Block 3722, lot 071
126 New Montgomery St
- City’s use
- Commercial Office
- Built
- 1901
- Stories
- 9
- Rooms
- 26 bathrooms
- Building
- 135,489 sq ft
- Lot
- 16,200 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 13, 2026 | Completed final sign-off Mar 2026 | 126 New Montgomery St | Nemarti Modern World Construction | move handicapped table, revision to 202507030100Details
move handicapped table, revision to 202507030100 | |
| Jan 5, 2026 | Completed final sign-off May 2026 | 116 New Montgomery St | Everon Llc | 2nd/f fire alarm revision to 202508153173: add 13 strobes only for phone boothDetails
2nd/f fire alarm revision to 202508153173: add 13 strobes only for phone booth | $7,000 |
| Sep 12, 2025 | Completed final sign-off Dec 2025 | 116 New Montgomery St | Anderson, Rowe & Buckley, Inc. | fire sprinikler ti arb job 25-145 add 36Details
fire sprinikler ti arb job 25-145 add 36 | $19,692 |
| Sep 5, 2025 | In progress issued Sep 2025 | 116 New Montgomery St | M C S Construction Services | revison to pa# 202505297541: 10 (n) phone booths on the 2nd floor.Details
revison to pa# 202505297541: 10 (n) phone booths on the 2nd floor. | $20,000 |
| Aug 15, 2025 | Completed final sign-off May 2026 | 116 New Montgomery St | Everon Llc | fire alarm t.i. on 2nd flr - add 4 strobes, relocate and replace 2 strobes with new add 1 control realy for card reader. ref:# 202505297541Details
fire alarm t.i. on 2nd flr - add 4 strobes, relocate and replace 2 strobes with new add 1 control realy for card reader. ref:# 202505297541 | $5,000 |
| Aug 7, 2025 | Completed final sign-off Sep 2025 | 116 New Montgomery St | Golden Gate Fire Protection Inc | ti for sigma suite on the 2nd floor: relocate (16) uprights and (8) concealed pendents. ref ti# 202505297541Details
ti for sigma suite on the 2nd floor: relocate (16) uprights and (8) concealed pendents. ref ti# 202505297541 | $6,000 |
| Jul 22, 2025 | In progress issued Jul 2025 | 116 New Montgomery St | M C S Construction Services | 2/f: deferred electrical and mechanical (ref pa#202505297541). mechanical-minor mech modificaitons & demo. includes removal of (e) registers and duct work as needed. install new supply and return registers, new split system, air con, assoc condenser, and air balance. electrical-lighting with...Details
2/f: deferred electrical and mechanical (ref pa#202505297541). mechanical-minor mech modificaitons & demo. includes removal of (e) registers and duct work as needed. install new supply and return registers, new split system, air con, assoc condenser, and air balance. electrical-lighting with... | $100,000 |
| Jul 3, 2025 | Completed final sign-off Mar 2026 | 126 New Montgomery St | Nemarti Modern World Construction | t.i. improvement of restaurant in vacant restaurant space, no walls new equpiment , new finishes w/mechanical. plumbing and electric design buildDetails
t.i. improvement of restaurant in vacant restaurant space, no walls new equpiment , new finishes w/mechanical. plumbing and electric design build | $10,000 |
| Jun 26, 2025 | In progress issued Jul 2025 | 116 New Montgomery St | M C S Construction Services | revision to pa # 2025-0529-7541 modification of existing roof deckDetails
revision to pa # 2025-0529-7541 modification of existing roof deck | $50,000 |
| May 29, 2025 | In progress issued Jun 2025 | 116 New Montgomery St | M C S Construction Services | 2nd fl ti - (n) non-structural partitions, interior storefront systems, lighting, electrical, plumbing. pantry upgrades. mep deferredDetails
2nd fl ti - (n) non-structural partitions, interior storefront systems, lighting, electrical, plumbing. pantry upgrades. mep deferred | $500,000 |
| May 2, 2025 | Completed final sign-off Jun 2025 | 116 New Montgomery St | Anderson, Rowe & Buckley, Inc. | fire sprinkler system 39 sprinklers (existing restaurant)Details
fire sprinkler system 39 sprinklers (existing restaurant) | $25,000 |
| Aug 4, 2023 | Completed final sign-off Aug 2023 | 116 New Montgomery St | Anderson, Rowe & Buckley, Inc. | 1/f: existing sprinkler system demo- add 48 new pendents sprinklers.Details
1/f: existing sprinkler system demo- add 48 new pendents sprinklers. | $30,000 |
| Jul 25, 2023 | Completed final sign-off Aug 2023 | 116 New Montgomery St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only relocate 4 uprights/add 5 to 1st fl and relocate 2 uprights/add 1 to the 2nd fl for signsDetails
fire sprinkler only relocate 4 uprights/add 5 to 1st fl and relocate 2 uprights/add 1 to the 2nd fl for signs | $6,750 |
| Jul 18, 2023 | Never finaled issued Jul 2023, no final | 116 New Montgomery St | Anderson, Rowe & Buckley, Inc. | ti. (e) fire sprinkler system. 12 added sprinkers under open stari. ref pa# 202212168572 & pa# 202208080112.Details
ti. (e) fire sprinkler system. 12 added sprinkers under open stari. ref pa# 202212168572 & pa# 202208080112. | $7,500 |
| Jun 22, 2023 | Completed final sign-off Sep 2023 | 116 New Montgomery St | Swinerton Builders | 2/f: mep drawings for permit. these are the engineered plan that are associated w/pa# 202212168572 & 202306150173Details
2/f: mep drawings for permit. these are the engineered plan that are associated w/pa# 202212168572 & 202306150173 | $250,000 |
| Jun 15, 2023 | Completed final sign-off Sep 2023 | 116 New Montgomery St | Swinerton Builders | revision to 202208080112 and 202212168572 to remove temporary egress passageway used during construction. provide access to egress stair #2. no exterior workDetails
revision to 202208080112 and 202212168572 to remove temporary egress passageway used during construction. provide access to egress stair #2. no exterior work | $25,000 |
| Apr 17, 2023 | Never finaled issued Apr 2023, no final | 116 New Montgomery St | Everon Llc | fire alarm t.i. on 2nd floor. add 20 horn/strobes and 6 strobes onlyDetails
fire alarm t.i. on 2nd floor. add 20 horn/strobes and 6 strobes only | $14,000 |
| Mar 24, 2023 | Completed final sign-off Apr 2023 | 116 New Montgomery St | Everon Llc | fire alarm as built for 202209283340. update layout to match arch drawing including 1 duct detector for fsdDetails
fire alarm as built for 202209283340. update layout to match arch drawing including 1 duct detector for fsd | |
| Mar 13, 2023 | Completed final sign-off May 2023 | 116 New Montgomery St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system -t.i. add 7 and relocoated 40 sprinkler - removed 3 sprinklers. ref permit 202212168572Details
existing fire sprinkler system -t.i. add 7 and relocoated 40 sprinkler - removed 3 sprinklers. ref permit 202212168572 | $32,000 |
| Mar 9, 2023 | Completed final sign-off Mar 2023 | 116 New Montgomery St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only ref to t.i. 202212229049. relocate 1 pendant, 2 upright, add 3 uprights to new office on 4 th fl.Details
fire sprinkler only ref to t.i. 202212229049. relocate 1 pendant, 2 upright, add 3 uprights to new office on 4 th fl. | $3,120 |
| Feb 6, 2023 | Completed final sign-off Apr 2023 | 116 New Montgomery St | Anderson, Rowe & Buckley, Inc. | fire sprinkler system schell 141 uprights, relocate 17 uprights, add 8 uprights ref 202212229042Details
fire sprinkler system schell 141 uprights, relocate 17 uprights, add 8 uprights ref 202212229042 | $104,000 |
| Jan 6, 2023 | Completed final sign-off Jun 2023 | 116 New Montgomery St | Everon Llc | 5th floor:fire alarm t.i. : add 12 horn strobes, add 2 strobes, and relocate 10 extg horn strobes and 3 strobes only. add 1 duct detector & relay. ref pa#202212229042.Details
5th floor:fire alarm t.i. : add 12 horn strobes, add 2 strobes, and relocate 10 extg horn strobes and 3 strobes only. add 1 duct detector & relay. ref pa#202212229042. | $9,000 |
| Jan 6, 2023 | Completed final sign-off Apr 2023 | 116 New Montgomery St | Everon Llc | 4th floor:fire alarm t.i. add 2 horn strobes and relocate 3 extg strobes and remove 1 extg strobe only. add 1 duct detector & relay. ref pa#202212229049.Details
4th floor:fire alarm t.i. add 2 horn strobes and relocate 3 extg strobes and remove 1 extg strobe only. add 1 duct detector & relay. ref pa#202212229049. | $2,600 |
| Dec 22, 2022 | Completed final sign-off Aug 2023 | 116 New Montgomery St | Swinerton Builders | 4th fl t.i. non structural partions, new all gender restroom, casework, fixtures and finishesDetails
4th fl t.i. non structural partions, new all gender restroom, casework, fixtures and finishes | $156,000 |
| Dec 22, 2022 | Completed final sign-off Aug 2023 | 116 New Montgomery St | Swinerton Builders | 5th fl non structural partions, new all gender restroom, casework, fixtures and finishesDetails
5th fl non structural partions, new all gender restroom, casework, fixtures and finishes | $608,500 |
| Dec 16, 2022 | Completed final sign-off Sep 2023 | 116 New Montgomery St | Swinerton Builders | 2/f: revision to pa# 202208080112. 2nd floor revisions.Details
2/f: revision to pa# 202208080112. 2nd floor revisions. | |
| Dec 16, 2022 | Completed final sign-off Aug 2023 | 116 New Montgomery St | Swinerton Builders | 1/f & 2/f: revision to pa# 202208080111. revision to 1st & 2nd floor interior stair.Details
1/f & 2/f: revision to pa# 202208080111. revision to 1st & 2nd floor interior stair. | |
| Dec 16, 2022 | Expired or cancelled cancelled Jan 2026 | 116 New Montgomery St | Swinerton Builders | rev to pa# 2021-1223-4967; revisions to ground fl. retail areaDetails
rev to pa# 2021-1223-4967; revisions to ground fl. retail area | |
| Dec 13, 2022 | Completed final sign-off Mar 2023 | 116 New Montgomery St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system. add 5 sprinklers, relocate 19 sprinklers, remove 1 sprinkler.Details
existing fire sprinkler system. add 5 sprinklers, relocate 19 sprinklers, remove 1 sprinkler. | $12,000 |
| Nov 22, 2022 | Completed final sign-off Aug 2023 | 116 New Montgomery St | Swinerton Builders | 8/f: ti to return space to single tenant work includes: install non-bearing interior partitions, new interior storefront systems, cinference & phone rooms, new single user restroom, new casework, new mep.Details
