Block 0283, lot 022
640 Sutter St
- City’s use
- Commercial Misc
- Built
- 1916
- Stories
- 6
- Units
- 1
- Rooms
- 59 bathrooms
- Building
- 101,662 sq ft
- Lot
- 18,906 sq ft
- Zoning
- C3G
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
33 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2023 | Completed final sign-off Nov 2023 | 640 Sutter St | Tom Lee Roofing Inc. | reroofing. crrc=0668-0146 sr1=.88Details
reroofing. crrc=0668-0146 sr1=.88 | $158,175 |
| Aug 3, 2021 | Completed final sign-off Jan 2023 | 640 Sutter St | Pyro-Comm Systems, Inc. | fire alarm - elevator modernization: new relay mod will be added fo rthe fireman hat.a new smoke detctor and heat detector wil be added in the elevator machine room to provide proper coverage.Details
fire alarm - elevator modernization: new relay mod will be added fo rthe fireman hat.a new smoke detctor and heat detector wil be added in the elevator machine room to provide proper coverage. | $1,500 |
| Jan 21, 2021 | Expired or cancelled cancelled Jan 2026 | 650 Sutter St | erecting 8 lf, 4' high, 4' o.c. wooden fence for city beautication.Details
erecting 8 lf, 4' high, 4' o.c. wooden fence for city beautication. | $3,800 | |
| Feb 20, 2020 | Never finaled issued Feb 2020, no final | 640 Sutter St | street spaceDetails
street space | ||
| Dec 12, 2019 | Never finaled issued Dec 2019, no final | 640 Sutter St | street space/mta metersDetails
street space/mta meters | ||
| Dec 12, 2019 | Completed final sign-off Oct 2020 | 640 Sutter St | Citidev Inc. | tapestry room skim coat walls, paint walls, wallpaper certain walls. replace broken glass in (2) existing window.Details
tapestry room skim coat walls, paint walls, wallpaper certain walls. replace broken glass in (2) existing window. | $26,000 |
| Jul 11, 2017 | Completed final sign-off Feb 2018 | 640 Sutter St | Hill's Pool Service Inc. | spa renovation new shape, tiles, and new steps. new led & low voltage light.Details
spa renovation new shape, tiles, and new steps. new led & low voltage light. | $75,000 |
| Jul 30, 2009 | Completed final sign-off Nov 2009 | 640 Sutter St | Turner Construction Co | to obtain final inspection for work approved under app #200803278155 all work is completeDetails
to obtain final inspection for work approved under app #200803278155 all work is complete | |
| Jun 22, 2009 | Completed final sign-off Jul 2009 | 640 Sutter St | Sierra Spray Foam Roofing Inc | reroofingDetails
reroofing | $30,000 |
| Jun 2, 2009 | Never finaled issued Jun 2009, no final | 640 Sutter St | street space & meter.Details
street space & meter. | ||
| Apr 21, 2009 | Completed final sign-off Nov 2009 | 640 Sutter St | Intrepid Electronic Systems Inc | fire alarm system modifications, phase 1 as built. added 3 manual pull stations, 1 smoke detector, 4 addressable dual input monitor module for sprinkler system switches. relocated devices per field conditions and revised 4th floor plan. addded 4 horn strobes to 4th fl. ref app 200808088788.Details
fire alarm system modifications, phase 1 as built. added 3 manual pull stations, 1 smoke detector, 4 addressable dual input monitor module for sprinkler system switches. relocated devices per field conditions and revised 4th floor plan. addded 4 horn strobes to 4th fl. ref app 200808088788. | $2,000 |
| Feb 19, 2009 | Expired or cancelled cancelled Jan 2026 | 640 Sutter St | Turner Construction Co | revision to pa# 2006-0817-9733-revise egress signage per field walk-through with fire marshall (mike estevez) and revision to egress path for floors 4m & 5Details
revision to pa# 2006-0817-9733-revise egress signage per field walk-through with fire marshall (mike estevez) and revision to egress path for floors 4m & 5 | $2,000 |
| Feb 10, 2009 | Completed final sign-off Feb 2009 | 640 Sutter St | Rapp Construction Co. | renew pa# 2007/10/18/5797 to obtain final inspection. all work has been completed.Details
renew pa# 2007/10/18/5797 to obtain final inspection. all work has been completed. | |
