Joseph Camajani
- License
- S5778
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S5778 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Jul 2023 to Nov 2026
8 permits since 2000 (engineer on 8 permits): 3 completed, 5 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Commercial Interior Builders Inc, Devcon Construction, Dome Construction Corp, Field Construction Inc., West Coast Build Aka Fairway Constructio
- Architects
- Eric Ibsen (3), Ariane Lebrilla, Marie Luzel Bermudez Buensuceso, Mark Cavagnero, Rory J. Carroll, Stanley H Lew
- Engineers
- Aditya Paranjape, Daniel Willis, Jawan R.H. Vesses, Sami Khoury
- Subcontractors
- Marcel Dean Matthew Legrande, Presley Fuentes
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2026 | In progress filed Nov 2026, not yet issued | 333 Brannan St | 5th flr: t.i. includes the demo of non-structural partitions, blding new non-structural partitions. add phone booth anchoring. all new or revised mep and life safety work will be design. build and submitted separately. (bldg is full sprinkled).Details
5th flr: t.i. includes the demo of non-structural partitions, blding new non-structural partitions. add phone booth anchoring. all new or revised mep and life safety work will be design. build and submitted separately. (bldg is full sprinkled). | $500,000 | |
| Nov 3, 2026 | In progress filed Nov 2026, not yet issued | 333 Ofarrell St | conversion of (e) bar inside an (e) hotel into a starbucks, scope includes (n) floor and wall finishes, food service equipment, millwork, lighting and ff&e.Details
conversion of (e) bar inside an (e) hotel into a starbucks, scope includes (n) floor and wall finishes, food service equipment, millwork, lighting and ff&e. | $5,000,000 | |
| Aug 26, 2026 | In progress filed Aug 2026, not yet issued | 198 Wisteria Ln | priority mayor 13-01. block c & d: erect 6-story (block c) & (block d), type 3a over 1a construction, market-rate multi-family residential with 243 units.Details
priority mayor 13-01. block c & d: erect 6-story (block c) & (block d), type 3a over 1a construction, market-rate multi-family residential with 243 units. | $95,000,000 | |
| Mar 16, 2026 | In progress issued Jul 2026 | 1800 Owens St | Dome Construction Corp | sector 1, level 1; t.i. to develop a pilates studio. work out area with (12) reformers machines, reception area with merchandise. propose new exterior entrance. approx 100 sqft. of the slab in new entry way to be demo and sloped (1.5% max) for accessiblity.Details
sector 1, level 1; t.i. to develop a pilates studio. work out area with (12) reformers machines, reception area with merchandise. propose new exterior entrance. approx 100 sqft. of the slab in new entry way to be demo and sloped (1.5% max) for accessiblity. | $255,000 |
| Feb 27, 2026 | Completed final sign-off Aug 2026 | 100 Montgomery St | West Coast Build Aka Fairway Constructio | 10/f: demolition of existing non-structural partitions, decorative ceiling baffles, lighting, millwork and finishes. new constructuion of new finishes, millwork and decorative lighting. existing floor plan layout to remain. no change in occupant group. no change in mechanical.Details
10/f: demolition of existing non-structural partitions, decorative ceiling baffles, lighting, millwork and finishes. new constructuion of new finishes, millwork and decorative lighting. existing floor plan layout to remain. no change in occupant group. no change in mechanical. | $525,000 |
| Jul 9, 2025 | Completed final sign-off May 2026 | 201 03rd St | Field Construction Inc. | 12 flr; t.i. on 12th flr. scope of work includes demolition of non-structural partitions,doors, and sidelights, millwork, ceiling and lighting, and finishes and power, construction of mother's room and accessible single user all gender restroom and existing accessibility upgradesDetails
12 flr; t.i. on 12th flr. scope of work includes demolition of non-structural partitions,doors, and sidelights, millwork, ceiling and lighting, and finishes and power, construction of mother's room and accessible single user all gender restroom and existing accessibility upgrades | $1,200,000 |
| Apr 18, 2024 | Completed final sign-off Jan 2025 | 201 03rd St | Commercial Interior Builders Inc | construction of interior storefront system and doors in lobbyDetails
construction of interior storefront system and doors in lobby | $100,000 |
| Jul 25, 2023 | In progress issued Aug 2024 | 2001 37th Av | Devcon Construction | the project consist of a proposed 142500 gsf addition of educational and accessory spaces to an existing education building. the existing building is 3 stories and the addition proposed is three stories plus basement. approximately 58800 gsf of existing educationaland accessory spaces will beDetails
the project consist of a proposed 142500 gsf addition of educational and accessory spaces to an existing education building. the existing building is 3 stories and the addition proposed is three stories plus basement. approximately 58800 gsf of existing educationaland accessory spaces will be | $75,000,000 |