Permit GraphShortlistSan Francisco building permits since 2000

Daniel Huntsman

License
C9255
Look the license up with the state
Listed as
architect, authorized agent-others, designer, engineer, lessee, pmt consultant/expediter
Firm
Huntsman Architectural Group
Based in
San Francisco
On San Francisco permits
Mar 2000 to Sep 2026

867 permits since 2000 (architect on 809 permits, authorized agent-others on 64 permits, engineer on 8 permits, designer on 2 permits, lessee on 2 permits, pmt consultant/expediter on 2 permits): 660 completed, 4 in progress, 73 never finaled, 130 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 867.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 18, 2026In progress
issued Sep 2026
185 Berry StHathaway Dinwiddie Co.revision to open permit#202602125816, design changes, revised evcs stall location.
Details
Permit
202609188353
Status
issued
Filed
Sep 18, 2026
Permit issued
Sep 22, 2026
Address
185 Berry St

revision to open permit#202602125816, design changes, revised evcs stall location.

Open the permit page

Jul 22, 2026In progress
issued Aug 2026
101 California StSource Planning And Construction Inc45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491
Details
Permit
202607225371
Status
issued
Filed
Jul 22, 2026
Permit issued
Aug 12, 2026
Declared cost
$202,000
Address
101 California St

45th flr: non-structural interior demolition of partitions doors, fihishes, ceilings, lighting, mechanical & electrical outlets & switches in common restrooms. restroom ada accessibility upgrades, electrical deferred. path of travel pa#202303103491

Open the permit page

$202,000
Jul 22, 2026In progress
issued Aug 2026
101 California StSource Planning And Construction Inc39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491
Details
Permit
202607225369
Status
issued
Filed
Jul 22, 2026
Permit issued
Aug 12, 2026
Declared cost
$202,000
Address
101 California St

39th fl:common area restrooms,shall consist of interior demolition and construction of non-structural elements including, but not necessary limited to, interior partitions, finishes,ceiling,light&fixtures. elect.& fire sprinkler drawn will be submitted as a separate defered permit#202303103491

Open the permit page

$202,000
May 20, 2026Completed
final sign-off Sep 2026
201 Mission StRichlen Construction21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approved
Details
Permit
202605201639
Status
complete
Filed
May 20, 2026
Permit issued
Jun 3, 2026
Final sign-off
Sep 10, 2026
Declared cost
$218,435
Address
201 Mission St

21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approved

Open the permit page

$218,435
Feb 26, 2026Completed
final sign-off Jul 2026
595 Market StDome Construction Corp22nd flr: interior demolition & new construction of non-structural partitions, door, finishes, & lighting. ada upgrades to the core restrooms. no changes to fixture counts. occupant loads, or path of travel. ref pa #202602135931. mep to be under deffered submittal. new phone booth structural drawing
Details
Permit
202602266610
Status
complete
Filed
Feb 26, 2026
Permit issued
Mar 4, 2026
Final sign-off
Jul 22, 2026
Declared cost
$1,097,019
Address
595 Market St

22nd flr: interior demolition & new construction of non-structural partitions, door, finishes, & lighting. ada upgrades to the core restrooms. no changes to fixture counts. occupant loads, or path of travel. ref pa #202602135931. mep to be under deffered submittal. new phone booth structural drawing

Open the permit page

$1,097,019
Oct 8, 2025In progress
issued Nov 2025
4 Embarcadero CenterGci, Increvision to previously approved permitdrawings for re-arrangement pantry idf copy storage room & (2) offices. previously approved permit#202505287341
Details
Permit
202510086955
Status
issued
Filed
Oct 8, 2025
Permit issued
Nov 20, 2025
Address
4 Embarcadero Center

revision to previously approved permitdrawings for re-arrangement pantry idf copy storage room & (2) offices. previously approved permit#202505287341

Open the permit page

Sep 22, 2022Completed
final sign-off Mar 2023
1 Embarcadero CenterSource Planning And Construction Inc7/f: revision to bpa#202102114449, reduce scope of work - delete mep
Details
Permit
202209222997
Status
complete
Filed
Sep 22, 2022
Permit issued
Oct 4, 2022
Final sign-off
Mar 3, 2023
Address
1 Embarcadero Center

7/f: revision to bpa#202102114449, reduce scope of work - delete mep

Open the permit page

Jul 20, 2022Never finaled
issued Aug 2022, no final
995 Market StSan Francisco Commercial Builders Incmain lobby upgrade including replaced lighting between desk and finishes added exteior metal box covers electrical and life safety plans will be submitted as a separate permit.
Details
Permit
202207208895
Status
issued
Filed
Jul 20, 2022
Permit issued
Aug 2, 2022
Declared cost
$275,000
Address
995 Market St

main lobby upgrade including replaced lighting between desk and finishes added exteior metal box covers electrical and life safety plans will be submitted as a separate permit.

Open the permit page

$275,000
Jul 12, 2022Completed
final sign-off Oct 2022
4 Embarcadero CenterM C S Construction Servicesnon structural demo. new non structural partitions, glass, doors, millwork,finishes. mep, life safety, sprinkler under sep permit
Details
Permit
202207128225
Status
complete
Filed
Jul 12, 2022
Permit issued
Jul 19, 2022
Final sign-off
Oct 6, 2022
Declared cost
$169,300
Address
4 Embarcadero Center

non structural demo. new non structural partitions, glass, doors, millwork,finishes. mep, life safety, sprinkler under sep permit

Open the permit page

$169,300
Jun 28, 2022Completed
final sign-off Feb 2023
580 California StPeacock Construction17th fl: t.i.. provide water line for ref & coffee maker. select demo of (e) non-load bearing walls & ceiling system. new walls, ceilings & lighting. modifications of elec/lighting/hvac. pot previously approved under pa# 201904037033 & 201909161721)
Details
Permit
202206287215
Status
complete
Filed
Jun 28, 2022
Permit issued
Jul 1, 2022
Final sign-off
Feb 13, 2023
Declared cost
$902,002
Address
580 California St

17th fl: t.i.. provide water line for ref & coffee maker. select demo of (e) non-load bearing walls & ceiling system. new walls, ceilings & lighting. modifications of elec/lighting/hvac. pot previously approved under pa# 201904037033 & 201909161721)

Open the permit page

$902,002
Jun 14, 2022Completed
final sign-off Feb 2023
633 Battery StField Construction Inc.1f & mezz: new air distribution being added to serve floor space. 1 owner furnished contractor installed air cooled self contained ac unit. 1 new exhaust air fan added. new break room sink. new lighting & relocated lighting.
Details
Permit
202206146323
Status
complete
Filed
Jun 14, 2022
Permit issued
Jun 23, 2022
Final sign-off
Feb 7, 2023
Declared cost
$194,000
Address
633 Battery St

1f & mezz: new air distribution being added to serve floor space. 1 owner furnished contractor installed air cooled self contained ac unit. 1 new exhaust air fan added. new break room sink. new lighting & relocated lighting.

Open the permit page

$194,000
Mar 29, 2022Completed
final sign-off Feb 2023
260 Townsend StAquamatic Fire Protection4/f: relocate/replace (55) fire sprinklers for t.i. no underground work.
Details
Permit
202203291108
Status
complete
Filed
Mar 29, 2022
Permit issued
Apr 4, 2022
Final sign-off
Feb 10, 2023
Declared cost
$16,600
Address
260 Townsend St

4/f: relocate/replace (55) fire sprinklers for t.i. no underground work.

Open the permit page

$16,600
Mar 29, 2022Completed
final sign-off Jun 2023
260 Townsend StWci-Gc Inc4/f:inteiror demo of non-structural elements including but not necessary limited to partitions,doors,finishes,lhghting,mech&elect outlets&switches. space shall remain vacant until future tenant buid-out.(e)opening ceiling requires sprinkler mod except in suspended ceilings to remain.
Details
Permit
202203291122
Status
complete
Filed
Mar 29, 2022
Permit issued
Apr 1, 2022
Final sign-off
Jun 13, 2023
Declared cost
$170,000
Address
260 Townsend St

4/f:inteiror demo of non-structural elements including but not necessary limited to partitions,doors,finishes,lhghting,mech&elect outlets&switches. space shall remain vacant until future tenant buid-out.(e)opening ceiling requires sprinkler mod except in suspended ceilings to remain.

