Andrew Levine
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Levine Architect
- Based in
- San Francisco
- On San Francisco permits
- Mar 2003 to Jun 2026
258 permits since 2000 (architect on 241 permits, authorized agent-others on 22 permits, designer on 2 permits, engineer on 2 permits): 172 completed, 20 in progress, 32 never finaled, 34 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 258.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Jul 2026 | 2001 Union St | Custom Construction Enterprises | interior demo of interior office suite in previously occupied office. removal only to include soft demo, no structural elements. (e) life-safety systems and sprinkler system remain in place. rated drywall partition separating the space from adjacent uses to remain in place and maintain wall ratings.Details
interior demo of interior office suite in previously occupied office. removal only to include soft demo, no structural elements. (e) life-safety systems and sprinkler system remain in place. rated drywall partition separating the space from adjacent uses to remain in place and maintain wall ratings. | $10,000 |
| Jun 22, 2026 | In progress issued Jun 2026 | 1035 Haight St | O'kane Construction Llc | revision to bpa#202406285493. remodel (e) kitchen with new plumbing fixtures and provide accessibility for doorways & travel path. accessible restroom remodel under seprate bpa# 202603238091. the kitchen is not open to the public, and the construction & operations are not publicly funded.Details
revision to bpa#202406285493. remodel (e) kitchen with new plumbing fixtures and provide accessibility for doorways & travel path. accessible restroom remodel under seprate bpa# 202603238091. the kitchen is not open to the public, and the construction & operations are not publicly funded. | $10,000 |
| May 13, 2026 | Completed final sign-off Sep 2026 | 219 Los Palmos Dr | A L Martin Construction | replace existing skylight in tunnel entrance way new roof structure and 3 new skylights. add fire rated wall at property line to support new skylights and roof structure. provide new r11 rated non-slip ceramic tile over existing concrete floor.Details
replace existing skylight in tunnel entrance way new roof structure and 3 new skylights. add fire rated wall at property line to support new skylights and roof structure. provide new r11 rated non-slip ceramic tile over existing concrete floor. | $30,000 |
| Jan 6, 2026 | In progress issued Jan 2026 | 237 Hartford St | Sasso Construction Inc. | replace (e) cement plaster front facade with victorian style facades. replace front window. structrually reinforce bay windows at front of residenceDetails
replace (e) cement plaster front facade with victorian style facades. replace front window. structrually reinforce bay windows at front of residence | $75,000 |
| Dec 19, 2025 | In progress issued Mar 2026 | 250 Cumberland St | Mc Gowan Builders | revision to permit 202410283893 to remove 2 burner stove and install new 4 burner electric stove and remove barrier wall at 4/f deck.Details
revision to permit 202410283893 to remove 2 burner stove and install new 4 burner electric stove and remove barrier wall at 4/f deck. | |
| Dec 16, 2025 | In progress issued Apr 2026 | 1486 Jackson St | E B W Builders Inc | unit 1486 - 2nd fl: demo all (e) construction back to framing, add bedroom, new kitchen, additional bathroom, all new mech system & structural upgrades. no bldg envelope changes, no sq ft added.Details
unit 1486 - 2nd fl: demo all (e) construction back to framing, add bedroom, new kitchen, additional bathroom, all new mech system & structural upgrades. no bldg envelope changes, no sq ft added. | $262,052 |
| Nov 21, 2025 | Completed final sign-off Oct 2026 | 2001 Union St | Custom Construction Enterprises | suite 520, 5th floor. interior tenant improvement work for office suite in previously occupied office. ref#: 200604259823Details
suite 520, 5th floor. interior tenant improvement work for office suite in previously occupied office. ref#: 200604259823 | $400,000 |
| Nov 6, 2025 | Completed final sign-off Dec 2025 | 531 06th Av | Custom Construction Enterprises | revision to pa# 202310138670: ground floor - remove (e) metal railing, provide (n) metal railing at driveway. 3/f- remove 2 skylights. provide (n) 2x2 skylight in lieu of 2x4 skylight.Details
revision to pa# 202310138670: ground floor - remove (e) metal railing, provide (n) metal railing at driveway. 3/f- remove 2 skylights. provide (n) 2x2 skylight in lieu of 2x4 skylight. | $1,000 |
| Aug 28, 2025 | Completed final sign-off Oct 2025 | 2001 Union St | Spectrum Development Co. | suite 480 on 4/f: interior tenant improvement work for office suite in previously occupied office.Details
suite 480 on 4/f: interior tenant improvement work for office suite in previously occupied office. | $8,750 |
| Aug 7, 2025 | Completed final sign-off Mar 2026 | 20 Longview Ct | A L Martin Construction | remove existing stucco & wood siding completely around house. replace with new stucco throughout. remove & replace existing roof: shingles & built-up roof. remove & replace all windows with new. remove rear deck. replace rear sliding doors with new windows. replace garage door in kind.Details
remove existing stucco & wood siding completely around house. replace with new stucco throughout. remove & replace existing roof: shingles & built-up roof. remove & replace all windows with new. remove rear deck. replace rear sliding doors with new windows. replace garage door in kind. | $56,000 |
