equipment, light fixtures, to comply with ab017, no exterior or stuctural work under permit; maher n/a

Open the permit page

$7,500
Apr 29, 2015Completed
final sign-off Dec 2015
333 Ofarrell StRoss Recreation Equip Co Inc(Lic D48)16th floor - install 3/8" robber - aquaflex non-porous surfacing overlay on existing swimming pool deck. approx 9500 sq ft. n/a maher ordinance
Details
Permit
201504294907
Permit issued
May 28, 2015
Final sign-off
Dec 3, 2015

16th floor - install 3/8" robber - aquaflex non-porous surfacing overlay on existing swimming pool deck. approx 9500 sq ft. n/a maher ordinance

Open the permit page

$200,000
Apr 24, 2015Completed
final sign-off Apr 2017
333 Ofarrell StPlant Construction Co, Lprenovation of (e) ground fl lobby to include (n) bar w/ lounge seating & nearby dining areas. alterations to include (n) finishes, lighting, furniture, millwork & food service equipment. scope also includes upgrades to (e) interior ramp to become fully accessible. l/s and sprinklers under sep.permit
Details
Permit
201504244593
Permit issued
Aug 28, 2015
Final sign-off
Apr 5, 2017

renovation of (e) ground fl lobby to include (n) bar w/ lounge seating & nearby dining areas. alterations to include (n) finishes, lighting, furniture, millwork & food service equipment. scope also includes upgrades to (e) interior ramp to become fully accessible. l/s and sprinklers under sep.permit

Open the permit page

$2,046,207
Feb 24, 2015Completed
final sign-off Jun 2015
333 Ofarrell StSiemens Industry, Inc.fire alarm work for the 16th floor guestrooms conversion ti in tower 3; additions are 4 speakers. low frequency smoke detectors by others. ref pa 2013.1223.4898
Details
Permit
201502249118
Permit issued
Feb 24, 2015
Final sign-off
Jun 17, 2015

fire alarm work for the 16th floor guestrooms conversion ti in tower 3; additions are 4 speakers. low frequency smoke detectors by others. ref pa 2013.1223.4898

Open the permit page

$2,000
Feb 9, 2015Never finaled
issued Feb 2015, no final
333 Ofarrell StBest Roofing & Waterproofing Increroofing
Details
Permit
201502097754
Permit issued
Feb 9, 2015

reroofing

Open the permit page

$350,000
Jan 23, 2015Expired or cancelled
cancelled Jan 2026
333 Ofarrell Stproject is the limited scope up-fit of an (e) single level tenant space "travel traders" new work is to include but not to be limited to the wall finishes, flooring, fixtures, lighting & equipment. n/a maher ordinance
Details
Permit
201501236517

project is the limited scope up-fit of an (e) single level tenant space "travel traders" new work is to include but not to be limited to the wall finishes, flooring, fixtures, lighting & equipment. n/a maher ordinance

Open the permit page

$60,000
Jan 12, 2015Completed
final sign-off Jun 2015
333 Ofarrell StSiemens Industry, Inc.25th to 28th floor: fire alarm work for the ada room upgrade. t.i. project on floors 25,26,27,and 28. the additions are 8 smoke detectors, 7 modules and 15 strobes. ref. appl. #2013.0821.4878. mahner n/a.
Details
Permit
201501125412
Permit issued
Jan 14, 2015
Final sign-off
Jun 17, 2015

25th to 28th floor: fire alarm work for the ada room upgrade. t.i. project on floors 25,26,27,and 28. the additions are 8 smoke detectors, 7 modules and 15 strobes. ref. appl. #2013.0821.4878. mahner n/a.

Open the permit page

$13,600
Jan 9, 2015Never finaled
issued Jan 2015, no final
333 Ofarrell StSiemens Industry, Inc.fire alarm work to add module for tower 2 elevator upgrade level s
Details
Permit
201501095287
Permit issued
Jan 9, 2015

fire alarm work to add module for tower 2 elevator upgrade level s

Open the permit page

$500
Jan 7, 2015Completed
final sign-off Jan 2015
333 Ofarrell Stflrs 7-28: fire sprinkler permit, relocate 20 and add 1 sidewall sprinkler, add 12 pendant sprinklers on floors 7-28, t.i. #201308214878; maher na.
Details
Permit
201501075093
Permit issued
Jan 7, 2015
Final sign-off
Jan 26, 2015

flrs 7-28: fire sprinkler permit, relocate 20 and add 1 sidewall sprinkler, add 12 pendant sprinklers on floors 7-28, t.i. #201308214878; maher na.

Open the permit page

$17,476
Dec 12, 2014Never finaled
issued Dec 2014, no final
333 Ofarrell Ststreet space w/mta
Details
Permit
M542807
Permit issued
Dec 12, 2014

street space w/mta

Open the permit page

Dec 12, 2014Never finaled
issued Dec 2014, no final
333 Ofarrell Ststreet space w/mta
Details
Permit
M542808
Permit issued
Dec 12, 2014

street space w/mta

Open the permit page

Nov 6, 2014Never finaled
issued Nov 2014, no final
333 Ofarrell Stelevator - remove all fire sprinklers in elevator machine room & the top of the hoistways in tower 2. sprinkler heads in pits to be lowered below 24", elev to comply with preapp (apply 10/10/14 attacged) & 2013 sbc sect 3006.4.1.
Details
Permit
201411060846
Permit issued
Nov 7, 2014

elevator - remove all fire sprinklers in elevator machine room & the top of the hoistways in tower 2. sprinkler heads in pits to be lowered below 24", elev to comply with preapp (apply 10/10/14 attacged) & 2013 sbc sect 3006.4.1.

Open the permit page

$11,533
Oct 14, 2014Never finaled
issued Oct 2014, no final
333 Ofarrell StCosco Fire Protection Inc.remove firehose racks & plug valves on entire standpipe as approved by fire marshall letter dated oct. 10, 2014, see attached.
Details
Permit
201410148717
Permit issued
Oct 14, 2014

remove firehose racks & plug valves on entire standpipe as approved by fire marshall letter dated oct. 10, 2014, see attached.

Open the permit page

$3,130
Mar 10, 2014Completed
final sign-off Apr 2014
333 Ofarrell Stfire sprinlker: relocate 21, add pendents and relocate 15 sidewall on floors 29-43
Details
Permit
201403100327
Permit issued
Mar 10, 2014
Final sign-off
Apr 25, 2014

fire sprinlker: relocate 21, add pendents and relocate 15 sidewall on floors 29-43

Open the permit page

$19,532
Mar 6, 2014Completed
final sign-off Apr 2014
333 Ofarrell StSiemens Industry, Inc.addition of 3 smoke detectors and 16 strobes for the phase 1 ada room upgrades project various floors. ref 201308214878. work in 19 rooms between floors 29 and 42. all need to be tested. compliance with maher ordinance # 155-13 does not apply
Details
Permit
201403060122
Permit issued
Mar 7, 2014
Final sign-off
Apr 28, 2014

addition of 3 smoke detectors and 16 strobes for the phase 1 ada room upgrades project various floors. ref 201308214878. work in 19 rooms between floors 29 and 42. all need to be tested. compliance with maher ordinance # 155-13 does not apply

