Block 0496, lot 003
1610 Lombard St
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 8,463 sq ft
- Lot
- 4,469 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
26 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 19, 2021 | Completed final sign-off Sep 2021 | 1610 Lombard St | B-Side Inc. | apt 303 - 4th flr: rev to pa202101122502 - convert (e) kitchen to bedroom. relocate kitchen. rehab (e) bathroom. install washer/dryer.Details
apt 303 - 4th flr: rev to pa202101122502 - convert (e) kitchen to bedroom. relocate kitchen. rehab (e) bathroom. install washer/dryer. | $22,000 |
| Jan 12, 2021 | Completed final sign-off Sep 2021 | 1610 Lombard St | B-Side Inc. | remodel unit 303. remodel kitchen, bath, existing washer dryer. no change in walls openings layout. maintain 1 hr separation between units for new work as applicable.Details
remodel unit 303. remodel kitchen, bath, existing washer dryer. no change in walls openings layout. maintain 1 hr separation between units for new work as applicable. | $23,000 |
| Sep 29, 2020 | Completed final sign-off Nov 2020 | 1610 Lombard St | B-Side Inc. | #104: replace washer and dryer. up grade line.Details
#104: replace washer and dryer. up grade line. | $8,000 |
| Dec 18, 2019 | Completed final sign-off Feb 2022 | 1610 Lombard St | Hue & Cry Security System | upgrade of extg fire alarm system with additions of wireless low frequency sounders in all sleeping areas to meet code 1103.7.6.1Details
upgrade of extg fire alarm system with additions of wireless low frequency sounders in all sleeping areas to meet code 1103.7.6.1 | $46,327 |
| Nov 13, 2019 | Never finaled issued Nov 2019, no final | 1610 Lombard St | Axa Construction | unit 202 rehab e bathroom 5x7, rehab e kitchen 8x11, add washer dryer in e closet ventlessDetails
unit 202 rehab e bathroom 5x7, rehab e kitchen 8x11, add washer dryer in e closet ventless | $32,000 |
| Nov 13, 2019 | Completed final sign-off Feb 2020 | 1610 Lombard St | Axa Construction | unit 302 rehab e bathroom, 5x7, rehab e kitchen 8x 11. add washer and dryer into e closet, ventlessDetails
unit 302 rehab e bathroom, 5x7, rehab e kitchen 8x 11. add washer and dryer into e closet, ventless | $28,000 |
| Sep 10, 2019 | Completed final sign-off Jun 2020 | 1610 Lombard St | Axa Construction | #103: add washer & dryer into existing closet (ventless). no alteration of walls. building not sprinklered.Details
#103: add washer & dryer into existing closet (ventless). no alteration of walls. building not sprinklered. | $10,000 |
| Aug 21, 2019 | Completed final sign-off Nov 2019 | 1610 Lombard St | Axa Construction | unit 304: kitchen & bathroom rehabDetails
unit 304: kitchen & bathroom rehab | $31,000 |
| Feb 11, 2019 | Never finaled issued Mar 2019, no final | 1610 Lombard St | B-Side Inc. | revision to 201812138256 unit 101 remodel. add dropped beam where bearing wall has been removedDetails
revision to 201812138256 unit 101 remodel. add dropped beam where bearing wall has been removed | $2,000 |
| Jan 17, 2019 | Never finaled issued Jan 2019, no final | 1610 Lombard St | B-Side Inc. | #101: install washer & dryer.Details
#101: install washer & dryer. | $3,000 |
| Jan 17, 2019 | Completed final sign-off Feb 2019 | 1610 Lombard St | B-Side Inc. | #203: installing washer dryer 220v, hookups in closet, and associated plumbing & electrical work. ref pa #201812219045.Details
#203: installing washer dryer 220v, hookups in closet, and associated plumbing & electrical work. ref pa #201812219045. | $5,000 |
| Jan 17, 2019 | Never finaled issued Jan 2019, no final | 1610 Lombard St | B-Side Inc. | #204: install electrical washer and dryer 220v, hookups in closet, provide plumbing for washer & dryer. ref pa #201812219041.Details
#204: install electrical washer and dryer 220v, hookups in closet, provide plumbing for washer & dryer. ref pa #201812219041. | $3,000 |
| Jan 17, 2019 | Completed final sign-off Jan 2019 | 1610 Lombard St | B-Side Inc. | #102: install electrical washer and dryer 220v, hookups in closet, provide plumbing for washer & dryer. ref pa #201812219052.Details