8/f: ti to return space to single tenant work includes: install non-bearing interior partitions, new interior storefront systems, cinference & phone rooms, new single user restroom, new casework, new mep. | $608,500 |
| Nov 22, 2022 | Never finaled issued Nov 2022, no final | 116 New Montgomery St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only relocate pendents to uprights on the 5th floor (22-212)Details
fire sprinkler only relocate pendents to uprights on the 5th floor (22-212) | $21,250 |
| Sep 30, 2022 | Never finaled issued Mar 2023, no final | 116 New Montgomery St | Swinerton Builders | 2/f: door sill adjustment & door modification to remove ramps @ 2nd fl roof deck. per coa2022009596Details
2/f: door sill adjustment & door modification to remove ramps @ 2nd fl roof deck. per coa2022009596 | $5,000 |
| Sep 28, 2022 | Completed final sign-off Apr 2023 | 116 New Montgomery St | Everon Llc | fire alarm t.i. on 8th fl. add 19 horn/strobes, 6 strobes only, relocate 5 horn/strobe, 2 strobes only and 1 smoke detector. ref pa# 202209021786Details
fire alarm t.i. on 8th fl. add 19 horn/strobes, 6 strobes only, relocate 5 horn/strobe, 2 strobes only and 1 smoke detector. ref pa# 202209021786 | $16,000 |
| Sep 2, 2022 | Completed final sign-off Jul 2023 | 116 New Montgomery St | Swinerton Builders | 8/f: demo (e) finishes & meps for future build-out. sprinklers + ls system to remain, currently sprinklers are all turn up because of exposed ceilings. ab-017Details
8/f: demo (e) finishes & meps for future build-out. sprinklers + ls system to remain, currently sprinklers are all turn up because of exposed ceilings. ab-017 | $75,000 |
| Aug 8, 2022 | Completed final sign-off Jan 2024 | 116 New Montgomery St | Swinerton Builders | 2/f: interior t.i: consisting of open work space and meeting rooms. new non-structural partitions, doors, ceilings, finishes, and millworks. mep deferred.Details
2/f: interior t.i: consisting of open work space and meeting rooms. new non-structural partitions, doors, ceilings, finishes, and millworks. mep deferred. | $1,484,280 |
| Aug 8, 2022 | Completed final sign-off Jan 2024 | 116 New Montgomery St | Swinerton Builders | construct new interior egress corridor and stair from 2/f to the g/f. stair connects 2 stories and is enclosed in 1-hr rated corridor per cbc 1023.2. no work at historic facade, stair, and balcony on this permit.Details
construct new interior egress corridor and stair from 2/f to the g/f. stair connects 2 stories and is enclosed in 1-hr rated corridor per cbc 1023.2. no work at historic facade, stair, and balcony on this permit. | $210,000 |
| Jun 14, 2022 | Completed final sign-off Apr 2023 | 116 New Montgomery St | Golden Gate Fire Protection Inc | basement: replace (e) fire pump. maher n/a.Details
basement: replace (e) fire pump. maher n/a. | $25,000 |
| Jan 18, 2022 | Never finaled issued Jan 2022, no final | 116 New Montgomery St | Pribuss Engineering Inc | g/f & 2/f: suite 100: modifity upright sprinkler protection on 1/f & 2/f for demo of (e) partitions and ceilings. plug off/remove (e) sprinkler drops. total (e) sprinklers relocated andchanged out to theupright sprinklers: 123. maher n/a.Details
g/f & 2/f: suite 100: modifity upright sprinkler protection on 1/f & 2/f for demo of (e) partitions and ceilings. plug off/remove (e) sprinkler drops. total (e) sprinklers relocated andchanged out to theupright sprinklers: 123. maher n/a. | $63,222 |
| Dec 23, 2021 | Never finaled issued Oct 2022, no final | 116 New Montgomery St | Swinerton Builders | t.i.constisting of specific suite build-outs for future ground floor retail. new restrooms @ ground floor. mep & elevator deferred. no work at historical facade.Details
t.i.constisting of specific suite build-outs for future ground floor retail. new restrooms @ ground floor. mep & elevator deferred. no work at historical facade. | $837,000 |
| Dec 17, 2021 | Completed final sign-off Sep 2023 | 116 New Montgomery St | Swinerton Builders | g/f & 2/f: interior demo - remove non-bearing partitions, finishes and fixtures.Details
g/f & 2/f: interior demo - remove non-bearing partitions, finishes and fixtures. | $30,000 |
| Nov 8, 2021 | Never finaled issued Oct 2022, no final | 116 New Montgomery St | Swinerton Builders | g/f: replacement of (e) non-original storefronts along mission str and the three northernmost storefronts along new montgomery st. no removal of original fabric modification of interior vestible. no mep work on this permit.Details
g/f: replacement of (e) non-original storefronts along mission str and the three northernmost storefronts along new montgomery st. no removal of original fabric modification of interior vestible. no mep work on this permit. | $300,000 |
| Sep 20, 2021 | Completed final sign-off Mar 2022 | 116 New Montgomery St | Thomas Swan Sign Co Inc | install (1) non-illuminated projecting banner sign: sigma.Details
install (1) non-illuminated projecting banner sign: sigma. | $2,000 |
| Jul 20, 2021 | Completed final sign-off Mar 2022 | 116 New Montgomery St | Thomas Swan Sign Co Inc | install 1 non-illuminated projecting banner signs: "door dash"Details
install 1 non-illuminated projecting banner signs: "door dash" | $4,000 |
| Dec 8, 2020 | Never finaled issued Jan 2021, no final | 116 New Montgomery St | Everon Llc | fire alarm t.i. - elevator modernization projecct. add (3) smoke detectors in machine room, add (3) control relays for designated recall, alternate recall, & fireman's flashing hat function.Details
fire alarm t.i. - elevator modernization projecct. add (3) smoke detectors in machine room, add (3) control relays for designated recall, alternate recall, & fireman's flashing hat function. | |
| Feb 18, 2020 | Never finaled issued Feb 2020, no final | 116 New Montgomery St | street spaceDetails
street space | ||
| Jul 29, 2019 | Completed final sign-off Sep 2019 | 116 New Montgomery St | Peacock Construction | 8/f: title 24 electrical compliance for pa 201903044276. maher n/a.Details
8/f: title 24 electrical compliance for pa 201903044276. maher n/a. | |
| May 23, 2019 | Completed final sign-off Jan 2021 | 116 New Montgomery St | Thomas Swan Sign Co Inc | install 2 non electric projecting double faces sign one on new montgomery and one on minnaDetails
install 2 non electric projecting double faces sign one on new montgomery and one on minna | $17,000 |
| May 16, 2019 | Completed final sign-off May 2019 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | ste 810: relocate (1) existing noticatin device horn/strobe. maher n/a.Details
ste 810: relocate (1) existing noticatin device horn/strobe. maher n/a. | $6,000 |
| Mar 4, 2019 | Completed final sign-off Sep 2019 | 116 New Montgomery St | Peacock Construction | 8th floor: selective demo and construction of non structural partitions, millwork and finishes, and new sink. n/a for maherDetails
8th floor: selective demo and construction of non structural partitions, millwork and finishes, and new sink. n/a for maher | $160,000 |
| Feb 26, 2019 | Completed final sign-off Mar 2019 | 116 New Montgomery St | M C S Construction Services | 5th fl ti include the demolishing of 1 non-structural partition only. maher n/a.Details
5th fl ti include the demolishing of 1 non-structural partition only. maher n/a. | $1,000 |
| May 29, 2018 | Completed final sign-off Aug 2018 | 116 New Montgomery St | Dome Construction Corp | revision to 201608104714 installation of guardrail @ skylight perimeter located on 2nd flr level roof.Details
revision to 201608104714 installation of guardrail @ skylight perimeter located on 2nd flr level roof. | $5,000 |
| May 14, 2018 | Never finaled issued May 2018, no final | 116 New Montgomery St | to obtain finalinspection for work approved under pa#201405296997 & 201203075516. all work is complete.Details
to obtain finalinspection for work approved under pa#201405296997 & 201203075516. all work is complete. | ||
| Apr 30, 2018 | Never finaled filed Apr 2018, never issued | 116 New Montgomery St | Thomas Swan Sign Co Inc | erect non-electrict, projecting, double-faced, non-illuminating, new sign **maher n/a**Details
erect non-electrict, projecting, double-faced, non-illuminating, new sign **maher n/a** | $3,000 |
| Apr 3, 2018 | Never finaled issued May 2018, no final | 116 New Montgomery St | Skyline Construction | 7th floor: revision to app#201802050348 to show extg won door at stair and revised 90 min. door to 20 min.. ref app#201805050348. n/a for maherDetails
7th floor: revision to app#201802050348 to show extg won door at stair and revised 90 min. door to 20 min.. ref app#201805050348. n/a for maher | |
| Feb 5, 2018 | Completed final sign-off Mar 2018 | 116 New Montgomery St | Skyline Construction | 7th floor: removal of partition and door. new double door to replace single door. n/a for maher. electrical work will be under separated permit.Details
7th floor: removal of partition and door. new double door to replace single door. n/a for maher. electrical work will be under separated permit. | $100,000 |
| Nov 8, 2017 | Completed final sign-off Sep 2018 | 116 New Montgomery St | D W Nicholson Corporation | 9/f roof- revision to pa#201607142351, add lateral bracing to supports for davits. all construction is below (e) parapet. n/a ordinance #155-13Details
9/f roof- revision to pa#201607142351, add lateral bracing to supports for davits. all construction is below (e) parapet. n/a ordinance #155-13 | $20,000 |
| Sep 18, 2017 | Never finaled issued Sep 2017, no final | 116 New Montgomery St | street spaceDetails
street space | ||
| Aug 18, 2017 | Completed final sign-off Oct 2017 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | add 4 new monitoring modules on extg valve tampers at fire pump. n/a for maherDetails
add 4 new monitoring modules on extg valve tampers at fire pump. n/a for maher | $2,500 |
| Jul 13, 2017 | Completed final sign-off Oct 2018 | 116 New Montgomery St | Donald S. Maclean, Inc | sidewalk rehab over subbasement. inclucing ada ramp at the corner of mission st & new montgomery st, s/e corner. reference street improvement permit 171e-0425. n/a maherDetails