Open the permit page

$170,000
Mar 28, 2022Completed
final sign-off Oct 2022
580 California StSan Francisco Commercial Builders Inc23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit.
Details
Permit
202203280981
Status
complete
Filed
Mar 28, 2022
Permit issued
Jun 16, 2022
Final sign-off
Oct 21, 2022
Declared cost
$190,000
Address
580 California St

23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit.

Open the permit page

$190,000
Jan 6, 2022Never finaled
issued Jan 2022, no final
50 California Stresubmittal of previously approved and completed pa# 201412184046 for purpose of confirming occupant load at break area #2635 in order to submit a permit to operate as required by sffd inspector michelle li, ref nov# 21120001
Details
Permit
202201065458
Status
issued
Filed
Jan 6, 2022
Permit issued
Jan 6, 2022
Address
50 California St

resubmittal of previously approved and completed pa# 201412184046 for purpose of confirming occupant load at break area #2635 in order to submit a permit to operate as required by sffd inspector michelle li, ref nov# 21120001

Open the permit page

Dec 13, 2021Completed
final sign-off Apr 2022
350 Rhode Island StRossi Builders Inc.added scope of work to floor 2 common restroom permit#2021/10271275.replace all fixtures,partitions, equipt lighting and finishes. no structural work to be performed.
Details
Permit
202112134290
Status
complete
Filed
Dec 13, 2021
Permit issued
Dec 17, 2021
Final sign-off
Apr 21, 2022
Declared cost
$50,000
Address
350 Rhode Island St

added scope of work to floor 2 common restroom permit#2021/10271275.replace all fixtures,partitions, equipt lighting and finishes. no structural work to be performed.

Open the permit page

$50,000
Feb 10, 2021Completed
final sign-off May 2021
909 Montgomery StCharles Pankow Builders Ltdsuite #400: revision to app#202010196842. modifications to extg a0.0 cover sheet regarding sprinkler system and construction type. all revisions clouded as bulletin 01, delta 2.2
Details
Permit
202102104382
Status
complete
Filed
Feb 10, 2021
Permit issued
Apr 7, 2021
Final sign-off
May 7, 2021
Address
909 Montgomery St

suite #400: revision to app#202010196842. modifications to extg a0.0 cover sheet regarding sprinkler system and construction type. all revisions clouded as bulletin 01, delta 2.2

Open the permit page

Nov 12, 2020Completed
final sign-off Mar 2021
275 Battery St19th fl demo of non structural partitions, construction of new non structural partitions, lighting, finishes. no change in occupancy and no change in floor area
Details
Permit
202011128752
Status
complete
Filed
Nov 12, 2020
Permit issued
Dec 28, 2020
Final sign-off
Mar 18, 2021
Declared cost
$7,544
Address
275 Battery St

19th fl demo of non structural partitions, construction of new non structural partitions, lighting, finishes. no change in occupancy and no change in floor area

Open the permit page

$7,544
Sep 24, 2020Completed
final sign-off Feb 2021
600 California Strestripe of (e) accessible parking and addition of new parking signage. add an accessible van stall. sprinkler pipe re-routing under separate permit.
Details
Permit
202009244912
Status
complete
Filed
Sep 24, 2020
Permit issued
Jan 21, 2021
Final sign-off
Feb 18, 2021
Declared cost
$24,000
Address
600 California St

restripe of (e) accessible parking and addition of new parking signage. add an accessible van stall. sprinkler pipe re-routing under separate permit.

Open the permit page

$24,000
Sep 23, 2020Completed
final sign-off Apr 2021
909 Montgomery StCharles Pankow Builders Ltdremoval of existing internal communicating stair & associated structural between 3rd and 4th floor. also infill of slab at the 4th floor.
Details
Permit
202009234856
Status
complete
Filed
Sep 23, 2020
Permit issued
Nov 25, 2020
Final sign-off
Apr 16, 2021
Declared cost
$225,000
Address
909 Montgomery St

removal of existing internal communicating stair & associated structural between 3rd and 4th floor. also infill of slab at the 4th floor.

Open the permit page

$225,000
Sep 12, 2020Never finaled
issued Jan 2021, no final
301 Howard StSkyline Construction18/f: accessibility upgrade of (e) balcony serving full floor tenant. interior ramp, balcony doors, raised floor paver system, illuminated exit sign, guard extensions.
Details
Permit
202009124053
Status
issued
Filed
Sep 12, 2020
Permit issued
Jan 4, 2021
Declared cost
$82,505
Address
301 Howard St

18/f: accessibility upgrade of (e) balcony serving full floor tenant. interior ramp, balcony doors, raised floor paver system, illuminated exit sign, guard extensions.

Open the permit page

$82,505
Aug 27, 2020Completed
final sign-off Jun 2021
275 Battery StHathaway Dinwiddie Co.demo of non structural non rated partitions,electrical tele data, lighting, ceiling tile and grid finishes. buildback of non rated glass partitions and non rated entrance doors. new ceiling work, finishes throughout and new millwork. no change of occupancy , use or area
Details
Permit
202008272791
Status
complete
Filed
Aug 27, 2020
Permit issued
Nov 17, 2020
Final sign-off
Jun 24, 2021
Declared cost
$363,260
Address
275 Battery St

demo of non structural non rated partitions,electrical tele data, lighting, ceiling tile and grid finishes. buildback of non rated glass partitions and non rated entrance doors. new ceiling work, finishes throughout and new millwork. no change of occupancy , use or area

Open the permit page

$363,260
Jul 22, 2020Completed
final sign-off Jan 2021
225 Bush StSource Planning And Construction Inc3 & 18/f: new nonstructural partitions, doors, lighting, millwork, & finishes. no change in occupancy, use or area. elec/plumb/life safety/sprinklers deferred
Details
Permit
202007220705
Status
complete
Filed
Jul 22, 2020
Permit issued
Sep 3, 2020
Final sign-off
Jan 26, 2021
Declared cost
$473,336
Address
225 Bush St

3 & 18/f: new nonstructural partitions, doors, lighting, millwork, & finishes. no change in occupancy, use or area. elec/plumb/life safety/sprinklers deferred

Open the permit page

$473,336
Jul 22, 2020Completed
final sign-off Jan 2021
2 Embarcadero CenterSource Planning And Construction Inc22/f: nonstructural demo, upgrade toilet room to be fully accessible, new finishes in toilet rooms, elevator lobby & corr. no change in occupancy, use or area. mep, life safety, sprinklers under seperate permit.
Details
Permit
202007220710
Status
complete
Filed
Jul 22, 2020
Permit issued
Aug 21, 2020
Final sign-off
Jan 20, 2021
Declared cost
$150,000
Address
2 Embarcadero Center

22/f: nonstructural demo, upgrade toilet room to be fully accessible, new finishes in toilet rooms, elevator lobby & corr. no change in occupancy, use or area. mep, life safety, sprinklers under seperate permit.

