Block 0174, lot 003
633 Battery St
- City’s use
- Commercial Office
- Built
- 1906
- Stories
- 6
- Units
- 1
- Rooms
- 36 bathrooms
- Building
- 97,848 sq ft
- Lot
- 17,855 sq ft
- Zoning
- C2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
108 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 16, 2024 | Completed final sign-off Nov 2025 | 633 Battery St | Hathaway Dinwiddie Co. | new interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain. share plans with 202412166861Details
new interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain. share plans with 202412166861 | |
| Sep 7, 2022 | Never finaled issued Sep 2023, no final | 633 Battery St | barrier removal only - to comply with accessible business entrance program ord. 51-16. auto door operator and buttons to be added to main entry at 633 battery street. electrical to be deferred. abe 202205110757Details
barrier removal only - to comply with accessible business entrance program ord. 51-16. auto door operator and buttons to be added to main entry at 633 battery street. electrical to be deferred. abe 202205110757 | $10,000 | |
| Aug 17, 2022 | Completed final sign-off Dec 2023 | 633 Battery St | Acco Engineered Systems Inc. Dba Acco En | basement: new mechanical equipment to replace existing at basement exercise rooms and building engineer's office. new duct at ground floor breezeway.Details
basement: new mechanical equipment to replace existing at basement exercise rooms and building engineer's office. new duct at ground floor breezeway. | $42,000 |
| Jul 22, 2022 | Completed final sign-off Aug 2022 | 633 Battery St | Ayoob & Peery Plumbing Co Inc | add and relocate sprinklers as neccesary in accordance with t.i. install pipe hangers as needed for new sprinkler pipe. ref 202206025475Details
add and relocate sprinklers as neccesary in accordance with t.i. install pipe hangers as needed for new sprinkler pipe. ref 202206025475 | $8,100 |
| Jul 13, 2022 | Completed final sign-off Dec 2023 | 633 Battery St | Acco Engineered Systems Inc. Dba Acco En | interior ti improvement on basement floor, boiler room remodel including; new mechanical and electrical euipment to replace (e), new concrete house keeping pad witthin boiler room.Details
interior ti improvement on basement floor, boiler room remodel including; new mechanical and electrical euipment to replace (e), new concrete house keeping pad witthin boiler room. | $655,000 |
| Jun 14, 2022 | Completed final sign-off Feb 2023 | 633 Battery St | Field Construction Inc. | 1f & mezz: new air distribution being added to serve floor space. 1 owner furnished contractor installed air cooled self contained ac unit. 1 new exhaust air fan added. new break room sink. new lighting & relocated lighting.Details
1f & mezz: new air distribution being added to serve floor space. 1 owner furnished contractor installed air cooled self contained ac unit. 1 new exhaust air fan added. new break room sink. new lighting & relocated lighting. | $194,000 |
| Jun 2, 2022 | Completed final sign-off Feb 2023 | 633 Battery St | Field Construction Inc. | 1f: interior ti includes new non-structural partitions, doors finishes and lighting. new ada restroom and drinking fountain upgrades.Details
1f: interior ti includes new non-structural partitions, doors finishes and lighting. new ada restroom and drinking fountain upgrades. | $575,000 |
| May 7, 2018 | Expired or cancelled cancelled Jan 2026 | 633 Battery St | 2nd flr - install thermostat and damper control for hvac. install and terminate cabling to connect 3 ahus to (e) bld management system maher naDetails
2nd flr - install thermostat and damper control for hvac. install and terminate cabling to connect 3 ahus to (e) bld management system maher na | $5,000 | |
| Apr 10, 2018 | Never finaled issued Apr 2018, no final | 633 Battery St | street spaceDetails
street space | ||
| Mar 28, 2018 | Never finaled issued Mar 2018, no final | 633 Battery St | Sabah International Incorporated | modify (e) fire alarm system - add 1 power supply, 1 photoelectric smk det, 17 ceiling horn/strobes. 12 ceiling strobe, 2 duct det, 2 control relay maher na ref 201802020225Details
modify (e) fire alarm system - add 1 power supply, 1 photoelectric smk det, 17 ceiling horn/strobes. 12 ceiling strobe, 2 duct det, 2 control relay maher na ref 201802020225 | $19,000 |
| Feb 2, 2018 | Completed final sign-off Aug 2018 | 633 Battery St | Hathaway Dinwiddie Co. | 2nd floor: mep permit for application app#201711033091Details
2nd floor: mep permit for application app#201711033091 | $200,000 |
| Dec 21, 2017 | Completed final sign-off Mar 2018 | 633 Battery St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 50 pendents; & add 9 pendents for keker & van nest on the 2nd floor. maher naDetails
fire sprinkler only - relocate 50 pendents; & add 9 pendents for keker & van nest on the 2nd floor. maher na | $17,000 |