Open the permit page

$9,500
Feb 6, 2014Never finaled
issued Feb 2014, no final
333 Ofarrell Ststreet space w/mta
Details
Permit
M461967
Permit issued
Feb 6, 2014

street space w/mta

Open the permit page

Feb 6, 2014Never finaled
issued Feb 2014, no final
333 Ofarrell Ststreet space w/mta
Details
Permit
M461908
Permit issued
Feb 6, 2014

street space w/mta

Open the permit page

Feb 5, 2014Never finaled
issued Feb 2014, no final
333 Ofarrell Ststreet space w/mta
Details
Permit
M461728
Permit issued
Feb 5, 2014

street space w/mta

Open the permit page

Jan 15, 2014Never finaled
issued Jan 2014, no final
333 Ofarrell Stdemolition of diesel driven fire pump and support equipment per attached letter and implementation. ref app#201310240085
Details
Permit
201401156390
Permit issued
Jan 15, 2014

demolition of diesel driven fire pump and support equipment per attached letter and implementation. ref app#201310240085

Open the permit page

$35,980
Dec 23, 2013Completed
final sign-off Apr 2015
333 Ofarrell Stconversion of 16th fl offices into 4 guestrooms in tower 3 of the hilton. inclusive of new plumbing fixtures, new finihses and new light fixtures
Details
Permit
201312234898
Permit issued
Apr 23, 2014
Final sign-off
Apr 30, 2015

conversion of 16th fl offices into 4 guestrooms in tower 3 of the hilton. inclusive of new plumbing fixtures, new finihses and new light fixtures

Open the permit page

$95,000
Oct 30, 2013Never finaled
issued Oct 2013, no final
333 Ofarrell StSiemens Industry, Inc.level b2: addition of 1 relay module for the kitcen elevator modernization to flash firefighter's hat light on elevator mach room and elevator hoistway smoke dtector activation. project on level b2. the module connects onto the fire alarm system.
Details
Permit
201310300586
Permit issued
Oct 30, 2013

level b2: addition of 1 relay module for the kitcen elevator modernization to flash firefighter's hat light on elevator mach room and elevator hoistway smoke dtector activation. project on level b2. the module connects onto the fire alarm system.

Open the permit page

$500
Oct 24, 2013Completed
final sign-off Jan 2014
333 Ofarrell StSiemens Industry, Inc.addition of 3 monitor modules for the "fire pump upgrade" project on basement level b2. all new devices connect onto the fire alarm system
Details
Permit
201310240085
Permit issued
Oct 24, 2013
Final sign-off
Jan 21, 2014

addition of 3 monitor modules for the "fire pump upgrade" project on basement level b2. all new devices connect onto the fire alarm system

Open the permit page

$1,500
Oct 17, 2013Never finaled
issued Nov 2013, no final
333 Ofarrell StCw Horton General Contractorcommercial tenant improvement to (e) lobby cafe, no mechanical of plumbing, new casework & finishes.
Details
Permit
201310179575
Permit issued
Nov 15, 2013

commercial tenant improvement to (e) lobby cafe, no mechanical of plumbing, new casework & finishes.

Open the permit page

$20,000
Aug 21, 2013Completed
final sign-off Apr 2015
333 Ofarrell Strenovation of 566 guest rooms in tower 1 on floors 7 - 44. this is inclusive of (n) plumbing fixtures at (e) locations. all new finishes & (n) light fixtures with equal wattage (or less) at (e) locations. mechanical system to remain.
Details
Permit
201308214878
Permit issued
Dec 5, 2013
Final sign-off
Apr 3, 2015

renovation of 566 guest rooms in tower 1 on floors 7 - 44. this is inclusive of (n) plumbing fixtures at (e) locations. all new finishes & (n) light fixtures with equal wattage (or less) at (e) locations. mechanical system to remain.

Open the permit page

$2,600,000
May 22, 2013Completed
final sign-off May 2013
333 Ofarrell Stdocument harddship for ballroom level (3rd fl) men's restroom stall revision. document scope of work ada accessibility guidelines using 1991 cbc as the reference guidelines. reference pa# 201107120009.
Details
Permit
201305227680
Permit issued
May 23, 2013
Final sign-off
May 30, 2013

document harddship for ballroom level (3rd fl) men's restroom stall revision. document scope of work ada accessibility guidelines using 1991 cbc as the reference guidelines. reference pa# 201107120009.

Open the permit page

Apr 11, 2013Completed
final sign-off Apr 2013
333 Ofarrell St6th floor:revision to app#201107120005. file hardships due to physical constraints within women's and men's restroom on 6th floor. no sprinkler or fire alarm changes required.
Details
Permit
201304114256
Permit issued
Apr 11, 2013
Final sign-off
Apr 24, 2013

6th floor:revision to app#201107120005. file hardships due to physical constraints within women's and men's restroom on 6th floor. no sprinkler or fire alarm changes required.

Open the permit page

$6,000
Jul 5, 2012Completed
final sign-off Jul 2012
333 Ofarrell StSiemens Industry, Inc.addition of 2 monitors for connection to 2 dict detectors extg at roof fans. the work is being done per the request of the sffd annual inspection.
Details
Permit
201207054083
Permit issued
Jul 5, 2012
Final sign-off
Jul 26, 2012

addition of 2 monitors for connection to 2 dict detectors extg at roof fans. the work is being done per the request of the sffd annual inspection.

Open the permit page

$1,000
May 24, 2012Completed
final sign-off Sep 2012
333 Ofarrell Stfull restroom renovation of 1 guestroom in tower 1 and floor 30 of the hilton. new plubming fixtures, finishes, and replacement of like for like entry light fixture and bath light fixtures
Details
Permit
201205241194
Permit issued
May 25, 2012
Final sign-off
Sep 20, 2012

full restroom renovation of 1 guestroom in tower 1 and floor 30 of the hilton. new plubming fixtures, finishes, and replacement of like for like entry light fixture and bath light fixtures

Open the permit page

$15,000
May 22, 2012Completed
final sign-off Jul 2012
333 Ofarrell StSiemens Industry, Inc.floors 4 & 6 - 'as-built' permit (per the sffd) for fire alarm system work done under original application #2012.03.16.6183. the revisions resulted in the deletion of 4 smoke detectors, & the additoins of 1 relay module & 1 strobe.
Details
Permit
201205220934
Permit issued
May 22, 2012
Final sign-off
Jul 5, 2012

floors 4 & 6 - 'as-built' permit (per the sffd) for fire alarm system work done under original application #2012.03.16.6183. the revisions resulted in the deletion of 4 smoke detectors, & the additoins of 1 relay module & 1 strobe.

Open the permit page

May 22, 2012Completed
final sign-off Jul 2012
333 Ofarrell StSiemens Industry, Inc.ballrooms - 'as-built' permit (per the sffd) for fire alarm system work done under original application #2012.02.24.4763. the revisions resulted in the additoin of 4 smoke detectors & 2 relay modules.
Details
Permit
201205220935
Permit issued
May 22, 2012
Final sign-off
Jul 5, 2012

ballrooms - 'as-built' permit (per the sffd) for fire alarm system work done under original application #2012.02.24.4763. the revisions resulted in the additoin of 4 smoke detectors & 2 relay modules.