Open the permit page

$150,000
Dec 20, 2019Completed
final sign-off Sep 2021
121 Spear StBevilacqua & Sonssuite 250: selective demo of non structural partiton, ceiling, lights, finishes. consturction new lights, patching of finishes. no change in use area or occupancy. mep. ls, sprinklers sep permit
Details
Permit
201912200101
Status
complete
Filed
Dec 20, 2019
Permit issued
Mar 13, 2020
Final sign-off
Sep 10, 2021
Declared cost
$2,343,634
Address
121 Spear St

suite 250: selective demo of non structural partiton, ceiling, lights, finishes. consturction new lights, patching of finishes. no change in use area or occupancy. mep. ls, sprinklers sep permit

Open the permit page

$2,343,634
Dec 6, 2019Never finaled
issued Dec 2019, no final
1 Daniel Burnham CtSan Francisco Commercial Builders Inc3rd fl/ste #300c - non structural demo, new non structural partitoins, doors, lighting, millwork, finishes. no change in area, occupancy or use. mep ls, sprinklers under sep permit
Details
Permit
201912068832
Status
issued
Filed
Dec 6, 2019
Permit issued
Dec 19, 2019
Declared cost
$94,527
Address
1 Daniel Burnham Ct

3rd fl/ste #300c - non structural demo, new non structural partitoins, doors, lighting, millwork, finishes. no change in area, occupancy or use. mep ls, sprinklers under sep permit

Open the permit page

$94,527
Dec 5, 2019Completed
final sign-off Jul 2020
555 California StPeacock Constructionconcourse level convert e storage room to mother's room
Details
Permit
201912058794
Status
complete
Filed
Dec 5, 2019
Permit issued
Dec 17, 2019
Final sign-off
Jul 7, 2020
Declared cost
$9,677
Address
555 California St

concourse level convert e storage room to mother's room

Open the permit page

$9,677
Dec 4, 2019Expired or cancelled
cancelled Jan 2026
600 Montgomery StHathaway Dinwiddie Co.revision to 201910154447 installation of 1 pair of s doors. no change in occupancy, use, or area. mep, ls, sprinklers under sep permit
Details
Permit
201912048596
Status
cancelled
Filed
Dec 4, 2019
Declared cost
$40,000
Address
600 Montgomery St

revision to 201910154447 installation of 1 pair of s doors. no change in occupancy, use, or area. mep, ls, sprinklers under sep permit

Open the permit page

$40,000
Oct 3, 2019Completed
final sign-off Oct 2020
535 Mission StPeacock Constructionalteration of clean up room sink to an all gender restroom. modification to e coffee bar to accomodate new equipment and seating
Details
Permit
201910033430
Status
complete
Filed
Oct 3, 2019
Permit issued
Oct 10, 2019
Final sign-off
Oct 14, 2020
Declared cost
$218,000
Address
535 Mission St

alteration of clean up room sink to an all gender restroom. modification to e coffee bar to accomodate new equipment and seating

Open the permit page

$218,000
Jul 18, 2019Completed
final sign-off Sep 2019
1 Maritime Pz11 floor: non structural demolition only per ab-017, no change in occupancy use or area. revision to app#201807305831. n/a for maher. tenant improvement required under separte permit.
Details
Permit
201907186317
Status
complete
Filed
Jul 18, 2019
Permit issued
Jul 19, 2019
Final sign-off
Sep 25, 2019
Declared cost
$105,360
Address
1 Maritime Pz

11 floor: non structural demolition only per ab-017, no change in occupancy use or area. revision to app#201807305831. n/a for maher. tenant improvement required under separte permit.

Open the permit page

$105,360
Jul 16, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmbc north. 1st time ti level 1-2. work includes new partitions, finishes, mep. work also includes coffee and smoothie bar and new communicating stair maher not req
Details
Permit
201907166051
Status
complete
Filed
Jul 16, 2019
Permit issued
Dec 5, 2019
Final sign-off
Sep 18, 2020
Declared cost
$2,000,971
Address
300 16th St

mbc north. 1st time ti level 1-2. work includes new partitions, finishes, mep. work also includes coffee and smoothie bar and new communicating stair maher not req

Open the permit page

$2,000,971
Jul 16, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 south. 1st time ti level 3. work includes new partitions, finishes, maher not req
Details
Permit
201907166063
Status
complete
Filed
Jul 16, 2019
Permit issued
Dec 5, 2019
Final sign-off
Sep 24, 2020
Declared cost
$1,407,574
Address
300 16th St

mb4 south. 1st time ti level 3. work includes new partitions, finishes, maher not req

Open the permit page

$1,407,574
Jul 16, 2019Completed
final sign-off Sep 2020
300 16th StDpr Constructionmb4 south. 1st time ti level 1 + 2. work includes new partitions, finishes, mep. maher not req
Details
Permit
201907166064
Status
complete
Filed
Jul 16, 2019
Permit issued
Oct 22, 2019
Final sign-off
Sep 24, 2020
Declared cost
$959,168
Address
300 16th St

mb4 south. 1st time ti level 1 + 2. work includes new partitions, finishes, mep. maher not req

Open the permit page

$959,168
May 16, 2019Completed
final sign-off Sep 2019
525 Market StHathaway Dinwiddie Co.14th floor: revision to app#201811196218: structural revision: 1 transformer is being installed & seismically anchored, rather than being suspended as shown previously. additional transformer is being supported on a unistrut frame lines. mep revision:nw heat pump hp14-s is being added.
Details
Permit
201905160802
Status
complete
Filed
May 16, 2019
Permit issued
May 22, 2019
Final sign-off
Sep 5, 2019
Declared cost
$50,000
Address
525 Market St

14th floor: revision to app#201811196218: structural revision: 1 transformer is being installed & seismically anchored, rather than being suspended as shown previously. additional transformer is being supported on a unistrut frame lines. mep revision:nw heat pump hp14-s is being added.

Open the permit page

$50,000
May 16, 2019Completed
final sign-off Oct 2019
1 Maritime PzGci, Inc#600:selective demolition of non-structural partitions, doors, glazing millwork, elec, lights, & finishes. construction of new non- structural partitions, doors, glazing, millwork, elec, ceiling, lights & finishes. restrooms under permit #201801027651. no change in occupancy, use or arae. mep. def
Details
Permit
201905160799
Status
complete
Filed
May 16, 2019
Permit issued
May 20, 2019
Final sign-off
Oct 18, 2019
Declared cost
$609,900
Address
1 Maritime Pz

#600:selective demolition of non-structural partitions, doors, glazing millwork, elec, lights, & finishes. construction of new non- structural partitions, doors, glazing, millwork, elec, ceiling, lights & finishes. restrooms under permit #201801027651. no change in occupancy, use or arae. mep. def

Open the permit page

$609,900
Jan 10, 2019Completed
final sign-off Jun 2019
1 California StR.M.R. Construction Company16th floor:demo of non-structural walls. construction new tenant suite including non structural walls, plumbing and ceiling systems. life safety and sprinkler to be design build under seperate permit. n/a for maher
Details
Permit
201901100071
Status
complete
Filed
Jan 10, 2019
Permit issued
Feb 8, 2019
Final sign-off
Jun 4, 2019
Declared cost
$1,672,776
Address
1 California St

16th floor:demo of non-structural walls. construction new tenant suite including non structural walls, plumbing and ceiling systems. life safety and sprinkler to be design build under seperate permit. n/a for maher

Open the permit page

$1,672,776
Dec 5, 2018Completed
final sign-off Aug 2019
560 Mission StDome Construction Corp18th floor: addition of a new corridor and demising walls to split a extg full floor tenant into half including work to the elevator lobby & upgrades to the restrooms as needed. this includes demolition & construction of non structural partitions, door, light fixtures, millwork & finishes, mep,
Details
Permit
201812057522
Status
complete
Filed
Dec 5, 2018
Permit issued
Feb 1, 2019
Final sign-off
Aug 15, 2019
Declared cost
$124,800
Address
560 Mission St

18th floor: addition of a new corridor and demising walls to split a extg full floor tenant into half including work to the elevator lobby & upgrades to the restrooms as needed. this includes demolition & construction of non structural partitions, door, light fixtures, millwork & finishes, mep,

Open the permit page

$124,800
Dec 3, 2018Completed
final sign-off Feb 2019
275 Battery StHathaway Dinwiddie Co.garage - mechanical & electrical scope ref pa 2018-0920-0920
Details
Permit
201812037282
Status
complete
Filed
Dec 3, 2018
Permit issued
Dec 20, 2018
Final sign-off
Feb 11, 2019
Declared cost
$275,000
Address
275 Battery St

garage - mechanical & electrical scope ref pa 2018-0920-0920

Open the permit page

$275,000
Oct 1, 2018Completed
final sign-off Sep 2020
300 16th StDpr Constructionsouth tower, 6th & 7th floor 2-story improvement & terrace upgrade to an (e) core/shell building w/ office, food preparation, dining, terrace, structural, mechanical, electrical, plumbing & hvac
Details
Permit
201810011925
Status
complete
Filed
Oct 1, 2018
Permit issued
May 21, 2019
Final sign-off
Sep 24, 2020
Declared cost
$10,091,039
Address
300 16th St

south tower, 6th & 7th floor 2-story improvement & terrace upgrade to an (e) core/shell building w/ office, food preparation, dining, terrace, structural, mechanical, electrical, plumbing & hvac