| Dec 18, 2017 | Completed final sign-off Aug 2018 | 633 Battery St | Hathaway Dinwiddie Co. | inter-connecting stair between 2nd & 3rd flrs: demo scope at 3rd floor at stair location. no change in use, occupancy or area. mep/fire/life safety under sep permit maher naDetails
inter-connecting stair between 2nd & 3rd flrs: demo scope at 3rd floor at stair location. no change in use, occupancy or area. mep/fire/life safety under sep permit maher na | $75,000 |
| Nov 3, 2017 | Completed final sign-off Aug 2018 | 633 Battery St | Hathaway Dinwiddie Co. | 2/f- non structural partitions, restrooms, cabinetry, lighting, finishes & demo. alter of (e) 3/f stair. no change in occ., use, or area. 4 new exterior window openings on north facade. mep, life safety & sprinklers under seperate permit. communicating stair under seperate permit. n/a for maher.Details
2/f- non structural partitions, restrooms, cabinetry, lighting, finishes & demo. alter of (e) 3/f stair. no change in occ., use, or area. 4 new exterior window openings on north facade. mep, life safety & sprinklers under seperate permit. communicating stair under seperate permit. n/a for maher. | $1,078,896 |
| Jun 23, 2017 | Completed final sign-off Aug 2018 | 633 Battery St | Hathaway Dinwiddie Co. | demo only 2nd fl - non structural partitions, cabinets, lighting, mech, plumbing, flooring. sprinkler demo permit received. permit 201706169532. per sfbc ab017 accessibility documentation deferred to tiDetails
demo only 2nd fl - non structural partitions, cabinets, lighting, mech, plumbing, flooring. sprinkler demo permit received. permit 201706169532. per sfbc ab017 accessibility documentation deferred to ti | $82,092 |
| Jun 16, 2017 | Completed final sign-off Aug 2017 | 633 Battery St | R L H Fire Protection Inc | 2nd flr: fire sprinkler demo - safe off/ remove 60 fire sprinklers at ceiling level verify upright protection meets code maher naDetails
2nd flr: fire sprinkler demo - safe off/ remove 60 fire sprinklers at ceiling level verify upright protection meets code maher na | $5,385 |
| Mar 31, 2017 | Never finaled issued Apr 2017, no final | 633 Battery St | Specialized Graphics Inc | to erect electrical led halo illuminated sign. n/a for maherDetails
to erect electrical led halo illuminated sign. n/a for maher | $4,000 |
| Sep 19, 2016 | Completed final sign-off Mar 2017 | 633 Battery St | Hathaway Dinwiddie Co. | 4/f & 6/f- electrical scope for pa#201607273475. n/a ordinance #155-13Details
4/f & 6/f- electrical scope for pa#201607273475. n/a ordinance #155-13 | $40,000 |
| Sep 7, 2016 | Completed final sign-off Mar 2017 | 633 Battery St | Hathaway Dinwiddie Co. | mechanical work for 201607273475. n/a maher ord. 155-13Details
mechanical work for 201607273475. n/a maher ord. 155-13 | $5,000 |
| Aug 12, 2016 | Completed final sign-off Aug 2016 | 633 Battery St | Golden Gate Fire Protection Inc | 4th floor fire sprinkler only - relcoate 2 pendents in restrooms. ref t.i. #2016-0727-3475. n/a maher ordinanceDetails
4th floor fire sprinkler only - relcoate 2 pendents in restrooms. ref t.i. #2016-0727-3475. n/a maher ordinance | $1,500 |
| Jul 27, 2016 | Completed final sign-off Jan 2017 | 633 Battery St | Hathaway Dinwiddie Co. | demo and new non-structural partitions, cabinets, lighting and finishes to portions of 4th and 6th floors. add unisex toilet. no change in occupancy, use or area. mep,life safety & sprinklers under separate permitDetails
demo and new non-structural partitions, cabinets, lighting and finishes to portions of 4th and 6th floors. add unisex toilet. no change in occupancy, use or area. mep,life safety & sprinklers under separate permit | $701,470 |
| May 4, 2016 | Expired or cancelled cancelled Jan 2026 | 633 Battery St | remove (3) antennas & rrus, remove (2) microwaves & odu, remove gps antenna, remove equipment cabinet on roof platform, remove conduit & support with wts, remove fiber junction boxes, remove emf signage & roof striping, remove generator plug. n/a ordinance #155-13Details
remove (3) antennas & rrus, remove (2) microwaves & odu, remove gps antenna, remove equipment cabinet on roof platform, remove conduit & support with wts, remove fiber junction boxes, remove emf signage & roof striping, remove generator plug. n/a ordinance #155-13 | $5,000 | |
| Mar 1, 2016 | Completed final sign-off Jun 2016 | 633 Battery St | Teevan Company | front 2/3/4/flrs: replace 48 double hung wood sash windows in kind with new double hung double glazed wood sash windows with ogee lugs at the 2nd, 3rd, and 4th floors. u factor .32. compliance with maher ordinance no 155-13 not required.Details
front 2/3/4/flrs: replace 48 double hung wood sash windows in kind with new double hung double glazed wood sash windows with ogee lugs at the 2nd, 3rd, and 4th floors. u factor .32. compliance with maher ordinance no 155-13 not required. | $80,000 |
| Jun 24, 2014 | Completed final sign-off Nov 2014 | 633 Battery St | Westower Communications | remove antennas, coax, cable tray and radio equipments by nextel. maher n/a.Details