| Jul 23, 2025 | In progress issued Jul 2025 | 4257 23rd St | Aurora Builders | alterations to pa #202109148342 (s1). change sprinkler designation from nfpa code standard 13r to 13d. eliminate gray water landscape system. add foundation phase installation plan. alter some existing wall framing stud thickness from 2x6 to 2x4 and provide revised energy calcs. mp 3.0 and mp 3.1Details
alterations to pa #202109148342 (s1). change sprinkler designation from nfpa code standard 13r to 13d. eliminate gray water landscape system. add foundation phase installation plan. alter some existing wall framing stud thickness from 2x6 to 2x4 and provide revised energy calcs. mp 3.0 and mp 3.1 | |
| Jun 27, 2025 | In progress issued Aug 2025 | 138 Arlington St | Kunkel Construction | permit application to replace in kind an (e), 1-story, home office and construction of a rear-yard, wood-framed deck less than 30 inches above grade along with associated wood-framed stairs.Details
permit application to replace in kind an (e), 1-story, home office and construction of a rear-yard, wood-framed deck less than 30 inches above grade along with associated wood-framed stairs. | $52,000 |
| May 21, 2025 | Expired or cancelled cancelled May 2025 | 270 25th Av | bring property into compliance with the planning code by legalizing ground floor apartment in response to notice of enforcement #2025-000664enf.Details
bring property into compliance with the planning code by legalizing ground floor apartment in response to notice of enforcement #2025-000664enf. | $10,000 | |
| May 2, 2025 | In progress issued May 2025 | 235 Capitol Av | revision to pa# 202409271847: add fireproof rollup door.Details
revision to pa# 202409271847: add fireproof rollup door. | $5,000 | |
| Mar 7, 2025 | In progress issued Mar 2025 | 235 Capitol Av | Baron Construction | revision to 201214259123-s3. revision to change window type. keep e) non-rated vinyl frame window type. infill e) window openingsDetails
revision to 201214259123-s3. revision to change window type. keep e) non-rated vinyl frame window type. infill e) window openings | |
| Feb 18, 2025 | Completed final sign-off Jul 2025 | 2487 37th Av | E B W Builders Inc | remodel of e ground fl family room into new larger family room with raised insulated wood floor, counter and sink. expansion of conditioned space and creation of new storage room. removal/replacement of 3 existing windows at rear facade. new exterior dbl door.Details
remodel of e ground fl family room into new larger family room with raised insulated wood floor, counter and sink. expansion of conditioned space and creation of new storage room. removal/replacement of 3 existing windows at rear facade. new exterior dbl door. | $70,280 |
| Jan 13, 2025 | In progress issued Jan 2025 | 22 Gennessee St | revision to 202407186837. remove portion of existing wall under stairs. create new niche for mechanical equipement. new concrete slab below niche, new stucco walls, new framing around niche perimeter. power and plumbing connections. install new heat pump.Details
revision to 202407186837. remove portion of existing wall under stairs. create new niche for mechanical equipement. new concrete slab below niche, new stucco walls, new framing around niche perimeter. power and plumbing connections. install new heat pump. | $4,000 | |
| Dec 24, 2024 | Completed final sign-off Mar 2025 | 525 27th St | North Bay Construction | unit 2: remove existing non-structural walls around kitchen and breakfast room, clad existing structural post in breakfast room add new base and wall cabinets in dining room. replace kitchen countertop no structural workDetails
unit 2: remove existing non-structural walls around kitchen and breakfast room, clad existing structural post in breakfast room add new base and wall cabinets in dining room. replace kitchen countertop no structural work | $15,000 |
| Nov 27, 2024 | Completed final sign-off Jun 2026 | 1250 Chestnut St | Luke Gilligan Inc. | ground floor: add a proposed 1-bed replacement dwelling unit. 2nd flr: merge and remodel 2 existing 1-bed dwelling units into one proposed 3-bedroom dwelling unit. 3rd floor: remodel the existing 3rd fl. unit kitchen and bath; add one full bath. uprade/replace -in - kind exiting windows throughoutDetails
ground floor: add a proposed 1-bed replacement dwelling unit. 2nd flr: merge and remodel 2 existing 1-bed dwelling units into one proposed 3-bedroom dwelling unit. 3rd floor: remodel the existing 3rd fl. unit kitchen and bath; add one full bath. uprade/replace -in - kind exiting windows throughout | $628,776 |
| Oct 28, 2024 | In progress issued Dec 2024 | 252 Cumberland St | permit to comply with planning enforcement notice 2021-005279. changes to ground floor to establish second unit including (n)1 hour wall, (n) 20 minute doors (n) kitchen remodel, conversion of former wine storage to (n) bedroom addition of trellis above entry at front facade, addition of parapetDetails
permit to comply with planning enforcement notice 2021-005279. changes to ground floor to establish second unit including (n)1 hour wall, (n) 20 minute doors (n) kitchen remodel, conversion of former wine storage to (n) bedroom addition of trellis above entry at front facade, addition of parapet | $200,834 | |