Open the permit page

$2,800
May 22, 2012Completed
final sign-off Jul 2012
333 Ofarrell StSiemens Industry, Inc.level g - 'as-built' permit (per the sffd) for fire alarm system work done under original application #2012.03.28.7080. the revisions resulted in the deletion of 1 pull station.
Details
Permit
201205220930
Permit issued
May 22, 2012
Final sign-off
Jul 26, 2012

level g - 'as-built' permit (per the sffd) for fire alarm system work done under original application #2012.03.28.7080. the revisions resulted in the deletion of 1 pull station.

Open the permit page

Apr 19, 2012Completed
final sign-off Nov 2012
333 Ofarrell StTriton Tower Inca (n) manned telecommunications facility consisting of (n) equipment room with a batter rack, (n) p.c. power plant (9) 19" das equipment w/ 16 rru's gps antenna, 12 rruw, 475 das antennas 34 fiber repeaters & 389 splitters.
Details
Permit
201204198677
Permit issued
May 24, 2012
Final sign-off
Nov 13, 2012

a (n) manned telecommunications facility consisting of (n) equipment room with a batter rack, (n) p.c. power plant (9) 19" das equipment w/ 16 rru's gps antenna, 12 rruw, 475 das antennas 34 fiber repeaters & 389 splitters.

Open the permit page

$735,000
Apr 6, 2012Completed
final sign-off Jul 2012
333 Ofarrell StAcco Engineered Systems Inc. Dba Acco Enlike for like replacement of 2 air handling units.
Details
Permit
201204067813
Permit issued
Apr 13, 2012
Final sign-off
Jul 23, 2012

like for like replacement of 2 air handling units.

Open the permit page

$150,000
Mar 28, 2012Completed
final sign-off May 2012
333 Ofarrell StSiemens Industry, Inc.level g-addition of 3 smoke detectors for the "west lounge" remodel on the "g" level. all new devices connect onto the extg life safty system.
Details
Permit
201203287080
Permit issued
Mar 28, 2012
Final sign-off
May 16, 2012

level g-addition of 3 smoke detectors for the "west lounge" remodel on the "g" level. all new devices connect onto the extg life safty system.

Open the permit page

$1,500
Mar 28, 2012Completed
final sign-off Aug 2012
333 Ofarrell StSiemens Industry, Inc.addition of 1 pull station, 1 speaker, and 2 strobes for the "project g" area on level 'g'. all new devices connect onto the life safety system.
Details
Permit
201203287007
Permit issued
Mar 28, 2012
Final sign-off
Aug 2, 2012

addition of 1 pull station, 1 speaker, and 2 strobes for the "project g" area on level 'g'. all new devices connect onto the life safety system.

Open the permit page

$1,700
Mar 23, 2012Completed
final sign-off May 2012
333 Ofarrell StAllied Fire Protectiontenant improvement at west louge: 15 added sprinklers, 30 relocated sprinklers
Details
Permit
201203236733
Permit issued
Mar 23, 2012
Final sign-off
May 1, 2012

tenant improvement at west louge: 15 added sprinklers, 30 relocated sprinklers

Open the permit page

$23,000
Mar 22, 2012Never finaled
issued Mar 2012, no final
333 Ofarrell Stfire sprinkler only:various hotel rooms:#1653 remove 2 heads. #1631 remove 1 head. #1693 add 1 head & remove 1 heads, #1753 remove 2 heads, #1698 relocate 1 head & remove 1 head, add 2 heads,#1898 relocate 1 head and add 2,#1798 relocate 1 head, add 2 heads,#1998 relocate 1 head and add 2.
Details
Permit
201203226702
Permit issued
Mar 23, 2012

fire sprinkler only:various hotel rooms:#1653 remove 2 heads. #1631 remove 1 head. #1693 add 1 head & remove 1 heads, #1753 remove 2 heads, #1698 relocate 1 head & remove 1 head, add 2 heads,#1898 relocate 1 head and add 2,#1798 relocate 1 head, add 2 heads,#1998 relocate 1 head and add 2.

Open the permit page

$6,500
Mar 16, 2012Completed
final sign-off Apr 2012
333 Ofarrell StSiemens Industry, Inc.addition of 3 "loop" modules, 96 smoke detectors, 45 relay modules, 36 speaker/strobes, and 16 door holders for the "meeting room". upgrade porject on floor 4 and 6, smoke detectors provide "full coverage" for rooms and common corridors with associated fire/smoke dampers.
Details
Permit
201203166183
Permit issued
Mar 16, 2012
Final sign-off
Apr 23, 2012

addition of 3 "loop" modules, 96 smoke detectors, 45 relay modules, 36 speaker/strobes, and 16 door holders for the "meeting room". upgrade porject on floor 4 and 6, smoke detectors provide "full coverage" for rooms and common corridors with associated fire/smoke dampers.

Open the permit page

$91,300
Mar 14, 2012Never finaled
issued Mar 2012, no final
333 Ofarrell StDurkin Signs & Graphics Incfloor 3,4, & 6 - evacuation maps for remodel floors
Details
Permit
201203146049
Permit issued
Mar 23, 2012

floor 3,4, & 6 - evacuation maps for remodel floors

Open the permit page

$8,000
Mar 14, 2012Never finaled
issued Mar 2012, no final
333 Ofarrell Ststreet space with meters.
Details
Permit
M307687
Permit issued
Mar 14, 2012

street space with meters.

Open the permit page

Feb 24, 2012Completed
final sign-off Jul 2012
333 Ofarrell StSiemens Industry, Inc.continental ballroom level - addition of 16 smoke detectors, 34 speaker/strobes, 10 speakers, 2 relay modules, 12 door holders, & 1 strobe power supply for the "continental ballroom" remodel project. 6 speaker/strobes are also being relcoated. all devices connnect onto the fire alarm system.
Details
Permit
201202244763
Permit issued
Feb 24, 2012
Final sign-off
Jul 5, 2012

continental ballroom level - addition of 16 smoke detectors, 34 speaker/strobes, 10 speakers, 2 relay modules, 12 door holders, & 1 strobe power supply for the "continental ballroom" remodel project. 6 speaker/strobes are also being relcoated. all devices connnect onto the fire alarm system.

Open the permit page

$32,000
Feb 17, 2012Completed
final sign-off Jul 2012
333 Ofarrell Strevision to 201107120005 new lighting, fixtures, suspended, gyp board ceiling, suspended acoustic ceiling and hvac equipment on the 3rd, 4th,5th, and 6th fls
Details
Permit
201202174435
Permit issued
Feb 22, 2012
Final sign-off
Jul 24, 2012

revision to 201107120005 new lighting, fixtures, suspended, gyp board ceiling, suspended acoustic ceiling and hvac equipment on the 3rd, 4th,5th, and 6th fls

Open the permit page

$7,500
Feb 1, 2012Completed
final sign-off May 2012
333 Ofarrell StAllied Fire Protection3rd floor-remove/replace & add sprinkler in california room & storage, 23 heads. rev #1-2011-1214-0632 & rev #2-2012-0104-1623
Details
Permit
201202013294
Permit issued
Feb 1, 2012
Final sign-off
May 1, 2012

3rd floor-remove/replace & add sprinkler in california room & storage, 23 heads. rev #1-2011-1214-0632 & rev #2-2012-0104-1623

Open the permit page

$11,500
Jan 24, 2012Completed
final sign-off May 2012
333 Ofarrell StAllied Fire Protection4th floor-remove & replace (e) sprinkler & add new sprinkler (276 heads). 6th floor-remove & replace (e) sprinklers & add new sprinklers in proposed area (92 heads).
Details
Permit
201201242747
Permit issued
Jan 24, 2012
Final sign-off
May 1, 2012

4th floor-remove & replace (e) sprinkler & add new sprinkler (276 heads). 6th floor-remove & replace (e) sprinklers & add new sprinklers in proposed area (92 heads).