remove antennas, coax, cable tray and radio equipments by nextel. maher n/a. | $10,000 |
| Mar 27, 2014 | Never finaled issued Mar 2014, no final | 633 Battery St | street space and mta permitDetails
street space and mta permit | ||
| Feb 24, 2014 | Expired or cancelled cancelled Jan 2026 | 633 Battery St | Hathaway Dinwiddie Co. | occupant load verification by fire dept. as requested by fire inspector on floors 1 and 4, previously permitted as 201107250982 and 201107250982 respectively.n/a for the maher ordinance #155-13Details
occupant load verification by fire dept. as requested by fire inspector on floors 1 and 4, previously permitted as 201107250982 and 201107250982 respectively.n/a for the maher ordinance #155-13 | |
| Feb 20, 2014 | Never finaled issued Feb 2014, no final | 633 Battery St | Weather Tight Waterproofing | reroof. no other exteriior workDetails
reroof. no other exteriior work | $60,000 |
| Oct 11, 2013 | Completed final sign-off Nov 2013 | 633 Battery St | Hathaway Dinwiddie Co. | evacuation sign submittal for approved app 201306210182Details
evacuation sign submittal for approved app 201306210182 | $500 |
| Oct 2, 2013 | Completed final sign-off Oct 2013 | 633 Battery St | Sabah International Incorporated | modify existing system add 5 smoke detectors, 4 relays, 3 monitoring modules 5", 1 door holder. (as builts)Details
modify existing system add 5 smoke detectors, 4 relays, 3 monitoring modules 5", 1 door holder. (as builts) | $3,500 |
| Jul 26, 2013 | Completed final sign-off Oct 2013 | 633 Battery St | Sabah International Incorporated | 3rd floor:modify extg sprinkler monitoring system at 633 battery st. added smoke detector and constrol relay for new door only. t.i. app#201306210182Details
3rd floor:modify extg sprinkler monitoring system at 633 battery st. added smoke detector and constrol relay for new door only. t.i. app#201306210182 | $6,200 |
| Jul 17, 2013 | Completed final sign-off Oct 2013 | 633 Battery St | Pribuss Engineering Inc | 3rd floor-fire sprinkler ti-relocate 17 sprinklers, relocate & change out 4, add 11 & plug 5- new bracing calc's and adding new bracing.Details
3rd floor-fire sprinkler ti-relocate 17 sprinklers, relocate & change out 4, add 11 & plug 5- new bracing calc's and adding new bracing. | $16,468 |
| Jul 12, 2013 | Expired or cancelled cancelled Sep 2023 | 633 Battery St | Sabah International Incorporated | modify existing sprinkler monitoring system at 633 battery street, add smoke detector and control relay for door only. ref. to t.i. pa# 201306210182Details
modify existing sprinkler monitoring system at 633 battery street, add smoke detector and control relay for door only. ref. to t.i. pa# 201306210182 | $6,200 |
| Jul 2, 2013 | Completed final sign-off Jul 2013 | 633 Battery St | Sabah International Incorporated | 5th floor-upgrd (e) fire alarm system for keker-provide monitoring of new firefly door on 5th fl connecting 633 battery st & 615 battery st. modify shall provide detection & door release for the the 633 battery side of the firefly door only. add 1 new photo electric smoke detectors & 1 new controlDetails
5th floor-upgrd (e) fire alarm system for keker-provide monitoring of new firefly door on 5th fl connecting 633 battery st & 615 battery st. modify shall provide detection & door release for the the 633 battery side of the firefly door only. add 1 new photo electric smoke detectors & 1 new control | $6,000 |
| Jun 21, 2013 | Completed final sign-off Oct 2013 | 633 Battery St | Hathaway Dinwiddie Co. | this project is a t.i to an (e) partially occupied floor, demo work includes removal of cosmetic fisnishes, lighting and hvac. new work consists of new non-structural partitions, lighting and hvac. there is no change in floor area of bldg height. all mep, sprinklers and life safety is design buildDetails
this project is a t.i to an (e) partially occupied floor, demo work includes removal of cosmetic fisnishes, lighting and hvac. new work consists of new non-structural partitions, lighting and hvac. there is no change in floor area of bldg height. all mep, sprinklers and life safety is design build | $975,000 |
| Jun 5, 2013 | Completed final sign-off Jun 2013 | 633 Battery St | Pribuss Engineering Inc | fire sprinkler t.i. add 1 head.Details
fire sprinkler t.i. add 1 head. | $515 |
| May 21, 2013 | Expired or cancelled cancelled Jan 2026 | 633 Battery St | 3rd floor t.i. to the exterior of (e) occupied bldg. demolitoin work includes removal of structurla masonry for new window openings. new work consists of new exterior windows, not visible from street, no change in floor area or bldg height,sprinklers are design build sumitted under separate permitDetails
3rd floor t.i. to the exterior of (e) occupied bldg. demolitoin work includes removal of structurla masonry for new window openings. new work consists of new exterior windows, not visible from street, no change in floor area or bldg height,sprinklers are design build sumitted under separate permit | $95,000 | |
