Permit GraphShortlistSan Francisco building permits since 2000

Rory James Carroll

License
C35881
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Axis Gfa Architecture & Design
Based in
San Francisco
On San Francisco permits
Aug 2017 to Nov 2026

59 permits since 2000 (architect on 59 permits): 39 completed, 8 in progress, 9 never finaled, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Hathaway Dinwiddie Co. (14), Centric Construction Inc (7), Continental Contractors Inc (7), Cw Horton General Contractor (5), Skanska Usa Building Inc (5), Singular Builders (4), Global Managing Innovations Inc Dba Nati (2), De Haro Ramirez Corp, Fdr Construction Inc, Hathaway Dinwiddie Construct Co, Nibbi Bros Assoc Inc., Precision Hotel Interiors Inc
Engineers
Vincent Waters (10), Emily Guglielmo (4), Paul Ferbrache (3), Peter Kraut (3), Jawan R.H. Vesses (2), Sandra Biddulph (2), Asmi Khoury, Benson Balan, David Zenor Heinzerling, Joseph Canajani, Michael Shepherd, Srdjan Rebraca, Tomislav Gajic
Authorized agents
Paul Gregory Cosko, Stephen Safran

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 10, 2026In progress
filed Nov 2026, not yet issued
345 Stockton Stremodel of 2 existing hotel guestrooms (room 401 and 402) and coordior (adjacent section). new walls, floor and ceiling finishes and new lavatory, fauceet and tub trim (e) tub to remain and new furniture and equipment. cooridor: new wall, floor and ceiling finishes; new floor base, decorative wall
Details
Permit
202611100594

remodel of 2 existing hotel guestrooms (room 401 and 402) and coordior (adjacent section). new walls, floor and ceiling finishes and new lavatory, fauceet and tub trim (e) tub to remain and new furniture and equipment. cooridor: new wall, floor and ceiling finishes; new floor base, decorative wall

Open the permit page

$125,000
Nov 3, 2026In progress
filed Nov 2026, not yet issued
333 Ofarrell Stconversion of (e) bar inside an (e) hotel into a starbucks, scope includes (n) floor and wall finishes, food service equipment, millwork, lighting and ff&e.
Details
Permit
202611030267

conversion of (e) bar inside an (e) hotel into a starbucks, scope includes (n) floor and wall finishes, food service equipment, millwork, lighting and ff&e.

Open the permit page

$5,000,000
Oct 15, 2026In progress
issued Oct 2026
55 Cyril Magnin StSingular Builders13-14/f: remodel of 3 (e) guestrooms (1320, 3215, 3209) including (n) finishes, plumbing fixtures, doors, and barrier removal.
Details
Permit
202610159518
Permit issued
Oct 26, 2026

13-14/f: remodel of 3 (e) guestrooms (1320, 3215, 3209) including (n) finishes, plumbing fixtures, doors, and barrier removal.

Open the permit page

$150,000
Oct 9, 2026In progress
issued Oct 2026
333 Ofarrell StSingular Builders(e) lobby to receive (n) carpet, light fixtures, millwork finishes & digital screens. (e) lobby market to be expanded & receive (n) finishes, (e) lounge to receive (n) finishes, mechanical diffucers & light fixtures, barrier removal in (e) public restrooms.
Details
Permit
202610099257
Permit issued
Oct 26, 2026

(e) lobby to receive (n) carpet, light fixtures, millwork finishes & digital screens. (e) lobby market to be expanded & receive (n) finishes, (e) lounge to receive (n) finishes, mechanical diffucers & light fixtures, barrier removal in (e) public restrooms.