Open the permit page

$184,000
Jan 4, 2012Completed
final sign-off May 2012
333 Ofarrell StAllied Fire Protectionremove existing piping in parlors 1,2,3,7,8,,9 on 3rd floor. install new lines and mains. replace existing sprinklers in lounge areas. total new sprinkler for above areas=170
Details
Permit
201201041623
Permit issued
Jan 4, 2012
Final sign-off
May 30, 2012

remove existing piping in parlors 1,2,3,7,8,,9 on 3rd floor. install new lines and mains. replace existing sprinklers in lounge areas. total new sprinkler for above areas=170

Open the permit page

$85,000
Dec 14, 2011Completed
final sign-off May 2012
333 Ofarrell StAllied Fire Protectionremove existing piping (lines and mains) and sprinklers above the continental ballroom. install new lines and mains and sprinklers i the ballroom. existing control valves to remain
Details
Permit
201112140632
Permit issued
Dec 14, 2011
Final sign-off
May 8, 2012

remove existing piping (lines and mains) and sprinklers above the continental ballroom. install new lines and mains and sprinklers i the ballroom. existing control valves to remain

Open the permit page

$86,000
Nov 22, 2011Completed
final sign-off Jul 2012
333 Ofarrell Strevision to 201108041780. revise lighting in corridors and fixture notes
Details
Permit
201111229467
Permit issued
Nov 23, 2011
Final sign-off
Jul 23, 2012

revision to 201108041780. revise lighting in corridors and fixture notes

Open the permit page

$35,000
Nov 18, 2011Never finaled
issued Nov 2011, no final
333 Ofarrell Stinterior non structural demolition to meeting rooms o floors 4 and 6. all work to comply with ab-017
Details
Permit
201111189218
Permit issued
Nov 18, 2011

interior non structural demolition to meeting rooms o floors 4 and 6. all work to comply with ab-017

Open the permit page

$45,000
Nov 17, 2011Completed
final sign-off Jul 2012
333 Ofarrell Stinterior non structural demolition on ballroom level, all work to comply with sfbc ab-017
Details
Permit
201111179095
Permit issued
Nov 18, 2011
Final sign-off
Jul 23, 2012

interior non structural demolition on ballroom level, all work to comply with sfbc ab-017

Open the permit page

$45,000
Oct 31, 2011Never finaled
issued Nov 2011, no final
333 Ofarrell Ststreet space with mta
Details
Permit
M286867
Permit issued
Nov 1, 2011

street space with mta

Open the permit page

Oct 24, 2011Completed
final sign-off Jul 2012
333 Ofarrell Strevision to pa 2010-1028-3951. new exterior shear wall, store front door and glazing.
Details
Permit
201110247505
Permit issued
Nov 7, 2011
Final sign-off
Jul 24, 2012

revision to pa 2010-1028-3951. new exterior shear wall, store front door and glazing.

Open the permit page

$140,000
Oct 14, 2011Never finaled
issued Jan 2012, no final
333 Ofarrell Stcore and shell remodel of ground floor retail space. new store front and entry doors, new accessible restroom. ti under separate permit
Details
Permit
201110146839
Permit issued
Jan 3, 2012

core and shell remodel of ground floor retail space. new store front and entry doors, new accessible restroom. ti under separate permit

Open the permit page

$370,000
Sep 27, 2011Completed
final sign-off Jul 2012
333 Ofarrell Strev. to pa# 2011.07.13.0104 to lighting and electrical in towers 2 and 3 restrooms
Details
Permit
201109275616
Permit issued
Oct 11, 2011
Final sign-off
Jul 23, 2012

rev. to pa# 2011.07.13.0104 to lighting and electrical in towers 2 and 3 restrooms

Open the permit page

$10,000
Aug 4, 2011Completed
final sign-off Jul 2012
333 Ofarrell Stinterior non struc remodel of 498guest rooms in tower #3. remodfel bathrooms and interior finishes. new unit entry door on all 550 rooms in tower#3. all existing mechanical system to remain. all restroom lighting shall be high-efficacy or occupancy sensor control per cec 150(k). verify door listing
Details
Permit
201108041780
Permit issued
Aug 29, 2011
Final sign-off
Jul 23, 2012

interior non struc remodel of 498guest rooms in tower #3. remodfel bathrooms and interior finishes. new unit entry door on all 550 rooms in tower#3. all existing mechanical system to remain. all restroom lighting shall be high-efficacy or occupancy sensor control per cec 150(k). verify door listing

Open the permit page

$5,000,000
Jul 13, 2011Completed
final sign-off Apr 2012
333 Ofarrell Sttower 2 & 3-men & women's public restroom remodel, barrier removal work only, no new lighting.
Details
Permit
201107130104
Permit issued
Jul 27, 2011
Final sign-off
Apr 16, 2012

tower 2 & 3-men & women's public restroom remodel, barrier removal work only, no new lighting.

Open the permit page

$189,220
Jul 12, 2011Completed
final sign-off Jul 2012
333 Ofarrell Stremodel of (e) ballrooms (ballroom level). new lighting and interior finishes in continental ballroom, pre function areas and public restrooms.
Details
Permit
201107120009
Permit issued
Dec 15, 2011
Final sign-off
Jul 24, 2012

remodel of (e) ballrooms (ballroom level). new lighting and interior finishes in continental ballroom, pre function areas and public restrooms.

Open the permit page

$4,780,957
Jul 12, 2011Completed
final sign-off Jul 2012
333 Ofarrell Stremodel of (e) meeting rooms on floors 4 and 6 . new lighting and interior finishes. remodel (e) bathrooms. limited amount of work on floors 3 & 5 shafts as shown on plans.
Details
Permit
201107120005
Permit issued
Jan 26, 2012
Final sign-off
Jul 24, 2012

remodel of (e) meeting rooms on floors 4 and 6 . new lighting and interior finishes. remodel (e) bathrooms. limited amount of work on floors 3 & 5 shafts as shown on plans.

Open the permit page

$3,550,386
May 12, 2011Never finaled
issued May 2011, no final
333 Ofarrell StWestern Roofing Servicereroofing
Details
Permit
201105125957
Permit issued
May 12, 2011

reroofing

Open the permit page

$730,000
Nov 2, 2010Expired or cancelled
cancelled Feb 2012
333 Ofarrell StMetropolitan Electrical Constructionwireless facility, rooftop: install 1 equipment rack & 3 internet services exchange switch antennas. modification to pa# 2010/01/29/5602.
Details
Permit
201011024219

wireless facility, rooftop: install 1 equipment rack & 3 internet services exchange switch antennas. modification to pa# 2010/01/29/5602.

Open the permit page

$15,000
Oct 28, 2010Never finaled
issued Apr 2011, no final
333 Ofarrell Stvoluntary seismic retrofit consisting of new concrete shearwalls in selected bays. relocation of employee entrance and offices on ellis st to facilitate the instalation of new shearwalls.
Details
Permit
201010283951
Permit issued
Apr 20, 2011

voluntary seismic retrofit consisting of new concrete shearwalls in selected bays. relocation of employee entrance and offices on ellis st to facilitate the instalation of new shearwalls.