Open the permit page

$10,091,039
Aug 2, 2018Completed
final sign-off Nov 2020
300 16th StDpr Constructionsouth tower - upgrades to core & shell including restrooms & openings between levels, space to remain unoccupied @ project completion. path of travel & restroom calculations to be provided in future tenant improvement applications ref #201606149954
Details
Permit
201808026296
Status
complete
Filed
Aug 2, 2018
Permit issued
May 21, 2019
Final sign-off
Nov 4, 2020
Declared cost
$1,085,908
Address
300 16th St

south tower - upgrades to core & shell including restrooms & openings between levels, space to remain unoccupied @ project completion. path of travel & restroom calculations to be provided in future tenant improvement applications ref #201606149954

Open the permit page

$1,085,908
Aug 2, 2018Completed
final sign-off Nov 2020
300 16th StDpr Constructionnorth tower - upgrade to core & shell including restrooms & openings between levels. space to remain unoccupied @ project completion. path of travel & restroom calculations to be provided in future tenant improvement applications. ref #201606149952
Details
Permit
201808026290
Status
complete
Filed
Aug 2, 2018
Permit issued
May 21, 2019
Final sign-off
Nov 4, 2020
Declared cost
$1,112,777
Address
300 16th St

north tower - upgrade to core & shell including restrooms & openings between levels. space to remain unoccupied @ project completion. path of travel & restroom calculations to be provided in future tenant improvement applications. ref #201606149952

Open the permit page

$1,112,777
Dec 11, 2017Completed
final sign-off Apr 2018
315 Montgomery StBcci Construction Companydemo of (e) non struc partitions, fh, millwork ceilings, lighting, power finishes. new construction of mens, womens multi accomodation rr. space will be prepared as an unoccupied space for market purposes.no change in occupancy mep deferred.sprinkler rev do to demo ceiling under sepaeate appl.
Details
Permit
201712116097
Status
complete
Filed
Dec 11, 2017
Permit issued
Dec 21, 2017
Final sign-off
Apr 23, 2018
Declared cost
$65,880
Address
315 Montgomery St

demo of (e) non struc partitions, fh, millwork ceilings, lighting, power finishes. new construction of mens, womens multi accomodation rr. space will be prepared as an unoccupied space for market purposes.no change in occupancy mep deferred.sprinkler rev do to demo ceiling under sepaeate appl.

Open the permit page

$65,880
Nov 9, 2017Completed
final sign-off Feb 2018
2 Embarcadero CenterSkyline Construction16th floor: admin permit for mechanical. ref app#201709209050. n/a for maher
Details
Permit
201711093650
Status
complete
Filed
Nov 9, 2017
Permit issued
Nov 9, 2017
Final sign-off
Feb 20, 2018
Declared cost
$90,000
Address
2 Embarcadero Center

16th floor: admin permit for mechanical. ref app#201709209050. n/a for maher

Open the permit page

$90,000
Dec 2, 2016Completed
final sign-off Jul 2020
345 California StGci, Incdemo of (e) non-structural partitions, door, millwork ceiling grid and tile, lighting, power & finishes. new non-structural partitions, doors, ceiling, lighting, power & finishes. mep, life safety & fire sprinkler are design build/under separate permit. no change in occupancy or use
Details
Permit
201612024028
Status
complete
Filed
Dec 2, 2016
Permit issued
Dec 9, 2016
Final sign-off
Jul 27, 2020
Declared cost
$254,592
Address
345 California St

demo of (e) non-structural partitions, door, millwork ceiling grid and tile, lighting, power & finishes. new non-structural partitions, doors, ceiling, lighting, power & finishes. mep, life safety & fire sprinkler are design build/under separate permit. no change in occupancy or use

Open the permit page

$254,592
Nov 15, 2016Completed
final sign-off Feb 2018
1 Post StSkyline Constructionrevision to 2016-1013-0150. selective non structural demo, new non structural partitions, new floors, wall, ceiling finishes, restroom upgrades. alarm/sprinkler/mep deferred.
Details
Permit
201611152688
Status
complete
Filed
Nov 15, 2016
Permit issued
Nov 15, 2016
Final sign-off
Feb 1, 2018
Address
1 Post St

revision to 2016-1013-0150. selective non structural demo, new non structural partitions, new floors, wall, ceiling finishes, restroom upgrades. alarm/sprinkler/mep deferred.

Open the permit page

Nov 15, 2016Completed
final sign-off May 2017
301 Howard StRylko Builders Inc.suite 950 - ref. t.i. appl #2016-1018-0536. title 24 elec lighting only. limited modification to (e) occupied tenant suite. (5) f-1, (7) f-2, (1) f-4, (1) f-5 light fixtures, and emergency and exit lighting, motion sensors. (8) receptacles and switches. maher ord 155-13 na
Details
Permit
201611152736
Status
complete
Filed
Nov 15, 2016
Permit issued
Nov 17, 2016
Final sign-off
May 8, 2017
Declared cost
$45,000
Address
301 Howard St

suite 950 - ref. t.i. appl #2016-1018-0536. title 24 elec lighting only. limited modification to (e) occupied tenant suite. (5) f-1, (7) f-2, (1) f-4, (1) f-5 light fixtures, and emergency and exit lighting, motion sensors. (8) receptacles and switches. maher ord 155-13 na

Open the permit page

$45,000
Nov 15, 2016Completed
final sign-off May 2017
301 Howard StRylko Builders Inc.suite 550 - ref. ti appl #2016-1018-0533. title 24 only -install power and lighting in spec suits, limited mod to (e) unoccupied tennant suite. install (10) f-2 light fixtures, (5) f-1 2x4 fixtures, (2) f-4 2x2 fixtures and (1) f-5 fixtures, motion sensors & exit signs. (8) receptacles and switches.
Details
Permit
201611152740
Status
complete
Filed
Nov 15, 2016
Permit issued
Nov 17, 2016
Final sign-off
May 8, 2017
Declared cost
$50,000
Address
301 Howard St

suite 550 - ref. ti appl #2016-1018-0533. title 24 only -install power and lighting in spec suits, limited mod to (e) unoccupied tennant suite. install (10) f-2 light fixtures, (5) f-1 2x4 fixtures, (2) f-4 2x2 fixtures and (1) f-5 fixtures, motion sensors & exit signs. (8) receptacles and switches.

Open the permit page

$50,000
Aug 19, 2016Completed
final sign-off Oct 2016
1045 Sansome StThomas Kessenich2nd floor: revision to app#201607263341: add 1 urinal to men's restroom, omit janitorial closet, revise drinking fountain specification.
Details
Permit
201608195479
Status
complete
Filed
Aug 19, 2016
Permit issued
Aug 22, 2016
Final sign-off
Oct 27, 2016
Address
1045 Sansome St

2nd floor: revision to app#201607263341: add 1 urinal to men's restroom, omit janitorial closet, revise drinking fountain specification.

Open the permit page

Jul 12, 2016Completed
final sign-off Nov 2017
795 Folsom StNovo Construction Inc4th flr: ti- to include demo of non structural partitions. new partitions, doors, millwork. mep/fire/life safety under sep permit. maher na
Details
Permit
201607122062
Status
complete
Filed
Jul 12, 2016
Permit issued
Jul 12, 2016
Final sign-off
Nov 22, 2017
Declared cost
$2,171,400
Address
795 Folsom St

4th flr: ti- to include demo of non structural partitions. new partitions, doors, millwork. mep/fire/life safety under sep permit. maher na

Open the permit page

$2,171,400
Jan 6, 2016Completed
final sign-off Apr 2016
275 Battery StHathaway Dinwiddie Co.3/f: non-structural demo. (n) non-structural partitions, electrical & finishes. no change in area, occupancy, use mep, l/s, sprinkler under separate permit. compliance with maher ordinance no 155-13 not required.
Details
Permit
201601066412
Status
complete
Filed
Jan 6, 2016
Permit issued
Jan 15, 2016
Final sign-off
Apr 18, 2016
Declared cost
$59,444
Address
275 Battery St

3/f: non-structural demo. (n) non-structural partitions, electrical & finishes. no change in area, occupancy, use mep, l/s, sprinkler under separate permit. compliance with maher ordinance no 155-13 not required.