| May 7, 2013 | Completed final sign-off Jan 2014 | 633 Battery St | Hathaway Dinwiddie Co. | 5th floor:lintel detail 3/s2.0 changed due to extg column and overhead beam condition. revision to app#201302250870Details
5th floor:lintel detail 3/s2.0 changed due to extg column and overhead beam condition. revision to app#201302250870 | |
| May 6, 2013 | Never finaled issued May 2013, no final | 633 Battery St | Hathaway Dinwiddie Co. | 4th floor:lintel retail 3/s2.0 changed due to extg column and overhead beam condition. revision to app#201110247494Details
4th floor:lintel retail 3/s2.0 changed due to extg column and overhead beam condition. revision to app#201110247494 | |
| Feb 25, 2013 | Never finaled issued Mar 2013, no final | 633 Battery St | Hathaway Dinwiddie Co. | construct communicating opening between 633 battery and 615 battery at 5th floor. demolition of extg masonry wall at 633 battery and concrete wall at 615 battery create new opening per ab-010 communicating openings. fire sprinklers under seperate permit/fire life safetyDetails
construct communicating opening between 633 battery and 615 battery at 5th floor. demolition of extg masonry wall at 633 battery and concrete wall at 615 battery create new opening per ab-010 communicating openings. fire sprinklers under seperate permit/fire life safety | $25,000 |
| Dec 7, 2012 | Completed final sign-off Jan 2017 | 633 Battery St | floors 1st, mezz, 4th & 5th - 7 evacuation signs only.Details
floors 1st, mezz, 4th & 5th - 7 evacuation signs only. | $3,000 | |
| Nov 19, 2012 | Never finaled issued Nov 2012, no final | 633 Battery St | Sabah International Incorporated | 4th floor-upgrade the (e) f.a. system-provide monitoring of roll up door in the open office 409, upgrade shall include the following 1 new photoelectric smoke detector, 1 new control relay & 1 new interposing relayr. ti pa# 2011-0719-0577Details
4th floor-upgrade the (e) f.a. system-provide monitoring of roll up door in the open office 409, upgrade shall include the following 1 new photoelectric smoke detector, 1 new control relay & 1 new interposing relayr. ti pa# 2011-0719-0577 | $5,000 |
| Sep 14, 2012 | Never finaled issued Sep 2012, no final | 633 Battery St | Sabah International Incorporated | as built dwgs for keker van nest fire alarm drawings for permit #201204168417Details
as built dwgs for keker van nest fire alarm drawings for permit #201204168417 | |
| Aug 2, 2012 | Completed final sign-off Jan 2017 | 633 Battery St | Ayoob & Peery Plumbing Co Inc | 1st floor-replace sprinkler heads to concealed heads & add sprinkler heads below canopies at 1st fl per tenant, total of 7 headsDetails
1st floor-replace sprinkler heads to concealed heads & add sprinkler heads below canopies at 1st fl per tenant, total of 7 heads | $8,000 |
| Apr 16, 2012 | Completed final sign-off Sep 2012 | 633 Battery St | Sabah International Incorporated | modify existing fire sprinkler monitoring/elevator recall system to monitor new fire smoke dampers, ahus, and door holders. provided my mech cont. 2nd,4,5th flDetails
modify existing fire sprinkler monitoring/elevator recall system to monitor new fire smoke dampers, ahus, and door holders. provided my mech cont. 2nd,4,5th fl | $20,973 |
| Oct 26, 2011 | Expired or cancelled cancelled Jan 2026 | 633 Battery St | Hathaway Dinwiddie Co. | 5th floor-refer to pa# 2011-0526-6916-new mechanical including 1 new air handler unit, 1 vfd, 9 vav's & t'stats. new ductwork, diffusers & transfer grilles as shown. new chws/r & hws/r piping as shownDetails
5th floor-refer to pa# 2011-0526-6916-new mechanical including 1 new air handler unit, 1 vfd, 9 vav's & t'stats. new ductwork, diffusers & transfer grilles as shown. new chws/r & hws/r piping as shown | $110,000 |
| Oct 26, 2011 | Expired or cancelled cancelled Jan 2026 | 633 Battery St | Hathaway Dinwiddie Co. | 4th floor-refer to pa# 2011-0719-0577-new mechanical including 1 new air handler unit, 1 new vfd, 5 vav's & t'stats. new ductwork, diffusers & transfer grilles as shown. new chws/r & hws/r piping as shownDetails
4th floor-refer to pa# 2011-0719-0577-new mechanical including 1 new air handler unit, 1 new vfd, 5 vav's & t'stats. new ductwork, diffusers & transfer grilles as shown. new chws/r & hws/r piping as shown | $110,000 |
| Oct 26, 2011 | Expired or cancelled cancelled Jan 2026 | 633 Battery St | Hathaway Dinwiddie Co. | 1st floor-refer to pa# 2011-0725-0982-new mechanical including 1 new air handler unit, 9 vav's & t'stats. new ductwork, diffusers & transfer grilles as shown. 1 new exhaust fan, new hws/r piping as shownDetails
1st floor-refer to pa# 2011-0725-0982-new mechanical including 1 new air handler unit, 9 vav's & t'stats. new ductwork, diffusers & transfer grilles as shown. 1 new exhaust fan, new hws/r piping as shown | $100,000 |