Open the permit page

$5,000,000
Sep 30, 2010Completed
final sign-off Apr 2011
333 Ofarrell StSwinerton Buildersremove extg revolving door. replace new power operated door, repair adjacent finishes with matching materials.
Details
Permit
201009302002
Permit issued
Oct 8, 2010
Final sign-off
Apr 8, 2011

remove extg revolving door. replace new power operated door, repair adjacent finishes with matching materials.

Open the permit page

$20,000
Aug 13, 2010Never finaled
issued Oct 2011, no final
333 Ofarrell Stoccupant load calcs only of continental ballroom (level 2). ref pa# 2007/06/08/3444. for occ. load verification only. req for public assemb. permit. fire insp to field verify exit signage; horiz exit standpipe locations; panic hardware at all required door locations; & occ load signage as per
Details
Permit
201008138746
Permit issued
Oct 20, 2011

occupant load calcs only of continental ballroom (level 2). ref pa# 2007/06/08/3444. for occ. load verification only. req for public assemb. permit. fire insp to field verify exit signage; horiz exit standpipe locations; panic hardware at all required door locations; & occ load signage as per

Open the permit page

Aug 4, 2010Completed
final sign-off Sep 2010
333 Ofarrell StThe Lawson Roofing Co Inc.re-roofing only.
Details
Permit
201008048114
Permit issued
Aug 4, 2010
Final sign-off
Sep 13, 2010

re-roofing only.

Open the permit page

$118,268
Jul 2, 2010Never finaled
filed Jul 2010, never issued
333 Ofarrell Stv o i d
Details
Permit
201007025895

v o i d

Open the permit page

Jun 4, 2010Never finaled
issued Jun 2010, no final
333 Ofarrell Ststreet space permit
Details
Permit
M205152
Permit issued
Jun 4, 2010

street space permit

Open the permit page

Feb 9, 2010Never finaled
issued Feb 2010, no final
333 Ofarrell Ststreet space
Details
Permit
M190348
Permit issued
Feb 9, 2010

street space

Open the permit page

Jan 29, 2010Completed
final sign-off Aug 2010
333 Ofarrell StMetropolitan Electrical Construction, Cccs, Incclearwire. internet backhaul installation. install 1 equipment rack, 6 internet services exchange switch antenna and 1 gps antenna on roof.
Details
Permit
201001295602
Permit issued
Jun 28, 2010
Final sign-off
Aug 5, 2010

clearwire. internet backhaul installation. install 1 equipment rack, 6 internet services exchange switch antenna and 1 gps antenna on roof.

Open the permit page

$45,000
Jan 26, 2010Completed
final sign-off May 2010
333 Ofarrell StAccutite Technology Engineeringremove old diesel fuel piping and replace with new double walled fiberglass piping from tank top sump to tie in point outside building. no inside work
Details
Permit
201001265375
Permit issued
Jan 27, 2010
Final sign-off
May 12, 2010

remove old diesel fuel piping and replace with new double walled fiberglass piping from tank top sump to tie in point outside building. no inside work

Open the permit page

$67,223
Dec 17, 2009Completed
final sign-off Jan 2010
333 Ofarrell StAyoob & Peery Plumbing Co Inc4th floor.add & relocate fire sprinkler heads per tenant improvements. add 3 & relocate 1.
Details
Permit
200912173412
Permit issued
Dec 17, 2009
Final sign-off
Jan 29, 2010

4th floor.add & relocate fire sprinkler heads per tenant improvements. add 3 & relocate 1.

Open the permit page

$800
Dec 10, 2009Never finaled
issued Feb 2010, no final
333 Ofarrell StDurkin Signs & Graphics Increvision to permit #200910279990- change braille location on stairwell signs.
Details
Permit
200912103012
Permit issued
Feb 16, 2010

revision to permit #200910279990- change braille location on stairwell signs.

Open the permit page

Dec 9, 2009Completed
final sign-off Jan 2010
333 Ofarrell StField Construction Inc.4th floor -construct new floor paltform in electric room, electric work under separate permit.
Details
Permit
200912092941
Permit issued
Dec 11, 2009
Final sign-off
Jan 8, 2010

4th floor -construct new floor paltform in electric room, electric work under separate permit.

Open the permit page

$20,000
Oct 27, 2009Never finaled
issued Oct 2009, no final
333 Ofarrell StDurkin Signs & Graphics Incalter existing stairway floor number signs to include braille
Details
Permit
200910279990
Permit issued
Oct 29, 2009

alter existing stairway floor number signs to include braille

Open the permit page

$30,000
Oct 23, 2009Never finaled
issued Jan 2010, no final
333 Ofarrell StCintas Fire Protectionsf hilton - l /street level. as built for upgrade of ansul fire system in main kitchen
Details
Permit
200910239730
Permit issued
Jan 5, 2010

sf hilton - l /street level. as built for upgrade of ansul fire system in main kitchen

Open the permit page

$250
Oct 2, 2009Never finaled
issued Oct 2009, no final
333 Ofarrell StWest Coast Signreplace kinko's signs with office sign. revision to pa 2009-0722-3174. original permit was for non illuminate. revision is for illuminated letter painted purple.
Details
Permit
200910028189
Permit issued
Oct 2, 2009

replace kinko's signs with office sign. revision to pa 2009-0722-3174. original permit was for non illuminate. revision is for illuminated letter painted purple.

Open the permit page

$100
Sep 24, 2009Completed
final sign-off Jan 2010
333 Ofarrell StAllied Heating & Air Conditioningmechanical replacement of supply & return fan motors, hot water coils, chilled water coils, control dampers, electrical disconnect reconnect, reinstall smoke duct detectors, air & water balance to original design (location @ 12th. flr. penthouse).
Details
Permit
200909247598
Permit issued
Sep 25, 2009
Final sign-off
Jan 25, 2010

mechanical replacement of supply & return fan motors, hot water coils, chilled water coils, control dampers, electrical disconnect reconnect, reinstall smoke duct detectors, air & water balance to original design (location @ 12th. flr. penthouse).

Open the permit page

$435,000
Sep 8, 2009Never finaled
issued Sep 2009, no final
333 Ofarrell StCosco Fire Protection Inc.capp off and safe fire hose stations. per letters from fire marshall schulteis and hilton hotel (asking for and approving removal).
Details
Permit
200909086350
Permit issued
Sep 9, 2009

capp off and safe fire hose stations. per letters from fire marshall schulteis and hilton hotel (asking for and approving removal).

Open the permit page

$3,500
Jul 22, 2009Never finaled
issued Jul 2009, no final
333 Ofarrell StWest Coast Signinstall a non-electric, single faced wall sign.
Details
Permit
200907223174
Permit issued
Jul 22, 2009

install a non-electric, single faced wall sign.