| Oct 10, 2024 | In progress issued Dec 2024 | 235 Capitol Av | Baron Construction | prop h: first time tenant improvement for new house cleaning business in existing shell building. replace front facade windows with fiberglass. mep work deferred. structural work associated with tenant improvement. ref pa# 201204259123, to be finaled prior or simultanious.Details
prop h: first time tenant improvement for new house cleaning business in existing shell building. replace front facade windows with fiberglass. mep work deferred. structural work associated with tenant improvement. ref pa# 201204259123, to be finaled prior or simultanious. | $450,000 |
| Sep 25, 2024 | Completed final sign-off Feb 2025 | 114 27th St | E B W Builders Inc | rev 202402226365- remove and replace (e) skylight. remove proposed 1 hr fire rated parapet wall. add structural componets to strengthen (e) stair to beam connectionDetails
rev 202402226365- remove and replace (e) skylight. remove proposed 1 hr fire rated parapet wall. add structural componets to strengthen (e) stair to beam connection | $1,000 |
| Sep 11, 2024 | Expired or cancelled expired Jun 2026 | 1414 06th Av | Mc Gowan Builders | rev 202201065454: new exterior stair connectiong rear yard & 2/f deck.Details
rev 202201065454: new exterior stair connectiong rear yard & 2/f deck. | $2,000 |
| Aug 14, 2024 | Completed final sign-off Feb 2025 | 384 Eureka St | A L Martin Construction | upgrade/replace existing windows and trim. modify west rear facade, replace siding on south and west sides of building. repair front porch stairway in kind. repaint exterior. interior finish changes. repair front stair, replace elements in-kind, as needed.Details
upgrade/replace existing windows and trim. modify west rear facade, replace siding on south and west sides of building. repair front porch stairway in kind. repaint exterior. interior finish changes. repair front stair, replace elements in-kind, as needed. | $50,000 |
| Jul 31, 2024 | Expired or cancelled expired Jun 2026 | 1414 06th Av | Mc Gowan Builders | revision to pa#202201065454. 3rd floor: m. bath and bed 2 & bath reconfiguration. replace exterior front stair and 2nd floor bay window in kind. remove exterior rear yard stair.Details
revision to pa#202201065454. 3rd floor: m. bath and bed 2 & bath reconfiguration. replace exterior front stair and 2nd floor bay window in kind. remove exterior rear yard stair. | $5,000 |
| Apr 30, 2024 | Completed final sign-off Jul 2024 | 48 Almaden Ct | John O'rourke | add 1 hour fire rated wall for exit passage through extg garage space from the extg stairway to the front door at exterior.Details
add 1 hour fire rated wall for exit passage through extg garage space from the extg stairway to the front door at exterior. | $3,900 |
| Apr 10, 2024 | Completed final sign-off May 2024 | 118 Rousseau St | revision to 202307051513 (renewal of 201505146315 & 201607212975) to remove 2 windows from the sunroomDetails
revision to 202307051513 (renewal of 201505146315 & 201607212975) to remove 2 windows from the sunroom | ||
| Feb 22, 2024 | Completed final sign-off Feb 2025 | 114 27th St | E B W Builders Inc | comply with nov 202308681. revision to pa 201312093710 provide 1 hr rated parapets. spiral stair case to be reconfigured. solid wall/ counterop & ipe wood tile deck installed. 2 new skylights and existing fire escape removed.Details
comply with nov 202308681. revision to pa 201312093710 provide 1 hr rated parapets. spiral stair case to be reconfigured. solid wall/ counterop & ipe wood tile deck installed. 2 new skylights and existing fire escape removed. | $9,500 |
| Feb 1, 2024 | In progress filed Feb 2024, not yet issued | 1451 Church St | 1451 church st: provide (n) automatic door operator, (n) door actuators, new metal kick-plates, new hardware adn signage for (e) door at main business entry- per compliance with sf accessible business entry (abe) program, abe# 202002212212Details
1451 church st: provide (n) automatic door operator, (n) door actuators, new metal kick-plates, new hardware adn signage for (e) door at main business entry- per compliance with sf accessible business entry (abe) program, abe# 202002212212 | $3,500 | |
| Feb 1, 2024 | In progress filed Feb 2024, not yet issued | 3885 Cesar Chavez St | abe# 202002212213: provide (n) automatic door operator, new door actuators, new metal kick-plates, new hardware and signage for (e) door at main business entry per compliance with the sf accessible business entry (abe) program.Details
abe# 202002212213: provide (n) automatic door operator, new door actuators, new metal kick-plates, new hardware and signage for (e) door at main business entry per compliance with the sf accessible business entry (abe) program. | $4,000 | |
| Jan 12, 2024 | Completed final sign-off Oct 2024 | 1725 Pacheco St | renovation and remodel of an extg 2 story, sfd residesntial building; modificattion of a kitchen and 2 batrooms, removal and addition of wal partitions and addition of one window at back. electrical and plumbing upgrades to be included.Details
renovation and remodel of an extg 2 story, sfd residesntial building; modificattion of a kitchen and 2 batrooms, removal and addition of wal partitions and addition of one window at back. electrical and plumbing upgrades to be included. | $25,000 | |
