Richard Dreyer
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Holmes Culley
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Sep 2023
36 permits since 2000 (engineer on 33 permits, authorized agent-others on 2 permits, architect on 1 permit): 28 completed, 1 in progress, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 26, 2023 | In progress issued Dec 2023 | 624 Taylor St | Rainbow Waterproofing & Restor | add structural steel and welding to (e) steel beams: 7 locations. treat remaining steel with epoxy and patch concrete. egress path to be clear at all times during construction.Details
add structural steel and welding to (e) steel beams: 7 locations. treat remaining steel with epoxy and patch concrete. egress path to be clear at all times during construction. | $50,000 |
| Nov 16, 2018 | Never finaled issued Nov 2018, no final | 200 Stockton St | Plant Construction Co, Lp | install temporary xmas signage decoration on building facade, decoration has 3 parts; 1 pendent and 2 branches. branch on stockton street shall not exceed 200 sf per planning code. remove by jan 25, 2019. n/a maherDetails
install temporary xmas signage decoration on building facade, decoration has 3 parts; 1 pendent and 2 branches. branch on stockton street shall not exceed 200 sf per planning code. remove by jan 25, 2019. n/a maher | $12,500 |
| Sep 20, 2018 | Completed final sign-off Nov 2020 | 1940 Vallejo St | Plant Construction Co, Lp | voluntary seismic strengthening shceme in accordance with asce 41-13. construction of a grade beam along the north side of bldg at basement level. installation of column concrete jackets & shotcrete wall overlay on the new elevelation between basemnt and 1st flDetails
voluntary seismic strengthening shceme in accordance with asce 41-13. construction of a grade beam along the north side of bldg at basement level. installation of column concrete jackets & shotcrete wall overlay on the new elevelation between basemnt and 1st fl | $500,000 |
| Apr 18, 2016 | Never finaled issued Jun 2017, no final | 570 Pacific Av | Lewis M Merlo Inc | retaining wall along east side of building.Details
retaining wall along east side of building. | $80,000 |
| Sep 28, 2015 | Completed final sign-off Apr 2016 | 450 Shotwell St | Rossi Builders Inc. | revision to 201501286911. demo of e mezzanines, stairs, shift of new bathrooms, revised config of new rated exit corridor and construction of communicating wall opening. n/a ordinance #155-13Details
revision to 201501286911. demo of e mezzanines, stairs, shift of new bathrooms, revised config of new rated exit corridor and construction of communicating wall opening. n/a ordinance #155-13 | |
| Nov 17, 2014 | Never finaled issued Nov 2014, no final | 722 Montgomery St | Pacific General Construction | revision to appl #2002.0520.6995: install seismic joints at northwest & southwest corners of bldg. n/a maher ordinanceDetails
revision to appl #2002.0520.6995: install seismic joints at northwest & southwest corners of bldg. n/a maher ordinance | $25,000 |
| Jul 17, 2014 | Never finaled issued Dec 2014, no final | 1940 Vallejo St | Bjlgc Inc | new exterior balcony at 9/fDetails
new exterior balcony at 9/f | $35,000 |
| Jun 5, 2014 | Completed final sign-off Sep 2016 | 2471 Clay St | Plant Construction Co, Lp | (townhouse# 3) to erect 3 stories, no basement, 3 units townhouse building.Details
(townhouse# 3) to erect 3 stories, no basement, 3 units townhouse building. | $1,500,000 |
| Jun 5, 2014 | Completed final sign-off Sep 2016 | 2468 Sacramento St | Plant Construction Company Lp, Plant Construction Co, Lp | (townhouse# 2) to erect 3 stories, no basement, 3 units townhouse building.Details
(townhouse# 2) to erect 3 stories, no basement, 3 units townhouse building. | $1,500,000 |
| Jun 5, 2014 | Completed final sign-off Nov 2016 | 2458 Sacramento St | Plant Construction Co, Lp | (townhouse #1) to erect 3 stories, no basement, 4 units townhouse building.Details
(townhouse #1) to erect 3 stories, no basement, 4 units townhouse building. | $2,000,000 |
| Apr 9, 2014 | Completed final sign-off Nov 2015 | 1610 Lombard St | Bai Construction | soft story retrofit per sfbc chapter 34b. engineering criteria to comply with 2012 iebc appendix a-4. convert 2 garage doors into one garage door opening. maher ord.no.#155-13 not applicable.Details
soft story retrofit per sfbc chapter 34b. engineering criteria to comply with 2012 iebc appendix a-4. convert 2 garage doors into one garage door opening. maher ord.no.#155-13 not applicable. | $60,000 |
| Apr 16, 2013 | Completed final sign-off Aug 2015 | 145 Jefferson St | Bcci Construction Company | core & shell improv incl:2 elevators fr 1st to 3rd, wheel chair lift fr bsmt to 1st, stair & enclosures from bsmt to 1st & 2nd from 1st to 2nd. opening in 1/fl slab for future amusement ride. related structure work. doing demo on all floor nad three tenants will remain in opertaionDetails
core & shell improv incl:2 elevators fr 1st to 3rd, wheel chair lift fr bsmt to 1st, stair & enclosures from bsmt to 1st & 2nd from 1st to 2nd. opening in 1/fl slab for future amusement ride. related structure work. doing demo on all floor nad three tenants will remain in opertaion | $500,000 |