sidewalk rehab over subbasement. inclucing ada ramp at the corner of mission st & new montgomery st, s/e corner. reference street improvement permit 171e-0425. n/a maher | $10,000 |
| Jun 19, 2017 | Completed final sign-off Sep 2017 | 116 New Montgomery St | Field Construction Inc. | mechanical engineering t-24. ref pa # 201612286088. n/a maherDetails
mechanical engineering t-24. ref pa # 201612286088. n/a maher | $15,000 |
| May 31, 2017 | Completed final sign-off Dec 2017 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | suite #812: add (7) seven ceiling hornstrobes, add (2) two ceiling stroves, relocate (1) one existing smoke detector. ref. t.i. #201612286088. maher naDetails
suite #812: add (7) seven ceiling hornstrobes, add (2) two ceiling stroves, relocate (1) one existing smoke detector. ref. t.i. #201612286088. maher na | $2,500 |
| May 18, 2017 | Completed final sign-off Oct 2017 | 116 New Montgomery St | Field Construction Inc. | 8/f- electrical engineering t-24 to pa#201612286088. maher not reqDetails
8/f- electrical engineering t-24 to pa#201612286088. maher not req | |
| May 16, 2017 | Completed final sign-off Jun 2017 | 116 New Montgomery St | Golden Gate Fire Protection Inc | 8th floor - fire sprinklers, relocate 6 pendent sprinklers, relocate 29 upright sprinklers. n/a ordinance #155-13Details
8th floor - fire sprinklers, relocate 6 pendent sprinklers, relocate 29 upright sprinklers. n/a ordinance #155-13 | $18,375 |
| May 1, 2017 | Completed final sign-off Jan 2018 | 116 New Montgomery St | Field Construction Inc. | revision to 201701066686: detail of anchor exterior window frames at suite 812 maher naDetails
revision to 201701066686: detail of anchor exterior window frames at suite 812 maher na | |
| Jan 6, 2017 | Completed final sign-off Jan 2018 | 116 New Montgomery St | Field Construction Inc. | anchorage of exterior window frames at suite 812 due to removal of existing interior cement plaster. maher naDetails
anchorage of exterior window frames at suite 812 due to removal of existing interior cement plaster. maher na | $22,000 |
| Jan 6, 2017 | Completed final sign-off Aug 2017 | 116 New Montgomery St | Dome Construction Corp | 8/f, suite 812: selective demo of non load bearing partitions, ceiling gride & tile, light fixtures & millwork. maher na. ab-017 demolition only.Details
8/f, suite 812: selective demo of non load bearing partitions, ceiling gride & tile, light fixtures & millwork. maher na. ab-017 demolition only. | $55,000 |
| Dec 28, 2016 | Completed final sign-off Oct 2017 | 116 New Montgomery St | Dome Construction Corp | suite 812: this project involve modification of (e) t.i. to include selective construction of non load bearing partitions, new ceiling grid & tiles, new light fitures, new office doors & frame, new millwork and sink and new finishes. maher n/aDetails
suite 812: this project involve modification of (e) t.i. to include selective construction of non load bearing partitions, new ceiling grid & tiles, new light fitures, new office doors & frame, new millwork and sink and new finishes. maher n/a | $175,000 |
| Aug 10, 2016 | Completed final sign-off Aug 2018 | 116 New Montgomery St | Dome Construction Corp | installation of guardrails at penthouse roof and 2nd fl roof, including access ladder between roof and penthouse roofDetails
installation of guardrails at penthouse roof and 2nd fl roof, including access ladder between roof and penthouse roof | $25,000 |
| Jul 14, 2016 | Completed final sign-off Aug 2018 | 116 New Montgomery St | Dome Construction Corp | install structural steel supports on roof to support a davit system for window washing and facade maintenance. not visable from street. n/a ordinance #155-13Details
install structural steel supports on roof to support a davit system for window washing and facade maintenance. not visable from street. n/a ordinance #155-13 | $140,000 |
| Jul 7, 2016 | Completed final sign-off Jul 2016 | 116 New Montgomery St | Golden Gate Fire Protection Inc | fire sprinklers: replace (e) 6"valve assembly with (n)6" ames double valve assemble; maher n/aDetails
fire sprinklers: replace (e) 6"valve assembly with (n)6" ames double valve assemble; maher n/a | $5,000 |
| Mar 22, 2016 | Completed final sign-off May 2016 | 116 New Montgomery St | Dome Construction Corp | change of anchorage for exterior windows on 3rd and 4th floors. revision to app#201503231577; maher n/aDetails
change of anchorage for exterior windows on 3rd and 4th floors. revision to app#201503231577; maher n/a | |
| Mar 14, 2016 | Completed final sign-off Aug 2016 | 116 New Montgomery St | 7th floor - non-structural demo, (n) non-structural partitions, ceiling, lights, millwork. no change in occupancy, use or area. mep, life safety, sprinkler under separate permit. n/a maher ordinanceDetails
7th floor - non-structural demo, (n) non-structural partitions, ceiling, lights, millwork. no change in occupancy, use or area. mep, life safety, sprinkler under separate permit. n/a maher ordinance | $176,715 | |
| Oct 16, 2015 | Never finaled issued Oct 2015, no final | 116 New Montgomery St | Dome Construction Corp | 2 evacuation signs 6th flDetails
2 evacuation signs 6th fl | $1,200 |
| Oct 13, 2015 | Completed final sign-off Nov 2015 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | 6th flr: t.i. to cover adding 23 horn/strobes, 3 smoke detectors, 3 duct det, 3 relays & 10 strobes, ref. 201501075072; maher n/aDetails
6th flr: t.i. to cover adding 23 horn/strobes, 3 smoke detectors, 3 duct det, 3 relays & 10 strobes, ref. 201501075072; maher n/a | $7,500 |
| Aug 28, 2015 | Completed final sign-off Oct 2015 | 116 New Montgomery St | Dome Construction Corp | evacuation sings for 9th floor & basementDetails
evacuation sings for 9th floor & basement | $800 |
| Aug 28, 2015 | Never finaled issued Aug 2015, no final | 116 New Montgomery St | Dome Construction Corp | (2) evacuation signs at each floor 4 totalDetails
(2) evacuation signs at each floor 4 total | $500 |
| Aug 26, 2015 | Never finaled issued Sep 2015, no final | 116 New Montgomery St | Dome Construction Corp | 6th flr: revision to 2015-0519-6626: to include selective construction of non load bearing partitions, (n) light fixtures, (n) doors, glazing & frames, (n) elect, (n) millwork & (n) finishes. maher na. life safety deferred.Details
6th flr: revision to 2015-0519-6626: to include selective construction of non load bearing partitions, (n) light fixtures, (n) doors, glazing & frames, (n) elect, (n) millwork & (n) finishes. maher na. life safety deferred. | $125,000 |
| Aug 21, 2015 | Expired or cancelled cancelled Mar 2020 | 116 New Montgomery St | unit #200. minor permit to alter. install deck on top of existing roof/patio area. height of deck above roof surface approx 9".Details
unit #200. minor permit to alter. install deck on top of existing roof/patio area. height of deck above roof surface approx 9". | $12,500 | |
| Aug 21, 2015 | Completed final sign-off Sep 2015 | 116 New Montgomery St | Golden Gate Fire Protection Inc | 6th flr: fire sprinklers only: installing new sprinkler system - for spec suite. 14 pendent in the common area/lobby and 92 upright heads 106 heads total. maher na pa 201505196626Details
6th flr: fire sprinklers only: installing new sprinkler system - for spec suite. 14 pendent in the common area/lobby and 92 upright heads 106 heads total. maher na pa 201505196626 | $53,000 |
| Jul 24, 2015 | Completed final sign-off May 2016 | 116 New Montgomery St | Dome Construction Corp | 9th floor/roof - revision to pa #2015.0501.5101 (replacement of skylight) - structural components submittal only. n/a maher ordinanceDetails
9th floor/roof - revision to pa #2015.0501.5101 (replacement of skylight) - structural components submittal only. n/a maher ordinance | $40,000 |
| Jun 29, 2015 | Completed final sign-off Jul 2015 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | t.i. adding new horn/strobes 5, strobe 2 & smoke detector 1, ref. 201503251811; maher n/aDetails
t.i. adding new horn/strobes 5, strobe 2 & smoke detector 1, ref. 201503251811; maher n/a | $7,500 |
| Jun 22, 2015 | Never finaled issued Jun 2015, no final | 116 New Montgomery St | renew permit application pa 201308073138 for final inspectionDetails
renew permit application pa 201308073138 for final inspection | ||
| Jun 22, 2015 | Never finaled issued Jun 2015, no final | 116 New Montgomery St | Novo Construction Inc | renew permit application 201308073736 for final inspection onlyDetails
renew permit application 201308073736 for final inspection only | |
| Jun 19, 2015 | Never finaled issued Jun 2015, no final | 116 New Montgomery St | street spaceDetails
street space | ||
| Jun 8, 2015 | Never finaled issued Aug 2015, no final | 116 New Montgomery St | Dome Construction Corp | installation of roof anchors & steel supports for use by window washing equipment. all installations on roof & roof over penthouse. all behind parapet - not visible from exterior. (maher ordinance - extended ordinance no.155-13 not required)Details
installation of roof anchors & steel supports for use by window washing equipment. all installations on roof & roof over penthouse. all behind parapet - not visible from exterior. (maher ordinance - extended ordinance no.155-13 not required) | $35,000 |
| Jun 2, 2015 | Completed final sign-off Apr 2018 | 116 New Montgomery St | Potter Fire Protection | 9th floor: relocate one and add one fire sprinklers. ref permit app#201503251811. n/a for maher.Details
9th floor: relocate one and add one fire sprinklers. ref permit app#201503251811. n/a for maher. | $1,850 |
| May 19, 2015 | Completed final sign-off May 2016 | 116 New Montgomery St | Dome Construction Corp | modification of existing tenant improvement to include selective demo and construction of non load bearing partitions, ddemo of e ceiling grid and tile, new light fixtures including reswitching, new interior doors, glazing, frames, new electrical, n millwork, finishes. restroom upgrade work prformedDetails