| Jan 11, 2024 | In progress issued Jan 2024 | 653 Chenery St | work as required to comply with the san francisco accessible business entrance (abe) program. repair/replace (e) threshold, add new auto door operator, actuators and access signage. abe# 201812032721Details
work as required to comply with the san francisco accessible business entrance (abe) program. repair/replace (e) threshold, add new auto door operator, actuators and access signage. abe# 201812032721 | $4,750 | |
| Dec 6, 2023 | Expired or cancelled withdrawn Jul 2025 | 373 Columbus Av | to compy with sf accessible business entrance program per ordinance 51-16, abe# 201812273547. including sidewalk repair, threshold repair/ replace (n) auto door operator & access signage.Details
to compy with sf accessible business entrance program per ordinance 51-16, abe# 201812273547. including sidewalk repair, threshold repair/ replace (n) auto door operator & access signage. | $1,500 | |
| Nov 29, 2023 | Completed final sign-off Dec 2025 | 2001 Union St | Dwp Co. | 5/f - suite 590: expand existing dental office. install vacuum and compressor. add 3 dental chairs.Details
5/f - suite 590: expand existing dental office. install vacuum and compressor. add 3 dental chairs. | $45,000 |
| Nov 8, 2023 | Completed final sign-off Dec 2024 | 3544 Baker St | Cook Construction | 3/f: conversion of bedroom/exterior terrace to (2) bedrooms & study space, includes removal of (1) window & (2) glazed doors, addition of (2) pairs of glazed doors. ref sturctural bpa#202309066027Details
3/f: conversion of bedroom/exterior terrace to (2) bedrooms & study space, includes removal of (1) window & (2) glazed doors, addition of (2) pairs of glazed doors. ref sturctural bpa#202309066027 | $48,950 |
| Oct 13, 2023 | Completed final sign-off Dec 2025 | 531 06th Av | Custom Construction Enterprises | three story horizontal addition on rear of bldg. add a new adu at ground floor facing rear yard under state program. remodel (e) kitchens & bathrooms at 2nd & 3rd floors. add new bathrooms at 2nd flr & 3rd flrs. replacing (e) furnaces & water heaters.Details
three story horizontal addition on rear of bldg. add a new adu at ground floor facing rear yard under state program. remodel (e) kitchens & bathrooms at 2nd & 3rd floors. add new bathrooms at 2nd flr & 3rd flrs. replacing (e) furnaces & water heaters. | $1,000,000 |
| Aug 11, 2023 | Never finaled filed Aug 2023, never issued | 124 Noriega St | D N S Construction | remodel (e) lower floor family room into new master bedroom & bathroom. add new raised wood deck at rear of residence. enclose existing front entryway.Details
remodel (e) lower floor family room into new master bedroom & bathroom. add new raised wood deck at rear of residence. enclose existing front entryway. | $195,000 |
| Jul 21, 2023 | Never finaled issued Jul 2023, no final | 46 Marcela Av | Stroud Construction | replace(e) picture window with (n) window in existing opening. (n) windows to consist of picture window (direct glaze) w/casement window @ each side. upgrade structural header, support posts and framing.Details
replace(e) picture window with (n) window in existing opening. (n) windows to consist of picture window (direct glaze) w/casement window @ each side. upgrade structural header, support posts and framing. | $25,000 |
| Jun 20, 2023 | Completed final sign-off Jul 2025 | 900 Bay St | Macrobuild Corporation | rev to pa201902062233: revise previously approved cmu planter on larkin st s/w to composite wood. remove exterior planter at unit 14 on driveway across rear of property.Details
rev to pa201902062233: revise previously approved cmu planter on larkin st s/w to composite wood. remove exterior planter at unit 14 on driveway across rear of property. | |
| May 23, 2023 | Completed final sign-off Jun 2023 | 615 10th Av | Miann Builder | revision to pa# 202105251016. exterior rear deck stair removal not shown on permit drawings.Details
revision to pa# 202105251016. exterior rear deck stair removal not shown on permit drawings. | |
| May 3, 2023 | In progress issued Jul 2025 | 30 Thor Av | Michael Paul Murray | to comply with planning 2022-003729enf,nov 202182479:enlarge g/f to rear yard to accomodate new bedroom.provide new windows and doors on 2/f. rebuild (e) deck, reconfigure (e) rear facade windows and doors.Details
to comply with planning 2022-003729enf,nov 202182479:enlarge g/f to rear yard to accomodate new bedroom.provide new windows and doors on 2/f. rebuild (e) deck, reconfigure (e) rear facade windows and doors. | $85,000 |
| Apr 4, 2023 | Completed final sign-off Jan 2024 | 3800 Scott St | rev to pa# 2018-1211-7983: remove non-compliant windows at new ground floor adu's replace with code windows to comply with dbi nov 202304558Details
rev to pa# 2018-1211-7983: remove non-compliant windows at new ground floor adu's replace with code windows to comply with dbi nov 202304558 | $15,000 | |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 1441 Funston Av | Miann Builder | revision to pa 2022-0714-8453 - notation of construction occuring on ground fl and 2nd fl in relation to structural work occuring on the 3rd fl (project site)Details
revision to pa 2022-0714-8453 - notation of construction occuring on ground fl and 2nd fl in relation to structural work occuring on the 3rd fl (project site) | |
| Feb 10, 2023 | Completed final sign-off Feb 2024 | 4470 24th St | E B W Builders Inc | add metal spiral stairway at rear yard adjacent to extg fire escape. extend and revise guardrail at extg fire escape.Details