Open the permit page

$2,970,000
Jun 26, 2026In progress
issued Jul 2026
333 Ofarrell StSingular Buildersremodel of 2 existing hotel guestrooms(rooms 2681 & 2682. remodel of 2 existing guestroom bathrooms only(rooms 2380 & 2683)
Details
Permit
202606263973
Permit issued
Jul 30, 2026

remodel of 2 existing hotel guestrooms(rooms 2681 & 2682. remodel of 2 existing guestroom bathrooms only(rooms 2380 & 2683)

Open the permit page

$75,000
May 15, 2026In progress
issued Jul 2026
55 Cyril Magnin StSingular Builders22nd floor: remodel of 2 existing hotel guestrooms( rooms 2213 & 2215). remodel of 2 existing guestroom bathrooms only(rooms 2214 & 2218)
Details
Permit
202605151348
Permit issued
Jul 30, 2026

22nd floor: remodel of 2 existing hotel guestrooms( rooms 2213 & 2215). remodel of 2 existing guestroom bathrooms only(rooms 2214 & 2218)

Open the permit page

$90,000
Oct 2, 2025Completed
final sign-off Jun 2026
555 North Point StContinental Contractors Inc2 and 3/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing).
Details
Permit
202510026633
Permit issued
Jan 13, 2026
Final sign-off
Jun 23, 2026

2 and 3/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing).

Open the permit page

$650,000
Oct 2, 2025Completed
final sign-off May 2026
555 North Point StContinental Contractors Inc4 and 5/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing). remove barrier at (e) public bathroom at ground floor to include (n) fixtures and finishes.
Details
Permit
202510026632
Permit issued
Jan 13, 2026
Final sign-off
May 29, 2026

4 and 5/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing). remove barrier at (e) public bathroom at ground floor to include (n) fixtures and finishes.

Open the permit page

$930,000
May 23, 2025In progress
filed May 2025, not yet issued
515 Mason Stbarrier removal of the existing employee locker rooms. scope includes new plumbing fixtures, lighting, finishes and toilet partitions.
Details
Permit
202505237161

barrier removal of the existing employee locker rooms. scope includes new plumbing fixtures, lighting, finishes and toilet partitions.

Open the permit page

$200,000
Dec 6, 2024Completed
final sign-off Apr 2025
299 02nd StSkanska Usa Building Increvision to pa 2023-1130-1690 for change to exterior wall detail 11/a8.01
Details
Permit
202412066295
Permit issued
Dec 11, 2024
Final sign-off
Apr 1, 2025

revision to pa 2023-1130-1690 for change to exterior wall detail 11/a8.01

Open the permit page

Mar 5, 2024Completed
final sign-off May 2024
333 Battery StCentric Construction Incref pa# 202305026872 administrative permit to confirm occupancy counts for ground fl restaurant
Details
Permit
202403057096
Permit issued
Mar 21, 2024
Final sign-off
May 20, 2024

ref pa# 202305026872 administrative permit to confirm occupancy counts for ground fl restaurant

Open the permit page

Feb 13, 2024In progress
filed Feb 2024, not yet issued
333 Battery Stref pa# 2022-1213-8174 adminstrative permit to confirm occupancy counts for level 3 public spaces
Details
Permit
202402135829

ref pa# 2022-1213-8174 adminstrative permit to confirm occupancy counts for level 3 public spaces

Open the permit page

Nov 30, 2023Completed
final sign-off Apr 2025
299 02nd StSkanska Usa Building Incselective replacement of eterior tile facade installed under permit 201812148389.
Details
Permit
202311301690
Permit issued
Jul 16, 2024
Final sign-off
Apr 1, 2025

selective replacement of eterior tile facade installed under permit 201812148389.

Open the permit page

Nov 9, 2023Completed
final sign-off Aug 2024
515 Mason StHathaway Dinwiddie Co.employee dining and cafeteria remodel at (e) hotel. scope includes new floor and wall finish. new act tiles. new lighting and ff & e. relocate e) hand wash sink
Details
Permit
202311090520
Permit issued
Jun 28, 2024
Final sign-off
Aug 13, 2024

employee dining and cafeteria remodel at (e) hotel. scope includes new floor and wall finish. new act tiles. new lighting and ff & e. relocate e) hand wash sink

Open the permit page

$100,000
Sep 14, 2023Completed
final sign-off May 2024
333 Battery StCentric Construction Increvision to pa# 202305026872. (e) storefront to remain. (n) framing & finishes at entry facade. (n) power door operator & high/low actuator switches for (n) entry door. revisions to structural and electrical drawings.
Details
Permit
202309146603
Permit issued
Dec 4, 2023
Final sign-off
May 20, 2024

revision to pa# 202305026872. (e) storefront to remain. (n) framing & finishes at entry facade. (n) power door operator & high/low actuator switches for (n) entry door. revisions to structural and electrical drawings.