modification of existing tenant improvement to include selective demo and construction of non load bearing partitions, ddemo of e ceiling grid and tile, new light fixtures including reswitching, new interior doors, glazing, frames, new electrical, n millwork, finishes. restroom upgrade work prformed | $1,224,219 |
| May 19, 2015 | Completed final sign-off May 2016 | 116 New Montgomery St | Dome Construction Corp | sidewalk over basement, beam and slab repair . lift at sidewalk, wall replacement maher not reqDetails
sidewalk over basement, beam and slab repair . lift at sidewalk, wall replacement maher not req | $50,000 |
| May 13, 2015 | Expired or cancelled cancelled Jan 2026 | 116 New Montgomery St | Richlen Construction | 8th floor: partial improvement of extg space including non structural demolition of partition/finishes. new construction to include new partition, door, furniture, finishes. a/v telecom and power. no structural work ot be performed. n/a for the maher.Details
8th floor: partial improvement of extg space including non structural demolition of partition/finishes. new construction to include new partition, door, furniture, finishes. a/v telecom and power. no structural work ot be performed. n/a for the maher. | $20,000 |
| May 8, 2015 | Completed final sign-off Jul 2015 | 116 New Montgomery St | Richlen Construction | th flr: partial ti: new partition walls, door, furniture, finishes, av, telecom & power. no structural work to be done. mep under sep permit. maher naDetails
th flr: partial ti: new partition walls, door, furniture, finishes, av, telecom & power. no structural work to be done. mep under sep permit. maher na | $45,000 |
| May 1, 2015 | Completed final sign-off May 2016 | 116 New Montgomery St | Dome Construction Corp | non-structural partitions, doors, ceiling, lighting, finishes, no change of occupancy. replacement of skylight at 9th flr, revision to permit 201503251811; maher n/aDetails
non-structural partitions, doors, ceiling, lighting, finishes, no change of occupancy. replacement of skylight at 9th flr, revision to permit 201503251811; maher n/a | |
| Apr 28, 2015 | Completed final sign-off Jul 2015 | 116 New Montgomery St | Dome Construction Corp | #250- this project involves modification & expansion of existing t.i. to include selective demolition of non-load bearing partitions and minor patching and repair. n/a ordinance #155-13Details
#250- this project involves modification & expansion of existing t.i. to include selective demolition of non-load bearing partitions and minor patching and repair. n/a ordinance #155-13 | $5,000 |
| Apr 14, 2015 | Completed final sign-off Jul 2015 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | revise pa#201503171036 to reflect change in type of horn/strobe notification devices from wall mounted to (5) ceiling mounted. t.i. pa#201411060850. n/a ordinance #155-13Details
revise pa#201503171036 to reflect change in type of horn/strobe notification devices from wall mounted to (5) ceiling mounted. t.i. pa#201411060850. n/a ordinance #155-13 | $300 |
| Apr 13, 2015 | Never finaled issued Apr 2015, no final | 116 New Montgomery St | Novo Construction Inc | to renew pa# 201312275121. all work complete.Details
to renew pa# 201312275121. all work complete. | |
| Mar 25, 2015 | Completed final sign-off May 2016 | 116 New Montgomery St | Dome Construction Corp | 9th floor: non structural partitions, doors, ceiling, lighting, finishes - no change of occupancy. maher - not req'd. replacement of skylight at 9th floor. mechanicals are included with this permit. comply with ab 047.Details
9th floor: non structural partitions, doors, ceiling, lighting, finishes - no change of occupancy. maher - not req'd. replacement of skylight at 9th floor. mechanicals are included with this permit. comply with ab 047. | $212,000 |
| Mar 24, 2015 | Never finaled issued Oct 2015, no final | 116 New Montgomery St | Thomas Swan Sign Co Inc | g/f exterior wall along minna st - erect 1 nos. of non-electric, projecting, double faced, non-illuminated sign. maher n/a.Details
g/f exterior wall along minna st - erect 1 nos. of non-electric, projecting, double faced, non-illuminated sign. maher n/a. | $1,500 |
| Mar 23, 2015 | Completed final sign-off May 2016 | 116 New Montgomery St | Dome Construction Corp | exterior window anchorage at 3rd and 4th flrs, all work performed on interior; maher n/aDetails
exterior window anchorage at 3rd and 4th flrs, all work performed on interior; maher n/a | $50,000 |
| Mar 19, 2015 | Completed final sign-off Jul 2015 | 116 New Montgomery St | Potter Fire Protection | install fire sprinklers on 3rd & 4th floors. ref fire sprinkler #201502239100. n/a for maher ordinance.Details
install fire sprinklers on 3rd & 4th floors. ref fire sprinkler #201502239100. n/a for maher ordinance. | $100,000 |
| Mar 18, 2015 | Completed final sign-off Jul 2015 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | adding 1 relay, relocating existing 17 horn/strobes, 5 strobes. t.i. pa# 201501075079 n/a ordinance #155-13Details
adding 1 relay, relocating existing 17 horn/strobes, 5 strobes. t.i. pa# 201501075079 n/a ordinance #155-13 | $7,500 |
| Mar 17, 2015 | Completed final sign-off Jul 2015 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | adding 2 ceiling horn/strobes, 6 ceiling strobes, 2 relays ref pa #2015 0107 5079 maher - not req'dDetails
adding 2 ceiling horn/strobes, 6 ceiling strobes, 2 relays ref pa #2015 0107 5079 maher - not req'd | $7,500 |
| Mar 17, 2015 | Completed final sign-off Jul 2015 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | 9/f: adding 1 horn/strobe, 4 smoke setector's, 2 duct detectors & 4 relays ref pa # 2014 1106 0850 maher - not req'dDetails
9/f: adding 1 horn/strobe, 4 smoke setector's, 2 duct detectors & 4 relays ref pa # 2014 1106 0850 maher - not req'd | $5,500 |
| Mar 10, 2015 | Completed final sign-off Apr 2015 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | adding 3 duct detector & 3 relays to ti at basement pa ref # 2015 0116 5945 pa ref # 2014 0801 2820 maher-not req'dDetails
adding 3 duct detector & 3 relays to ti at basement pa ref # 2015 0116 5945 pa ref # 2014 0801 2820 maher-not req'd | $3,500 |
| Feb 26, 2015 | Completed final sign-off May 2015 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | suite 235,adding 3 horn/strobes to existing system. t.i. pa#201406239070, fa pa#201409186664 n/a ordinance #155-13Details
suite 235,adding 3 horn/strobes to existing system. t.i. pa#201406239070, fa pa#201409186664 n/a ordinance #155-13 | $4,500 |
| Feb 23, 2015 | Completed final sign-off Aug 2018 | 116 New Montgomery St | Potter Fire Protection | install fire sprinklers throughout floor, total 53. existing valves and monitoring system. t.i. pa# 201411060850. n/a ordinance #155-13Details
install fire sprinklers throughout floor, total 53. existing valves and monitoring system. t.i. pa# 201411060850. n/a ordinance #155-13 | $27,500 |
| Jan 27, 2015 | Completed final sign-off Feb 2015 | 116 New Montgomery St | Golden Gate Fire Protection Inc | basement: fire sprinkler only t.i. 201408012820; relocate 2 pendants; and add 1 relocate 2 upright, and add 5 uprights, total 10 heaeds for bicycle room in the basement; maher n/aDetails
basement: fire sprinkler only t.i. 201408012820; relocate 2 pendants; and add 1 relocate 2 upright, and add 5 uprights, total 10 heaeds for bicycle room in the basement; maher n/a | $5,000 |
| Jan 16, 2015 | Completed final sign-off May 2015 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | add 1 horn/strobe, 35 smoke detectors, 13 heat detectors, 1 single loop controller, 2 strobes. n/a ordinance #155-13Details
add 1 horn/strobe, 35 smoke detectors, 13 heat detectors, 1 single loop controller, 2 strobes. n/a ordinance #155-13 | $7,500 |
| Jan 7, 2015 | Never finaled issued Feb 2015, no final | 116 New Montgomery St | Dome Construction Corp | 4 fl:modifiction of extg t.i. to include selective demo & construction of non-loadbearing partitions, demo of ceiling grid & tile to conc slab above, nw light fixtures include reswitching, nw interior drs, glazing & frames, reuse of extg materials if practical , nw elect.,nw millwks, nw finishes.Details
4 fl:modifiction of extg t.i. to include selective demo & construction of non-loadbearing partitions, demo of ceiling grid & tile to conc slab above, nw light fixtures include reswitching, nw interior drs, glazing & frames, reuse of extg materials if practical , nw elect.,nw millwks, nw finishes. | $1,224,219 |
| Jan 7, 2015 | Completed final sign-off May 2016 | 116 New Montgomery St | Dome Construction Corp | 3rd flr: modification of existing t.i. to include selective demo & construction of non-load bearing partitions, demo of ceiling grid & tile to concrete slab above,new light fixtures,interior doors,glazing&frames,salvage/reuse of (e) materials if practicable,new elec,millwork & finishes; maher n/aDetails
3rd flr: modification of existing t.i. to include selective demo & construction of non-load bearing partitions, demo of ceiling grid & tile to concrete slab above,new light fixtures,interior doors,glazing&frames,salvage/reuse of (e) materials if practicable,new elec,millwork & finishes; maher n/a | $1,224,219 |
| Jan 7, 2015 | Completed final sign-off Dec 2015 | 116 New Montgomery St | Dome Construction Corp | new accessible restrooms & renovation of (e) elevator lobbies to include selective demo & construction of non-load bearing partitions, demo of ceiling grid & tile to concrete slab above, new light fixts, new interior doors/glazing frames, salvage & reuse of (e) materials where applicable. new won doDetails
new accessible restrooms & renovation of (e) elevator lobbies to include selective demo & construction of non-load bearing partitions, demo of ceiling grid & tile to concrete slab above, new light fixts, new interior doors/glazing frames, salvage & reuse of (e) materials where applicable. new won do | $140,211 |