add metal spiral stairway at rear yard adjacent to extg fire escape. extend and revise guardrail at extg fire escape. | $6,000 |
| Dec 9, 2022 | Completed final sign-off Jan 2023 | 3737 23rd St | Christopher Gate Construction Inc | remove extg non-load bearing walls. revision to permit pa#202202087528.Details
remove extg non-load bearing walls. revision to permit pa#202202087528. | |
| Nov 3, 2022 | Completed final sign-off Mar 2024 | 575 19th Av | Miann Builder | ground fl: relocate bedroom and laundryroom,add family room, fire-rate garage enclosure, add interior stairway to second fl. modify exterior doors and windows at rear. second fl: enlarge and remodel kitchen, modify two bedrooms and study, relocate bathroom, remodel powder room, change one rearDetails
ground fl: relocate bedroom and laundryroom,add family room, fire-rate garage enclosure, add interior stairway to second fl. modify exterior doors and windows at rear. second fl: enlarge and remodel kitchen, modify two bedrooms and study, relocate bathroom, remodel powder room, change one rear | $250,000 |
| Oct 3, 2022 | In progress issued Jun 2024 | 3701 Buchanan St | Acg Construction Inc | core and shell improvements and compliance with abeDetails
core and shell improvements and compliance with abe | $500,000 |
| Jul 14, 2022 | Completed final sign-off Aug 2023 | 1441 Funston Av | Miann Builder | 3/f: remodel (e) kitchen/bathroom, living/dining rooms, new closet & half bath, enlarge primary suite closet, new skylight @ kitchen/living room.Details
3/f: remodel (e) kitchen/bathroom, living/dining rooms, new closet & half bath, enlarge primary suite closet, new skylight @ kitchen/living room. | $78,000 |
| Jul 14, 2022 | Completed final sign-off Oct 2023 | 557 Duncan St | Craftworks Construction, A-1 Dynamic Builders Inc. | 1st fl: convert (e) bedroom, office, and laundry room to kitchen, living room & dining room. add new half bath. 2nd fl: convert (e) living room to master suite including new bathroom with skylight. remove (e) rear deck and replace with (n) cantilevered decks within rear yard.Details
1st fl: convert (e) bedroom, office, and laundry room to kitchen, living room & dining room. add new half bath. 2nd fl: convert (e) living room to master suite including new bathroom with skylight. remove (e) rear deck and replace with (n) cantilevered decks within rear yard. | $250,000 |
| Jun 21, 2022 | Completed final sign-off Jun 2023 | 4470 24th St | E B W Builders Inc | add 1 window (4'-11"x6'-0") in new opening, 4'-0 from property line. (at side)Details
add 1 window (4'-11"x6'-0") in new opening, 4'-0 from property line. (at side) | $1,500 |
| Jun 13, 2022 | Expired or cancelled expired Mar 2026 | 1418 16th Av | remodel existing kitchen and bathroom. add new bathroom. 1 (e) bed to study. infill ground floor under existing second floor "pop-out" on rear of residence for 2 new bedrooms.Details
remodel existing kitchen and bathroom. add new bathroom. 1 (e) bed to study. infill ground floor under existing second floor "pop-out" on rear of residence for 2 new bedrooms. | $150,000 | |
| Jun 8, 2022 | Completed final sign-off Dec 2022 | 1340 Mcallister St | A L Martin Construction | selected demo (non-structural); replace selected windows; remodel kitchen, sunroom, full bathroom & closet windows not visible from public view work on one unit.Details
selected demo (non-structural); replace selected windows; remodel kitchen, sunroom, full bathroom & closet windows not visible from public view work on one unit. | $47,600 |
| May 18, 2022 | Expired or cancelled withdrawn Jun 2022 | 529 Bright St | replace exterior facade with new finishes and details to match neighborhood context: mission style. relocate entry door. widen (e) garage door to 8'0" wide, reconfigure porch & porch stairs for improved headroom.Details
replace exterior facade with new finishes and details to match neighborhood context: mission style. relocate entry door. widen (e) garage door to 8'0" wide, reconfigure porch & porch stairs for improved headroom. | $42,000 | |
| May 10, 2022 | Completed final sign-off Feb 2025 | 1472 Sanchez St | Urban Builder General Contracting Inc, Lemma Construction, Inc. | renovation & remodel of (e) 3-story, 2-unit residential bldg, 2nd flr horizontal addition. work is to include demolition of (e) construction, a structural upgrade w/ (n) foundation & structural framing, upgraded eletrical & plumbing systems & a (n) elevator.Details
renovation & remodel of (e) 3-story, 2-unit residential bldg, 2nd flr horizontal addition. work is to include demolition of (e) construction, a structural upgrade w/ (n) foundation & structural framing, upgraded eletrical & plumbing systems & a (n) elevator. | $255,000 |
| Mar 22, 2022 | Completed final sign-off Jun 2023 | 615 10th Av | Miann Builder | rev to pa 202105251016 provide revised new window types at all (e) openings. remove & replace exterior siding. ground floor provide new doorway at (e) window opening. replace 2nd floor patio doors. remove (e) window in bath provide skylight + 1 hour parapet walls @ prop line adjacent to skylights asDetails
rev to pa 202105251016 provide revised new window types at all (e) openings. remove & replace exterior siding. ground floor provide new doorway at (e) window opening. replace 2nd floor patio doors. remove (e) window in bath provide skylight + 1 hour parapet walls @ prop line adjacent to skylights as | $5,000 |