| Oct 24, 2011 | Completed final sign-off Aug 2013 | 633 Battery St | Hathaway Dinwiddie Co. | 4th floor tenant improvement - demolition work , communicating opening between 615 & 633 battery st. construction of accessible ramp, ab-010 local equivalency for communicating openings between bldgs, existing communicating opening on 4th floor. ref pa #201110247498.Details
4th floor tenant improvement - demolition work , communicating opening between 615 & 633 battery st. construction of accessible ramp, ab-010 local equivalency for communicating openings between bldgs, existing communicating opening on 4th floor. ref pa #201110247498. | $25,000 |
| Oct 4, 2011 | Never finaled issued Nov 2011, no final | 633 Battery St | Hathaway Dinwiddie Co. | provide new notification & initiating devices to monitor new fire smoke dampers. ref. #201105266916,201107190577 4th,201107250982 1st floorDetails
provide new notification & initiating devices to monitor new fire smoke dampers. ref. #201105266916,201107190577 4th,201107250982 1st floor | $378,000 |
| Aug 29, 2011 | Completed final sign-off Jan 2015 | 633 Battery St | groundfloor-remove (e) exterior canopy @bldg entry, repl bldg entry door for accessibility. repl (e) stone in-fill in exterior windows with metal. install new canopy at bldg entry, repl (e) access control gate with new at courtyard.Details
groundfloor-remove (e) exterior canopy @bldg entry, repl bldg entry door for accessibility. repl (e) stone in-fill in exterior windows with metal. install new canopy at bldg entry, repl (e) access control gate with new at courtyard. | $120,000 | |
| Jul 28, 2011 | Completed final sign-off Aug 2013 | 633 Battery St | Hathaway Dinwiddie Co. | tenant improvement to existing partially occupied floor. demo work consists of removal of 1 structural column. new work consists of strengthening e structural beam. no change in floor area or building height. all mep sprinklers, life safety system design build and under sep permitDetails
tenant improvement to existing partially occupied floor. demo work consists of removal of 1 structural column. new work consists of strengthening e structural beam. no change in floor area or building height. all mep sprinklers, life safety system design build and under sep permit | $60,000 |
| Jul 25, 2011 | Completed final sign-off Jun 2015 | 633 Battery St | Hathaway Dinwiddie Co. | ti to existing partially occupied floor demo work includes removal of convenience stair, cosmetic finishes, lighting, hvac. new ork consists of infill of removed stair, extension off mezz, non struct partitions, lighting, hvac. no change i flr area,bldg height. mep sprklers,ls,design buildDetails
ti to existing partially occupied floor demo work includes removal of convenience stair, cosmetic finishes, lighting, hvac. new ork consists of infill of removed stair, extension off mezz, non struct partitions, lighting, hvac. no change i flr area,bldg height. mep sprklers,ls,design build | $523,000 |
| Jul 19, 2011 | Completed final sign-off Jun 2015 | 633 Battery St | Hathaway Dinwiddie Co. | this project is a ti to an existing partially occupied floor on the 4th. floor. demo work includes cosmetic, finishes lighting & hvac. new work consists of new non str partitions, lighting, & hvac. there is no change in floor area or building height. all mep,sprinklers & life safety seperate permitDetails
this project is a ti to an existing partially occupied floor on the 4th. floor. demo work includes cosmetic, finishes lighting & hvac. new work consists of new non str partitions, lighting, & hvac. there is no change in floor area or building height. all mep,sprinklers & life safety seperate permit | $498,000 |
| Jul 19, 2011 | Completed final sign-off Sep 2011 | 633 Battery St | Ayoob & Peery Plumbing Co Inc | 1st, 4th & 5th floors-tenant improvement-1st fl-1 added, 14 relocated, 2 removed. 4th fl-16 relocated, 7 removed. 5th fl-1 added, 32 relocatedDetails
1st, 4th & 5th floors-tenant improvement-1st fl-1 added, 14 relocated, 2 removed. 4th fl-16 relocated, 7 removed. 5th fl-1 added, 32 relocated | $32,000 |
| Jul 13, 2011 | Completed final sign-off Oct 2016 | 633 Battery St | Hathaway Dinwiddie Co. | structural alteration to exterior of an extg occupied bldg. demo work includes removal of structural masonry for three new window openings. new work consists of 4 new exterior windows. no change in floor, area or bldg,height. sprinklers are design/build and will be submitted under seperate permit.Details
structural alteration to exterior of an extg occupied bldg. demo work includes removal of structural masonry for three new window openings. new work consists of 4 new exterior windows. no change in floor, area or bldg,height. sprinklers are design/build and will be submitted under seperate permit. | $65,000 |
| Jul 5, 2011 | Completed final sign-off Dec 2012 | 633 Battery St | Hathaway Dinwiddie Co. | 4th floor:demolition of extg non-structural, interior partitions, doors,millwork, flooring, electrical, ceiling and lighting. future construction drawings to be submitted under seperate permit. interior demo pfr sf bc ab#017Details