| Jan 7, 2015 | Completed final sign-off Dec 2015 | 116 New Montgomery St | Dome Construction Corp | new accessible restrooms and renovation of existing elevator lobbies to include slelective demo and construction of non load bearing paritions, demo of ceiling grid tile to concrete slab abvove new light fixtures, new interior doors and frames, reuse of e materials where practical, new elec, newDetails
new accessible restrooms and renovation of existing elevator lobbies to include slelective demo and construction of non load bearing paritions, demo of ceiling grid tile to concrete slab abvove new light fixtures, new interior doors and frames, reuse of e materials where practical, new elec, new | $280,422 |
| Dec 24, 2014 | Expired or cancelled withdrawn Sep 2015 | 116 New Montgomery St | 1st floor - non structural demolition, removal of main entry doors & conduit, new non-structural replacement of doors, frames, hardware. install new accent lighting at entry & balustrade. no mech. /plumbing. n/a ordinance #155-13Details
1st floor - non structural demolition, removal of main entry doors & conduit, new non-structural replacement of doors, frames, hardware. install new accent lighting at entry & balustrade. no mech. /plumbing. n/a ordinance #155-13 | $50,000 | |
| Dec 22, 2014 | Never finaled issued Dec 2014, no final | 116 New Montgomery St | Novo Construction Inc | renew permit application #2013.0717.2024 for final inspection only.Details
renew permit application #2013.0717.2024 for final inspection only. | |
| Dec 22, 2014 | Expired or cancelled cancelled May 2016 | 116 New Montgomery St | Novo Construction Inc | renew permit application #2013.0717.2028 for final inspection only.Details
renew permit application #2013.0717.2028 for final inspection only. | |
| Nov 6, 2014 | Completed final sign-off May 2016 | 116 New Montgomery St | Dome Construction Corp | remodel of extg 9th floor lobby & restrooms. installation of an amenity & private roof deck, including access stairs and ramps. deferred: alarm upgrade; sprinkler system modification to sprinkled the entire 9th floor(design bldg);removal of extg class 2 standpipe hose cabinet(design bldg) n/a maher.Details
remodel of extg 9th floor lobby & restrooms. installation of an amenity & private roof deck, including access stairs and ramps. deferred: alarm upgrade; sprinkler system modification to sprinkled the entire 9th floor(design bldg);removal of extg class 2 standpipe hose cabinet(design bldg) n/a maher. | $556,118 |
| Oct 20, 2014 | Never finaled issued Oct 2014, no final | 116 New Montgomery St | street space permitDetails
street space permit | ||
| Oct 15, 2014 | Completed final sign-off Oct 2014 | 116 New Montgomery St | Golden Gate Fire Protection Inc | 2nd flr: relocate 11 upright sprinkler heads on the 2nd flr, t.i. #201406239070; maher n/aDetails
2nd flr: relocate 11 upright sprinkler heads on the 2nd flr, t.i. #201406239070; maher n/a | $5,665 |
| Sep 18, 2014 | Completed final sign-off Oct 2014 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | 2nd flr: adding (2) strobes & 8 horn/strobes, ref. 201406239070; maher n/aDetails
2nd flr: adding (2) strobes & 8 horn/strobes, ref. 201406239070; maher n/a | $7,500 |
| Aug 20, 2014 | Completed final sign-off Oct 2014 | 116 New Montgomery St | Golden Gate Fire Protection Inc | relocate 38 upright sprinkler heads on the 2/f, relocate 2 pendent sprinlker. reference ti: 201406239070. n/a ordinance #155-13Details
relocate 38 upright sprinkler heads on the 2/f, relocate 2 pendent sprinlker. reference ti: 201406239070. n/a ordinance #155-13 | $20,600 |
| Aug 13, 2014 | Never finaled issued Aug 2014, no final | 116 New Montgomery St | street space permit and mta permitDetails
street space permit and mta permit | ||
| Aug 11, 2014 | Completed final sign-off Nov 2014 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | 8th floor - adding 8 strobes, 9 horn.strobes, 7 smoke det., 2 duct det., 4 control relays, 4 interposing relays & 1 pull station. smoke detector of "won" door at elevator lobby. ref #2014.0428.4280. n/a maher ordinanceDetails
8th floor - adding 8 strobes, 9 horn.strobes, 7 smoke det., 2 duct det., 4 control relays, 4 interposing relays & 1 pull station. smoke detector of "won" door at elevator lobby. ref #2014.0428.4280. n/a maher ordinance | $7,500 |
| Aug 8, 2014 | Completed final sign-off Apr 2018 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | add one new horn strobe, one new smoke detector and one new manual pullstation. relocated 10 existing horn and strobes. ref permit 2014-0613-8371Details
add one new horn strobe, one new smoke detector and one new manual pullstation. relocated 10 existing horn and strobes. ref permit 2014-0613-8371 | $7,500 |
| Aug 1, 2014 | Completed final sign-off Aug 2015 | 116 New Montgomery St | Clune Construction Company L P | basement level - partial remodel of existing basement space to provide for bike storage & one unisex shower room.Details
basement level - partial remodel of existing basement space to provide for bike storage & one unisex shower room. | $140,000 |
| Jul 30, 2014 | Completed final sign-off Aug 2014 | 116 New Montgomery St | Pioneer Fire Inc. | 7th floor fire sprinkler - relocate 2 pendents and remove 3 pendents. n/a maher ordinanceDetails
7th floor fire sprinkler - relocate 2 pendents and remove 3 pendents. n/a maher ordinance | $5,941 |
| Jul 24, 2014 | Completed final sign-off Mar 2015 | 116 New Montgomery St | Novo Construction Inc | revision to 2014.0604.7426 and 201403100259: non structural, new partitions, doors, ceiling, lighting, finishes. no change in occupancy, use, area. omit 2 offices,revised lighting, elec layoutDetails
revision to 2014.0604.7426 and 201403100259: non structural, new partitions, doors, ceiling, lighting, finishes. no change in occupancy, use, area. omit 2 offices,revised lighting, elec layout | |
| Jul 2, 2014 | Completed final sign-off Jul 2014 | 116 New Montgomery St | G P Fire Protection | relocate 2 sprinklers and add one for new consult room. n/a for the maher ordinance #155-13. ref app#201404082771Details
relocate 2 sprinklers and add one for new consult room. n/a for the maher ordinance #155-13. ref app#201404082771 | $3,982 |
| Jun 30, 2014 | Expired or cancelled cancelled Jan 2026 | 116 New Montgomery St | 5th floor suite 500 - modificatoin of (e) t.i.include selective demo & construct non-load bearing walls, modify to (e) ceiling grid & tiles, relocate light fixtures, new light fixtrues, new switching, (e) & relocated doors & frames,(e) new millwork,(e) sink w/new faucet,waterlines for coffee,fridgDetails
5th floor suite 500 - modificatoin of (e) t.i.include selective demo & construct non-load bearing walls, modify to (e) ceiling grid & tiles, relocate light fixtures, new light fixtrues, new switching, (e) & relocated doors & frames,(e) new millwork,(e) sink w/new faucet,waterlines for coffee,fridg | $132,000 | |
| Jun 26, 2014 | Completed final sign-off May 2015 | 116 New Montgomery St | Clune Construction Company L P | modification of existing tenant improvements to include selective demo and consruction of non load bearing partitons, demo of ceiling grid and tile to the concrete slab above, new lt fixtures including switching, new interior doors, glazing, and frames, salvage and reuse existing selected materialsDetails
modification of existing tenant improvements to include selective demo and consruction of non load bearing partitons, demo of ceiling grid and tile to the concrete slab above, new lt fixtures including switching, new interior doors, glazing, and frames, salvage and reuse existing selected materials | $86,700 |
| Jun 23, 2014 | Completed final sign-off Jan 2015 | 116 New Montgomery St | Clune Construction Company L P | ste200 2/f modification (e) ti to include selective demo & construction of non-load bearing partitions, demo of ceiling grid & tile to the concrete slab above, new light fixtures incl reswitching, new interior doors, glazing & frames, salvage & reuse of, add ramp in terraceDetails
ste200 2/f modification (e) ti to include selective demo & construction of non-load bearing partitions, demo of ceiling grid & tile to the concrete slab above, new light fixtures incl reswitching, new interior doors, glazing & frames, salvage & reuse of, add ramp in terrace | $326,700 |
| Jun 13, 2014 | Completed final sign-off Nov 2014 | 116 New Montgomery St | Richlen Construction | office tenant improvement on the 7th floor. to include mep and title 24. no structural work. life safety and fire sprinklers under separate permit.Details
office tenant improvement on the 7th floor. to include mep and title 24. no structural work. life safety and fire sprinklers under separate permit. | $200,000 |
| Jun 9, 2014 | Never finaled issued Jun 2014, no final | 116 New Montgomery St | Novo Construction Inc | strenghening of floor to accomodate installation of server room equipment. revision to permit application # 2014-0604-7426; compliance with ord. 155-13 not requiredDetails
strenghening of floor to accomodate installation of server room equipment. revision to permit application # 2014-0604-7426; compliance with ord. 155-13 not required | $8,000 |
| Jun 4, 2014 | Completed final sign-off Mar 2015 | 116 New Montgomery St | Novo Construction Inc | revision to pa#201403100259 non structural (n) partitions, doors, ceiling, lighting, finishes. no change in occupancy use area. n/a ordinance #155-13.Details
revision to pa#201403100259 non structural (n) partitions, doors, ceiling, lighting, finishes. no change in occupancy use area. n/a ordinance #155-13. | |
| May 29, 2014 | Completed final sign-off Jun 2018 | 116 New Montgomery St | Pioneer Fire Inc. | remove (36) upright pendents. relocate (6) upright. add (11) uprights. add (27) pendents; compliance with ord 155-13 not requiredDetails
remove (36) upright pendents. relocate (6) upright. add (11) uprights. add (27) pendents; compliance with ord 155-13 not required | $18,000 |