| Mar 14, 2022 | Completed final sign-off Mar 2024 | 636 Clarendon Av | Freestone Reconstruction Inc | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infillDetails
remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infill | $4,000 |
| Mar 14, 2022 | Completed final sign-off Mar 2024 | 648 Clarendon Av | Freestone Reconstruction Inc | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infillDetails
remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infill | $4,000 |
| Mar 14, 2022 | Completed final sign-off Apr 2024 | 660 Clarendon Av | Freestone Reconstruction Inc | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infillDetails
remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infill | $4,000 |
| Mar 14, 2022 | Completed final sign-off Mar 2024 | 618 Clarendon Av | Freestone Reconstruction Inc | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infillDetails
remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infill | $4,000 |
| Mar 14, 2022 | Completed final sign-off Mar 2024 | 630 Clarendon Av | Freestone Reconstruction Inc | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infillDetails
remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infill | $4,000 |
| Mar 14, 2022 | Completed final sign-off Apr 2024 | 652 Clarendon Av | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infillDetails
remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infill | $4,000 | |
| Mar 14, 2022 | Completed final sign-off Mar 2024 | 640 Clarendon Av | Freestone Reconstruction Inc | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infillDetails
remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infill | $4,000 |
| Feb 8, 2022 | Completed final sign-off Jan 2023 | 3737 23rd St | Christopher Gate Construction Inc | partial infill of existing lighwell. remodel of two existing apartments including selected demolition of walls, doors, kitchens & baths, plus reframing of walls and new kitchens, baths, finishes, lighting.Details
partial infill of existing lighwell. remodel of two existing apartments including selected demolition of walls, doors, kitchens & baths, plus reframing of walls and new kitchens, baths, finishes, lighting. | $160,000 |
| Jan 6, 2022 | Expired or cancelled cancelled Jan 2026 | 237 Hartford St | replace (e) cement plaster front facade w/victorian style facade, replace windows on front, structurally reinforce (e) sagging bay windows in front.Details
replace (e) cement plaster front facade w/victorian style facade, replace windows on front, structurally reinforce (e) sagging bay windows in front. | $120,000 | |
| Jan 4, 2022 | Completed final sign-off Feb 2023 | 1108 Tennessee St | D N S Construction | add new apartment unit, kitchen and bath; add 2 gas heating units; raise ceiling height at breezeway; add fire sprinklers at entire ground fl in accordance with nfpa 13r under a separate permitDetails
add new apartment unit, kitchen and bath; add 2 gas heating units; raise ceiling height at breezeway; add fire sprinklers at entire ground fl in accordance with nfpa 13r under a separate permit | $103,000 |
| Dec 21, 2021 | Expired or cancelled withdrawn Oct 2023 | 2140 Polk St | install 2 new doors, one for access convenience, one for security & rated separation.Details
install 2 new doors, one for access convenience, one for security & rated separation. | $4,167 | |
| Dec 8, 2021 | Completed final sign-off May 2022 | 108 Divisadero St | A L Martin Construction | remodel (e) bathroom including demolition, new construction with new plumbing fixtures, electrical lighting and finishes.Details
remodel (e) bathroom including demolition, new construction with new plumbing fixtures, electrical lighting and finishes. | $18,000 |
| Nov 3, 2021 | Completed final sign-off Nov 2024 | 1461 Vallejo St | Gomez Iron Works | removal of existing wrought-iron vehicle security gate. replacement with wrought-iron pedestrian/vehicle security gate.Details
removal of existing wrought-iron vehicle security gate. replacement with wrought-iron pedestrian/vehicle security gate. | $10,200 |
| Oct 8, 2021 | Never finaled filed Oct 2021, never issued | 115 Maynard St | expand (e) house w/3-story horizontal expansion of primary suite, skylights, remodeled kitchen & bathrooms, and new interior stair. 1/f: dance studio & expanded parking, new entry stairs @ front, new rear deck w/stairs.Details
expand (e) house w/3-story horizontal expansion of primary suite, skylights, remodeled kitchen & bathrooms, and new interior stair. 1/f: dance studio & expanded parking, new entry stairs @ front, new rear deck w/stairs. | $300,000 | |
| Sep 14, 2021 | Never finaled issued Jul 2023, no final | 4257 23rd St | Aurora Builders | to erect 2 stories, no basement, type v-b, single family dwelling.Details
to erect 2 stories, no basement, type v-b, single family dwelling. | $1,141,200 |
| Aug 20, 2021 | Expired or cancelled withdrawn Sep 2021 | 4220 California St | accessible business entrance progame - to provide ada upgrades: new stair handrail, painted stripes onexterior stairs,modity (e) entry door to conform tocurrent access code.Details
accessible business entrance progame - to provide ada upgrades: new stair handrail, painted stripes onexterior stairs,modity (e) entry door to conform tocurrent access code. | $11,000 | |