Open the permit page

$59,444
Dec 22, 2015Completed
final sign-off Mar 2016
275 Battery StHathaway Dinwiddie Co.demolition of existing non-structural partitions, doors/frames, millwork, lighting, power & finishes. construction consists of new non-structural9 partitions, doors/frames, lighting and finishes. life safety and fire sprinkler is design build and under sep permit, mep is design build and udner
Details
Permit
201512225767
Status
complete
Filed
Dec 22, 2015
Permit issued
Dec 29, 2015
Final sign-off
Mar 30, 2016
Declared cost
$117,194
Address
275 Battery St

demolition of existing non-structural partitions, doors/frames, millwork, lighting, power & finishes. construction consists of new non-structural9 partitions, doors/frames, lighting and finishes. life safety and fire sprinkler is design build and under sep permit, mep is design build and udner

Open the permit page

$117,194
Dec 17, 2015Expired or cancelled
cancelled Jan 2026
340 Bryant St3rd flr: full floor including mezz ti including non structural demlition, non structural partitions, interior finishes, doors, casework, light fixtures, plumb fixt, life safety, fire sprnkler sep permit
Details
Permit
201512175413
Status
cancelled
Filed
Dec 17, 2015
Declared cost
$147,863
Address
340 Bryant St

3rd flr: full floor including mezz ti including non structural demlition, non structural partitions, interior finishes, doors, casework, light fixtures, plumb fixt, life safety, fire sprnkler sep permit

Open the permit page

$147,863
Nov 10, 2015Completed
final sign-off Mar 2016
50 California StSkyline Constructionnew non structural partitions, lighting, electrical, finishes, millwork. no change in occupancy or use, or area. n/a for maher.
Details
Permit
201511102250
Status
complete
Filed
Nov 10, 2015
Permit issued
Nov 30, 2015
Final sign-off
Mar 11, 2016
Declared cost
$700,000
Address
50 California St

new non structural partitions, lighting, electrical, finishes, millwork. no change in occupancy or use, or area. n/a for maher.

Open the permit page

$700,000
Aug 31, 2015Completed
final sign-off Aug 2016
50 California StRichlen Constructionground floor: alteration of extg curtainwall, replacement of extg light fixtures, and addition of new light fixtures. n/a for maher.
Details
Permit
201508315620
Status
complete
Filed
Aug 31, 2015
Permit issued
Sep 30, 2015
Final sign-off
Aug 31, 2016
Declared cost
$100,000
Address
50 California St

ground floor: alteration of extg curtainwall, replacement of extg light fixtures, and addition of new light fixtures. n/a for maher.

Open the permit page

$100,000
Jun 24, 2015Completed
final sign-off Jun 2016
1 Market StDpr Construction4th floor: defered submittal for structural anchorage (for equipment) to pa# 201503231539 issued on 6/8/15
Details
Permit
201506249743
Status
complete
Filed
Jun 24, 2015
Permit issued
Jun 24, 2015
Final sign-off
Jun 6, 2016
Declared cost
$200,000
Address
1 Market St

4th floor: defered submittal for structural anchorage (for equipment) to pa# 201503231539 issued on 6/8/15

Open the permit page

$200,000
Apr 15, 2015Completed
final sign-off May 2017
555 Market StField Construction Inc.demolition of interconnecting stairs between 5th and 6th flrs and refill of slab as required to separate floors. not for egress. floors 5 and 6 currently unoccupied and will remain unoccupied. any tenant work will be submitted under separate permit. no change in occupancy . no change in floor area
Details
Permit
201504153646
Status
complete
Filed
Apr 15, 2015
Permit issued
Jun 8, 2015
Final sign-off
May 3, 2017
Declared cost
$150,000
Address
555 Market St

demolition of interconnecting stairs between 5th and 6th flrs and refill of slab as required to separate floors. not for egress. floors 5 and 6 currently unoccupied and will remain unoccupied. any tenant work will be submitted under separate permit. no change in occupancy . no change in floor area

Open the permit page

$150,000
Nov 10, 2014Never finaled
issued Dec 2014, no final
350 California StSwinerton Builders1st and 24th floor mechanical work only. replacement of fan and ventilation equipment in kind and electrical connections as it relates to the equipment replacement. maher n/a.
Details
Permit
201411101129
Status
issued
Filed
Nov 10, 2014
Permit issued
Dec 18, 2014
Declared cost
$210,000
Address
350 California St

1st and 24th floor mechanical work only. replacement of fan and ventilation equipment in kind and electrical connections as it relates to the equipment replacement. maher n/a.

Open the permit page

$210,000
Oct 27, 2014Never finaled
issued Nov 2014, no final
100 Pine StMartinelli Environmental Graphprovide evacuation signs on floors b3,b2,b1,1,2,and 3. twenty-three signs total. no structural work included in this scope. maher n/a.
Details
Permit
201410279932
Status
issued
Filed
Oct 27, 2014
Permit issued
Nov 17, 2014
Declared cost
$6,900
Address
100 Pine St

provide evacuation signs on floors b3,b2,b1,1,2,and 3. twenty-three signs total. no structural work included in this scope. maher n/a.

Open the permit page

$6,900
Sep 4, 2014Completed
final sign-off Nov 2014
1 Embarcadero CenterGci, Inc10th floor:non-structural demo. new non-structural partitions, outlets, millwork, finishes, no new ceiling, or lighting work. no increase in area, no change in occupancy or use. n/ for the maher ordinance #155-13
Details
Permit
201409045373
Status
complete
Filed
Sep 4, 2014
Permit issued
Sep 12, 2014
Final sign-off
Nov 18, 2014
Declared cost
$100,000
Address
1 Embarcadero Center

10th floor:non-structural demo. new non-structural partitions, outlets, millwork, finishes, no new ceiling, or lighting work. no increase in area, no change in occupancy or use. n/ for the maher ordinance #155-13

Open the permit page

$100,000
Jun 16, 2014Completed
final sign-off Dec 2014
555 California StGci, Inc52nd floor: revision to app#201311151984. reduce scope at restroom to only walls and stub out for plumbing.n/a for the maher ordinance #155-13
Details
Permit
201406168526
Status
complete
Filed
Jun 16, 2014
Permit issued
Jun 19, 2014
Final sign-off
Dec 2, 2014
Address
555 California St

52nd floor: revision to app#201311151984. reduce scope at restroom to only walls and stub out for plumbing.n/a for the maher ordinance #155-13

Open the permit page

May 16, 2014Completed
final sign-off Dec 2014
760 Market StGci, Incon 8th floor - new non-structural partitions ceiling & lighting... millwork finishes. non structural demolition. upgrade toilet rooms. no change in occupancy, use, or area. na for maher ordiance.
Details
Permit
201405165944
Status
complete
Filed
May 16, 2014
Permit issued
May 16, 2014
Final sign-off
Dec 26, 2014
Declared cost
$1,000,000
Address
760 Market St

on 8th floor - new non-structural partitions ceiling & lighting... millwork finishes. non structural demolition. upgrade toilet rooms. no change in occupancy, use, or area. na for maher ordiance.

Open the permit page

$1,000,000
Apr 8, 2014Completed
final sign-off Oct 2014
425 Market StGci, Inc13/f: t.i. improvement. non-structural demo, non-structural partitions, ceiling, lighting, electrical finishes. no change in occupancy, use or area. mahr ord. 155-13 not applicable.
Details
Permit
201404082701
Status
complete
Filed
Apr 8, 2014
Permit issued
Apr 15, 2014
Final sign-off
Oct 30, 2014
Declared cost
$950,000
Address
425 Market St

13/f: t.i. improvement. non-structural demo, non-structural partitions, ceiling, lighting, electrical finishes. no change in occupancy, use or area. mahr ord. 155-13 not applicable.