Open the permit page

$1,800
Jul 22, 2009Never finaled
issued Jul 2009, no final
333 Ofarrell Ststreet space
Details
Permit
M173546
Permit issued
Jul 22, 2009

street space

Open the permit page

Jul 20, 2009Completed
final sign-off Jul 2009
333 Ofarrell Stto obtain final inspection for work approved under pa 200804149601; all work has been completed
Details
Permit
200907202974
Permit issued
Jul 20, 2009
Final sign-off
Jul 23, 2009

to obtain final inspection for work approved under pa 200804149601; all work has been completed

Open the permit page

Jul 20, 2009Completed
final sign-off Jul 2009
333 Ofarrell Stto obtain inspection for work approved under pa 200802215243; all work has been completed
Details
Permit
200907202964
Permit issued
Jul 20, 2009
Final sign-off
Jul 29, 2009

to obtain inspection for work approved under pa 200802215243; all work has been completed

Open the permit page

Jul 20, 2009Completed
final sign-off Jul 2009
333 Ofarrell Stto obtain final inspection for work approved under ap #200807011826. all work is complete.
Details
Permit
200907202954
Permit issued
Jul 20, 2009
Final sign-off
Jul 30, 2009

to obtain final inspection for work approved under ap #200807011826. all work is complete.

Open the permit page

Jul 20, 2009Completed
final sign-off Jul 2009
333 Ofarrell Stto obtain final inspection for work approved under pa 200706083444; all work has been completed
Details
Permit
200907202973
Permit issued
Jul 20, 2009
Final sign-off
Jul 27, 2009

to obtain final inspection for work approved under pa 200706083444; all work has been completed

Open the permit page

Jul 20, 2009Completed
final sign-off Jul 2009
333 Ofarrell Stto obtain final inspection for work approved under ap #200801303549.
Details
Permit
200907202958
Permit issued
Jul 20, 2009
Final sign-off
Jul 30, 2009

to obtain final inspection for work approved under ap #200801303549.

Open the permit page

Jul 20, 2009Completed
final sign-off Jul 2009
333 Ofarrell Stto obtain inspection for work approved under pa 200808118827; all work has been completed
Details
Permit
200907202965
Permit issued
Jul 20, 2009
Final sign-off
Jul 28, 2009

to obtain inspection for work approved under pa 200808118827; all work has been completed

Open the permit page

Jul 20, 2009Completed
final sign-off Jul 2009
333 Ofarrell Stto obtain final inspection for work approved under pa 200708160003; all work has been completed
Details
Permit
200907202972
Permit issued
Jul 20, 2009
Final sign-off
Jul 27, 2009

to obtain final inspection for work approved under pa 200708160003; all work has been completed

Open the permit page

Jul 20, 2009Completed
final sign-off Jul 2009
333 Ofarrell Stto obtain inspection for work approved under pa 200806255334; all work has been completed
Details
Permit
200907202963
Permit issued
Jul 20, 2009
Final sign-off
Jul 29, 2009

to obtain inspection for work approved under pa 200806255334; all work has been completed

Open the permit page

Jul 20, 2009Completed
final sign-off Jul 2009
333 Ofarrell Stto obtain final inspection for work approved under ap #200907202957. all work is complete.
Details
Permit
200907202957
Permit issued
Jul 20, 2009
Final sign-off
Jul 30, 2009

to obtain final inspection for work approved under ap #200907202957. all work is complete.

Open the permit page

Jul 20, 2009Completed
final sign-off Jul 2009
333 Ofarrell Stto obtain final inspection for work approved under pa 200802225430; all work has been completed
Details
Permit
200907202971
Permit issued
Jul 20, 2009
Final sign-off
Jul 28, 2009

to obtain final inspection for work approved under pa 200802225430; all work has been completed

Open the permit page

Jul 20, 2009Completed
final sign-off Jul 2009
333 Ofarrell Stto obtain final inspection for work approved under pa 200711218748; all work has been completed
Details
Permit
200907202975
Permit issued
Jul 20, 2009
Final sign-off
Jul 27, 2009

to obtain final inspection for work approved under pa 200711218748; all work has been completed

Open the permit page

Jul 14, 2009Expired or cancelled
cancelled Sep 2010
333 Ofarrell Stt-mobile is proposing to construct and operate a wireless telecommunications facility on an existing penthouse with associated equipment cabinets on the roof of the hilton hotel.
Details
Permit
200907142612

t-mobile is proposing to construct and operate a wireless telecommunications facility on an existing penthouse with associated equipment cabinets on the roof of the hilton hotel.

Open the permit page

$75,000
Jul 10, 2009Never finaled
issued Jul 2009, no final
333 Ofarrell StCintas Fire Protectionrenew pa# 2007/05/18/1714 to obtain final inspection. all work has been completed.
Details
Permit
200907102385
Permit issued
Jul 10, 2009

renew pa# 2007/05/18/1714 to obtain final inspection. all work has been completed.

Open the permit page

Jul 1, 2009Never finaled
issued Jul 2009, no final
333 Ofarrell StMarchetti Construction Inc.to obtain final inspection for work approved under pa#200711208597. all work is complete.
Details
Permit
200907011826
Permit issued
Jul 1, 2009

to obtain final inspection for work approved under pa#200711208597. all work is complete.

Open the permit page

Feb 6, 2009Completed
final sign-off Mar 2009
333 Ofarrell StAccu Tempreplace duct on dryers at basement
Details
Permit
200902061594
Permit issued
Mar 12, 2009
Final sign-off
Mar 13, 2009

replace duct on dryers at basement

Open the permit page

$140,000
Jan 23, 2009Completed
final sign-off Mar 2009
333 Ofarrell StAyoob & Peery Plumbing Co Inc1st fl - relocate fire sprinkler heads per tenant improvements. 57 relocate.
Details
Permit
200901230734
Permit issued
Jan 26, 2009
Final sign-off
Mar 9, 2009

1st fl - relocate fire sprinkler heads per tenant improvements. 57 relocate.

Open the permit page

$14,250
Jan 8, 2009Completed
final sign-off Jan 2009
333 Ofarrell StAyoob & Peery Plumbing Co Incgarage level relocate fire sprinkler heads per tenant improvement.(2 relocate)
Details
Permit
200901089791
Permit issued
Jan 8, 2009
Final sign-off
Jan 22, 2009

garage level relocate fire sprinkler heads per tenant improvement.(2 relocate)

Open the permit page

$360
Dec 18, 2008Never finaled
issued Dec 2008, no final
333 Ofarrell StAllied Fire Protectionreplace formerly removed 2 sprinkler heads in the vista level room, rpovide 1 new sprinkler head in the maid's closet in t-i service area on fl 42, 39, 36, 33, 30, 27, 24, 21, 18, 15, 11, & 8th floor.
Details
Permit
200812188806
Permit issued
Dec 18, 2008

replace formerly removed 2 sprinkler heads in the vista level room, rpovide 1 new sprinkler head in the maid's closet in t-i service area on fl 42, 39, 36, 33, 30, 27, 24, 21, 18, 15, 11, & 8th floor.

Open the permit page

$6,460
Dec 12, 2008Completed
final sign-off Jan 2009
333 Ofarrell StAyoob & Peery Plumbing Co Increlocate fire sprinkler heads per tenant improvements. 1 relocate
Details
Permit
200812128400
Permit issued
Dec 12, 2008
Final sign-off
Jan 16, 2009

relocate fire sprinkler heads per tenant improvements. 1 relocate

Open the permit page

$400
Nov 24, 2008Never finaled
issued Nov 2008, no final
1 Hilton Sqstreet space only.
Details
Permit
M143564
Permit issued
Nov 24, 2008

street space only.