#102: install electrical washer and dryer 220v, hookups in closet, provide plumbing for washer & dryer. ref pa #201812219052. | $3,000 |
| Dec 21, 2018 | Completed final sign-off Feb 2019 | 1610 Lombard St | B-Side Inc. | unit 203: remodeling unit. remodeling bathroom and kitchen, new lights, outlets, switches, new rough and final plumbing.Details
unit 203: remodeling unit. remodeling bathroom and kitchen, new lights, outlets, switches, new rough and final plumbing. | $7,000 |
| Dec 21, 2018 | Completed final sign-off Jan 2019 | 1610 Lombard St | B-Side Inc. | unit 102: remodeling unit, rough plubming and electrical in bathroom and kitchen.Details
unit 102: remodeling unit, rough plubming and electrical in bathroom and kitchen. | $9,000 |
| Dec 21, 2018 | Never finaled issued Dec 2018, no final | 1610 Lombard St | B-Side Inc. | unit 204: remodeling unit, kitchen, and bathroom.Details
unit 204: remodeling unit, kitchen, and bathroom. | $9,000 |
| Dec 13, 2018 | Never finaled issued Dec 2018, no final | 1610 Lombard St | rehabilitate (e) kitchn & bath. install w/d convert (e) kitchen tpo officeDetails
rehabilitate (e) kitchn & bath. install w/d convert (e) kitchen tpo office | $36,000 | |
| Nov 9, 2018 | Completed final sign-off Nov 2018 | 1610 Lombard St | Lingruen Associates | perform to repairs as per lingruen assoc termite report #79955 item 3aDetails
perform to repairs as per lingruen assoc termite report #79955 item 3a | $4,800 |
| Oct 18, 2016 | Completed final sign-off Feb 2017 | 1610 Lombard St | Talmadge Maintenance & Repair | work in unit #104: remodel kitchen: remove/replace cabinets, sink, appliances and flooring. install electrical for microwave and dishwasher. bathroom: remove/replace toilet, vanity and shower controls. install outlet and fan.Details
work in unit #104: remodel kitchen: remove/replace cabinets, sink, appliances and flooring. install electrical for microwave and dishwasher. bathroom: remove/replace toilet, vanity and shower controls. install outlet and fan. | $17,000 |
| Jul 20, 2016 | Completed final sign-off Sep 2016 | 1610 Lombard St | Talmadge Maintenance & Repair | unit #102: bathroom repair and remove/replace toilet, vanity and shower controls and tub surround. (minimal dry wall work)Details
unit #102: bathroom repair and remove/replace toilet, vanity and shower controls and tub surround. (minimal dry wall work) | $3,000 |
| Jun 14, 2016 | Completed final sign-off Sep 2016 | 1610 Lombard St | Talmadge Maintenance & Repair | apt# 102. remodel kitchen. n/a for maher.Details
apt# 102. remodel kitchen. n/a for maher. | $14,000 |
| Feb 18, 2016 | Completed final sign-off Apr 2016 | 1610 Lombard St | Talmadge Maintenance & Repair | brick replacement/front elevation to comply with violation # 201546121 replace brick in-kind.Details
brick replacement/front elevation to comply with violation # 201546121 replace brick in-kind. | $7,000 |
| Sep 28, 2015 | Never finaled issued Sep 2015, no final | 1610 Lombard St | street spaceDetails
street space | ||
| Jun 18, 2015 | Completed final sign-off Nov 2015 | 1610 Lombard St | Bai Construction | seismic retrofit of soft story, comply with sfbc 34b. mandatory seismic retrofit 2012 iebc a4. revision to pa# 201404092869. revising foundations, moment frame and shear walls.Details
seismic retrofit of soft story, comply with sfbc 34b. mandatory seismic retrofit 2012 iebc a4. revision to pa# 201404092869. revising foundations, moment frame and shear walls. | |
| Apr 9, 2014 | Completed final sign-off Nov 2015 | 1610 Lombard St | Bai Construction | soft story retrofit per sfbc chapter 34b. engineering criteria to comply with 2012 iebc appendix a-4. convert 2 garage doors into one garage door opening. maher ord.no.#155-13 not applicable.Details
soft story retrofit per sfbc chapter 34b. engineering criteria to comply with 2012 iebc appendix a-4. convert 2 garage doors into one garage door opening. maher ord.no.#155-13 not applicable. | $60,000 |
| Jun 14, 2007 | Never finaled issued Jun 2007, no final | 1610 Lombard St | street space and sidewalk permitDetails
street space and sidewalk permit |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.