Open the permit page

$950,000
Mar 18, 2014Completed
final sign-off Aug 2014
100 01st StSkyline Constructioninterior non structural demo of paritions, ceiling electrial outlets and finishes throughout ab-017
Details
Permit
201403180991
Status
complete
Filed
Mar 18, 2014
Permit issued
Mar 19, 2014
Final sign-off
Aug 21, 2014
Declared cost
$21,000
Address
100 01st St

interior non structural demo of paritions, ceiling electrial outlets and finishes throughout ab-017

Open the permit page

$21,000
Jan 17, 2014Completed
final sign-off May 2014
555 California StBcci Construction Companydemo project on 31st floor of extg non structural partitions, door/frames, millwork, ceiling grid and tile, hvac loop, lighting,power and finishes. no new construction other than build back of hvac loop and sprinkler loop & distribution & service elevator lobby and walls in passenger elev lobby
Details
Permit
201401176544
Status
complete
Filed
Jan 17, 2014
Permit issued
Jan 31, 2014
Final sign-off
May 7, 2014
Declared cost
$300,000
Address
555 California St

demo project on 31st floor of extg non structural partitions, door/frames, millwork, ceiling grid and tile, hvac loop, lighting,power and finishes. no new construction other than build back of hvac loop and sprinkler loop & distribution & service elevator lobby and walls in passenger elev lobby

Open the permit page

$300,000
Dec 26, 2013Completed
final sign-off Apr 2014
100 Pine StTeam Commercial Construction Inc.demo of non-structural walls. construction of new non-structural partitions, lighting, outlets, millwork and finishes. no structural work included in scope. no change to occupancy, use or area. mep under same permit. life safety and sprinkler to be design build under sep permit.;compliance with ord
Details
Permit
201312265025
Status
complete
Filed
Dec 26, 2013
Permit issued
Jan 24, 2014
Final sign-off
Apr 14, 2014
Declared cost
$129,600
Address
100 Pine St

demo of non-structural walls. construction of new non-structural partitions, lighting, outlets, millwork and finishes. no structural work included in scope. no change to occupancy, use or area. mep under same permit. life safety and sprinkler to be design build under sep permit.;compliance with ord

Open the permit page

$129,600
Dec 26, 2013Completed
final sign-off May 2014
180 Howard StTeam Commercial Construction Inc.12/f: interior office tenant suite of an unoccupied warm shell condition space on a multi-tenant floor. construction of new partitions, glazing, doors, millwork and finishes. aera of work: 1275 sq ft. no structural work, mep under same permit. life safety under sep permit. maher ordinance exempt/na
Details
Permit
201312265027
Status
complete
Filed
Dec 26, 2013
Permit issued
Mar 26, 2014
Final sign-off
May 30, 2014
Declared cost
$138,975
Address
180 Howard St

12/f: interior office tenant suite of an unoccupied warm shell condition space on a multi-tenant floor. construction of new partitions, glazing, doors, millwork and finishes. aera of work: 1275 sq ft. no structural work, mep under same permit. life safety under sep permit. maher ordinance exempt/na

Open the permit page

$138,975
Dec 19, 2013Never finaled
issued May 2014, no final
460 Bryant Stt-i in basement, ground floor & mezzanine. non structural partitions, ceiling lights, millwork. sprinkler on seperate permit. -maher- compliance with ordinanace no.155-13.not required.
Details
Permit
201312194664
Status
issued
Filed
Dec 19, 2013
Permit issued
May 22, 2014
Declared cost
$3,273,488
Address
460 Bryant St

t-i in basement, ground floor & mezzanine. non structural partitions, ceiling lights, millwork. sprinkler on seperate permit. -maher- compliance with ordinanace no.155-13.not required.

Open the permit page

$3,273,488
Nov 15, 2013Completed
final sign-off Oct 2014
555 California StGci, Inccommon area upgrades including 1 hour corridor, new elevator lobby finishes, new lighting, accessible restrooms. mep, ls separate permit- floor tenant improvement separate permit.
Details
Permit
201311151984
Status
complete
Filed
Nov 15, 2013
Permit issued
Dec 5, 2013
Final sign-off
Oct 14, 2014
Declared cost
$1,087,765
Address
555 California St

common area upgrades including 1 hour corridor, new elevator lobby finishes, new lighting, accessible restrooms. mep, ls separate permit- floor tenant improvement separate permit.

Open the permit page

$1,087,765
Nov 12, 2013Completed
final sign-off Nov 2016
1 California StR.M.R. Construction Company11th & 26th floors-demolition of (e) buildout & abatement. build back of restrooms & elevator lobbies
Details
Permit
201311121585
Status
complete
Filed
Nov 12, 2013
Permit issued
Jan 27, 2014
Final sign-off
Nov 28, 2016
Declared cost
$300,000
Address
1 California St

11th & 26th floors-demolition of (e) buildout & abatement. build back of restrooms & elevator lobbies

Open the permit page

$300,000
Oct 22, 2013Never finaled
issued Oct 2013, no final
225 Bush StEco Bay Services Inc.16th floor-demolition only-all non structural, per ab-017
Details
Permit
201310229856
Status
issued
Filed
Oct 22, 2013
Permit issued
Oct 24, 2013
Declared cost
$50,000
Address
225 Bush St

16th floor-demolition only-all non structural, per ab-017

Open the permit page

$50,000
Oct 22, 2013Completed
final sign-off Jun 2014
100 Pine StTeam Commercial Construction Inc.24th floor-non structural demoltion, non structural partitions, millwork, lighting & finishes. no change in occupancy, use or area. m.e.p under seperate permit
Details
Permit
201310229854
Status
complete
Filed
Oct 22, 2013
Permit issued
Oct 24, 2013
Final sign-off
Jun 11, 2014
Declared cost
$175,000
Address
100 Pine St

24th floor-non structural demoltion, non structural partitions, millwork, lighting & finishes. no change in occupancy, use or area. m.e.p under seperate permit

Open the permit page

$175,000
Oct 4, 2013Completed
final sign-off Dec 2013
50 California StRichlen Constructiontenant improvement including paritial dmo of existing non structural partitoins, new non structural partitons, new doors, frames, sidelights, pwoer data, elec, millwork, finishes. mep, sprinklers and fire alarm on sep permit.
Details
Permit
201310048485
Status
complete
Filed
Oct 4, 2013
Permit issued
Oct 15, 2013
Final sign-off
Dec 31, 2013
Declared cost
$197,133
Address
50 California St

tenant improvement including paritial dmo of existing non structural partitoins, new non structural partitons, new doors, frames, sidelights, pwoer data, elec, millwork, finishes. mep, sprinklers and fire alarm on sep permit.

Open the permit page

$197,133
Sep 30, 2013Completed
final sign-off Nov 2014
575 Market StField Construction Inc.26th fl-ste# 2600-demolition of finishes, non structural partitions, ceiling tile, grid, light fixtures. construct new non structural partitions, grids, side lights, doors/frames/hardware & finishes. demo & construct new finishes @elevator lobby. full ada upgrades @men's & women's restrms, m.e.p & s
Details
Permit
201309308081
Status
complete
Filed
Sep 30, 2013
Permit issued
Oct 11, 2013
Final sign-off
Nov 13, 2014
Declared cost
$345,000
Address
575 Market St

26th fl-ste# 2600-demolition of finishes, non structural partitions, ceiling tile, grid, light fixtures. construct new non structural partitions, grids, side lights, doors/frames/hardware & finishes. demo & construct new finishes @elevator lobby. full ada upgrades @men's & women's restrms, m.e.p & s

Open the permit page

$345,000
Sep 30, 2013Completed
final sign-off Feb 2014
220 Bush StSan Francisco Commercial Builders Inc16th fl: barrier removal for voluntary restroom upgrade for the 16th floor women's restroom. no increase in area or change in occupancy. removal of existing restroom fixtures, accessories and finishes. install new restroom fixtures, accessories, finishes and signage.
Details
Permit
201309308098
Status
complete
Filed
Sep 30, 2013
Permit issued
Oct 1, 2013
Final sign-off
Feb 25, 2014
Declared cost
$69,000
Address
220 Bush St

16th fl: barrier removal for voluntary restroom upgrade for the 16th floor women's restroom. no increase in area or change in occupancy. removal of existing restroom fixtures, accessories and finishes. install new restroom fixtures, accessories, finishes and signage.