4th floor:demolition of extg non-structural, interior partitions, doors,millwork, flooring, electrical, ceiling and lighting. future construction drawings to be submitted under seperate permit. interior demo pfr sf bc ab#017 | $29,750 |
| Jun 30, 2011 | Never finaled issued Jun 2011, no final | 633 Battery St | streetspace streetspaceDetails
streetspace streetspace | ||
| May 26, 2011 | Completed final sign-off Aug 2013 | 633 Battery St | Hathaway Dinwiddie Co. | tenant improvement to existing office space. remove existing finiahes, lighting, mech. new non-structural partitions lighting and mechDetails
tenant improvement to existing office space. remove existing finiahes, lighting, mech. new non-structural partitions lighting and mech | $700,000 |
| Apr 1, 2011 | Completed final sign-off Dec 2012 | 633 Battery St | Hathaway Dinwiddie Co. | demo of extg partitions,doors, flooring, ceiling and lighting.Details
demo of extg partitions,doors, flooring, ceiling and lighting. | $35,000 |
| Mar 9, 2011 | Never finaled issued Mar 2011, no final | 633 Battery St | street space and mta permitsDetails
street space and mta permits | ||
| Feb 24, 2011 | Completed final sign-off May 2011 | 633 Battery St | Teevan Company | the removal of 2 balconies at the 5th floor and restoring the bldg to match original facade on 5th floor.install 6 windows in kind.match extg.install bricks as needed.Details
the removal of 2 balconies at the 5th floor and restoring the bldg to match original facade on 5th floor.install 6 windows in kind.match extg.install bricks as needed. | $30,000 |
| Jan 27, 2011 | Completed final sign-off Dec 2012 | 633 Battery St | Hathaway Dinwiddie Co. | 5th floor-demolition of tenant improvements in (e) vacant office space. demoltion of (e) non structural partitions, electrical, ceiling & lighting. space shall remain unoccupied per admin ab-017Details
5th floor-demolition of tenant improvements in (e) vacant office space. demoltion of (e) non structural partitions, electrical, ceiling & lighting. space shall remain unoccupied per admin ab-017 | $25,000 |
| Apr 9, 2010 | Completed final sign-off Jul 2010 | 633 Battery St | Teevan Company | 5th floor-replace 10 windows sashes, front eastside, all new windows will be installed on the (e) openings, in kind. all windows will be wood custom made in kindDetails
5th floor-replace 10 windows sashes, front eastside, all new windows will be installed on the (e) openings, in kind. all windows will be wood custom made in kind | $20,000 |
| Aug 7, 2009 | Completed final sign-off Jul 2010 | 617 Battery St | Metropolitan Electrical Construction | installation of: 1-base transformer cabinet on the roof top, outdoors; 3-panel antennas (1 per sector) on monopole mounts; 1 internet services exchange switch antennas on a monopole; 1-gps antenna.Details
installation of: 1-base transformer cabinet on the roof top, outdoors; 3-panel antennas (1 per sector) on monopole mounts; 1 internet services exchange switch antennas on a monopole; 1-gps antenna. | $45,000 |
| Nov 10, 2008 | Completed final sign-off Jan 2009 | 633 Battery St | Teevan Company | replace 16 windows sashes at 6/fl(frt), east side. all new windows will be install on the existing openings in kind. and will have integral springs, integral sash lugs and will not have a sub sill but sit on (e) sill & wood sashes.Details
replace 16 windows sashes at 6/fl(frt), east side. all new windows will be install on the existing openings in kind. and will have integral springs, integral sash lugs and will not have a sub sill but sit on (e) sill & wood sashes. | $5,000 |
| Oct 14, 2008 | Never finaled issued Nov 2008, no final | 633 Battery St | Wells Electrical, Inc | add new generator and steel platform, 100 kw 30. new gas piping, electrical supply with transfer switch on existing roof.Details
add new generator and steel platform, 100 kw 30. new gas piping, electrical supply with transfer switch on existing roof. | $35,000 |
| Oct 14, 2008 | Completed final sign-off Apr 2009 | 633 Battery St | Ayoob & Peery Plumbing Co Inc | at 6th fl: add, relocate & remove fire sprinkler heads per t.i.Details
at 6th fl: add, relocate & remove fire sprinkler heads per t.i. | $19,750 |
| Oct 6, 2008 | Never finaled issued Oct 2008, no final | 633 Battery St | street space onlyDetails
street space only | ||
| Sep 9, 2008 | Completed final sign-off Apr 2009 | 633 Battery St | 6th floor tenant improvment upgrade mechanical & electrical systems, new equipment & lighting. architectural work under pa #200807297841.Details
6th floor tenant improvment upgrade mechanical & electrical systems, new equipment & lighting. architectural work under pa #200807297841. | $108,000 | |
| Sep 4, 2008 | Completed final sign-off Apr 2009 | 633 Battery St | revision to 200807297841: remove 3 steps leading upg to the existing fire escapeDetails
revision to 200807297841: remove 3 steps leading upg to the existing fire escape | ||