| May 12, 2014 | Completed final sign-off Mar 2015 | 116 New Montgomery St | Novo Construction Inc | 1st floor lobby improvements - new glass wall panels. new paint in selected locations. n/a for the maher ordinance #155-13Details
1st floor lobby improvements - new glass wall panels. new paint in selected locations. n/a for the maher ordinance #155-13 | $45,000 |
| Apr 28, 2014 | Completed final sign-off May 2014 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | 8th floor suite 850: adding new strobes 3 and horn/strobes 4. ref app#201403060018. n/a for the maher ordinance #155-13Details
8th floor suite 850: adding new strobes 3 and horn/strobes 4. ref app#201403060018. n/a for the maher ordinance #155-13 | $5,000 |
| Apr 22, 2014 | Completed final sign-off May 2014 | 116 New Montgomery St | Pioneer Fire Inc. | existing fire sprikler system expansion. 141 heads added sprinkler added at 8th floor. ref pa# 2014-0306-0018 / 2014-0310-0259.Details
existing fire sprikler system expansion. 141 heads added sprinkler added at 8th floor. ref pa# 2014-0306-0018 / 2014-0310-0259. | $70,500 |
| Apr 14, 2014 | Completed final sign-off Mar 2015 | 116 New Montgomery St | Novo Construction Inc | 2 evacuation signs for 1st floor only. compliance with ordinance #155-13 not requiredDetails
2 evacuation signs for 1st floor only. compliance with ordinance #155-13 not required | $600 |
| Apr 8, 2014 | Completed final sign-off Jul 2014 | 116 New Montgomery St | Walgreen Company | remodel existing walgreens. includes adding a consult room in the pharmacy, extend the office, remove a low wall behind cash registers, add refrigerated cases and related work assiciated with these modifications. no sinks involved. life safety seperate permit.Details
remodel existing walgreens. includes adding a consult room in the pharmacy, extend the office, remove a low wall behind cash registers, add refrigerated cases and related work assiciated with these modifications. no sinks involved. life safety seperate permit. | $40,000 |
| Apr 4, 2014 | Completed final sign-off Feb 2015 | 116 New Montgomery St | Novo Construction Inc | evacuation signs only for floors 2,7,8. no structural work included in scope. n/a ordinance #155-13.Details
evacuation signs only for floors 2,7,8. no structural work included in scope. n/a ordinance #155-13. | $3,000 |
| Mar 10, 2014 | Completed final sign-off Mar 2015 | 116 New Montgomery St | Novo Construction Inc | 8th floor:non structural demo new non-structural partitions, doors, ceiling, lighting, finishes, no change of occupancy use or area. n/a for the maher ordinanace and n/a for the interim control #428-13Details
8th floor:non structural demo new non-structural partitions, doors, ceiling, lighting, finishes, no change of occupancy use or area. n/a for the maher ordinanace and n/a for the interim control #428-13 | $506,500 |
| Mar 6, 2014 | Never finaled issued Mar 2014, no final | 116 New Montgomery St | Novo Construction Inc | 8th floor - non-structural demo, (n) non-structural partitions, doors, ceiling, lighting, finsihes. no change in occupancy, use area. compliance with ordinance #155-13 not requiredDetails
8th floor - non-structural demo, (n) non-structural partitions, doors, ceiling, lighting, finsihes. no change in occupancy, use area. compliance with ordinance #155-13 not required | $136,487 |
| Feb 12, 2014 | Completed final sign-off Nov 2014 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | 2nd & 7th floor - adding (6) relay's, (2) smoke det's, (6) duct det's, (16) horn/strobes, (4) strobe's, (6) interposing relay's & (2) door holders. mech pa #2013.12.27.5121. ti #2013.12.13.4160 (under review)Details
2nd & 7th floor - adding (6) relay's, (2) smoke det's, (6) duct det's, (16) horn/strobes, (4) strobe's, (6) interposing relay's & (2) door holders. mech pa #2013.12.27.5121. ti #2013.12.13.4160 (under review) | $6,500 |
| Feb 4, 2014 | Never finaled issued Feb 2014, no final | 116 New Montgomery St | 2nd and 7th floors:non-structural demolition. new non-structural partitions, doors, frames and hardware, new lighting and accoustic ceiling and new finishes in extg 2nd and 7th floor lobbies. no mechanical or plmg work. no mechanical systems in project area. n/a for the maher ordinance #155-13Details
2nd and 7th floors:non-structural demolition. new non-structural partitions, doors, frames and hardware, new lighting and accoustic ceiling and new finishes in extg 2nd and 7th floor lobbies. no mechanical or plmg work. no mechanical systems in project area. n/a for the maher ordinance #155-13 | $188,500 | |
| Jan 23, 2014 | Completed final sign-off Mar 2014 | 116 New Montgomery St | Pioneer Fire Inc. | 2nd & 7th floor - relocate (34) pendents, ref t.i. #2013.12.13.4160. compliance with ordinance #155-13 not required.Details
2nd & 7th floor - relocate (34) pendents, ref t.i. #2013.12.13.4160. compliance with ordinance #155-13 not required. | $11,000 |
| Dec 27, 2013 | Never finaled issued Jan 2014, no final | 116 New Montgomery St | Novo Construction Inc | 2nd & 7th floors. extensive rerouting of exhaust ducting requiring five new fire smoke dampers. reference arch. pa#2013-08-07-3736.n/a for the maher ordinance #155-13Details
2nd & 7th floors. extensive rerouting of exhaust ducting requiring five new fire smoke dampers. reference arch. pa#2013-08-07-3736.n/a for the maher ordinance #155-13 | $20,000 |
| Dec 13, 2013 | Completed final sign-off Jan 2014 | 116 New Montgomery St | Pioneer Fire Inc. | revision to pa# 201310048454 remaining fire sprinkler work in #235 under seperate permit. t.i. pa# 201307172028Details
revision to pa# 201310048454 remaining fire sprinkler work in #235 under seperate permit. t.i. pa# 201307172028 | |
| Dec 13, 2013 | Expired or cancelled cancelled Jan 2016 | 116 New Montgomery St | Novo Construction Inc | 1st,2nd, 7th fl. non-structural demo, new non-structural partitions, doors, frames & hardware, new lighting & acoustical ceiling & new finishes. recognized historical building.Details
1st,2nd, 7th fl. non-structural demo, new non-structural partitions, doors, frames & hardware, new lighting & acoustical ceiling & new finishes. recognized historical building. | $279,419 |
| Oct 4, 2013 | Completed final sign-off Jan 2014 | 116 New Montgomery St | Pioneer Fire Inc. | 2nd and 7th floors: fire sprinkler system expansion t.i. 2nd floor:152 sprinklers and 7th floor: 150 sprinklers. ref app#201307172028Details
2nd and 7th floors: fire sprinkler system expansion t.i. 2nd floor:152 sprinklers and 7th floor: 150 sprinklers. ref app#201307172028 | $150,000 |
| Oct 2, 2013 | Completed final sign-off Apr 2018 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | 2nd floor-adding 7 new strobes & 19 horn/strobes & removing 1 honr/strobeDetails
2nd floor-adding 7 new strobes & 19 horn/strobes & removing 1 honr/strobe | $5,000 |
| Oct 2, 2013 | Completed final sign-off Nov 2013 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | 7th floor-adding 4 new strobes & 16 horn/strobesDetails
7th floor-adding 4 new strobes & 16 horn/strobes | $7,500 |
| Aug 7, 2013 | Never finaled issued Aug 2013, no final | 116 New Montgomery St | accessible toilet upgrades to provide a fully accessible womens and new accessible multi accomodation mens toilet room in lieu of single accomodation with urinal and additonal convenience toilet is provided in the mens where the fixture count exceeds the min previously permitted per sf cbc 2902.1Details
accessible toilet upgrades to provide a fully accessible womens and new accessible multi accomodation mens toilet room in lieu of single accomodation with urinal and additonal convenience toilet is provided in the mens where the fixture count exceeds the min previously permitted per sf cbc 2902.1 | $80,000 | |
| Aug 7, 2013 | Never finaled issued Aug 2013, no final | 116 New Montgomery St | accessible toilet room upgrades to provide a fully accessible womens and new accessible multi accomodation mens toilet room in lieu of single accomodation with urinal. additional convenience toilet is provided i the mens where fixture count excees min previously permitted per sf cbc 2902.1 existingDetails
accessible toilet room upgrades to provide a fully accessible womens and new accessible multi accomodation mens toilet room in lieu of single accomodation with urinal. additional convenience toilet is provided i the mens where fixture count excees min previously permitted per sf cbc 2902.1 existing | $80,000 | |
| Jul 17, 2013 | Completed final sign-off Mar 2015 | 116 New Montgomery St | Novo Construction Inc | 2nd floor t.i. to include selective demolition & construction of non-load bearing partitions, demolitoin of ceiling grid+tile to concrete slab above, new light fixtures including re-switching, new int doors, glazing+ frames, galvage+ reuse of (e) selected materials, new elect, millwork + finishes.Details
2nd floor t.i. to include selective demolition & construction of non-load bearing partitions, demolitoin of ceiling grid+tile to concrete slab above, new light fixtures including re-switching, new int doors, glazing+ frames, galvage+ reuse of (e) selected materials, new elect, millwork + finishes. | $146,125 |
| Jul 17, 2013 | Completed final sign-off Mar 2015 | 116 New Montgomery St | Novo Construction Inc | 7th floor t.i. to include selective demolition & construction of non-load bearing partitions, demolitoin of ceiling grid+tile to concrete slab above, new light fixtures including re-switching, new int doors, glazing+ frames, salvage+ reuse of (e) selected materials, new elect, millwork + finishes.Details
7th floor t.i. to include selective demolition & construction of non-load bearing partitions, demolitoin of ceiling grid+tile to concrete slab above, new light fixtures including re-switching, new int doors, glazing+ frames, salvage+ reuse of (e) selected materials, new elect, millwork + finishes. | $804,573 |
| Mar 7, 2012 | Never finaled issued Mar 2012, no final | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | 9th floor:fire alarm as built submission for 116 new montgomery 9th floor. ref#201106097735. adding 4 exterior hor/strobes 9th floor exterior deck.Details
