Sami Khoury
- Listed as
- engineer
- On San Francisco permits
- Apr 2022 to Mar 2026
10 permits since 2000 (engineer on 10 permits): 8 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 16, 2026 | In progress issued Jul 2026 | 1800 Owens St | Dome Construction Corp | sector 1, level 1; t.i. to develop a pilates studio. work out area with (12) reformers machines, reception area with merchandise. propose new exterior entrance. approx 100 sqft. of the slab in new entry way to be demo and sloped (1.5% max) for accessiblity.Details
sector 1, level 1; t.i. to develop a pilates studio. work out area with (12) reformers machines, reception area with merchandise. propose new exterior entrance. approx 100 sqft. of the slab in new entry way to be demo and sloped (1.5% max) for accessiblity. | $255,000 |
| Oct 22, 2025 | In progress filed Oct 2025, not yet issued | 433 Kearny St | elevator modernization of two traction elevator 1 & 2. refurbish hoistway machines, new door operator, new spring roller guides, new normal and terminal switches. new travel cables etc.Details
elevator modernization of two traction elevator 1 & 2. refurbish hoistway machines, new door operator, new spring roller guides, new normal and terminal switches. new travel cables etc. | $2,300,000 | |
| Feb 5, 2025 | Completed final sign-off May 2025 | 3533 California St | Turner Construction Co | interior soft demo of (e) vacant space. ada upgrades will be provide on subsequent ti permit ab-017. level 1 consists of demo (e) interior non-structural paritions, doors, millwork, floor finishes, furnitures, atm, ceiling systems, light fixtures, ceiling accesories, electrical outlets, mechanicalDetails
interior soft demo of (e) vacant space. ada upgrades will be provide on subsequent ti permit ab-017. level 1 consists of demo (e) interior non-structural paritions, doors, millwork, floor finishes, furnitures, atm, ceiling systems, light fixtures, ceiling accesories, electrical outlets, mechanical | $100,000 |
| Dec 17, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | Turner Construction Co | revision to pa# 202406275356: 2/f mechanical update to add dedicated backup exhaust serving idf room.Details
revision to pa# 202406275356: 2/f mechanical update to add dedicated backup exhaust serving idf room. | $20,000 |
| Sep 25, 2024 | Completed final sign-off Apr 2025 | 111 Pine St | Turner Construction Co | 2/f- revision to permit# 202406275356: there is a new corridor/hallway and idf room updates.Details
2/f- revision to permit# 202406275356: there is a new corridor/hallway and idf room updates. | $50,000 |
| Aug 9, 2024 | Completed final sign-off Feb 2025 | 111 Pine St | Turner Construction Co | revision to pa# 202402075406: updating mechanical drawing m-201 to show correct as-built conditions and (e) fsd locations. scope is limited to mechanical only.Details
revision to pa# 202402075406: updating mechanical drawing m-201 to show correct as-built conditions and (e) fsd locations. scope is limited to mechanical only. | |
| Nov 13, 2023 | Completed final sign-off Aug 2024 | 180 Montgomery St | Bcci Construction Company | 13/f: new office ti to include new non-structural partitions, ceilings, finishes, and associated mep work. ref demo permit 202310108327Details
13/f: new office ti to include new non-structural partitions, ceilings, finishes, and associated mep work. ref demo permit 202310108327 | $1,912,802 |
| Oct 11, 2023 | Completed final sign-off Aug 2024 | 180 Montgomery St | Bcci Construction Company | 25th floor: demo only permit per ab-017, demo without full access compliance for interior demo only. mep demo included. tenant improvement permit deferred.Details
25th floor: demo only permit per ab-017, demo without full access compliance for interior demo only. mep demo included. tenant improvement permit deferred. | $100,000 |
| Mar 21, 2023 | Completed final sign-off Nov 2023 | 1 Bush St | Bcci Construction Company | 18th/f office t.i. demo (e) partition & ceiling. new partitions and finishes, mep includedDetails
18th/f office t.i. demo (e) partition & ceiling. new partitions and finishes, mep included | $1,100,000 |
| Apr 7, 2022 | Completed final sign-off Oct 2022 | 222 Sansome St | Cw Horton General Contractor | revision to pa# 201907186324. to document change in designated accessible mobility guestrooms.Details
revision to pa# 201907186324. to document change in designated accessible mobility guestrooms. |