Open the permit page

$69,000
Sep 13, 2013Completed
final sign-off Feb 2014
130 Sutter StTear-N-It-Up Demolition Incedemolition only of existing non structural tenant improvements. t.i. under separate permit.
Details
Permit
201309136816
Status
complete
Filed
Sep 13, 2013
Permit issued
Sep 17, 2013
Final sign-off
Feb 3, 2014
Declared cost
$15,000
Address
130 Sutter St

demolition only of existing non structural tenant improvements. t.i. under separate permit.

Open the permit page

$15,000
Aug 27, 2013Expired or cancelled
cancelled Jul 2015
900 Battery Stchange in use for the (e) vacant 3 story (plus 1 basement) building from s-1 warehouse to b office space.
Details
Permit
201308275339
Status
cancelled
Filed
Aug 27, 2013
Address
900 Battery St

change in use for the (e) vacant 3 story (plus 1 basement) building from s-1 warehouse to b office space.

Open the permit page

Aug 26, 2013Completed
final sign-off Oct 2013
444 Spear StCci Com'l Constr & Improv**See 985808***reno suite 213. demo non structrual partitions, millwork and carpet. construct partiton millwork. mep under separate permit
Details
Permit
201308265170
Status
complete
Filed
Aug 26, 2013
Permit issued
Aug 26, 2013
Final sign-off
Oct 2, 2013
Declared cost
$100,000
Address
444 Spear St

reno suite 213. demo non structrual partitions, millwork and carpet. construct partiton millwork. mep under separate permit

Open the permit page

$100,000
Aug 16, 2013Never finaled
issued Aug 2013, no final
201 Spear St8th & 9th floors-evacuation signs only
Details
Permit
201308164504
Status
issued
Filed
Aug 16, 2013
Permit issued
Aug 26, 2013
Declared cost
$1,800
Address
201 Spear St

8th & 9th floors-evacuation signs only

Open the permit page

$1,800
Aug 15, 2013Completed
final sign-off Nov 2013
555 California StRichlen Constructionsuite 3305:remove demising wall between 2 suites to combine into one. selective demolition of walls, doors, frames, glazing, ceiling tiles, lighting, & millwork. construction of doors, frames, lighting,ceiling tiles, millwork & finishes mep, sprklr/life sfty sperte prmt. relocate card reader
Details
Permit
201308154424
Status
complete
Filed
Aug 15, 2013
Permit issued
Sep 5, 2013
Final sign-off
Nov 19, 2013
Declared cost
$200,000
Address
555 California St

suite 3305:remove demising wall between 2 suites to combine into one. selective demolition of walls, doors, frames, glazing, ceiling tiles, lighting, & millwork. construction of doors, frames, lighting,ceiling tiles, millwork & finishes mep, sprklr/life sfty sperte prmt. relocate card reader

Open the permit page

$200,000
Aug 14, 2013Completed
final sign-off Dec 2013
201 Spear StPeacock Construction Incdemolition/construction of non-structural, non rated ceiling height partitions. existing light fixture relocations, new power/tele/data, new finishes. minor disabled access upgrades at men's/women's restroom, m.e.p. life safety & sprinklers under seperate permit.
Details
Permit
201308144251
Status
complete
Filed
Aug 14, 2013
Permit issued
Aug 19, 2013
Final sign-off
Dec 5, 2013
Declared cost
$138,600
Address
201 Spear St

demolition/construction of non-structural, non rated ceiling height partitions. existing light fixture relocations, new power/tele/data, new finishes. minor disabled access upgrades at men's/women's restroom, m.e.p. life safety & sprinklers under seperate permit.

Open the permit page

$138,600
Aug 13, 2013Completed
final sign-off Dec 2013
121 Spear StCommercial Interior Builders Inc2nd fl:t.i. selective demolition of interior partitions. relocation of extg light fixtures. construction of new interior high partitions. nw finishes throughout. mep to be design build and submitted under seperate permit. sprinklers & life safety to be design build & submitted under separate permit.
Details
Permit
201308134204
Status
complete
Filed
Aug 13, 2013
Permit issued
Sep 26, 2013
Final sign-off
Dec 20, 2013
Declared cost
$291,000
Address
121 Spear St

2nd fl:t.i. selective demolition of interior partitions. relocation of extg light fixtures. construction of new interior high partitions. nw finishes throughout. mep to be design build and submitted under seperate permit. sprinklers & life safety to be design build & submitted under separate permit.

Open the permit page

$291,000
Aug 7, 2013Never finaled
issued Nov 2013, no final
350 California StSwinerton Builders23rd floor - project consists primarily of mechaical equipment & piping replacement & electrical system upgrades. no accessibility upgrades are proposed. includes structural reinforcement of (e) cupola roof and enlargement of one equipment pad.
Details
Permit
201308073680
Status
issued
Filed
Aug 7, 2013
Permit issued
Nov 5, 2013
Declared cost
$1,500,000
Address
350 California St

23rd floor - project consists primarily of mechaical equipment & piping replacement & electrical system upgrades. no accessibility upgrades are proposed. includes structural reinforcement of (e) cupola roof and enlargement of one equipment pad.

Open the permit page

$1,500,000
Aug 5, 2013Completed
final sign-off Feb 2014
266 King StEvolv Commercial Construction Incnon-structural demo, (n) non-structural partitions lighting, electrical, finishes. all interior work only. no change in occupancy use area. mep. sprinklers, life safety under seperate permit.
Details
Permit
201308053477
Status
complete
Filed
Aug 5, 2013
Permit issued
Nov 7, 2013
Final sign-off
Feb 10, 2014
Declared cost
$50,000
Address
266 King St

non-structural demo, (n) non-structural partitions lighting, electrical, finishes. all interior work only. no change in occupancy use area. mep. sprinklers, life safety under seperate permit.

Open the permit page

$50,000
Aug 2, 2013Completed
final sign-off Jan 2014
45 Fremont StR.M.R. Construction Companyinstallation of new ceiling and lighting, new carpet. the floor is vacant.
Details
Permit
201308023406
Status
complete
Filed
Aug 2, 2013
Permit issued
Aug 21, 2013
Final sign-off
Jan 8, 2014
Declared cost
$237,000
Address
45 Fremont St

installation of new ceiling and lighting, new carpet. the floor is vacant.

Open the permit page

$237,000
Aug 1, 2013Completed
final sign-off Dec 2013
1 Bush StGci, Inc9th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety & a structural stair will be submitted under seperate permit
Details
Permit
201308013346
Status
complete
Filed
Aug 1, 2013
Permit issued
Sep 3, 2013
Final sign-off
Dec 16, 2013
Declared cost
$1,374,300
Address
1 Bush St

9th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety & a structural stair will be submitted under seperate permit

Open the permit page

$1,374,300
Aug 1, 2013Completed
final sign-off Dec 2013
1 Bush StGci, Inc10th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety, card readers & a structural stair will be submitted under seperate permit.
Details
Permit
201308013349
Status
complete
Filed
Aug 1, 2013
Permit issued
Sep 3, 2013
Final sign-off
Dec 16, 2013
Declared cost
$1,374,300
Address
1 Bush St

10th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety, card readers & a structural stair will be submitted under seperate permit.

Open the permit page

$1,374,300
Jul 26, 2013Expired or cancelled
cancelled Sep 2023
180 Howard St2nd floor-evacuation signs (3 total), no structural work
Details
Permit
201307262833
Status
cancelled
Filed
Jul 26, 2013
Declared cost
$900
Address
180 Howard St

2nd floor-evacuation signs (3 total), no structural work

Open the permit page

$900
Jul 17, 2013Completed
final sign-off Aug 2015
4 Embarcadero CenterGci, Inc37th floor-demo of non structural partitions, new non structural partitions, lighting, power/data, electrical, millwork & finishes
Details
Permit
201307172006
Status
complete
Filed
Jul 17, 2013
Permit issued
Aug 1, 2013
Final sign-off
Aug 25, 2015
Declared cost
$60,000
Address
4 Embarcadero Center

37th floor-demo of non structural partitions, new non structural partitions, lighting, power/data, electrical, millwork & finishes

Open the permit page

$60,000
Jul 17, 2013Completed
final sign-off Aug 2013
225 Bush StEco Bay Services Inc.13th floor-demo of non structural walls, doors, ceiling componenets & abandoned equipment & conduit. construction of non structural wall, relocation of door & frame & hardware- tennat improvement, mep, sprinklers and fire alarms separate permit.
Details
Permit
201307172009
Status
complete
Filed
Jul 17, 2013
Permit issued
Jul 22, 2013
Final sign-off
Aug 6, 2013
Declared cost
$55,000
Address
225 Bush St

13th floor-demo of non structural walls, doors, ceiling componenets & abandoned equipment & conduit. construction of non structural wall, relocation of door & frame & hardware- tennat improvement, mep, sprinklers and fire alarms separate permit.