9th floor:fire alarm as built submission for 116 new montgomery 9th floor. ref#201106097735. adding 4 exterior hor/strobes 9th floor exterior deck. | |
| Dec 8, 2011 | Expired or cancelled cancelled Jan 2026 | 116 New Montgomery St | new sales area checkout and merchandising fixtures. new reach in freezer and cooler cases. expand pharmacy and upgrade fixtures and equipment. reconfigure restrooms and surrounding areas to meet accessibility requirements. new condenser on roof.Details
new sales area checkout and merchandising fixtures. new reach in freezer and cooler cases. expand pharmacy and upgrade fixtures and equipment. reconfigure restrooms and surrounding areas to meet accessibility requirements. new condenser on roof. | $257,000 | |
| Dec 1, 2011 | Never finaled issued Dec 2011, no final | 138 Minna St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Nov 3, 2011 | Completed final sign-off Nov 2011 | 116 New Montgomery St | Stevens-Hemingway-Stevens | to obtain final inspection for work approved under pa#201004281229. all work is complete.Details
to obtain final inspection for work approved under pa#201004281229. all work is complete. | |
| Jun 9, 2011 | Completed final sign-off Mar 2012 | 116 New Montgomery St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. at 116 new montgomery, 9th floor, trulia. (1) booster power supply with batteries. (1) smoke detector. (4) existing replace wall horn/strobes (3) new ceiling horn/strobes.Details
fire alarm t.i. at 116 new montgomery, 9th floor, trulia. (1) booster power supply with batteries. (1) smoke detector. (4) existing replace wall horn/strobes (3) new ceiling horn/strobes. | $5,329 |
| Apr 19, 2011 | Completed final sign-off Apr 2012 | 116 New Montgomery St | Field Construction Inc. | 9th floor t.i. includes the demolition of non-structural partitions & bldg new non-structural partitions; all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted under separate permit. (building is partially sprinklered).Details
9th floor t.i. includes the demolition of non-structural partitions & bldg new non-structural partitions; all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted under separate permit. (building is partially sprinklered). | $62,000 |
| Mar 28, 2011 | Completed final sign-off Nov 2011 | 116 New Montgomery St | Walgreen Company | wallgreens. revision to pa# 2010.04.28.1229 and 2010.07.27.7556. new reach in coolers and compressor, new counter and fixtures, new floor sinks for reach in coolersDetails
wallgreens. revision to pa# 2010.04.28.1229 and 2010.07.27.7556. new reach in coolers and compressor, new counter and fixtures, new floor sinks for reach in coolers | $25,000 |
| Feb 2, 2011 | Completed final sign-off Apr 2011 | 116 New Montgomery St | Hawk Mechanical Inc | 5th floor-install new air conditioner with duct and grilles, relocate (e) grilles and duct workDetails
5th floor-install new air conditioner with duct and grilles, relocate (e) grilles and duct work | $15,000 |
| Jan 28, 2011 | Completed final sign-off Mar 2011 | 116 New Montgomery St | Diversified Fire Products | 5th floor-5 horn/strobes (wall), 14 horn/strobes (ceiling) and 3 strobes (ceiling). mech and sprinkler permit required on separate permit.Details
5th floor-5 horn/strobes (wall), 14 horn/strobes (ceiling) and 3 strobes (ceiling). mech and sprinkler permit required on separate permit. | $6,500 |
| Dec 2, 2010 | Completed final sign-off Apr 2018 | 116 New Montgomery St | G P Fire Protection | add 4 concealed sprinklers to new soffittDetails
add 4 concealed sprinklers to new soffitt | $3,800 |
| Nov 18, 2010 | Completed final sign-off Feb 2011 | 116 New Montgomery St | Field Construction Inc. | revision to 201008249427, change room name from server room to storage, room 407, 4th flDetails
revision to 201008249427, change room name from server room to storage, room 407, 4th fl | |
| Nov 15, 2010 | Completed final sign-off Feb 2011 | 116 New Montgomery St | Columbia Mechanical Contractors | 4th floor - add ceiling supply diffusers for the new layout. add one vav box to the (e) air conditioning system. add osa & return air dampers to an existing supply air fan. t.i. appl #201008249427.note: existing fans exceed 2000cfm and must shut down per one of the required methods. field verify.Details
4th floor - add ceiling supply diffusers for the new layout. add one vav box to the (e) air conditioning system. add osa & return air dampers to an existing supply air fan. t.i. appl #201008249427.note: existing fans exceed 2000cfm and must shut down per one of the required methods. field verify. | $17,500 |
| Nov 15, 2010 | Completed final sign-off Feb 2011 | 116 New Montgomery St | Columbia Mechanical Contractors | 3rd floor - replace one broken supply fan with a new one & one vav box & outside air ductwork to the (e) air conditioning unit. add supply air diffusers for the enw layout. t.i. appl #201008249427.Details
3rd floor - replace one broken supply fan with a new one & one vav box & outside air ductwork to the (e) air conditioning unit. add supply air diffusers for the enw layout. t.i. appl #201008249427. | $17,500 |
| Nov 5, 2010 | Completed final sign-off Feb 2011 | 116 New Montgomery St | Diversified Fire Products | 3rd & 4th floor fire alarm t.i. - (1) new smoke detector, (2) new wall horn/strobes, (37) ceiling horn, strobes new, (9) new ceiling strobes.Details
3rd & 4th floor fire alarm t.i. - (1) new smoke detector, (2) new wall horn/strobes, (37) ceiling horn, strobes new, (9) new ceiling strobes. | $13,342 |
| Oct 20, 2010 | Completed final sign-off Mar 2011 | 116 New Montgomery St | Field Construction Inc. | 5th floor-t.i. includes demolition of non-structural partitions & build, new non-structural partitions. all new or revised hvac, electrical, lighting, plumbing & life safety work will be design build & submitted for permit seperately. building is partially sprinkleredDetails
5th floor-t.i. includes demolition of non-structural partitions & build, new non-structural partitions. all new or revised hvac, electrical, lighting, plumbing & life safety work will be design build & submitted for permit seperately. building is partially sprinklered | $276,880 |
| Aug 24, 2010 | Completed final sign-off Jan 2011 | 116 New Montgomery St | Field Construction Inc. | interior tenant improvement to extg offices. demolition of partitions ceililng grid and select lighting.new interior partition, lighting power, paint and carpet. mechanical, electrical, & plumbing on seperate permit.Details
interior tenant improvement to extg offices. demolition of partitions ceililng grid and select lighting.new interior partition, lighting power, paint and carpet. mechanical, electrical, & plumbing on seperate permit. | $500,000 |
| Jul 27, 2010 | Completed final sign-off Oct 2012 | 116 New Montgomery St | Walgreen Company | remvision to appl #201004281229 - eliminate photo shop expansion, delete sink & water heater.Details
remvision to appl #201004281229 - eliminate photo shop expansion, delete sink & water heater. | |
| Jul 7, 2010 | Completed final sign-off Jul 2010 | 116 New Montgomery St | Diversified Fire Products | fire alarm ti for suite 633, 6th fl. adding 3 hornstrobes, 1 strobeDetails
fire alarm ti for suite 633, 6th fl. adding 3 hornstrobes, 1 strobe | $7,150 |
| Jul 7, 2010 | Completed final sign-off Jul 2010 | 116 New Montgomery St | Diversified Fire Products | fire alarm ti for 635, 6th fl. add 2 horn/strobesDetails
fire alarm ti for 635, 6th fl. add 2 horn/strobes | $5,775 |
| Jun 21, 2010 | Completed final sign-off Jul 2010 | 116 New Montgomery St | Field Construction Inc. | 6th fl: tenant improvement includes demo of non structural partitons, new non structural partitions. hvac,elec,plumb,ls sep permit. bufilding is partially sprinkleredDetails
6th fl: tenant improvement includes demo of non structural partitons, new non structural partitions. hvac,elec,plumb,ls sep permit. bufilding is partially sprinklered | $36,000 |
| Jun 15, 2010 | Completed final sign-off Sep 2010 | 116 New Montgomery St | Diversified Fire Products | fire alarm t.i. filter, suite 600; adding 4-horn/strobes.Details
fire alarm t.i. filter, suite 600; adding 4-horn/strobes. | $6,150 |
| May 21, 2010 | Completed final sign-off Jul 2010 | 116 New Montgomery St | Field Construction Inc. | 6th. flr. suite 633 t.i.: includes demo of non-structural partitions & bldg. (n) non-structural partitions. all (n) or revised hvac, electrical, plumbing & life safety work will be desing build & submitted under separate permit. bldg. is fully sprinklered.Details
6th. flr. suite 633 t.i.: includes demo of non-structural partitions & bldg. (n) non-structural partitions. all (n) or revised hvac, electrical, plumbing & life safety work will be desing build & submitted under separate permit. bldg. is fully sprinklered. | $36,000 |
| Apr 28, 2010 | Expired or cancelled expired Nov 2013 | 116 New Montgomery St | Walgreen Company | wallgreen. 440 sqft expansin into vacant retail space. relocated photodept and new refrigerated cases includes photo sink and new water heater. existing hvac system to serve expansion. some new elec. outlets sprinklers under separate permit-Details
wallgreen. 440 sqft expansin into vacant retail space. relocated photodept and new refrigerated cases includes photo sink and new water heater. existing hvac system to serve expansion. some new elec. outlets sprinklers under separate permit- | $75,000 |
| Apr 15, 2010 | Completed final sign-off Jun 2010 | 116 New Montgomery St | Field Construction Inc. | 6th. frl. t.i. includes demolition of non-structural partitions & building (n) non-structural partitions; all (n) or revised. hvac, electrical, plumbing & life safety work will be design guild & submitted for permit separately. building is partially sprinklered.Details