| Jul 29, 2008 | Completed final sign-off Apr 2009 | 633 Battery St | tenant improvements: build new offices, meeting rooms, toilet rooms and support facilities. install new casework and millwork. electrical, plumbing & mechanical under separate permit. demolition work completed under 200805071511.Details
tenant improvements: build new offices, meeting rooms, toilet rooms and support facilities. install new casework and millwork. electrical, plumbing & mechanical under separate permit. demolition work completed under 200805071511. | $360,000 | |
| Jul 29, 2008 | Completed final sign-off Apr 2009 | 633 Battery St | 6th floor - tenant improvements. install 2 new windows in the building exterior property line brick wall. tenant improvement work under appl. 200707297841. sprinkler work under separate permit. new windows to match existing.Details
6th floor - tenant improvements. install 2 new windows in the building exterior property line brick wall. tenant improvement work under appl. 200707297841. sprinkler work under separate permit. new windows to match existing. | $38,000 | |
| May 22, 2008 | Never finaled issued May 2008, no final | 633 Battery St | street space permitDetails
street space permit | ||
| May 7, 2008 | Completed final sign-off Apr 2009 | 633 Battery St | 6th floor: tenant improvement - demolition phase only, remove itnerior non-load bearing partitions ceilings, all finishes and raised floor platforms (per ab-017). remove mechanical system & lighting. per ab-017.Details
6th floor: tenant improvement - demolition phase only, remove itnerior non-load bearing partitions ceilings, all finishes and raised floor platforms (per ab-017). remove mechanical system & lighting. per ab-017. | $48,000 | |
| Jul 12, 2007 | Expired or cancelled expired May 2009 | 633 Battery St | Delta Service Company | roof top air conditioning unit replacement: remove and replace existing "trane"brand chiller on roof & replace with "carrier" brand. new equipment is approx. 2 inches higher, wider by 19" and shorter by 4 ft. weight is less;new matching mounting frame & altered stell support will be installed.Details
roof top air conditioning unit replacement: remove and replace existing "trane"brand chiller on roof & replace with "carrier" brand. new equipment is approx. 2 inches higher, wider by 19" and shorter by 4 ft. weight is less;new matching mounting frame & altered stell support will be installed. | $239,039 |
| Jul 26, 2006 | Completed final sign-off Jul 2006 | 633 Battery St | Dpr Construction Inc | renew pa# 200504281074, 200505041573, 200508251234 for final inspection.Details
renew pa# 200504281074, 200505041573, 200508251234 for final inspection. | |
| Aug 25, 2005 | Expired or cancelled expired Jul 2006 | 633 Battery St | Dpw Inc. | plug off (e) 64 drops with pendent die to ceiling reoval and change gut (96) existing upright onDetails
plug off (e) 64 drops with pendent die to ceiling reoval and change gut (96) existing upright on | $9,000 |
| Aug 22, 2005 | Completed final sign-off Jul 2006 | 633 Battery St | Dpr Construction Inc | oti-2 5th floor el, meDetails
oti-2 5th floor el, me | $150,000 |
| May 24, 2005 | Completed final sign-off Jul 2006 | 633 Battery St | Dpr Construction Inc | oti-1 5th floor elDetails
oti-1 5th floor el | $350,000 |
| May 12, 2005 | Completed final sign-off Jul 2006 | 633 Battery St | Dpr Construction Inc | add 2 property lines windows thru exist brick wall.new openings @5&6th fls for constr of new stairs.Details
add 2 property lines windows thru exist brick wall.new openings @5&6th fls for constr of new stairs. | $100,000 |
| May 4, 2005 | Expired or cancelled expired Jul 2006 | 633 Battery St | Dpr Construction Inc | remodel kitchen area on 3&4/fl.alter 4/fl reception area.new flooring @ copy rms&kitchen facilities.Details
remodel kitchen area on 3&4/fl.alter 4/fl reception area.new flooring @ copy rms&kitchen facilities. | $90,000 |
| Apr 28, 2005 | Expired or cancelled expired Jul 2006 | 633 Battery St | Dpr Construction Inc | revision to 200502115315:oti-1 rev 4th floor: drinking fountain to meet ada requirementsDetails
revision to 200502115315:oti-1 rev 4th floor: drinking fountain to meet ada requirements | $800 |
| Apr 22, 2005 | Completed final sign-off Oct 2005 | 633 Battery St | Decker Electric Co Inc Electrical Contra | oti-3, 4th floor, el.Details
oti-3, 4th floor, el. | $15,000 |
| Apr 6, 2005 | Expired or cancelled expired Jul 2011 | 633 Battery St | R L H Fire Protection Inc | oti-2, 2nd floor, sp.Details
oti-2, 2nd floor, sp. | $15,000 |
| Apr 4, 2005 | Completed final sign-off Oct 2005 | 633 Battery St | Dpr Construction Inc | oti-2, 4th floor, me.Details
oti-2, 4th floor, me. | $18,000 |
| Apr 4, 2005 | Expired or cancelled expired May 2011 | 633 Battery St | Dpr Construction Inc | oti-1, 2nd/fl - el, me, ls, sp.Details
oti-1, 2nd/fl - el, me, ls, sp. | $500,000 |