Open the permit page

$55,000
Jul 10, 2013Completed
final sign-off Mar 2014
575 Market StField Construction Inc.#2150- mechanical & electrical upgrades including hvac upgrade and power to the fan-power boxes plus conical tap to existing risers addition of fsd's and fire alarm interface. ref. to pa#201205110277
Details
Permit
201307101451
Status
complete
Filed
Jul 10, 2013
Permit issued
Jul 19, 2013
Final sign-off
Mar 10, 2014
Declared cost
$40,000
Address
575 Market St

#2150- mechanical & electrical upgrades including hvac upgrade and power to the fan-power boxes plus conical tap to existing risers addition of fsd's and fire alarm interface. ref. to pa#201205110277

Open the permit page

$40,000
Jul 5, 2013Completed
final sign-off Aug 2013
353 Sacramento StPeacock Construction Inc10th floor:demo selected non-structural partitions, construct new non-structural partitions. install minimal electrical, data - tele, new finishes. mep, sprinkler, and life safety done under sep permit
Details
Permit
201307051213
Status
complete
Filed
Jul 5, 2013
Permit issued
Jul 5, 2013
Final sign-off
Aug 20, 2013
Declared cost
$70,000
Address
353 Sacramento St

10th floor:demo selected non-structural partitions, construct new non-structural partitions. install minimal electrical, data - tele, new finishes. mep, sprinkler, and life safety done under sep permit

Open the permit page

$70,000
Jul 1, 2013Completed
final sign-off Jan 2014
1 California StR.M.R. Construction Companynon structural demo. new non structural partitions, doors, glazing, millwork and finishes. no change in occupancy or use. no increase in footprint. mep separate permit
Details
Permit
201307010827
Status
complete
Filed
Jul 1, 2013
Permit issued
Jul 16, 2013
Final sign-off
Jan 17, 2014
Declared cost
$124,000
Address
1 California St

non structural demo. new non structural partitions, doors, glazing, millwork and finishes. no change in occupancy or use. no increase in footprint. mep separate permit

Open the permit page

$124,000
Jun 28, 2013Completed
final sign-off Oct 2013
575 Market StField Construction Inc.demo and construction of non structural partitions, ceiling, light fixtures, door and sidelights. no change in occupancy or use. revision to 201211053532 suite 2125.
Details
Permit
201306280772
Status
complete
Filed
Jun 28, 2013
Permit issued
Jul 2, 2013
Final sign-off
Oct 4, 2013
Declared cost
$100,000
Address
575 Market St

demo and construction of non structural partitions, ceiling, light fixtures, door and sidelights. no change in occupancy or use. revision to 201211053532 suite 2125.

Open the permit page

$100,000
Jun 21, 2013Completed
final sign-off Oct 2013
633 Battery StHathaway Dinwiddie Co.this project is a t.i to an (e) partially occupied floor, demo work includes removal of cosmetic fisnishes, lighting and hvac. new work consists of new non-structural partitions, lighting and hvac. there is no change in floor area of bldg height. all mep, sprinklers and life safety is design build
Details
Permit
201306210182
Status
complete
Filed
Jun 21, 2013
Permit issued
Jun 28, 2013
Final sign-off
Oct 4, 2013
Declared cost
$975,000
Address
633 Battery St

this project is a t.i to an (e) partially occupied floor, demo work includes removal of cosmetic fisnishes, lighting and hvac. new work consists of new non-structural partitions, lighting and hvac. there is no change in floor area of bldg height. all mep, sprinklers and life safety is design build

Open the permit page

$975,000
Jun 21, 2013Completed
final sign-off Oct 2013
4 Embarcadero CenterPeacock Construction Incnon-structural demo, new non-structural partions and new retail entry door. no change in occupancy, use or footprint, mep, sprinkers, life safety under sep permit.
Details
Permit
201306210178
Status
complete
Filed
Jun 21, 2013
Permit issued
Jun 25, 2013
Final sign-off
Oct 10, 2013
Declared cost
$40,000
Address
4 Embarcadero Center

non-structural demo, new non-structural partions and new retail entry door. no change in occupancy, use or footprint, mep, sprinkers, life safety under sep permit.

Open the permit page

$40,000
Jun 19, 2013Completed
final sign-off Jul 2013
353 Sacramento StDome Construction Corpthis project is a tenant improvement in an existing bldg consisting of -demo of existing walls, doors, relocation/demo of fixtures -framing, door in stalls, flooring/carpet, painting,window treatments -all mep/fp work will be design build under separate permit
Details
Permit
201306199901
Status
complete
Filed
Jun 19, 2013
Permit issued
Jun 19, 2013
Final sign-off
Jul 29, 2013
Declared cost
$280,000
Address
353 Sacramento St

this project is a tenant improvement in an existing bldg consisting of -demo of existing walls, doors, relocation/demo of fixtures -framing, door in stalls, flooring/carpet, painting,window treatments -all mep/fp work will be design build under separate permit

Open the permit page

$280,000
Jun 11, 2013Completed
final sign-off Oct 2013
555 Market StNovo Construction Incnon-structural alteration. (n) non-structural partitions, ceiling, lights, electrical, finishes, millwork. no change in area use, occupancy. mep, sprinkler & fire alarm under sep permit.
Details
Permit
201306119140
Status
complete
Filed
Jun 11, 2013
Permit issued
Jun 17, 2013
Final sign-off
Oct 1, 2013
Declared cost
$450,000
Address
555 Market St

non-structural alteration. (n) non-structural partitions, ceiling, lights, electrical, finishes, millwork. no change in area use, occupancy. mep, sprinkler & fire alarm under sep permit.

Open the permit page

$450,000
Jun 10, 2013Expired or cancelled
cancelled Sep 2023
100 Pine Stevacuation signs only: b1,b2,b3, 1st, 2nd, 3rd floors (24 signs)
Details
Permit
201306109020
Status
cancelled
Filed
Jun 10, 2013
Declared cost
$7,200
Address
100 Pine St

evacuation signs only: b1,b2,b3, 1st, 2nd, 3rd floors (24 signs)

Open the permit page

$7,200
Jun 6, 2013Expired or cancelled
withdrawn Feb 2014
600 California Stalteration project on the 6th fl of 600 california. consists of demo of existing non structural partitions, doors/frames, furniture, millwork, plumbin, ceiling grid, tile, soffits, lighting, power, floor finishes. new construction under this permit app. no change in occupancy or floor area
Details
Permit
201306068830
Status
withdrawn
Filed
Jun 6, 2013
Declared cost
$70,000
Address
600 California St

alteration project on the 6th fl of 600 california. consists of demo of existing non structural partitions, doors/frames, furniture, millwork, plumbin, ceiling grid, tile, soffits, lighting, power, floor finishes. new construction under this permit app. no change in occupancy or floor area

Open the permit page

$70,000
May 29, 2013Completed
final sign-off Aug 2014
575 Market StGci, Incdemolition of non structural partitions, millwork, and relocation of doors and light fixtures. no change in area, occupancy, or use. sprinlkers and life safety separte permit.
Details
Permit
201305298105
Status
complete
Filed
May 29, 2013
Permit issued
Jun 5, 2013
Final sign-off
Aug 20, 2014
Declared cost
$95,000
Address
575 Market St

demolition of non structural partitions, millwork, and relocation of doors and light fixtures. no change in area, occupancy, or use. sprinlkers and life safety separte permit.

Open the permit page

$95,000
Daniel Huntsman, license C9255 | Permit Graph