Open the permit page

Jun 23, 2023Completed
final sign-off May 2024
333 Battery StCentric Construction Incnew mechanical system for (n)ground fl restaurant renovation.scope of work basement level a and levels 1-3.ref# 202305026872
Details
Permit
202306230780
Permit issued
Nov 9, 2023
Final sign-off
May 20, 2024

new mechanical system for (n)ground fl restaurant renovation.scope of work basement level a and levels 1-3.ref# 202305026872

Open the permit page

$250,000
Jun 6, 2023Completed
final sign-off Apr 2024
333 Battery StCentric Construction Incbasement: conversion of (e) back of house space to new offices/changing rooms, new partitions, finishes & lighting
Details
Permit
202306069335
Permit issued
Aug 22, 2023
Final sign-off
Apr 3, 2024

basement: conversion of (e) back of house space to new offices/changing rooms, new partitions, finishes & lighting

Open the permit page

$20,000
May 2, 2023Completed
final sign-off May 2024
333 Battery StCentric Construction Incbasement l/a, l/1 and l/2: scope includes new wine storage condensing unit on basement level a, renovation of (e) restaurant and bar on l/1, new partitions, finishes, and lighting, new kitchen with new partitions, finishes, lighting, & equipment. new boh restaurant prep area on l/2.
Details
Permit
202305026872
Permit issued
Aug 28, 2023
Final sign-off
May 20, 2024

basement l/a, l/1 and l/2: scope includes new wine storage condensing unit on basement level a, renovation of (e) restaurant and bar on l/1, new partitions, finishes, and lighting, new kitchen with new partitions, finishes, lighting, & equipment. new boh restaurant prep area on l/2.

Open the permit page

$1,000,000
Dec 16, 2022Never finaled
issued Apr 2023, no final
333 Battery StContinental Contractors Inc15-24/flrs: renovations of guestrooms including new finishes, plumbing fixtures and lighting.
Details
Permit
202212168537
Permit issued
Apr 14, 2023

15-24/flrs: renovations of guestrooms including new finishes, plumbing fixtures and lighting.

Open the permit page

$900,000
Dec 16, 2022Never finaled
issued Apr 2023, no final
333 Battery StContinental Contractors Inc5-14/flrs: renovation of guestrooms including n finishes, plumbing fixtures and lighting
Details
Permit
202212168525
Permit issued
Apr 14, 2023

5-14/flrs: renovation of guestrooms including n finishes, plumbing fixtures and lighting

Open the permit page

$900,000
Aug 26, 2022Completed
final sign-off Dec 2023
333 Battery StCentric Construction Incbasement c: expansion of (e) fitness center, new finishes, mech & lighting. basement b & level 2: new finishes, retrofit lighting at (e) prefunction & meeting spaces, new vanity, sinks, lighting at public restrooms. maher n/a.
Details
Permit
202208261359
Permit issued
Nov 22, 2022
Final sign-off
Dec 14, 2023

basement c: expansion of (e) fitness center, new finishes, mech & lighting. basement b & level 2: new finishes, retrofit lighting at (e) prefunction & meeting spaces, new vanity, sinks, lighting at public restrooms. maher n/a.

Open the permit page

$400,000
Aug 17, 2022Completed
final sign-off Dec 2023
333 Battery StCentric Construction Inclevel 1: new paving, drains, finishes, exterior screen, entry door at porte-cochere; new lighting, mech, finishes, ff&e @new pre-arrival lobby; new handrail extensions (level 1 only) & floor finishes @ grand stair (levels 1-3).
Details
Permit
202208170750
Permit issued
Dec 20, 2022
Final sign-off
Dec 14, 2023

level 1: new paving, drains, finishes, exterior screen, entry door at porte-cochere; new lighting, mech, finishes, ff&e @new pre-arrival lobby; new handrail extensions (level 1 only) & floor finishes @ grand stair (levels 1-3).