| Apr 16, 2013 | Completed final sign-off Aug 2015 | 145 Jefferson St | Bcci Construction Company | non structural t.i on portions of basement, 1st,2nd & 3rd flrs. include: amusement attraction with amusement rides in the basement, titleing + retail on 1st and wax museum on the 2nd +3rd flrs w/ ticketing & retail on the 1st. related mech, plumb, elect. sprinkler/fire alarm on separate permits.Details
non structural t.i on portions of basement, 1st,2nd & 3rd flrs. include: amusement attraction with amusement rides in the basement, titleing + retail on 1st and wax museum on the 2nd +3rd flrs w/ ticketing & retail on the 1st. related mech, plumb, elect. sprinkler/fire alarm on separate permits. | $5,500,000 |
| Feb 27, 2013 | Completed final sign-off Nov 2013 | 2799 Broadway | William Gregory Clause | reinforce (e) framing system at deck to support gravity loading from new hot tub.Details
reinforce (e) framing system at deck to support gravity loading from new hot tub. | $10,000 |
| Feb 15, 2013 | Expired or cancelled cancelled Jan 2026 | 146 Geary St | Centrix Builders Inc. | remove existing rusted lintel above window on the 4th fl. install new lentil as per drawings.Details
remove existing rusted lintel above window on the 4th fl. install new lentil as per drawings. | $12,500 |
| Apr 19, 2012 | Completed final sign-off Dec 2013 | 180 Montgomery St | Hathaway Dinwiddie Co. | install power fasteners to support operable partiton and relocate 1 steel angle. t.i. pa #2012.02.23.4679.Details
install power fasteners to support operable partiton and relocate 1 steel angle. t.i. pa #2012.02.23.4679. | $5,000 |
| Mar 28, 2012 | Completed final sign-off Oct 2012 | 800 Pacheco St | Bbc Construction Inc. | (n)infill in the buildable area by extending the (e) roof from the (e) storage area toward the street to butt against the (e) garage wall, along the north property line, approx 32 sq ft in area.Details
(n)infill in the buildable area by extending the (e) roof from the (e) storage area toward the street to butt against the (e) garage wall, along the north property line, approx 32 sq ft in area. | $60,000 |
| Aug 10, 2011 | Completed final sign-off Jul 2012 | 425 Market St | Richlen Construction | revision to pa# 2010.03.29.9157. enlarge (e) fcc room, relocate annuciator panel. any electrical. fire sprinkler or life safety upgraded or relocated accordingly at ground floor.Details
revision to pa# 2010.03.29.9157. enlarge (e) fcc room, relocate annuciator panel. any electrical. fire sprinkler or life safety upgraded or relocated accordingly at ground floor. | $45,000 |
| Feb 24, 2011 | Completed final sign-off May 2011 | 633 Battery St | Teevan Company | the removal of 2 balconies at the 5th floor and restoring the bldg to match original facade on 5th floor.install 6 windows in kind.match extg.install bricks as needed.Details
the removal of 2 balconies at the 5th floor and restoring the bldg to match original facade on 5th floor.install 6 windows in kind.match extg.install bricks as needed. | $30,000 |
| Oct 14, 2010 | Completed final sign-off Jun 2012 | 2830 Pacific Av | Koala Development Corporation | general remodel of interior spaces, new bath at 2nd level, new window at basement, remodel extg penthouse.Details
general remodel of interior spaces, new bath at 2nd level, new window at basement, remodel extg penthouse. | $200,000 |
| Oct 5, 2010 | Completed final sign-off Jun 2012 | 2830 Pacific Av | Koala Development Corporation | voluntary seismic strengthenting per plan.Details
voluntary seismic strengthenting per plan. | $80,000 |
| Oct 1, 2010 | Completed final sign-off Dec 2010 | 2502 Jackson St | Teevan Company | revision to application #2010-0907-0310 to include details 3/s2 cornice reattachment and 4/s2 lintel replacementDetails
revision to application #2010-0907-0310 to include details 3/s2 cornice reattachment and 4/s2 lintel replacement | $2,000 |
| May 6, 2010 | Completed final sign-off Jan 2013 | 717 Battery St | Bcci Construction Company | seimic upgrade to an (e) unreinforced masonry building. work includes structural, foundations, diaphrans & all associated umb upgrade work.Details
seimic upgrade to an (e) unreinforced masonry building. work includes structural, foundations, diaphrans & all associated umb upgrade work. | $6,000,000 |
| Apr 12, 2010 | Completed final sign-off Nov 2010 | 2 Stockton St | Ward Alan Emery Construction Inc. | construction of a closure wall to enable abandonment of approx 1800 sf of (e) building area located in the basement beneath the sidewalk & outside the property line. new gas meter roots new fire service line connection. no change in use.Details
construction of a closure wall to enable abandonment of approx 1800 sf of (e) building area located in the basement beneath the sidewalk & outside the property line. new gas meter roots new fire service line connection. no change in use. | $350,000 |