| Jan 14, 2009 | Never finaled issued Jan 2009, no final | 640 Sutter St | strete space permit only.Details
strete space permit only. | ||
| Dec 16, 2008 | Completed final sign-off Nov 2009 | 640 Sutter St | Turner Construction Co | revision to appl #200608179733 - noting b occupancy at 2nd floor treatment rooms & non-rated hallway. correcting egress path plans to show hallway 204 is exiting only b occup. area.Details
revision to appl #200608179733 - noting b occupancy at 2nd floor treatment rooms & non-rated hallway. correcting egress path plans to show hallway 204 is exiting only b occup. area. | |
| Oct 21, 2008 | Completed final sign-off Nov 2009 | 640 Sutter St | Turner Construction Co | this permit is in reference to approved permit app #200608179733. supply and install new pre fabricated central stairs from 3rd floor to roof level. shop drawings by steel fabricator,glacier iron works, include structural steel framing and calcs. see letter attached rom both the architect of recordDetails
this permit is in reference to approved permit app #200608179733. supply and install new pre fabricated central stairs from 3rd floor to roof level. shop drawings by steel fabricator,glacier iron works, include structural steel framing and calcs. see letter attached rom both the architect of record | $225,000 |
| Sep 4, 2008 | Completed final sign-off Sep 2008 | 650 Sutter St | Turner Construction Co | renew pa# 2007/10/24/6364 for final inspection only.Details
renew pa# 2007/10/24/6364 for final inspection only. | |
| Aug 8, 2008 | Completed final sign-off Nov 2009 | 640 Sutter St | Intrepid Electronic Systems Inc | fire alarm system modifications, phase 1 1 annunciator, 14 relays, 1 monitor module, 17 smoke detectors, 1 heat detector, 12 duct detectors, 15 manual pull stations, 8 magnetic door holders, 1 power booster (strobe panel) 60 horn/strobes, 27 strobes. fire alarm constrol panel is existing.Details
fire alarm system modifications, phase 1 1 annunciator, 14 relays, 1 monitor module, 17 smoke detectors, 1 heat detector, 12 duct detectors, 15 manual pull stations, 8 magnetic door holders, 1 power booster (strobe panel) 60 horn/strobes, 27 strobes. fire alarm constrol panel is existing. | $30,000 |
| Aug 5, 2008 | Never finaled issued Aug 2008, no final | 640 Sutter St | street space permit only.Details
street space permit only. | ||
| Jul 21, 2008 | Completed final sign-off Nov 2009 | 640 Sutter St | Turner Construction Co | ref. appl#200608179733, new design-build central stairs serving basement, first fl, second fl. plans include structural steel framing & calcs serving this portion of work. (separate plans will be submitted for stairs serving third fl to roof level.)Details
ref. appl#200608179733, new design-build central stairs serving basement, first fl, second fl. plans include structural steel framing & calcs serving this portion of work. (separate plans will be submitted for stairs serving third fl to roof level.) | $150,000 |
| May 13, 2008 | Never finaled filed May 2008, never issued | 640 Sutter St | partial bldg fire alarm upgrade-expand (e) fire alarm control panel, add or replace the following: 20 smoke detectors, 1 heat detector, 12 duct smoke detectors, 15 manual pull stations, 8 magnetic door holders, 14 relays, 1 monitor module, 1 strobe power supply, 57 horn/strobes, 27 strobes, monitorDetails
partial bldg fire alarm upgrade-expand (e) fire alarm control panel, add or replace the following: 20 smoke detectors, 1 heat detector, 12 duct smoke detectors, 15 manual pull stations, 8 magnetic door holders, 14 relays, 1 monitor module, 1 strobe power supply, 57 horn/strobes, 27 strobes, monitor | $25,000 | |
| Apr 10, 2008 | Completed final sign-off Oct 2009 | 640 Sutter St | Pribuss Engineering Inc | install fire sprinkler, t.i. - total 359 sprinkler heads.Details
install fire sprinkler, t.i. - total 359 sprinkler heads. | $89,750 |
| Mar 27, 2008 | Expired or cancelled expired Jan 2010 | 640 Sutter St | Turner Construction Co | revision to appl #200608179733 - to change the means & methods of palcing identified walls in the basement as well as first floor from cast in place to shotcrete. revision to pa 200608179733Details