Open the permit page

$600,000
Jul 22, 2022Expired or cancelled
cancelled Jan 2026
333 Battery Stdemo of (e) tile paving & mortar and install of (n) paving materials @ the public right away (clay st)
Details
Permit
202207229093

demo of (e) tile paving & mortar and install of (n) paving materials @ the public right away (clay st)

Open the permit page

$28,000
Jun 14, 2022Completed
final sign-off Feb 2023
1800 Sutter StContinental Contractors Increnovation of (e) guest bathrooms including (n) floor and wall finishes, and (n) plumbing fixtures. conversion of (e) tubs to (n) showers.
Details
Permit
202206146283
Permit issued
Jul 6, 2022
Final sign-off
Feb 7, 2023

renovation of (e) guest bathrooms including (n) floor and wall finishes, and (n) plumbing fixtures. conversion of (e) tubs to (n) showers.

Open the permit page

$750,000
May 27, 2022Never finaled
filed May 2022, never issued
5 Embarcadero Centeraddition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windows
Details
Permit
202205275168

addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windows

Open the permit page

$1,100,000
Apr 25, 2022Expired or cancelled
cancelled Jan 2026
5 Embarcadero CenterHathaway Dinwiddie Co.revision to pa# 202012030185. revising rating on doors from approved permit.
Details
Permit
202204252894

revision to pa# 202012030185. revising rating on doors from approved permit.

Open the permit page

Apr 8, 2022Completed
final sign-off Nov 2024
299 02nd StPrecision Hotel Interiors Incexpansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck.
Details
Permit
202204081881
Permit issued
Jul 19, 2022
Final sign-off
Nov 15, 2024

expansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck.

Open the permit page

$900,000
Apr 7, 2022Completed
final sign-off Oct 2022
222 Sansome StCw Horton General Contractorrevision to pa# 201907186324. to document change in designated accessible mobility guestrooms.
Details
Permit
202204071785
Permit issued
Jun 28, 2022
Final sign-off
Oct 17, 2022

revision to pa# 201907186324. to document change in designated accessible mobility guestrooms.

Open the permit page

Dec 2, 2021Completed
final sign-off Jun 2022
333 Battery StContinental Contractors Inc5/f: renovation of two guestrooms and partial corridor, including new finishes, plumbing fixtures, light fixtures, and flooring. new tactile exist signs at hotel entry.
Details
Permit
202112023520
Permit issued
May 9, 2022
Final sign-off
Jun 21, 2022

5/f: renovation of two guestrooms and partial corridor, including new finishes, plumbing fixtures, light fixtures, and flooring. new tactile exist signs at hotel entry.

Open the permit page

$10,000
Nov 18, 2021Never finaled
issued Jan 2022, no final
5 Embarcadero CenterHathaway Dinwiddie Co.identify the calculated and approved occupant load for the assembly spaces at the atrium level 3rd fl of existing hotel
Details
Permit
202111182732
Permit issued
Jan 4, 2022

identify the calculated and approved occupant load for the assembly spaces at the atrium level 3rd fl of existing hotel

Open the permit page

Nov 8, 2021Completed
final sign-off Mar 2022
125 03rd StHathaway Dinwiddie Co.new evacuation signage at lobby lvel of e hotel. interior renovation approved under 202106031577
Details
Permit
202111082006
Permit issued
Nov 17, 2021
Final sign-off
Mar 29, 2022

new evacuation signage at lobby lvel of e hotel. interior renovation approved under 202106031577

Open the permit page

$2,200
Sep 17, 2021Never finaled
issued Sep 2021, no final
333 Ofarrell StHathaway Dinwiddie Co.new evacuation signs (17 total) in grand ballroom on 3/f and mezz level. interior renovation permit under pa201910306012. maher n/a.
Details
Permit
202109178697
Permit issued
Sep 28, 2021

new evacuation signs (17 total) in grand ballroom on 3/f and mezz level. interior renovation permit under pa201910306012. maher n/a.