Open the permit page

Nov 20, 2008Completed
final sign-off Jan 2009
333 Ofarrell StRichlen Constructionluggage storage conversion: convert and enclose (e) open space to luggage storage. work will include new walls, electrical sep permit, and finishes. (e)xtg life safety to remain.
Details
Permit
200811207001
Permit issued
Dec 3, 2008
Final sign-off
Jan 16, 2009

luggage storage conversion: convert and enclose (e) open space to luggage storage. work will include new walls, electrical sep permit, and finishes. (e)xtg life safety to remain.

Open the permit page

$23,000
Nov 17, 2008Completed
final sign-off Jan 2009
333 Ofarrell Stconvert (e) vacant cafe to office space upgrade lighting
Details
Permit
200811176740
Permit issued
Nov 18, 2008
Final sign-off
Jan 22, 2009

convert (e) vacant cafe to office space upgrade lighting

Open the permit page

$20,000
Nov 4, 2008Never finaled
issued Nov 2008, no final
333 Ofarrell StSiemens Industry, Inc.life safety "as-built" drawings which indicate the addition of 11 smoke detectors, 4 duct detectors, 2 relay modules 1 monitor module & 2 speaker/strobes. original pa# 2007/11/20/8597, ref:pa# 2008/01/30/3549 (revision).
Details
Permit
200811045757
Permit issued
Nov 4, 2008

life safety "as-built" drawings which indicate the addition of 11 smoke detectors, 4 duct detectors, 2 relay modules 1 monitor module & 2 speaker/strobes. original pa# 2007/11/20/8597, ref:pa# 2008/01/30/3549 (revision).

Open the permit page

$6,700
Sep 3, 2008Completed
final sign-off Mar 2009
333 Ofarrell Stinterior tenant improvement to (e) plaza. scope of work to inclcude new finishes, lighting and electrical work. (e) mech. system to remain as is. groundfloor only. remove & cap (e) fire hose cabinet. fire sprinkler in separate permit.
Details
Permit
200809030657
Permit issued
Sep 3, 2008
Final sign-off
Mar 9, 2009

interior tenant improvement to (e) plaza. scope of work to inclcude new finishes, lighting and electrical work. (e) mech. system to remain as is. groundfloor only. remove & cap (e) fire hose cabinet. fire sprinkler in separate permit.

Open the permit page

$700,000
Aug 15, 2008Never finaled
filed Aug 2008, never issued
333 Ofarrell StAlart Mechanical Contractorsadd new exterior fire sprinkler heads to satisfy ab-05. ref. appl. 200706083444 and correction notice dated 06/30/2008. add 6 sprinkler heads.
Details
Permit
200808159247

add new exterior fire sprinkler heads to satisfy ab-05. ref. appl. 200706083444 and correction notice dated 06/30/2008. add 6 sprinkler heads.

Open the permit page

$1,500
Aug 11, 2008Never finaled
issued Aug 2008, no final
333 Ofarrell StMarchetti Construction Inc.revision to application 200706083444 r-2. garage level- upgrade existing wall to 2 hr rating. install add'l duct work w/applicable fso/sd. remove (e) pair of doors & stair enclosure/path exit way
Details
Permit
200808118827
Permit issued
Aug 11, 2008

revision to application 200706083444 r-2. garage level- upgrade existing wall to 2 hr rating. install add'l duct work w/applicable fso/sd. remove (e) pair of doors & stair enclosure/path exit way

Open the permit page

Jul 24, 2008Never finaled
issued Jul 2008, no final
333 Ofarrell StAlart Mechanical Contractorsadd 4 sidewall exterior heads with canopy's @ storefront.
Details
Permit
200807247481
Permit issued
Jul 24, 2008

add 4 sidewall exterior heads with canopy's @ storefront.

Open the permit page

$1,100
Jul 24, 2008Completed
final sign-off Aug 2008
333 Ofarrell StMarchetti Construction Inc.relocated 2 doors and hardware.cap plumbing drain.revision to permit 2007 0801 8423.
Details
Permit
200807247461
Permit issued
Jul 24, 2008
Final sign-off
Aug 5, 2008

relocated 2 doors and hardware.cap plumbing drain.revision to permit 2007 0801 8423.

Open the permit page

Jun 25, 2008Never finaled
issued Jun 2008, no final
333 Ofarrell StAlart Mechanical Contractorstower 3, garage & lobby: submit as-built dwgs w/changes & new calculations - garage level: (1) relocate, (2) delete, 60'-2" main relocate. lobby level: (14) relocate pendent heads, (2) tie-ins at existing 6" risers w/4" control valves/drains. difference from orig pa#200711218748/r-1.
Details
Permit
200806255334
Permit issued
Jun 27, 2008

tower 3, garage & lobby: submit as-built dwgs w/changes & new calculations - garage level: (1) relocate, (2) delete, 60'-2" main relocate. lobby level: (14) relocate pendent heads, (2) tie-ins at existing 6" risers w/4" control valves/drains. difference from orig pa#200711218748/r-1.

Open the permit page

$3,200
Jun 25, 2008Never finaled
issued Jun 2008, no final
333 Ofarrell StAlart Mechanical Contractorstower 3, 2nd floor: submit as-built fire sprinkler dwgs w/ changes - add (1) head, change 31 heads. above totals are difference between original pa#200712281477 / & as-built dwgs.
Details
Permit
200806255330
Permit issued
Jun 27, 2008

tower 3, 2nd floor: submit as-built fire sprinkler dwgs w/ changes - add (1) head, change 31 heads. above totals are difference between original pa#200712281477 / & as-built dwgs.

Open the permit page

$700
Apr 28, 2008Never finaled
issued May 2008, no final
333 Ofarrell StThomas Swan Sign Co Increvision to engineering and attachement to building for 2 canopy structures per app 200802195045, o'farrell street elevation
Details
Permit
200804280762
Permit issued
May 1, 2008

revision to engineering and attachement to building for 2 canopy structures per app 200802195045, o'farrell street elevation

Open the permit page

Apr 14, 2008Never finaled
issued Jun 2008, no final
333 Ofarrell StZebra Awning Co Incpaint "applygraphics" on valance. non-electric, single faced.
Details
Permit
200804149605
Permit issued
Jun 10, 2008

paint "applygraphics" on valance. non-electric, single faced.

Open the permit page

$75
Apr 14, 2008Never finaled
issued Jun 2008, no final
333 Ofarrell StZebra Awning Co Incfabricate and install 1 new triangle style awning with graphics. 6'x4' projection and 9' drop to include a 9" fixed valance, glazed steel tube primed and painted. fabricate cover of awning canvas fasten with teck screws.
Details
Permit
200804149601
Permit issued
Jun 10, 2008

fabricate and install 1 new triangle style awning with graphics. 6'x4' projection and 9' drop to include a 9" fixed valance, glazed steel tube primed and painted. fabricate cover of awning canvas fasten with teck screws.

Open the permit page

$2,500
Feb 22, 2008Never finaled
issued Feb 2008, no final
333 Ofarrell StMarchetti Construction Inc.wall sill detail clarification to 200706083444
Details
Permit
200802225430
Permit issued
Feb 22, 2008

wall sill detail clarification to 200706083444

Open the permit page

Feb 21, 2008Never finaled
issued Feb 2008, no final
333 Ofarrell StMarchetti Construction Inc.revisions to p.a. 200706083444. changes to doors, door hardware, corridor construction, etc.
Details
Permit
200802215243
Permit issued
Feb 21, 2008

revisions to p.a. 200706083444. changes to doors, door hardware, corridor construction, etc.