revision to appl #200608179733 - to change the means & methods of palcing identified walls in the basement as well as first floor from cast in place to shotcrete. revision to pa 200608179733 | |
| Feb 6, 2008 | Never finaled issued Feb 2008, no final | 640 Sutter St | street space.Details
street space. | ||
| Nov 26, 2007 | Never finaled issued Nov 2007, no final | 640 Sutter St | street space permit only.Details
street space permit only. | ||
| Oct 24, 2007 | Completed final sign-off Nov 2009 | 640 Sutter St | Turner Construction Co | work in basement and common area. rev. to appl.#2006.08.17.9733. 1. repair (e) steel columns in alleyway-east side. 2. anchor bolt installation for slab reinstatement at (e) stair opening. 3. repairs to (e) level 1 conc. slab due to deteriroation. corrosion of reinforcing steel & concrete spacing.Details
work in basement and common area. rev. to appl.#2006.08.17.9733. 1. repair (e) steel columns in alleyway-east side. 2. anchor bolt installation for slab reinstatement at (e) stair opening. 3. repairs to (e) level 1 conc. slab due to deteriroation. corrosion of reinforcing steel & concrete spacing. | $3,000 |
| Oct 18, 2007 | Expired or cancelled expired Jan 2010 | 640 Sutter St | Rapp Construction Co. | new plumbing equipment for pool & spa, replace existing leaking plastic spa with s. steel spa(tiled). replace some existing tiles of the pool. new lighting in spa.Details
new plumbing equipment for pool & spa, replace existing leaking plastic spa with s. steel spa(tiled). replace some existing tiles of the pool. new lighting in spa. | $290,400 |
| Oct 2, 2007 | Expired or cancelled cancelled Jan 2026 | 640 Sutter St | new plumbing and equipment for pool and spa,including filtration and chlorination, new spa, new lightingDetails
new plumbing and equipment for pool and spa,including filtration and chlorination, new spa, new lighting | $290,400 | |
| Aug 17, 2006 | Completed final sign-off Oct 2009 | 640 Sutter St | voluntary seismic strengthening. life safety and programmatic upgrades, at basement, 1st & 2nd levels, new exit stair from basement to roof, fire rating of exposed structure of steel at property line. phase 1 seismic. phase 2 under separate permit.Details
voluntary seismic strengthening. life safety and programmatic upgrades, at basement, 1st & 2nd levels, new exit stair from basement to roof, fire rating of exposed structure of steel at property line. phase 1 seismic. phase 2 under separate permit. | $6,500,000 | |
| Sep 10, 2003 | Never finaled issued Sep 2003, no final | 640 Sutter St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Jun 24, 2003 | Completed final sign-off Sep 2003 | 640 Sutter St | American Mechanical Services | install outside air louver/ductwork and fan to ventilate a roomDetails
install outside air louver/ductwork and fan to ventilate a room | $2,915 |
| Jun 16, 2003 | Completed final sign-off Jul 2003 | 640 Sutter St | Enterprise Roofing Service Inc | reroofingDetails
reroofing | $16,000 |
| Sep 11, 2000 | Expired or cancelled expired Jul 2001 | 640 Sutter St | Mountain Cable & Communications Inc | install fire alarm system throughout basement w/new control panelDetails
install fire alarm system throughout basement w/new control panel | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Turner Construction Co (8), Intrepid Electronic Systems Inc (2), Rapp Construction Co. (2), American Mechanical Services, Citidev Inc., Enterprise Roofing Service Inc, Hill's Pool Service Inc., Mountain Cable & Communications Inc, Pribuss Engineering Inc, Pyro-Comm Systems, Inc., Sierra Spray Foam Roofing Inc, Tom Lee Roofing Inc.
- Architects
- Jack Munson (3), A. J. Miller, Eric Ibsen
- Engineers
- Bill Tremayne (3), Avery Miller, George W Sening, Isacc Perez, Mike Howe, Steven James Foster
- Authorized agent-otherss
- Jodee August
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.