Open the permit page

$7,500
Sep 15, 2021Completed
final sign-off Oct 2022
5 Embarcadero CenterHathaway Dinwiddie Co.floors 2-11: renovate (e) guestrooms to provide clear floor space at plmbing fixtures scope.inlcludes outlet relocation and new ff&e,finishes, lhgting and plumbing fixtures.renoation of corridors on flrs 2-11,including new finishes and pf%e. (e) hvac system to remain.
Details
Permit
202109158502
Permit issued
Nov 17, 2021
Final sign-off
Oct 13, 2022

floors 2-11: renovate (e) guestrooms to provide clear floor space at plmbing fixtures scope.inlcludes outlet relocation and new ff&e,finishes, lhgting and plumbing fixtures.renoation of corridors on flrs 2-11,including new finishes and pf%e. (e) hvac system to remain.

Open the permit page

$5,000,000
Aug 10, 2021Completed
final sign-off Dec 2021
555 North Point StGlobal Managing Innovations Inc Dba Natibarrier removal related to accessible business entrance program 51-16 category 2. including item 1: route from accessible passenger loading zone exceeds 1:48.regrade excessive slipes at accessible passenger loading zone; new handrails at (e) ramp (in parking lot)
Details
Permit
202108106163
Permit issued
Oct 22, 2021
Final sign-off
Dec 15, 2021

barrier removal related to accessible business entrance program 51-16 category 2. including item 1: route from accessible passenger loading zone exceeds 1:48.regrade excessive slipes at accessible passenger loading zone; new handrails at (e) ramp (in parking lot)

Open the permit page

$25,000
Jul 23, 2021Completed
final sign-off Oct 2022
5 Embarcadero CenterHathaway Dinwiddie Co.renovation of e guestrooms ( flrs 12,14,15) to provide clear floor space at plumbing fixtures. scope also includes outlet relocation and new ffe, finishes, lighting, plumbing fixtures. renovation of corridors on floors 12-17, including new finishes ffe and lighting. (e) hvac systems to remain.
Details
Permit
202107234963
Permit issued
Oct 27, 2021
Final sign-off
Oct 13, 2022

renovation of e guestrooms ( flrs 12,14,15) to provide clear floor space at plumbing fixtures. scope also includes outlet relocation and new ffe, finishes, lighting, plumbing fixtures. renovation of corridors on floors 12-17, including new finishes ffe and lighting. (e) hvac systems to remain.

Open the permit page

$26,554
Jun 29, 2021Never finaled
issued Aug 2021, no final
689 Mission Stapplying for level 9 roof terrace assembly permit. all spaces over 49 occupants require a place of assembly permit. per a recent correction notice from sffd, a place of assembly permit has never been filed even though the space is not new. provided plans include ref.200008309233 to show occupantload
Details
Permit
202106293451
Permit issued
Aug 10, 2021

applying for level 9 roof terrace assembly permit. all spaces over 49 occupants require a place of assembly permit. per a recent correction notice from sffd, a place of assembly permit has never been filed even though the space is not new. provided plans include ref.200008309233 to show occupantload

Open the permit page

Jun 3, 2021Completed
final sign-off Mar 2022
125 03rd AvHathaway Dinwiddie Construct Corenovation of the first floor including the lobby, lounge, reception, and bar areas, including- replacement od interior finishes, new mill work and changes to bar layout, including new equipment and changes to plumbing and electrical replacement of light fixtures.
Details
Permit
202106031577
Permit issued
Aug 25, 2021
Final sign-off
Mar 30, 2022

renovation of the first floor including the lobby, lounge, reception, and bar areas, including- replacement od interior finishes, new mill work and changes to bar layout, including new equipment and changes to plumbing and electrical replacement of light fixtures.

Open the permit page

$1,408,132
Apr 29, 2021Completed
final sign-off Feb 2022
555 North Point StGlobal Managing Innovations Inc Dba Natiroom 554: barrier removal at executive suite to a mobility accessible guestroom to meet dispersion. scope includes reconfiguration of bathroom, replacement of plumbing fixtures, and replacement of finishes to match existing.
Details
Permit
202104299570
Permit issued
Oct 22, 2021
Final sign-off
Feb 2, 2022

room 554: barrier removal at executive suite to a mobility accessible guestroom to meet dispersion. scope includes reconfiguration of bathroom, replacement of plumbing fixtures, and replacement of finishes to match existing.