| Apr 12, 2010 | Completed final sign-off Nov 2010 | 77 Ofarrell St | Ward Alan Emery Construction Inc. | construction of a closure wall to enable abandonement of approx 1400 sf of existing building area located in the basement beneath the sidewalk and outside the property line. no change in use. tenant improvements under seperate permit.Details
construction of a closure wall to enable abandonement of approx 1400 sf of existing building area located in the basement beneath the sidewalk and outside the property line. no change in use. tenant improvements under seperate permit. | $250,000 |
| Jan 21, 2010 | Completed final sign-off May 2014 | 1095 Mission St | Ncr Construction Inc | replace building interior finishes and residential windows in kind. upgrade unit kitchenettes & heaters, create a basement community room and recycling area.Details
replace building interior finishes and residential windows in kind. upgrade unit kitchenettes & heaters, create a basement community room and recycling area. | $2,100,000 |
| Jan 13, 2009 | Completed final sign-off Nov 2009 | 212 Stockton St | temporary shoring in advance of structural work under seperate pa# 2008-0528-3073Details
temporary shoring in advance of structural work under seperate pa# 2008-0528-3073 | $7,500 | |
| Oct 21, 2008 | Completed final sign-off Nov 2009 | 640 Sutter St | Turner Construction Co | this permit is in reference to approved permit app #200608179733. supply and install new pre fabricated central stairs from 3rd floor to roof level. shop drawings by steel fabricator,glacier iron works, include structural steel framing and calcs. see letter attached rom both the architect of recordDetails
this permit is in reference to approved permit app #200608179733. supply and install new pre fabricated central stairs from 3rd floor to roof level. shop drawings by steel fabricator,glacier iron works, include structural steel framing and calcs. see letter attached rom both the architect of record | $225,000 |
| Oct 14, 2008 | Never finaled issued Nov 2008, no final | 633 Battery St | Wells Electrical, Inc | add new generator and steel platform, 100 kw 30. new gas piping, electrical supply with transfer switch on existing roof.Details
add new generator and steel platform, 100 kw 30. new gas piping, electrical supply with transfer switch on existing roof. | $35,000 |
| Aug 19, 2008 | Expired or cancelled expired Mar 2010 | 2090 Pacific Av | build a block wall 6ft tall 12ft long 10' from front property line.Details
build a block wall 6ft tall 12ft long 10' from front property line. | $2,000 | |
| Jul 25, 2008 | Completed final sign-off Jun 2009 | 45 05th Av | Daniel Larsen Builders | revision to pa# 2008/04/07/8948. relocate kitchen, reconfigure bathroom, remove fire place at dining room. kitchen & bathroom remodeling with structural modifications, structural strengthening at garage level. no building footprint change. window alteration at side elevation.Details
revision to pa# 2008/04/07/8948. relocate kitchen, reconfigure bathroom, remove fire place at dining room. kitchen & bathroom remodeling with structural modifications, structural strengthening at garage level. no building footprint change. window alteration at side elevation. | $100,000 |
| Jul 21, 2008 | Completed final sign-off Nov 2009 | 640 Sutter St | Turner Construction Co | ref. appl#200608179733, new design-build central stairs serving basement, first fl, second fl. plans include structural steel framing & calcs serving this portion of work. (separate plans will be submitted for stairs serving third fl to roof level.)Details
ref. appl#200608179733, new design-build central stairs serving basement, first fl, second fl. plans include structural steel framing & calcs serving this portion of work. (separate plans will be submitted for stairs serving third fl to roof level.) | $150,000 |
| Oct 24, 2007 | Completed final sign-off Nov 2009 | 640 Sutter St | Turner Construction Co | work in basement and common area. rev. to appl.#2006.08.17.9733. 1. repair (e) steel columns in alleyway-east side. 2. anchor bolt installation for slab reinstatement at (e) stair opening. 3. repairs to (e) level 1 conc. slab due to deteriroation. corrosion of reinforcing steel & concrete spacing.Details
work in basement and common area. rev. to appl.#2006.08.17.9733. 1. repair (e) steel columns in alleyway-east side. 2. anchor bolt installation for slab reinstatement at (e) stair opening. 3. repairs to (e) level 1 conc. slab due to deteriroation. corrosion of reinforcing steel & concrete spacing. | $3,000 |
| Oct 18, 2006 | Completed final sign-off Jan 2008 | 1650 Mission St | Pankow Special Projects Lp | seismic strengthening to (e) brace frame @ 4th/5th level.Details
seismic strengthening to (e) brace frame @ 4th/5th level. | $250,000 |
| Jul 25, 2006 | Completed final sign-off Jun 2007 | 1650 Mission St | structural element to communication stair. between 4th & 5th floor. t.i. pa# 2006/07/25/7570 file seperately.Details
structural element to communication stair. between 4th & 5th floor. t.i. pa# 2006/07/25/7570 file seperately. | $10,000 | |
| Dec 14, 2004 | Completed final sign-off Jan 2005 | 530 29th St | A-1 Designs | renew app 200103214903-200408232269 for final inspectionDetails
renew app 200103214903-200408232269 for final inspection |