6th. frl. t.i. includes demolition of non-structural partitions & building (n) non-structural partitions; all (n) or revised. hvac, electrical, plumbing & life safety work will be design guild & submitted for permit separately. building is partially sprinklered. | $120,000 |
| Mar 4, 2010 | Completed final sign-off May 2010 | 116 New Montgomery St | Diversified Fire Products | fire alarm ti for 6th fl tenant launch squad, adding 1 syne module, 6 horn/strobes, 2 strobes.Details
fire alarm ti for 6th fl tenant launch squad, adding 1 syne module, 6 horn/strobes, 2 strobes. | $7,000 |
| Feb 26, 2010 | Completed final sign-off May 2010 | 116 New Montgomery St | Ayoob & Peery Plumbing Co Inc | 7th floor-relocate & removed fire sprinkler heads per tenant improvement-1 relocate & 3 removedDetails
7th floor-relocate & removed fire sprinkler heads per tenant improvement-1 relocate & 3 removed | $1,000 |
| Jan 13, 2010 | Expired or cancelled expired Oct 2013 | 116 New Montgomery St | Field Construction Inc. | 7th floor tenant improvement include th edemolition of non-structurual partitions & build new non-structural partitions. all new or revised hvac, electrical/lighting, desing build & submitted for permit separately. (building partially sprinklered).Details
7th floor tenant improvement include th edemolition of non-structurual partitions & build new non-structural partitions. all new or revised hvac, electrical/lighting, desing build & submitted for permit separately. (building partially sprinklered). | $80,000 |
| Dec 23, 2009 | Completed final sign-off Jan 2010 | 138 Minna St | Melo Willard Tabudlo Dba Dreamt Design | hvac-install (n) fire/smoke damper in exhaust duct, 8" dia. up. connect to (e) toilet exhaust duct at underside of slab.Details
hvac-install (n) fire/smoke damper in exhaust duct, 8" dia. up. connect to (e) toilet exhaust duct at underside of slab. | $1,000 |
| Dec 22, 2009 | Completed final sign-off May 2010 | 116 New Montgomery St | Field Construction Inc. | 6th floor-t.i. demo of non-structural partitions & build new non-structural partitions. all new or revised hvac, electrical, lighting, plumbing & life safety work will be design build & under seperate permitDetails
6th floor-t.i. demo of non-structural partitions & build new non-structural partitions. all new or revised hvac, electrical, lighting, plumbing & life safety work will be design build & under seperate permit | $117,000 |
| Nov 19, 2009 | Never finaled issued Nov 2009, no final | 116 New Montgomery St | Diversified Fire Products | fire alarm t.i. ada upgrade on 7th floor. aading 10 horn/strobes, 2 strobes. moving 1 smoke detector, demoing 1 door/closer.Details
fire alarm t.i. ada upgrade on 7th floor. aading 10 horn/strobes, 2 strobes. moving 1 smoke detector, demoing 1 door/closer. | $8,010 |
| Sep 10, 2009 | Completed final sign-off Jan 2010 | 116 New Montgomery St | Diversified Fire Products | 1st floor-fire alarm t.i. for "john collins lounge", adding 5 strobes & 5 horn/strobesDetails
1st floor-fire alarm t.i. for "john collins lounge", adding 5 strobes & 5 horn/strobes | $4,430 |
| Aug 31, 2009 | Never finaled issued Aug 2009, no final | 138 Minna St | street space and mta parkingDetails
street space and mta parking | ||
| Jun 9, 2009 | Never finaled issued Jun 2009, no final | 138 Minna St | street spaceDetails
street space | ||
| Mar 26, 2009 | Never finaled issued Mar 2009, no final | 138 Minna St | street space permitDetails
street space permit | ||
| Mar 25, 2009 | Completed final sign-off Jan 2010 | 126 New Montgomery St | remove right bay area windows and replace with two new double glazed windows. remove existing entry door, replace with new metal fram door. remove (e) tile on tight bay area and match finish of left bay area, add exterior flood ligths. change of use to a2 sep permit app 200902172224.Details
remove right bay area windows and replace with two new double glazed windows. remove existing entry door, replace with new metal fram door. remove (e) tile on tight bay area and match finish of left bay area, add exterior flood ligths. change of use to a2 sep permit app 200902172224. | $5,000 | |
| Feb 17, 2009 | Completed final sign-off Jan 2010 | 138 Minna St | remodeling interior, adding 3 toilet rooms (bathrooms), close (e) stairway, move hvac (all work for nite club only). change of use from office into bar/lounge.change from b occupancy to a-2. no exterior facade work in this scope close up mezzanine wall. mep separate permitDetails
remodeling interior, adding 3 toilet rooms (bathrooms), close (e) stairway, move hvac (all work for nite club only). change of use from office into bar/lounge.change from b occupancy to a-2. no exterior facade work in this scope close up mezzanine wall. mep separate permit | $120,000 | |
| Jan 26, 2009 | Completed final sign-off Jan 2010 | 138 Minna St | Richard De Nola | demolition per ab-017, removal of interior partitions. close existing stairwell to mezzanine. provide temporary guardrail for opening of stairwell.Details
demolition per ab-017, removal of interior partitions. close existing stairwell to mezzanine. provide temporary guardrail for opening of stairwell. | $5,000 |
| Jan 14, 2009 | Completed final sign-off Aug 2009 | 116 New Montgomery St | Diversified Fire Products | at 2nd fl: fire alarm t.i., ada upgrade 5 strobes.Details
at 2nd fl: fire alarm t.i., ada upgrade 5 strobes. | $5,080 |
| Jan 14, 2009 | Never finaled issued Jan 2009, no final | 116 New Montgomery St | Diversified Fire Products | at 1st & 2nd fl: fire alarm t.i., ada upgrade 1 control relay & 3 strobes.Details
at 1st & 2nd fl: fire alarm t.i., ada upgrade 1 control relay & 3 strobes. | $5,080 |
| Dec 19, 2008 | Completed final sign-off Aug 2009 | 116 New Montgomery St | R L H Fire Protection Inc | t. i. upgrade on the extg fire sprinkler system for. the rialto 2nd floor. relocate 10 heads and add 5 head, delete 16 heads 15 total.Details
t. i. upgrade on the extg fire sprinkler system for. the rialto 2nd floor. relocate 10 heads and add 5 head, delete 16 heads 15 total. | $3,375 |
| Dec 5, 2008 | Completed final sign-off Aug 2009 | 116 New Montgomery St | revise one door to existing permit appl.#200810174453 located on 2nd. flr. main stairway.Details
revise one door to existing permit appl.#200810174453 located on 2nd. flr. main stairway. | ||
| Oct 23, 2008 | Expired or cancelled cancelled Aug 2022 | 116 New Montgomery St | replacement of 2 awnings and 4 planters. installation of 5 light fixtures at exterior entrance. cleaning of facade at entrance. electrical work under seperate permit. sign of awnings under seperate permit.Details
replacement of 2 awnings and 4 planters. installation of 5 light fixtures at exterior entrance. cleaning of facade at entrance. electrical work under seperate permit. sign of awnings under seperate permit. | $11,000 | |
| Oct 17, 2008 | Completed final sign-off Aug 2009 | 116 New Montgomery St | Field Construction Inc. | office suite remodel, tenant improvment including demolition of non structural walls, construction of new offices, ceiling and lighting. mep sep permit.Details
office suite remodel, tenant improvment including demolition of non structural walls, construction of new offices, ceiling and lighting. mep sep permit. | $150,000 |
| Oct 17, 2008 | Completed final sign-off Aug 2009 | 116 New Montgomery St | Field Construction Inc. | ground floor: new elevator cab interiors, refurbish marble floor, add missing door. 2nd fl: demo non structural walls,ceiling tiels, light fixtures. new fire rated walls, new fire rated doors, suspenced ceiling and lighting. new hi lo drinking fountain. mep sep permit.Details
ground floor: new elevator cab interiors, refurbish marble floor, add missing door. 2nd fl: demo non structural walls,ceiling tiels, light fixtures. new fire rated walls, new fire rated doors, suspenced ceiling and lighting. new hi lo drinking fountain. mep sep permit. | $550,000 |
| Dec 18, 2006 | Never finaled issued Dec 2006, no final | 116 New Montgomery St | street spaceDetails
street space | ||
| Oct 11, 2006 | Expired or cancelled expired Dec 2008 | 116 New Montgomery St | Dri Commercial Corporation | reroofing.Details
reroofing. | $37,474 |
| Mar 10, 2005 | Expired or cancelled expired Apr 2007 | 116 New Montgomery St | Mc Millan Electric | install 2 smoke detector on 3rd floor. install 2 smoke detector on 8th floor.Details
install 2 smoke detector on 3rd floor. install 2 smoke detector on 8th floor. | $4,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dome Construction Corp (23), Red Hawk Fire & Security Ca Llc (21), Novo Construction Inc (16), Field Construction Inc. (15), Swinerton Builders (15), Anderson, Rowe & Buckley, Inc. (10), Diversified Fire Products (10), Everon Llc (8), Golden Gate Fire Protection Inc (8), Pioneer Fire Inc. (6), M C S Construction Services (5), Thomas Swan Sign Co Inc (5), Walgreen Company (4), Clune Construction Company L P (3), Potter Fire Protection (3), Richlen Construction (3), Columbia Mechanical Contractors (2), G P Fire Protection (2), Nemarti Modern World Construction (2), Peacock Construction (2), Skyline Construction (2), Ayoob & Peery Plumbing Co Inc, D W Nicholson Corporation, Donald S. Maclean, Inc, Dri Commercial Corporation, Hawk Mechanical Inc, Mc Millan Electric, Melo Willard Tabudlo Dba Dreamt Design, Pribuss Engineering Inc, R L H Fire Protection Inc, Richard De Nola, Stevens-Hemingway-Stevens
- Architects
- George Soskin (10), Dennis O'kelly (7), Michael Dubitsky (5), Jason Mccarthy (4), Pamela Harris (3), Ahmad Mohazab (2), Andrew Levine (2), Ashley Miller (2), Melissa Pesci (2), Robert Lyman (2), Andy Levine, Carolyn Jones, Diversified / Five Product, Joseph A. Remling, Rex Mclean, Susan Kaeuper
- Engineers
- Rodolfo Bustos (4), Alexander Joseph Pacheco (3), Edward Rivera (3), Edward Rivera (3), Peter Kogan (2), William E. Tremayne (2), Anderson & Rowe & Buckey, Stephen Shaffer
- Authorized agent-otherss
- Joe Deluca (3), David Ford
- Designers
- Brian Willis (2), Donald Dammen, Golden Gate Fire Protection, Robert Buckley
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.