Open the permit page

$55,000
Apr 9, 2021Never finaled
issued Jun 2021, no final
299 02nd StFdr Construction Incremoval of (e) specific pieces of laundry euipment. reconfiguration of storage and employee area addition of office spaces (2) exterior wall louvers to be demolished and replaced with (n) wall to match existing.
Details
Permit
202104098212
Permit issued
Jun 14, 2021

removal of (e) specific pieces of laundry euipment. reconfiguration of storage and employee area addition of office spaces (2) exterior wall louvers to be demolished and replaced with (n) wall to match existing.

Open the permit page

$58,000
Dec 24, 2020Completed
final sign-off Mar 2022
125 03rd StHathaway Dinwiddie Co.barrier removel: accessible passenger drop-off/loading zone & access aisle, accessible entries, modification to accessible parking signage & elevator door jamp signs. widen women's accessible restroom stall. removal of urinal in men's restroom to probide adequate door clearance.
Details
Permit
202012241729
Permit issued
Jun 2, 2021
Final sign-off
Mar 30, 2022

barrier removel: accessible passenger drop-off/loading zone & access aisle, accessible entries, modification to accessible parking signage & elevator door jamp signs. widen women's accessible restroom stall. removal of urinal in men's restroom to probide adequate door clearance.

Open the permit page

$150,000
Dec 3, 2020Completed
final sign-off Oct 2022
5 Embarcadero CenterHathaway Dinwiddie Co.enclosing 3 vestibules along sacramento alley. scope includes new wall & egress doors. no change to occupancy load or egress path.
Details
Permit
202012030185
Permit issued
Feb 18, 2022
Final sign-off
Oct 7, 2022

enclosing 3 vestibules along sacramento alley. scope includes new wall & egress doors. no change to occupancy load or egress path.

Open the permit page

$50,000
Aug 5, 2020Never finaled
issued Oct 2020, no final
5 The EmbarcaderoHathaway Dinwiddie Co.5th fl: renovation of 2 existing guestrooms and partial corridor/door drop, including new finishes, plumbing fixtures, lighting fixtures and flooring. maher na
Details
Permit
202008051189
Permit issued
Oct 7, 2020

5th fl: renovation of 2 existing guestrooms and partial corridor/door drop, including new finishes, plumbing fixtures, lighting fixtures and flooring. maher na

Open the permit page

$153,482
Nov 18, 2019Never finaled
issued Feb 2020, no final
222 Sansome StCw Horton General Contractorno change to building area or room count. accessible path of travel upgrades/barrier removal exterior & hotel entry. non-structural demo & repair of (e) materials.new lighting at select areas in elevator lobby & restaurant. 3rd floor corridor new finishes & decorative lighting. new entry at lobby.
Details
Permit
201911187527
Permit issued
Feb 27, 2020

no change to building area or room count. accessible path of travel upgrades/barrier removal exterior & hotel entry. non-structural demo & repair of (e) materials.new lighting at select areas in elevator lobby & restaurant. 3rd floor corridor new finishes & decorative lighting. new entry at lobby.

Open the permit page

$300,000
Nov 18, 2019Completed
final sign-off May 2023
222 Sansome StDe Haro Ramirez Corpaccessible path of travel upgrades/barrier removal at exterior of the building. new curb ramp at passenger loading zone on city sidewalk
Details
Permit
201911187525
Permit issued
May 19, 2022
Final sign-off
May 15, 2023

accessible path of travel upgrades/barrier removal at exterior of the building. new curb ramp at passenger loading zone on city sidewalk

Open the permit page

$35,000
Oct 30, 2019Completed
final sign-off Nov 2021
333 Ofarrell StHathaway Dinwiddie Co.interior remodel of grand ballroom at 3rd fl and adjacent atrium/escalator space extending from gr fl lobby to 4th fl. public toilets at 1/2 level above ballroom to be upgraded to comply with current accessibility codes. 2 unisex bath within meeting room suites will be upgraded. scope includes new
Details
Permit
201910306012
Permit issued
Aug 5, 2021
Final sign-off
Nov 15, 2021

interior remodel of grand ballroom at 3rd fl and adjacent atrium/escalator space extending from gr fl lobby to 4th fl. public toilets at 1/2 level above ballroom to be upgraded to comply with current accessibility codes. 2 unisex bath within meeting room suites will be upgraded. scope includes new