| Mar 14, 2005 | Completed final sign-off Oct 2005 | 633 Battery St | Dpw Inc. | modify (e) sprinkler system on the 4th floor only.Details
modify (e) sprinkler system on the 4th floor only. | $3,000 |
| Feb 11, 2005 | Completed final sign-off Oct 2005 | 633 Battery St | Dpr Construction Inc | oti-1, 4th floor, el, me, sp.Details
oti-1, 4th floor, el, me, sp. | $105,000 |
| Apr 29, 2004 | Completed final sign-off Aug 2004 | 633 Battery St | Dpr Construction Inc | oti-1,1st/f-sp,elDetails
oti-1,1st/f-sp,el | $171,000 |
| Apr 29, 2004 | Completed final sign-off Aug 2004 | 633 Battery St | Dpr Construction Inc | oti-2,1st/f-sp,elDetails
oti-2,1st/f-sp,el | $171,000 |
| Oct 25, 2002 | Completed final sign-off Feb 2003 | 633 Battery St | Skyline Construction | #620- mechancial & sprinkler work, add (3), relocate (27) removing (4)Details
#620- mechancial & sprinkler work, add (3), relocate (27) removing (4) | $40,000 |
| Oct 1, 2002 | Completed final sign-off Nov 2003 | 633 Battery St | Skyline Construction | construct 2 new window openings in (e) 6/fl office, wall is on property line & is brick masonry,Details
construct 2 new window openings in (e) 6/fl office, wall is on property line & is brick masonry, | $14,000 |
| Sep 16, 2002 | Expired or cancelled expired Feb 2004 | 633 Battery St | Universal Service Adminisration | renew expired appn. 200004147240,200006304114,9915303Details
renew expired appn. 200004147240,200006304114,9915303 | |
| Sep 16, 2002 | Expired or cancelled expired Mar 2004 | 633 Battery St | Universal Service Adminisration | renew expired appn. 9923628Details
renew expired appn. 9923628 | |
| Sep 13, 2002 | Never finaled issued Sep 2002, no final | 633 Battery St | Universal Service Adminisration | to renew app#'s 9917622,2000/01/18/327 & 09904563 for final inspection.Details
to renew app#'s 9917622,2000/01/18/327 & 09904563 for final inspection. | |
| Aug 13, 2002 | Completed final sign-off Feb 2003 | 633 Battery St | Skyline Construction | interior partitions, ceilings, accessible toilet rooms within suite, new finishesDetails
interior partitions, ceilings, accessible toilet rooms within suite, new finishes | $235,000 |
| Jul 19, 2002 | Completed final sign-off Jul 2002 | 633 Battery St | renew appn. 200111213703 for final inspectionDetails
renew appn. 200111213703 for final inspection | ||
| Jul 17, 2002 | Expired or cancelled expired Mar 2004 | 633 Battery St | Robbins General Contr Inc | demo non-load bearing walls, doors, framing & carpetDetails
demo non-load bearing walls, doors, framing & carpet | $12,000 |
| Jun 27, 2002 | Expired or cancelled expired Mar 2004 | 633 Battery St | Russell-Filand Builders Inc | revisions to app#200201187280/r-1 suite 103Details
revisions to app#200201187280/r-1 suite 103 | $500 |
| Apr 26, 2002 | Expired or cancelled expired Oct 2002 | 633 Battery St | Pribuss Engineering Inc | g/f- fire sprinkler t.i. 56 new/ relocate 1Details
g/f- fire sprinkler t.i. 56 new/ relocate 1 | $15,000 |
| Jan 18, 2002 | Expired or cancelled expired Mar 2004 | 633 Battery St | Russell-Filand Builders Inc | t.i. includes new offices & rebuild messznine, increase area by 150 sq.ft.total less than 1/3 of g/fDetails
t.i. includes new offices & rebuild messznine, increase area by 150 sq.ft.total less than 1/3 of g/f | $120,000 |
| Nov 21, 2001 | Expired or cancelled expired Mar 2002 | 633 Battery St | canopy install in front of footprint of 8'x5'Details
canopy install in front of footprint of 8'x5' | $3,000 | |
| Jul 12, 2001 | Expired or cancelled expired Jan 2002 | 633 Battery St | renovate interior space in (e) flower stand & convert to coffee stand to include cabinets, shewingDetails
renovate interior space in (e) flower stand & convert to coffee stand to include cabinets, shewing | $25,000 | |
| Dec 21, 2000 | Expired or cancelled expired Apr 2001 | 633 Battery St | Potter Fire Protection | add (2) fire sprinklers in an existing phone equipment room to cover an unsprinklered area behind fuDetails
add (2) fire sprinklers in an existing phone equipment room to cover an unsprinklered area behind fu | $850 |
| Sep 8, 2000 | Completed final sign-off Jun 2001 | 633 Battery St | one-stop,c.h.,install 12-2foot panel antennas on the roof w/associated equipDetails
one-stop,c.h.,install 12-2foot panel antennas on the roof w/associated equip | $78,000 | |
| Jun 30, 2000 | Expired or cancelled expired Oct 2000 | 633 Battery St | Heath Plumbing & Fire Protective | add 4 sprinkler for stair opening from (e) fire schedule systemDetails
add 4 sprinkler for stair opening from (e) fire schedule system | $900 |
| Apr 14, 2000 | Expired or cancelled expired Aug 2000 | 633 Battery St | Heath Plumbing & Fire Protective | modify existing pipe schedual system for t-1Details
modify existing pipe schedual system for t-1 | $3,000 |
| Jan 18, 2000 | Expired or cancelled expired Mar 2001 | 633 Battery St | install n stair from 1st floor to bsmntDetails
install n stair from 1st floor to bsmnt | $80,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.