| Aug 20, 2021 | Completed final sign-off Jun 2022 | 566 Lombard St | Wong Construction Inc | work to be performed in unit 3, 566 lombard and unit 5, 570 lombard demolition, remodel and rebuild of (e) kitchens, dining bed and bathrooms; including new walls, doors, applicances, fixtures and casework. new structural (seismic) framingDetails
work to be performed in unit 3, 566 lombard and unit 5, 570 lombard demolition, remodel and rebuild of (e) kitchens, dining bed and bathrooms; including new walls, doors, applicances, fixtures and casework. new structural (seismic) framing | $120,000 |
| Jun 14, 2021 | In progress issued Apr 2026 | 237 Ripley St | Doyle Developments | provide new downslope driveway from (e) curb cut to (e) garage that was mad inaccessible when street was raised. remove tree within publice right-of-way. rebuild front exterior entry stairway.Details
provide new downslope driveway from (e) curb cut to (e) garage that was mad inaccessible when street was raised. remove tree within publice right-of-way. rebuild front exterior entry stairway. | $30,000 |
| May 25, 2021 | Completed final sign-off Jun 2023 | 615 10th Av | Miann Builder | renovation and remodel existing 3 story single family home, including demolitionof (e) construction, remodeled foundation & structural/seismic framework, new walls, door and windows finishes and utility upgradesDetails
renovation and remodel existing 3 story single family home, including demolitionof (e) construction, remodeled foundation & structural/seismic framework, new walls, door and windows finishes and utility upgrades | $227,000 |
| May 5, 2021 | Completed final sign-off May 2023 | 608 Clarendon Av | Freestone Reconstruction Inc | replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings.Details
replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings. | $10,000 |
| Apr 22, 2021 | Completed final sign-off May 2023 | 610 Clarendon Av | Freestone Reconstruction Inc | replace existing cantilevered exterior deck that has been structually compromised by dryout. install new wood support beam and posts w/ concrete footings. no change in egress or deck area.Details
replace existing cantilevered exterior deck that has been structually compromised by dryout. install new wood support beam and posts w/ concrete footings. no change in egress or deck area. | $15,000 |
| Apr 13, 2021 | Completed final sign-off Aug 2023 | 616 02nd Av | Bartley Construction | add 158 sf of (n) habitable ground fl space at rear with roof deck at 2nd fl level to replace (e) freestanding deck. convert (e) rear ground fl storage areas to (n) family room, bedroom & bathroom. lower ground fl concrete slab & replace concrete footings. add lowered patio in rear yard.Details
add 158 sf of (n) habitable ground fl space at rear with roof deck at 2nd fl level to replace (e) freestanding deck. convert (e) rear ground fl storage areas to (n) family room, bedroom & bathroom. lower ground fl concrete slab & replace concrete footings. add lowered patio in rear yard. | $52,500 |
| Mar 24, 2021 | Expired or cancelled cancelled Jan 2026 | 160 Central Av | replace (e) carport with a two car garage. create (n) deck on roof of new garage to replace (e) freestanding elevated wood deck. replace (e) exterior wood stair to 2nd fl owner's unit with (n) wood stair in same location.Details
replace (e) carport with a two car garage. create (n) deck on roof of new garage to replace (e) freestanding elevated wood deck. replace (e) exterior wood stair to 2nd fl owner's unit with (n) wood stair in same location. | $30,000 | |
| Mar 22, 2021 | Completed final sign-off Jul 2023 | 70 Deming St | replace existing wood stair from rear yard to rear deck with new steel spiral stair.Details
replace existing wood stair from rear yard to rear deck with new steel spiral stair. | $8,000 | |
| Feb 2, 2021 | Completed final sign-off Jun 2021 | 131 Albion St | Cesar Garcia General Contractor Inc | to comply with nov # 202070531. convert a portion of storage room into a laundry room on ground floor.Details
to comply with nov # 202070531. convert a portion of storage room into a laundry room on ground floor. | $3,000 |
| Jan 22, 2021 | In progress issued Jun 2026 | 4176 Cesar Chavez St | Stroub Construction | 4176 cesar chavez st-rear bulding. total rebuild of structur in-kind to prior demo w/ interior reconfiguration of 1st & 2nd flrs. (n) flat roof and (n) bay window configuration at rear elevation. no addition to height or footprint. (e) decks to be rebuilt in-kind. electric & plumb work as required.Details
4176 cesar chavez st-rear bulding. total rebuild of structur in-kind to prior demo w/ interior reconfiguration of 1st & 2nd flrs. (n) flat roof and (n) bay window configuration at rear elevation. no addition to height or footprint. (e) decks to be rebuilt in-kind. electric & plumb work as required. | $360,000 |
| Jan 22, 2021 | In progress issued Jun 2026 | 4176 Cesar Chavez St | Stroub Construction | demo rear building at 4176 cesar chavez st. due to toxic mold.Details
demo rear building at 4176 cesar chavez st. due to toxic mold. | $32,000 |
| Jan 13, 2021 | Completed final sign-off Aug 2021 | 4024 Cesar Chavez St | Best Value Home Improvements | replace existing rear stairs and deck in kindDetails
replace existing rear stairs and deck in kind | $8,000 |
| Jan 11, 2021 | Expired or cancelled cancelled Jan 2026 | 142 Whitney St | relocate closets to create new hall @ 2nd floor bedroomsDetails
relocate closets to create new hall @ 2nd floor bedrooms | $4,000 | |