Open the permit page

$3,920,000
Oct 29, 2019Completed
final sign-off Feb 2020
125 03rd StContinental Contractors Incunit 1102. barrier removal at guestroom including new finishes, plumbing fixtures, and flooring
Details
Permit
201910295811
Permit issued
Jan 23, 2020
Final sign-off
Feb 7, 2020

unit 1102. barrier removal at guestroom including new finishes, plumbing fixtures, and flooring

Open the permit page

$20,776
Oct 4, 2019Completed
final sign-off Feb 2022
222 Sansome StCw Horton General Contractor3rd fl - inteior remodel of health club and unisex restroom scope include new floor and wall finishes, fitness equipment. existing unisex restroom to be upgrade to comply with current codes with no change in fixture counts. work consist of finishes only and barrier removal.
Details
Permit
201910043609
Permit issued
Oct 31, 2019
Final sign-off
Feb 9, 2022

3rd fl - inteior remodel of health club and unisex restroom scope include new floor and wall finishes, fitness equipment. existing unisex restroom to be upgrade to comply with current codes with no change in fixture counts. work consist of finishes only and barrier removal.

Open the permit page

$17,000
Aug 26, 2019Completed
final sign-off Dec 2019
5 The EmbarcaderoHathaway Dinwiddie Co.floors 2-17:revision to 201812208921 to include special inspections for fireproof patching at (e) metal decking and beams. removal of (e) spray fireproofing at (e) beam where indicated. new spray fire proofing and intumescent paint where indicated
Details
Permit
201908269838
Permit issued
Aug 28, 2019
Final sign-off
Dec 17, 2019

floors 2-17:revision to 201812208921 to include special inspections for fireproof patching at (e) metal decking and beams. removal of (e) spray fireproofing at (e) beam where indicated. new spray fire proofing and intumescent paint where indicated

Open the permit page

Jul 23, 2019Completed
final sign-off Mar 2021
299 02nd StSkanska Usa Building Increvision to 201812148389 and 201901251235: (e) roof trellis to remain, changes to elevations revised structural design to art box, marquee, rest, canopy, ext light fixture remove from scope
Details
Permit
201907236735
Permit issued
Sep 18, 2019
Final sign-off
Mar 30, 2021

revision to 201812148389 and 201901251235: (e) roof trellis to remain, changes to elevations revised structural design to art box, marquee, rest, canopy, ext light fixture remove from scope

Open the permit page

Jun 21, 2019Completed
final sign-off Dec 2019
5 The EmbarcaderoHathaway Dinwiddie Co.revision to app#201812208921. revision to include revised partition type "e" for the 2 hour guest room to corridor partition. n/a for maher
Details
Permit
201906214146
Permit issued
Jun 26, 2019
Final sign-off
Dec 17, 2019

revision to app#201812208921. revision to include revised partition type "e" for the 2 hour guest room to corridor partition. n/a for maher

Open the permit page

Apr 16, 2019Completed
final sign-off Oct 2019
5 The Embarcaderodemo of existing windows on east side of building, 2nd-17th floors. replace in-kind with mission safety class. no change to (e) window size, mullions or appearance. one glass window panel to be reviewed for matching purposes in advance by preservation planning staff. no other work under this permit.
Details
Permit
201904168154
Permit issued
Aug 13, 2019
Final sign-off
Oct 25, 2019

demo of existing windows on east side of building, 2nd-17th floors. replace in-kind with mission safety class. no change to (e) window size, mullions or appearance. one glass window panel to be reviewed for matching purposes in advance by preservation planning staff. no other work under this permit.