Open the permit page

Feb 19, 2008Never finaled
issued Feb 2008, no final
333 Ofarrell StThomas Swan Sign Co Inctwo fabricated canopy structure for 2 signs per application no.2008-0215-4933, 4 feet x 18 feet each at o'farrell street.
Details
Permit
200802195045
Permit issued
Feb 19, 2008

two fabricated canopy structure for 2 signs per application no.2008-0215-4933, 4 feet x 18 feet each at o'farrell street.

Open the permit page

$10,000
Feb 15, 2008Expired or cancelled
expired Sep 2009
333 Ofarrell StThomas Swan Sign Co Incnew illuminated sign at o'farrell street
Details
Permit
200802154936
Permit issued
Feb 19, 2008

new illuminated sign at o'farrell street

Open the permit page

$5,001
Feb 15, 2008Completed
final sign-off Aug 2008
333 Ofarrell StThomas Swan Sign Co Incnon illuminated sign at o'farrell street
Details
Permit
200802154933
Permit issued
Feb 19, 2008
Final sign-off
Aug 14, 2008

non illuminated sign at o'farrell street

Open the permit page

Feb 5, 2008Never finaled
issued Feb 2008, no final
333 Ofarrell StAlart Mechanical Contractorslobby level: install 13 total fire hose valve/outlets w/associated piping, connect to existing 6" combination standpipe risers @ 3-locations.
Details
Permit
200802054035
Permit issued
Feb 14, 2008

lobby level: install 13 total fire hose valve/outlets w/associated piping, connect to existing 6" combination standpipe risers @ 3-locations.

Open the permit page

$19,500
Jan 30, 2008Expired or cancelled
expired Nov 2009
333 Ofarrell StSierra Electric Corevision to life safety permit appl.# 2007.11.20.8597 on lobby and 2nd fl (within lobby area). add 21 smoke detectors, 1 duct detector, 2 relay modules for fire code coverage at magnetic door holders and fire/smoke dampers associated with 2-hour wall construction.
Details
Permit
200801303549
Permit issued
Jan 30, 2008

revision to life safety permit appl.# 2007.11.20.8597 on lobby and 2nd fl (within lobby area). add 21 smoke detectors, 1 duct detector, 2 relay modules for fire code coverage at magnetic door holders and fire/smoke dampers associated with 2-hour wall construction.

Open the permit page

$8,500
Dec 28, 2007Never finaled
issued Dec 2007, no final
333 Ofarrell StAlart Mechanical Contractorsrevision to 2007-1121-8748 sprinkler. relocate 1 head, drop new 12 new heads at existing location, add 15 new heads to system, change 20 heads to quick response @ existing opening. location.
Details
Permit
200712281477
Permit issued
Dec 28, 2007

revision to 2007-1121-8748 sprinkler. relocate 1 head, drop new 12 new heads at existing location, add 15 new heads to system, change 20 heads to quick response @ existing opening. location.

Open the permit page

$4,500
Dec 17, 2007Never finaled
issued Dec 2007, no final
333 Ofarrell StThomas Swan Sign Co Incerect three signs inside the bldg. with lighting. not visible from the street.
Details
Permit
200712170605
Permit issued
Dec 17, 2007

erect three signs inside the bldg. with lighting. not visible from the street.

Open the permit page

Dec 11, 2007Completed
final sign-off Mar 2008
333 Ofarrell Stfirst floor: non-structural interior partitions, fixtures & finishes, existing shared ada restrooms in hotel lobby, existing ceiling & light fixtures (no change in wattage).
Details
Permit
200712110157
Permit issued
Dec 13, 2007
Final sign-off
Mar 21, 2008

first floor: non-structural interior partitions, fixtures & finishes, existing shared ada restrooms in hotel lobby, existing ceiling & light fixtures (no change in wattage).

Open the permit page

$75,000
Dec 6, 2007Completed
final sign-off Jan 2008
333 Ofarrell StSign Of Lightvinyl graphics (door & window). signs f-i-h
Details
Permit
200712069884
Permit issued
Dec 10, 2007
Final sign-off
Jan 29, 2008

vinyl graphics (door & window). signs f-i-h

Open the permit page

Dec 6, 2007Never finaled
issued Dec 2007, no final
333 Ofarrell StSign Of Lighterect electric double faced interior wall sign.
Details
Permit
200712069885
Permit issued
Dec 10, 2007

erect electric double faced interior wall sign.

Open the permit page

Dec 6, 2007Expired or cancelled
expired Jan 2010
333 Ofarrell StSign Of Lighterect electric single faced wall sign.
Details
Permit
200712069887
Permit issued
Dec 10, 2007

erect electric single faced wall sign.

Open the permit page

Nov 21, 2007Never finaled
issued Dec 2007, no final
333 Ofarrell StAlart Mechanical Contractorsfire sprinkler garage,lobby and second floor
Details
Permit
200711218748
Permit issued
Dec 14, 2007

fire sprinkler garage,lobby and second floor

Open the permit page

$90,000
Nov 20, 2007Never finaled
issued Nov 2007, no final
333 Ofarrell StSierra Electric Cofire alarm modification- lobby level conference center/ add 5 strobes, 40 speaker/strobes,60 smoke detectors, 39 duct detectors, 1 interface module.
Details
Permit
200711208597
Permit issued
Nov 20, 2007

fire alarm modification- lobby level conference center/ add 5 strobes, 40 speaker/strobes,60 smoke detectors, 39 duct detectors, 1 interface module.

Open the permit page

$125,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Siemens Industry, Inc. (29), Alart Mechanical Contractors (7), Plant Construction Co, Lp (7), Allied Fire Protection (6), Cw Horton General Contractor (6), Hathaway Dinwiddie Co. (6), Marchetti Construction Inc. (5), Pribuss Engineering Inc (5), Thomas Swan Sign Co Inc (5), Ayoob & Peery Plumbing Co Inc (4), Durkin Signs & Graphics Inc (3), Sign Of Light (3), Acco Engineered Systems Inc. Dba Acco En (2), Cintas Fire Protection (2), Cosco Fire Protection Inc. (2), Metropolitan Electrical Construction (2), Sierra Electric Co (2), Singular Builders (2), West Coast Sign (2), Zebra Awning Co Inc (2), Accu Temp, Accutite Technology Engineering, Allied Heating & Air Conditioning, Best Roofing & Waterproofing Inc, Carrier Corporation, Cccs, Inc, Communication Technology Services Llc, Field Construction Inc., Kgpco Services Llc, Pacific Automatic Sprinkler, Richlen Construction, Ross Recreation Equip Co Inc(Lic D48), Swinerton Builders, The Lawson Roofing Co Inc., Triton Tower Inc, Union Rolling Door Company, Walschon Fire Protection Inc, Western Roofing Service
Architects
Rory J. Carroll (7), Adam Winig (6), Adam Wing (4), Gensler (3), John M'nulty (2), Stanley Wong (2), David Delasantos, Harvey J Hacker, James Stapleton, Michael Wilk
Engineers
Theresa Chung (2), Alan E Money, Albert Teng, David Johnson, Ding Guo Xie, Jawan R.H. Vesses, Joseph Canajani, Lewis James Burrows, Michael Quigley, Theodore G. Garcia
Authorized agents
Lawrence Connell
Designers
Ronald Demartini
Lessees
John Mcnulty

Find contractors for work like this