| Nov 13, 2020 | Completed final sign-off Oct 2021 | 797 Corbett Av | Kadima-Schoepp, Inc | rev to pa201909121438, to comply with nov201972841: replace wealkway deck to plans, repair any damagaed rot, wire, paper, stucco.Details
rev to pa201909121438, to comply with nov201972841: replace wealkway deck to plans, repair any damagaed rot, wire, paper, stucco. | $10,000 |
| Nov 9, 2020 | Completed final sign-off Jul 2021 | 2535 31st Av | Hubert Penny | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $30,000 |
| Oct 14, 2020 | Completed final sign-off May 2023 | 668 Clarendon Av | Freestone Reconstruction Inc | replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings.Details
replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings. | $15,000 |
| Oct 13, 2020 | Completed final sign-off May 2023 | 656 Clarendon Av | Freestone Reconstruction Inc | install new wood support beam and posts with concrete footings at exterior wood deck. diagonal bracing between posts.Details
install new wood support beam and posts with concrete footings at exterior wood deck. diagonal bracing between posts. | $5,000 |
| Oct 13, 2020 | Never finaled filed Oct 2020, never issued | 680 Clarendon Av | install new wood support beam and posts with concrete footings at exterior wood deck. diagonal bracing between posts.Details
install new wood support beam and posts with concrete footings at exterior wood deck. diagonal bracing between posts. | $3,000 | |
| Sep 24, 2020 | Completed final sign-off May 2023 | 664 Clarendon Av | Freestone Reconstruction Inc | install new wood support beam, posts with concrete footings & diagonal bracing at existing front exterior wood deckDetails
install new wood support beam, posts with concrete footings & diagonal bracing at existing front exterior wood deck | $20,000 |
| Sep 9, 2020 | Expired or cancelled cancelled Nov 2022 | 658 Clarendon Av | Sequoia Construction Services Inc | install new wood support beam, posts, diagonal bracing, & concrete footins at exterior wood deck.Details
install new wood support beam, posts, diagonal bracing, & concrete footins at exterior wood deck. | $3,000 |
| May 27, 2020 | Completed final sign-off Feb 2021 | 690 Clarendon Av | Freestone Reconstruction Inc, Sequoia Construction Services Inc | less than 50% in-kind replacement of rear deckDetails
less than 50% in-kind replacement of rear deck | $1,250 |
| Dec 30, 2019 | Expired or cancelled cancelled Jun 2025 | 299 Cole St | using ordinance 162-16,convert ground floor garage to three accessory dwelling units. relocate elctrical meters, add fire sprinklers to ground fl under separate permit.Details
using ordinance 162-16,convert ground floor garage to three accessory dwelling units. relocate elctrical meters, add fire sprinklers to ground fl under separate permit. | $150,000 | |
| Dec 10, 2019 | Never finaled issued Aug 2022, no final | 1537 Cole St | to erect a front detached 3-story, type 5b, single family building w/ 1 basement; reference p/a 2019-1210-9141 for associated form 6 demolition permit application, dmj 05/31/2024;Details
to erect a front detached 3-story, type 5b, single family building w/ 1 basement; reference p/a 2019-1210-9141 for associated form 6 demolition permit application, dmj 05/31/2024; | $325,000 | |
| Dec 10, 2019 | Never finaled filed Dec 2019, never issued | 1537 Cole St | to demolish a detached 1-story, type 5, front garage bldg. (e) rear sfr bldg to remain.Details
to demolish a detached 1-story, type 5, front garage bldg. (e) rear sfr bldg to remain. | $2,000 | |
| Nov 20, 2019 | Completed final sign-off Oct 2021 | 1889 Union St | E B W Builders Inc | accessible business entrance program per ordinance 51-16. technical infeasibilty request for 1889 union, 2860 laguna & 2840 laguna st . new power door operator at 1895 union. nw power door activator at 1899 union.Details
accessible business entrance program per ordinance 51-16. technical infeasibilty request for 1889 union, 2860 laguna & 2840 laguna st . new power door operator at 1895 union. nw power door activator at 1899 union. | $12,000 |
| Sep 27, 2019 | Completed final sign-off Feb 2021 | 2301 Chestnut St | E B W Builders Inc | comply w/ accessible business entry program. install power door operators at 2301-2317-2323 chestnutDetails
comply w/ accessible business entry program. install power door operators at 2301-2317-2323 chestnut | $12,000 |
| Sep 19, 2019 | Completed final sign-off Oct 2021 | 105 Broad St | E B W Builders Inc | install powered door operator at 107 broad. a.b.e ordinance 51-16.Details
install powered door operator at 107 broad. a.b.e ordinance 51-16. | $5,000 |
| Sep 19, 2019 | Completed final sign-off Oct 2021 | 101 Broad St | E B W Builders Inc | install powered door operator at 101,101a broad. replace entry door hardware at 103 & 103a broad a.b.e ordinance 51-16.Details
install powered door operator at 101,101a broad. replace entry door hardware at 103 & 103a broad a.b.e ordinance 51-16. | $10,000 |
| Sep 19, 2019 | Completed final sign-off Apr 2023 | 798 Great Hy | Coastal Tile & Construction Inc | unit 3. interior remodel of top floor unit. replace fixtures, finishes & doors at (e) master bath, kitchen & guest bath. convert (e) dining room & den into new bedrooms.Details
unit 3. interior remodel of top floor unit. replace fixtures, finishes & doors at (e) master bath, kitchen & guest bath. convert (e) dining room & den into new bedrooms. | $30,000 |