Open the permit page

$100,000
Apr 12, 2019Completed
final sign-off Sep 2019
222 Sansome StNibbi Bros Assoc Inc.48th fl - renovation of guest rooms 4804 and 4805, including (n) finishes, plumbing fixtures and flooring
Details
Permit
201904127829
Permit issued
May 17, 2019
Final sign-off
Sep 16, 2019

48th fl - renovation of guest rooms 4804 and 4805, including (n) finishes, plumbing fixtures and flooring

Open the permit page

$20,037
Jan 25, 2019Completed
final sign-off Mar 2021
299 02nd StSkanska Usa Building Incselective demo of 1st & 2nd fl, interior and exterior selective demo of (e) porte cochere, public open space at folsom and courtyard public open space. demolition of roof trellis. associated with bpa #201812148389.
Details
Permit
201901251235
Permit issued
Mar 5, 2019
Final sign-off
Mar 30, 2021

selective demo of 1st & 2nd fl, interior and exterior selective demo of (e) porte cochere, public open space at folsom and courtyard public open space. demolition of roof trellis. associated with bpa #201812148389.

Open the permit page

$1,000,000
Dec 18, 2018Completed
final sign-off Oct 2019
5 The Embarcadero15/f: 1540/1541/1542: remodel (e) suite including plmb fixtures lighting and finishes. maher n/a.
Details
Permit
201812188651
Permit issued
Apr 15, 2019
Final sign-off
Oct 25, 2019

15/f: 1540/1541/1542: remodel (e) suite including plmb fixtures lighting and finishes. maher n/a.

Open the permit page

$65,000
Dec 14, 2018Completed
final sign-off Aug 2021
299 02nd StSkanska Usa Building Incground & 2nd floor - selective remodel of exterior, new interior finishes. expand lobby at ground floor, partial infill of (e) port-cochere, new exterior covered outdoor space, interior renovation of ground floor public spaces, basement parking restriping. ** maher: n/a **
Details
Permit
201812148389
Permit issued
May 3, 2019
Final sign-off
Aug 26, 2021

ground & 2nd floor - selective remodel of exterior, new interior finishes. expand lobby at ground floor, partial infill of (e) port-cochere, new exterior covered outdoor space, interior renovation of ground floor public spaces, basement parking restriping. ** maher: n/a **

Open the permit page

$6,300,000
Oct 10, 2018Completed
final sign-off Aug 2019
5 The EmbarcaderoHathaway Dinwiddie Co.fitness center, removal of wall, replacement of selected floor finishes, new wall finishes, ceiling, doors and selected lighting. all upgraded areas will be reconfigured to comply w/ accessibility requirements per 2016 cbc. maher n/a
Details
Permit
201810102851
Permit issued
Feb 28, 2019
Final sign-off
Aug 5, 2019

fitness center, removal of wall, replacement of selected floor finishes, new wall finishes, ceiling, doors and selected lighting. all upgraded areas will be reconfigured to comply w/ accessibility requirements per 2016 cbc. maher n/a

Open the permit page

$210,000
Dec 12, 2017Expired or cancelled
cancelled Jan 2026
5 The Embarcaderomodification to 225 guestroom guardrails majer na
Details
Permit
201712126249

modification to 225 guestroom guardrails majer na

Open the permit page

$440,000
Aug 9, 2017Completed
final sign-off Apr 2018
333 Ofarrell StCw Horton General Contractor8th floor - conversion of office space, which was originally guest rooms back to guest rooms. no additional quantity of rooms being added. mep & life safety separate permit. n/a maher ordinance. work in rooms 831, 832, 8/f, tower 3
Details
Permit
201708094390
Permit issued
Oct 18, 2017
Final sign-off
Apr 2, 2018

8th floor - conversion of office space, which was originally guest rooms back to guest rooms. no additional quantity of rooms being added. mep & life safety separate permit. n/a maher ordinance. work in rooms 831, 832, 8/f, tower 3

Open the permit page

$157,007
Aug 8, 2017Completed
final sign-off Feb 2018
333 Ofarrell StCw Horton General Contractorfloors 5,8,9,10,11,12,14 - replacement of (e) guest room & back of house doors. n/a maher ordinance
Details
Permit
201708084203
Permit issued
Oct 12, 2017
Final sign-off
Feb 2, 2018

floors 5,8,9,10,11,12,14 - replacement of (e) guest room & back of house doors. n/a maher ordinance

Open the permit page

$991,007